HomeMy WebLinkAboutNCG030623_Letter RE Site Inspection_20190301Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
March 1, 2019
Industrial Fabricators, Incorporated
Attention: Roger Bingham, President
4328 South York Highway
Gastonia, North Carolina 28052
Subject: Compliance Evaluation Inspection
NPDES Stormwater Certificate of Coverage- NCG030623
Gaston County, North Carolina
Dear Mr. Bingham:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
MAR 0 4 2G13
DENR-LAND QUALIV
STORMWATER FERr i1 i i ING
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted
at the Industrial Fabricators South Plant located at 4328 South York Highway on February 6, 2019. The report
should be self-explanatory; however, should you have any questions concerning this reports, please do not hesitate
to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov.
Sincerely,
James Moore
Assistant Regional Engineer
Land Quality Section
Enclosed: Inspection report
c: Stormwater Permitting Branch
Permit: NCG030623
SOC:
County: Gaston
Region: Mooresville
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Roger Bingham
Effective: Expiration: Facility: Industrial Fabricators Main Plant
4328 S York Hwy
Contact Person: Roger Bingham
Directions to Facility:
intersection of Hwy 321 S & Crowders Creek Rd
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Gastonia NC 28052
Title: Phone: 704-864-3032
Certification: Phone:
Inspection Date: 02/06/2019 Entry Time: 02:OOPM Exit Time: 03:45PM
Primary Inspector: Holliday Keen Phone:
Secondary Inspector(s):
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030623 Owner - Facility: Roger Bingham
Inspection Date: 02/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
This inspection was conducted as a follow up to a Notice of Deficiency issued on January22, 2018. Since the initial
inspection, Industrial Fabricators has created and implemented all aspects of the Stormwater Pollution Prevention Plan. This
site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed.
Page 2 of 3
Permit: NCG030623 Owner -Facility: Roger Bingham
Inspection Date: 02/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
® ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0 ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
E ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
E ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Rosponeiblo Party(s)?
E ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? M ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes No. NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3