Loading...
HomeMy WebLinkAbout310015_Sect. 4 Rainfall-Freeboard Report 2018_20190315FORM FRBD-1 Farm Owner Operator P 7aHL ti n Re isr 317 15 Date (mm/dd/yy) **Waste Structure Freeboard (inches) *Precipitation (inches) Initials DM 4-1 DM 4-2 DM 4-3 DM 4-4 DM 3-4 DM 3-5 7/21 /2006 7/22/2006 7/23/2006 7/24/2006 7/25/2006 7/26/2006 7/27/2006 7/28/2006 Rainfall should be recorded daily and the freeboard should be recorded weekly. When entering the rainfall, simply enter the amount. On the day that you record the freeboard, enter the freeboard, space 2 times, and enter the rainfall. Very important, if there is a rainfall event greater than 1 inch in 24 hours, an inspection of the waste system must be conducted and the report initialed in the appropriate box. If there is not a rainfall event of greater than 1 inch in 24 hours, the system must be inspected at minimum of once per month and initialed. E-MAIL INSTRUCTIONS: Save this file to your computer.. DO NOT CHANGE THE FILE NAME. Enter your daily rainfall and weekly freeboard information and save to this file. On Monday of each week, email this saved file to me at kpope@murfam.com 1. Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded. 2. Freeboard plus available storage capacity must be recorded at least weekly. 3. Rainfall must be recorded for every rain event. 3/14/2003 FORM FF2BO-9 Waste Structure Freeboard ar-�d wily Precipitation-� Record Farm Ow rear .I-,,LLC Facility Number 3'1 - '1 S Operator Ir4fl"w-"NrFar-r�ii Ver-�tu res� LLC Date (mm/dd/yy> ""VVa ste Structure Freeboard o ric"es) o "P reci Pitation �ir�cl-�es� Iri itia is OM 4-'i OM 4-2 OM 4-3 OM 4-4 OM 3-4 OM 3-S 1 /1 /201 8 1 /2/201 8 1 /3/20'1 8 1 /4/201 8 snow 1 /5/201 8 52 50 60 47 49 43 O cb/es 1 /6/201 8 1 /7/201 8 1 /8/201 8 1 /9/201 8 1 / 1 O/20 1 8 1 /1 1 /201 8 1 /1 2/201 8 51 51 59 46 48 42 O.9 cb/es 1 /1 3/201 8 42 O.5 es 1/ 1 4/2 O 1 8 1 /1 5/201 8 1 /1 6/201 8 1 / 1 7/2O 1 8 1 /1 8/201 8 1 /1 9/201 8 48 50 57 45 46 42 1 cb/es 1 /20/201 8 1 /2 1 /2 O 1 8 1 /22/201 8 1 /23/201 8 42 O es 1 /24/201 8 1 /25/201 8 1 /26/201 8 48 49 55 45 45 42 O.3 cb/es 1 /27/201 8 1 /28/201 8 1 /29/201 8 40 2 es 1 /30/201 8 38 O.4 es 1 /31 /201 8 1 _ Lagoon freeboard is the differ re rice between the lowest point of a lagoori em bar�Kmer�t grid the level of liquid_ For lagooris with spillways, the diffe re rice between the level of liquid grid the bottom of the spillway sFiould be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least wee Kly_ 3_ Rair�fall must be recorded for every ram event_ 3/14/2003 Totes 1 Ra i ri 5.1 FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC DateWaste (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E:)M 4-1 E:)M 4-2 E:)M 4-3 E:)M 4-4 E:)M 3-4 MM 3-5 2/l /201 8 2/2/201 8 46 47 54 43 38 38 0.2 cb/es 2/3/201 8 2/4/201 8 2/5/201 8 44 46 53 42 39 38 0.8 cb/es 2/6/201 8 2/7/201 8 2/8/201 8 2/9/201 8 44 46 53 42 39 38 0.8 cb/es 2/1 0/201 8 38 0 es 2/1 1 /201 8 2/1 2/201 8 2/1 3/201 8 2/1 4/201 8 2/1 5/201 8 2/1 6/201 8 43 42 50 42 39 38 0 cb/es 2/1 7/201 8 2/1 8/201 8 2/1 9/201 8 2/20/201 8 37 0.4 2/21 /201 8 2/22/201 8 2/23/201 8 42 42 45 42 39 37 0 cb/es 2/24/201 8 2/25/201 8 2/26/201 8 2/27/201 8 2/28/201 8 37 0 es 2/29/201 8 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 2.2 FORM FFRBE)-1 Waste Structure Freeboard and E)aily Precipitation Record Farm Owner Ironside Investment Mgt_ LLC Facility Number 31 - -15 Operator I Murphy Family Ventures, L- E:) --I t ca (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E)M 4-1 E)M 4-2 E)M 4-3 E)M 4-4 E)M 3-4 E)M 3-5 3/1/201 8 41 41 43 41 39 37 0.5 es 3/2/201 8 41 41 43 41 39 36 0.6 cb/es 3/3/201 8 3/4/201 8 3/5/201 8 3/6/201 8 3/7/201 8 41 40 43 40 39 35 0.5 cb/es 3/8/201 8 3/9/201 8 40 39 43 40 39 35 0 cb/es 3/1 0/201 8 3/1 1 /201 8 3/1 2/201 8 3/1 3/201 8 40 39 43 40 39 40 0.5 cb/es 3/ 1 4/201 8 3/1 5/201 8 3/1 6/201 8 40 39 43 40 39 38 0.05 cb/es 3/1 7/201 8 3/1 8/201 8 3/1 9/201 8 3/20/201 8 38 0.5 es 3/21 /2 01 8 37 0.5 e s 3/22/201 8 3/23/201 8 40 38 43 42 38 37 0 cb/es 3/24/201 8 3/25/201 8 39 38 43 41 38 36 0.7 es 3/2 6/2 01 8 3/2 7/2 01 8 3/2 8/2 01 8 3/2 9/2 01 8 3/30/201 8 39 38 43 41 38 34 0 cb/es 3/31 /201 8 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 3.85 FORM FFRBE)-1 Waste Structure Freeboard and E)aily Precipitation Record Farm Owner Ironside Investment Mgt_ LLC Facility Number 31 - -15 Operator I Murphy Family Ventures, L- E:) --I t ca (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E)M 4-1 E)M 4-2 E)M 4-3 E)M 4-4 E)M 3-4 E)M 3-5 4/1 /201 8 4/2/201 8 4/3/201 8 4/4/201 8 4/5/201 8 4/6/201 8 37 38 40 41 38 36 0 escb/es 4/7/201 8 4/8/201 8 37 36 39 40 38 34 1 _4 es 4/9/201 8 4/1 0/201 8 34 0.3 4/1 1 /201 8 4/1 2/201 8 4/1 3/201 8 41 36 39 40 38 34 0 cb/es 4/1 4/201 8 4/1 5/201 8 4/1 6/201 8 50 34 44 38 37 32 1 _9 es 4/1 7/201 8 4/1 8/201 8 4/1 9/201 8 4/20/201 8 50 34 44 38 37 32 0 cb/es 4/21 /2 01 8 4/22/201 8 4/2 3/2 01 8 4/24/201 8 49 32 45 37 36 30 1 _9 es 4/25/201 8 49 32 45 37 36 30 0.3 4/2 6/2 01 8 4/27/201 8 49 32 45 37 36 30 0.2 cb/es 4/2 8/2 01 8 4/2 9/2 01 8 4/30/201 8 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Tota I Rain FORM FRBD-1 Waste Structure Freeboard and Daily Precipitation Record Farm Owner Ironside Investment Mgt. LLC Operator Murphy Family Ventures, LLC Facility Number 31 1 15 Date (mm/dd/yy) **Waste Structure Freeboard (inches) *Precipitation (inches) Initials DM 4-1 DM 4-2 DM 4-3 DM 4-4 DM 3-4 DM 3-5 5/1 /2018 5/2/2018 5/3/2018 5/4/2018 49 32 55 37 32 30 0 cb/es 5/5/2018 5/6/2018 49 32 55 40 32 30 0.3 es 5/7/2018 5/8/2018 5/9/2018 5/10/2018 5/11/2018 50 32 55 57 32 31 0 cb/es 5/12/2018 5/13/2018 5/14/2018 5/15/2018 5/16/2018 5/17/2018 5/18/2018 50 32 55 57 32 48 0.7 cb/es 5/19/2018 47 0.6 5/20/2018 48 30 53 55 31 46 1.5 es 5/21 /2018 46 0 5/22/2018 49 0 5/23/2018 49 0 5/24/2018 52 54 30 51 1.1 es 5/25/2018 48 30 52 54 30 52 0 cb/es 5/26/2018 5/27/2018 5/28/2018 48 30 51 54 31 52 0.4 es 5/29/2018 48 30 49 52 33 50 1.8 es 5/30/2018 46 28 48 51 34 50 0.4 es 5/31/2018 46 28 48 51 1 35 1 49 0.3 cb/es 1. Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid. For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded. 2. Freeboard plus available storage capacity must be recorded at least weekly. 3. Rainfall must be recorded for every rain event. 3/14/2003 Total Rain 7.1 FORM FFRBE:)-9 Waste Structure Freeboard and wily Precipitation Record Farm Owner Irons. -ice Investment Mgt_ LLC Facility Number 31 15 Operator Murphy Family Ventures, LLC mateWaste (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E:)M 4-1 E:)M 4-2 E:)M 4-3 E:)M 4-4 E:)M 3-4 E:)M 3-5 6/1 /201 8 46 28 48 51 35 49 0.4 cb/es 6/2/201 8 6/3/201 8 6/4/201 8 6/5/201 8 6/6/201 8 6/7/201 8 6/8/201 8 46 28 48 51 35 49 O C 13/ES 6/9/201 8 6/1 0/201 8 6/1 1 /201 8 6/1 2/201 8 49 0.6 6/ 1 3/201 8 49 0.3 6/1 4/201 8 6/1 5/201 8 46 27 48 s0 35 48 0.3 cb/es 6/1 6/201 8 6/1 7/201 8 6/1 8/201 8 6/1 9/201 8 6/20/201 8 6/21 /201 8 46 27 48 s0 36 s0 0.7 es 6/22/201 8 46 27 48 s0 36 s0 0 cb/es 6/23/201 8 6/24/201 8 6/25/201 8 49 0.6 6/26/201 8 0 6/27/201 8 48 2 es 6/28/201 8 6/29/201 8 44 25 43 48 33 48 0.2 Im/es 6/30/201 8 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 5.1 January 5.1 February 2.2 March 3.85 April 6 May 7.1 June 5.1 July 7.1 August 6 September 52.3 October 1.7 November 4.2 December 6.7 Total 107.35 FORM FF2BO-9 Waste Structure Freeboard ar-�d wily Precipitation-� Record Farm Ow rear .I-,,LLC Facility Number 3'1 - 9 S Operator Ir4fl"w-"NrFar-r�ii Ver-�tu resLLC Date (mm/dd/yy> ""VVa ste Structure Freeboard o ric"es) o "Precipitation �ir�cl-�es� Iriitials OM 4-'i OM 4-2 OM 4-3 OM 4-4 OM 3-4 OM 3-S 7/1 /20'1 8 7/2/201 8 -7, C) -1 8 2O -1 8 7/5/2O 1 8 7/6/201 8 44 27 43 48 35 48 O cb/es 7/7/201 8 7/8/20'1 8 7/9/201 8 7/1 O/201 8 7/1 1 /201 8 7/ 1 2/20 1 8 7/1 3/201 8 44 27 43 48 35 48 O cb/es 7/ 1 4/20 1 8 7/1 5/201 8 7/1 6/201 8 7/1 7/201 8 7/1 8/201 8 45 27 43 49 35 48 O.2 cb/es 7/1 9/201 8 7/20/201 8 45 27 43 49 35 48 O cb/es 7/21 /201 8 45 27 42 49 35 48 O.4 7/22/20 1 8 7/23/20 1 8 7/24/20 1 8 44 28 42 50 33 47 1 _ 7 es 7/25/20 1 8 44 28 42 50 33 47 O _ 1 7/26/20 1 8 7/27/201 8 44 28 42 50 33 47 O es 7/28/201 8 44 28 40 48 31 47 O 7/29/20 1 8 43 27 39 46 30 46 O _ 5 7/30/20 1 8 41 25 38 45 31 44 2 _4 44 7/31 /201 8 40 24 37 43 30 41 1 _8 es 1 _ Lagoon freeboard is the differ re rice between the lowest point of a lagoori em bar�Kmer�t grid the level of liquid_ For lagooris with spillways, the diffe re rice between the level of liquid grid the bottom of the spillway sFiould be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least wee Kly_ 3_ Rai"-FaII must be recorded for every ram eve nit_ 3/14/2003 Totes 1 Ra i ri 7.1 FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC DateWaste (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E:)M 4-1 E:)M 4-2 E:)M 4-3 E:)M 4-4 E:)M 3-4 MM 3-5 8/l /201 8 39 23 37 42 28 41 0 8/2/201 8 39 23 36 42 27 41 1 8/3/201 8 39 23 36 42 27 40 0.8 cb/es 8/4/201 8 40 8/5/201 8 38 22 30 42 27 40 0.9 8/6/201 8 38 22 30 42 26 40 0 8/7/201 8 38 22 30 42 26 40 0 8/8/201 8 38 22 29 42 26 40 0 8/9/201 8 38 22 29 42 26 40 0 8/1 0/201 8 38 22 29 42 26 41 0 cb/es 8/1 1 /201 8 8/1 2/201 8 38 22 36 42 26 41 0.5 8/1 3/201 8 37 21 34 42 24 41 0.4 8/1 4/201 8 8/1 5/201 8 8/1 6/201 8 8/1 7/201 8 37 21 34 42 24 40 0. 5 cb/es 8/1 8/201 8 8/1 9/201 8 8/20/201 8 37 21 33 41 23 39 1 _4 es 8/21 /201 8 36 19 33 41 23 39 0.5 8/22/201 8 8/23/201 8 8/24/201 8 36 19 33 41 23 39 0 cb/es 8/25/201 8 8/26/201 8 8/27/201 8 8/28/201 8 8/29/201 8 8/30/201 8 8/31 /201 8 31 27 34 44 33 39 0 cb/es 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC .. - 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 52.3 FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC DateWaste (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E:)M 4-1 E:)M 4-2 E:)M 4-3 E:)M 4-4 E:)M 3-4 MM 3-5 1 0/'I /201 8 1 1 18 12 1 0/2/201 8 1 1 1 0/3/201 8 1 1 1 0/4/201 8 1 1 1 0/5/201 8 16 15 1 1 18 17 24 0 cb/es 1 0/6/201 8 1 0/7/201 8 1 0/8/201 8 1 0/9/201 8 1 0/1 0/201 8 10/11/2018 1 0/1 2/201 8 22 15 24 18 17 24 0.4 cb/es 1 0/1 3/201 8 1 0/1 4/201 8 1 0/1 5/201 8 10/16/2018 1 0/1 7/201 8 53 25 30 18 20 22 0.2 10/18/2018 1 0/1 9/201 8 53 25 30 18 20 21 0 cb/es 1 0/20/201 8 10/21/2018 1 0/22/201 8 1 0/23/201 8 1 0/24/201 8 1 0/25/201 8 1 0/26/201 8 55 25 28 70 42 21 0. 1 cb/es 1 0/27/201 8 55 25 55 63 42 20 1 cb/es 1 0/28/201 8 1 0/29/201 8 1 0/30/201 8 10/31/2018 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 1 _7 FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC .. - 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 4.2 FORM FFR13E:)-9 Waste Structure Freeboard and daily Precipitation Record Farm Owner Ironsicle Investment Mgt_ LLC Facility Number 31 - is Operator I Murphy Family Ventures, LLC DateWaste (mm/dd/yy) Structure Freeboard (inches) Precipitation (inches) Initials E:)M 4-1 E:)M 4-2 E:)M 4-3 E:)M 4-4 E:)M 3-4 MM 3-5 1 2/l /201 8 30 60 42 0 12/2/2018 50 35 30 60 45 40 1 _2 es 1 2/3/201 8 30 60 40 0 1 2/4/201 8 29 60 40 0 1 2/5/201 8 29 60 40 0 1 2/6/201 8 29 60 40 0 1 2/7/201 8 50 35 31 60 45 41 0 cb/es 1 2/8/201 8 50 35 31 60 45 41 0 1 2/9/201 8 48 34 31 60 43 40 1 _4 es 1 2/1 0/201 8 48 33 30 60 43 39 0.6 es 1 2/1 1 /201 8 48 33 30 60 43 39 0 1 2/1 2/201 8 48 33 30 60 43 39 0 1 2/1 3/201 8 48 33 30 60 43 39 0 1 2/14/201 8 48 33 30 60 43 39 0_ 1 cb/es 1 2/1 5/201 8 46 31 29 60 42 37 2.4 es 1 2/1 6/201 8 44 30 27 60 40 37 0 1 2/1 7/201 8 27 60 37 0 1 2/1 8/201 8 27 60 37 0 1 2/1 9/201 8 27 60 37 0 1 2/20/201 8 27 60 37 0 1 2/21 /201 8 44 30 27 60 40 35 0.5 cb/es 1 2/22/201 8 1 2/23/201 8 1 2/24/201 8 1 2/25/201 8 1 2/26/201 8 1 2/27/201 8 1 2/28/201 8 43 30 26 57 39 35 0.5 cb/es 1 2/29/201 8 1 2/30/201 8 12/31/2018 1 _ Lagoon freeboard is the difference between the lowest point of a lagoon embankment and the level of liquid_ For lagoons with spillways, the difference between the level of liquid and the bottom of the spillway should be recorded_ 2_ Freeboard plus available storage capacity must be recorded at least weekly- 3- Rainfall must be recorded for every rain event_ 3/14/2003 Total Rain 6.7