Loading...
HomeMy WebLinkAbout20190321 Ver 1_PCN Form Submission_20190311DXR -,, pbblen of wMer Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r, Yes r No Is this project a public transportation project?* r Yes O No Change only if needed. BIMS # Assigned* Version#* 20190321 1 Is a payment required for this project? C No payment required What amout is owed?* r Fee received r $240.00 G Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Central Office - (919) 707-9000 Paul Wojoski:EADS\pawojoski Information for Initial Review 1a. Name of project: Gingergate Streambank Stabilization 1a. Who is the Primary Contact?* Eric Kulz 1 b. Primary Contact Email:* eric.kulz@townofcary.org Date Submitted 3/11/2019 Nearest Body of Water Turkey Creek Basin Neuse Water Classification C: NSW Site Coordinates Latitude: 35.787341 Longitude: -78.853498 1c. Primary Contact Phone:* (919)462-3931 A. Processing Information W County (or Counties) where the project is located: Wake Is this project a public transportation project?* C Yes G No 1a. Type(s) of approval sought from the Corps: V Section 404 Permit (wetlands, streams and waters, Clean Water Act) r- Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (MNP) r- Regional General Permit (RGP) r- Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes C No Nationwide Permit (NWP) Number: 12 - Utility Lines Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: P 401 Water Quality Certification - Regular ❑ 401 Water Quality Certification - E)press ❑ Non -404 Jurisdictional General Permit P Riparian Buffer Authorization ❑ Individual Permit 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: O Yes C No For the record onlyfor Corps Permit: O Yes C No 1f. Is this an after -the -fact permit application?* C Yes O No tg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? O Yes C No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? O Yes O No Acceptance Letter Attachment 1h. lathe project located in any of NC's twenty coastal counties? O Yes C No 1j. Is the project located in a designated trout watershed? O Yes C No B. Applicant Information C^) 1d. Who is applying for the permit? ❑ Owner [7 Applicant (other than owner) le. Is there an Agent/Consultant for this project? O Yes O No 2. Owner Information 2a. Name(s) on recorded deed: Tsui, Daniel Pui & Yen Yun 2b. Deed book and page no.: 008742/00452 2c. Responsible party: Town of Cary (Town of Cary Sanitary Sewer Easement) 2d. Address ai ee Addrew 302 Gingergate Drive Address Line 2 CRY Cary Postal / Zip Code 27519-9290 2e. Telephone Number: (919)462-3931 2g. Email Address:* eric. ku Iz@townofca ry.org 2a. Name(s) on recorded deed: Nunez, Pedro & Claudia 2b. Deed book and page no.: State / Rwice./ (tion NC Caunby USA 2f. Fax Number: 011717/01151 2c. Responsible party: Town of Cary (Town of Cary Sanitary Sewer Easement) 2d. Address Street Address 304 Gingergate Drive Address line 2 CKY Cary Postal / Zip Code 27519-8406 2e. Telephone Number: (919)462-3931 2g. Email Address:* eric.kulz@to,Anofcary.org 3. Applicant Information (if different from owner) 3a. Name: Town of Cary 3b. Business Name: Town of Cary (Town of Cary Sanitary Sewer Easement) 3c. Address Street Address P.O. Box 8005 Address Lire 2 CKY Cary Postal / Zip Code 27512-8005 3d. Telephone Number: (919)462-3931 3f. Email Address:* eric. kulz@townofcary.org C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appn{xiate) Whitebridge Subdivision 1c. Nearest municipality/ town: Cary 2. Project Identification 2a. Property Identification Number: 0744315501/0744314426 2c. Project Address Street Address 302 and 304 Gingergate Drive Address lire 2 cfty Cary postal / Zip Code 27519 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Turkey Creek 3b. Water Resources Classification of nearest receiving water:* C: NSW State / Rwince / Region NC Country USA 2f. Fax Number: State / Rwince / legion NC Country USA 3e. Fax Number: 2b. Property size: 0.63 acres State / Rwince / Fisgion NC Country 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12 -digit HUC in which the project is located. 030202010801 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site is located at the rear of two single-family residential properties within a residential subdivision, with a commercial office park immediately to the north. Approximately 10 feet of an 18 -inch PVC sanitary sewer line is exposed in the left (north) streambank due to erosion. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No C Unknown 4d. Attach an 81/2 X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Fig1 Topo.pdf 125.68KB 4e. Attach an 81/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Fig2 Soils.pdf 178.68KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 200 linear feet 4h. Explain the purpose of the proposed project:* The purpose of the project is to re -construct the eroded stream bank that has exposed the sanitary sewer line, and stabilize the streambank with coir fabric and riprap to protect the sewer line and prevent re -exposing it. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project involves placing fill over the exposed sewer line, reshaping the bank at a 2:1 slope, matting with coir fabric, and armoring the streambank with riprap to prevent the sewer line from being re -exposed. A tracked excavator was used to perform the work. 4j. Please upload project drawings for the proposed project. Impact Map. pdf 438.46KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No a Unknown Comments: The subdivision was constructed in the mid-90s. Installation date of sewer line unknown. 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Not Verified 6 Unknown r WA Corps AID Number: 5c. If 5a is ves. who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes C No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands it Streams -tributaries W Buffers r Open Waters ❑ Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact *3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* Streambank stabilisation ff:] Bank Stabilisation Jt Turke Creek Both h�] yPerennial (Inear fed) 3i. Total jurisdictional ditch impact in square feet: 6c. Per or Temp 0 6e. Buffer mitigation required? 31. Total permanent stream impacts: 31. Total temporary stream impacts: 28 0 31. Total stream and ditch impacts: No 28 0 3j. Comments: streambank reshaped over sewer line with fill at a 2:1 slope, coir fabric applied, and riprap was placed to protect the streambank/sewer line from future erosion. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. G? Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Goose Creek ❑ Jordan Lake ❑ Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 7 impact 6g. Zone 2 impact Streambank stabilization P Turkey Creek No 168 0 6h. Total buffer impacts: Zone 7 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 7 Zone 2 Total Permanent impacts: 168.00 0.00 Zone t Zone 2 Total combined buffer impacts: 168.00 0.00 61. Comments: Riprap placed on streambank above ordinary high water mark. Supporting Documentation E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Fill/riprap limited to the amount necessary to cover a)posed sewer line and stabilize streambank. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Repair was done during a period of lowflow. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? O Yes O No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Streambank stabilization projects do not require compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C Yes O No What type of SCM are you providing? ❑ Level Spreader ❑ Vegetated Conveyance (Ironer SHWT) ❑ Wetland Swale (higher SHWT) ❑ Other SCM that removes minimum 30% nitrogen ® Proposed project will not create concentrated stormvater flowthrough the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? OYes MNo 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes C No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? f Yes r, No 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters.* /! Stormwater Management r Antidegradation Plan Calculations 3b. Stormwater Management Plan Stormwater.pdf 3c. Antidegradation Calculations: Comments: Stormwater flow in project area unchanged. No concentrated flow generated. G. Supplementary Information 1. Environmental Documentation 6.73KB 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r. Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments:* Local funds only. 2. Violations (DWR Requirement) 2a. lathe site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* a Yes O No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* G Yes O No 3b. If you answered "no," provide a short narrative description. Project involves protecting an emsting sanitary sewer line. Area around project site completely built out. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR forth is project?* r Yes r No r WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? G Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP website (2/1/19) and USFWS iPac website (2/1/19). Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Project site not located within a coastal county. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC Historic Preservation Office HPOWEB Service (accessed 1/31/19). No elements on or near project site. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? r Yes r No 8c. What source(s) did you use to make the floodplain determination?* Map No. 3720076400K FIRM Panel 0764. Date: 5/2/06 Miscellaneous C� Comments Miscellaneous attachments not previously requested. Fig3 Aerial Photo.pdf 153.2KB Pre -Construction Photo 2-1-19.pdf 285.66KB Post -Construction Photo 3-1-19 Photo.pdf 281.72KB Signature S? By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Eric W. Kulz Signature Date 3/11/2019 t r OM I F, m0t L TERRASTONE OL �N- PF 'VGER ECT AREA 4eb' r? lip 161 L 400 e for- w A rff �? PL. . if;%qLv 17 7 135 270 540 810 LON OR 0 1�r FIGURE 1 USGS TOPOGRAPHIC MAP CARY QUADRANGLE 2016 z; imo Gingergate Streambank Stabilization Cary, NC - :"C2 132 ar . Y°xvu awe 4i 4Y..-: He W r•.� d Y } r L.Ly.., o % 4L 10 1 `a —.:. .TERRaST NE II+r;FisY '. n SSS° PRGJE TAI EA - E .'' M = f r - 3� � ■ � `� °F". t r - Vis. .. `` 9'� �y ,�qc, n4 ._ r rir{tr�i4 [+'� Ni- '. 4t,� °�:. � ... g • _ Do.. — n .• ]] ,. f RGGG EL4'G 9 ter. 135 270 540 8101,080 �1 � Fe c°Y e _ �sRT PCi DR.• 01 } FIGURE 2 Gingergate Streambank NRCS SOILS MAP Stabilization WAKE COUNTY Cary, NC T 1970 �\ R 390 z v IGH H o SITE N / S✓ �� / z Vicinity Map Not To Scale / RIPRAP WITH G EOTEXTI LE sus /- UNDERLAYMENT LEGEND � i> / p� CQ ai / N G o QS SANITARY SEWER MANHOLE �\ �� / / �� J� i 5/LU CL SS SANITARY SEWER - - RIW ROAD RIGHT-OF-WAY = -�-� --'a / / 11,302 GINGERGATE/ O (90 - - R PROPERTY LINE `\ ' �� DRIVE ,/ W v EXISTING STREAM — TOP OF BANKLU C 19 0 / N�I— v o U r� `390 , Revisions x`�� g l 11G / \ 1 Drawn By: Project No. RAC scare. N/A 1.. � I / -400- \ Date: = 50' �- 3/8/2019 SHEET NO. Stormwater Issues This project involves stabilizing streambank to protect an existing sanitary sewer line located beneath the stream bank. No concentrated stormwater flow will result from this project.