Loading...
HomeMy WebLinkAbout20061623 Ver 1_More Info Received_20061113Baldwin & Associates Engineering & Land Surveying 1015 Conference Drive A _ ___ __. T __.__.. Greenville NC 27858 252-756-1390 To: NCDENR-Express Review Permitting Unit 1650 Mail Service Center Raleigh, NC 27604 Date: Job No: 11 /10/06 05-278 Attention: Cyndi Karoly ~ io - ~ ~ ~,3 Re: Bridgewater North We are sending you: ]Attached ~ Under separate cover via ^ Drawings ~ Plans ~ Prints ~ Samples ~~ Letter ^ Order ^ Other 5 11/10/05 Response Letters 5 10/27/06 Revised Drawings 5 11/6/06 Copies of letter from Coastal Management _ the following: I~ Specifications 4 7 ~ ~~, ~~ .~ 4.333. p~~ ; ' Ef t, '']~3f~ rf.~r Transmitted as checked b elow: n'~+yrr~ I,~ For approval ~'~ Approved as noted ~! Resubmit _______ __ copies for approval '_J~~ For your use ~ Approved as submitted ~ Submit ___ __ _ ___ copies for distribution ~__ As requested ~ J Returned for corrections ~ Return _ corrected copies For review ~ Other Remarks: Signed: Derek Ste#ter/kdm Copy to: A 0 and ASSOCIATES ENGINEERING, SURVEYING & PLANNING o~-~~a3 November 10, 2006 Michael W. Baldwin, PLS J.S. Janowski, PE DRAINAGE PLAN After reviewing the proposed drainage plan for the Bridgewater North project, Baldwin and Associates has changed the drainage plan for the area adjacent to the wetlands crossing. We are now proposing that the four swales pitch away from the wetlands crossing as well as raising the elevation of the road and making the road pitch away from the wetlands. There will be no swales inside the 50' buffer. There only will be sheet flow run off with in the 50' buffer. This solution should neglect the need for any additional information concerning the grassed swales (Additional Information Request #4). This revised drainage solution was submitted and has been approved for a Stormwater permit for Bridgewater North. ( .~ ~ ~` /: ... L l... "_~ ~~° ff~~~~tt ~ ~ ... ,.' r lYG~\uJ i.i.J vi ~,.,i..e;~ 1i:i7 ~~~Li~ 1015 Conference Drive ^ Greenville, North Carolina 27858 ^ 252-756-1390 ^ Fax: 252-321-1412 Email: admin@baldwinandassociatesnc.com ~oF c°'ur~T North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary 6 November 2006 Derek Stetter Baldwin & Associates 1015 Conference Dr. Greenville, NC 27858 _ ro .~ ~~.~ t~ ( ~ I l RE: Coastal Wetland Determination at Bridgewater North. Dear Mr. Stetter: o~-~~a3 i`:~'1~' ~~~ ~'uij11 i ~,, , i~ ~ r At your request I met with you and Jay Johnson on 1 November 2006 at the Bridgewater North Subdivision on SR1339 (Creek Road), near the Town of Bath, in Beaufort County, North Carolina. The purpose of this meeting was to confirm the absence of coastal wetlands, under the jurisdiction of the North Carolina Division of Coastal Management, in the location of the proposed road crossing. My field verification concludes that there are no coastal wetlands where the road crossing is planned. Coastal wetlands exist downstream of the proposed crossing and in several other areas along the project site. If you have questions regarding this determination please feel free to contact me at (252)-948- 3950. Sincerely, `r0~ t O ( / ~. Mike S. Thomas Field Representative NC Division of Coastal Management Cc: Jay Johnson. ~. i a ~.; ~ 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.net/ An Equal Opportunity \ Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper