HomeMy WebLinkAbout20061623 Ver 1_More Info Received_20061113Baldwin & Associates
Engineering & Land Surveying
1015 Conference Drive
A _ ___ __. T __.__..
Greenville NC 27858
252-756-1390
To: NCDENR-Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27604
Date: Job No:
11 /10/06 05-278
Attention:
Cyndi Karoly ~ io - ~ ~ ~,3
Re:
Bridgewater North
We are sending you: ]Attached ~ Under separate cover via
^ Drawings ~ Plans ~ Prints ~ Samples
~~ Letter ^ Order ^ Other
5 11/10/05 Response Letters
5 10/27/06 Revised Drawings
5 11/6/06 Copies of letter from Coastal Management
_ the following:
I~ Specifications
4
7 ~ ~~,
~~ .~
4.333. p~~ ; ' Ef t, '']~3f~
rf.~r
Transmitted as checked b elow: n'~+yrr~
I,~ For approval ~'~ Approved as noted ~! Resubmit _______ __ copies for approval
'_J~~ For your use ~ Approved as submitted ~ Submit ___ __ _ ___ copies for distribution
~__ As requested ~ J Returned for corrections ~ Return _ corrected copies
For review ~ Other
Remarks:
Signed: Derek Ste#ter/kdm Copy to:
A
0
and ASSOCIATES
ENGINEERING, SURVEYING & PLANNING
o~-~~a3
November 10, 2006
Michael W. Baldwin, PLS
J.S. Janowski, PE
DRAINAGE PLAN
After reviewing the proposed drainage plan for the Bridgewater North project,
Baldwin and Associates has changed the drainage plan for the area adjacent to
the wetlands crossing. We are now proposing that the four swales pitch away
from the wetlands crossing as well as raising the elevation of the road and
making the road pitch away from the wetlands. There will be no swales inside
the 50' buffer. There only will be sheet flow run off with in the 50' buffer. This
solution should neglect the need for any additional information concerning the
grassed swales (Additional Information Request #4). This revised drainage
solution was submitted and has been approved for a Stormwater permit for
Bridgewater North.
( .~ ~ ~`
/:
... L l...
"_~
~~°
ff~~~~tt ~ ~ ... ,.' r
lYG~\uJ i.i.J vi ~,.,i..e;~ 1i:i7 ~~~Li~
1015 Conference Drive ^ Greenville, North Carolina 27858 ^ 252-756-1390 ^ Fax: 252-321-1412
Email: admin@baldwinandassociatesnc.com
~oF c°'ur~T
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary
6 November 2006
Derek Stetter
Baldwin & Associates
1015 Conference Dr.
Greenville, NC 27858
_ ro
.~ ~~.~ t~
( ~ I
l
RE: Coastal Wetland Determination at Bridgewater North.
Dear Mr. Stetter:
o~-~~a3
i`:~'1~' ~~~ ~'uij11 i
~,, , i~ ~ r
At your request I met with you and Jay Johnson on 1 November 2006 at the Bridgewater North
Subdivision on SR1339 (Creek Road), near the Town of Bath, in Beaufort County, North
Carolina. The purpose of this meeting was to confirm the absence of coastal wetlands, under the
jurisdiction of the North Carolina Division of Coastal Management, in the location of the
proposed road crossing. My field verification concludes that there are no coastal wetlands where
the road crossing is planned. Coastal wetlands exist downstream of the proposed crossing and in
several other areas along the project site.
If you have questions regarding this determination please feel free to contact me at (252)-948-
3950.
Sincerely,
`r0~ t O
( / ~.
Mike S. Thomas
Field Representative
NC Division of Coastal Management
Cc: Jay Johnson.
~.
i
a
~.; ~
943 Washington Square Mall, Washington, North Carolina 27889
Phone: 252-946-6481 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.net/
An Equal Opportunity \ Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper