Loading...
HomeMy WebLinkAbout310321_2018 inspection_20180126(d"Division of Water Resources Facility Number FTFI- 7 O Division of Soil and Water Conservation r /' 0 Other Agency V Type of Visit: 0 7Routinc ljance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: / / k} A rrival 'Time: Departure Time: /� County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Owner Email: Phone: Title: Phone: Integrator: Certification Number: 1 J Certification Number: Latitude: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Laver I I ::] Non -La er W to Finish can to Feeder Feeder to Finish 4 ? f Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Dry Poultry Canacitv Pon_ Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer —.Dry Cow ,Non-Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes EfNo ❑ NA ❑ NE Yes ❑ No ❑ NA ❑ NE Yes ❑ No ❑ NA ❑ NE 0 Yes ❑ No ❑ NA ❑ NE ❑ Yes E7]�� ❑ NA ❑ NE ❑ Yes2N�o ❑ NA ❑ NE Page I of 3 21412015 Continued Facili Number: - Z Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑-too ❑ N A ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): T- 3 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 0-N_o___0 NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [-]Yes �oo ❑ NA ❑ N E waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DW R 7. Do any of the structures need maintenance or improvement? ❑ Yes Io ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any .part of the waste management system other than the waste structures require ❑ Yes No ❑ N A ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No NA NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �No❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 12<0 ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes LjNo DNA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: jDate of Inspection: & 24, Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes []'NO ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Ld O _❑ N A ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑' o-E j NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? �j Yes n No I ;F<An NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ICJ No ❑ N A ❑ N E and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ETNo ❑ N A ❑ N F If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes To ❑ NA ❑ N F. permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes Flo ❑ NA ❑ N F ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ io ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes FrN o ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. 7 Use drawings of facility to better explain situations (use additional pap_es as necessarv). � s L I jra ss . elz/ for _� ("')l p0r,(4-r Reviewer/Inspector Name: y)G+ v �o �� !i 2 Phone: T O 7l 6 7 30 y Reviewer/Inspector Signature: Date: V—Zfv Page 3 of 3 2/4/201 S