Loading...
HomeMy WebLinkAbout310015_2019 inspection_20190221 Division of Water Resources Facility Number - S 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: ommpliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: GKR'outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 01-.?/-/9 Arrival Time: 1?p Departure Time:O County: Region: 1 Farm Name: �-t- S�t tc, - S 3 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: , Title: Phone: /Q Onsite Representative: / z4io�.11 Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish (j , 7„2 , Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 1�No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes LAA No 0 NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes M No 0 NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: 3 - ,f jDate of Inspection: -L Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 3 S 3ZI �� 3 �� M�f 3 Spillway?: Designed Freeboard(in): Observed Freeboard(in): .2q 3 �02 .2 7 #7 .33 (p1� 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ ti'e [X No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Cb No 0 NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes W No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 10 No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 1g No ❑ NA ❑ NE maintenance or improvement? TT�� Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes 10 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes W No ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes W No ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes E4 No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [� No ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [� No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes M No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? 0 Yes ❑ No ❑ NA ® NE Page 2 of 3 21412015 Continued Facility Number: 3/ - Date of Inspection: 2,21 1 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes j No ❑ NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [ ( No ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes [:] No E� NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes (� No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes [ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [A No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [ No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). OO& �r �C� Go� S I )e;or c, ojr\ c44- \r ,,b,U'-6 VdwcAk ro(ke, look.vy 4Dv, e.�'osron (���,v. -�;les ���� c�o�v� ►nla��; jV\ AeA+k i✓lspe.C,{-" Reviewer/Inspector Name: n L41a /�?d�� Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 21412015