Loading...
HomeMy WebLinkAboutNCG030693_Ltr re Site Inspection_20190301Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 1, 2019 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030693 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director 70F!\ � D . MAR 0 4 20113 DENR-LAND QUALITY STORWATER PERMI i i ING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators Central Plant located on Chickasaw Road on February 6, 2019. The report should be self-explanatory; however, should you have any questions concerning this reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, resMoore Assistant Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Compliance Inspection Report Permit: NCG030693 Effective: 11/01/18 Expiration: 05/31/21 Owner: Industrial Fabricators SOC: Effective: Expiration: Facility: Industrial Fabricators VC Plant County: Gaston 4920 S York Hwy Region: Mooresville Gastonia NC 28052 Contact Person: Jack Herndon Title: Phone: 704-864-3032 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/06/2019 Primary Inspector: Holliday Keen Secondary Inspector(s): Certification: Phone: Entry Time: 02:OOPM Exit Time: 03:45PM Phone: Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG030693 Owner- Facility: Industrial Fabricators Inspection Date: 02/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This inspection was conducted as a follow up to a Notice of Deficiency issued on January 22, 2018. Since the initial inspection, Industrial Fabricators has created and implemented all aspects of the Stormwater Pollution Prevention Plan. This site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed. Page 2 of 3 Permit: NCG030693 Owner - Facility: Industrial Fabricators Inspection Date: 02/06/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ® ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? M❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? E ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3