Loading...
HomeMy WebLinkAbout310160_3972 Bermuda Pasture 18_20190308• Form IRR-1 Farm: Carter & Sons 1&2 Facility* 31-160 Year: 2018 By signing this form, you certify that all of the information on this form is true, provided by you, and complete to the best of your knowledge, and that inspections were completed at least every 120 minutes. Owner Signature: ,/-k4-6 Operator's Signature: Operator's Cert. No.: AWA 994541 Form IRR-1 Farm: Carter & Sons 1&2 Facility #: 31-160 Year: 2018 Lagoon Pull Date Start End Total Crop Weather Code 2 12 5/8/2018 9:00 AM 3:00 PM 360 Bermuda C 2 13 5/8/2018 9:00 AM 12:00 PM 180 Bermuda C 2 14 5/8/2018 9:00 AM 3:00 PM 360 Bermuda C 2 15 5/8/2018 3:00 PM 5:00 PM 120 Bermuda C 1 12 5/12/2018 8:00 AM 2:00 PM 360 Bermuda C 1 13 5/12/2018 8:00 AM 11:00 AM 180 Bermuda C 1 14 5/12/2018 8:00 AM 2:00 PM 360 Bermuda C 1 1 15 5/12/2018 2:00 PM 4:00 PM 120 Bermuda C 2 12 6/29/2018 10:00 AM 12:00 PM 120 Bermuda C 2 14 6/29/2018 10:00 AM 12:00 PM 120 Bermuda C 2 12 6/30/2018 9:00 AM 11:00 AM 120 Bermuda C 2 14 6/30/2018 9:00 AM 11:00 AM 120 Bermuda C 2 12 7/3/2018 11:00 AM 1:00 PM 120 Bermuda C 2 14 7/3/2018 11:00 AM 1:00 PM 120 Bermuda C 2 12 8/2/2018 8:00 AM 1:30 PM 330 Bermuda C 2 14 8/2/2018 8:00 AM 1:30 PM 330 Bermuda C 1 12 8/10/2018 8:00 AM 1:30 PM 330 Bermuda C 1 14 8/10/2018 8:00 AM 1:30 PM 330 Bermuda C 1 15 8/10/2018 1:30 PM 3:30 PM 120 Bermuda C 1 13 8/14/2018 9:00 AM 12:00 PM 180 1 Bermuda C 1 16 8/14/2018 9:00 AM 11:00 AM 120 Bermuda C 1 12 8/15/2018 10:00 AM 3:00 PM 300 Bermuda C 1 14 8/15/2018 10:00 AM 3:00 PM 300 Bermuda C 1 3 8/18/2018 9:00 AM 2:00 PM 300 Bermuda C 1 4 8/18/2018 2:00 PM 5:00 PM 180 Bermuda C 2 4 8/22/2018 10:00 AM 12:00 PM 120 Bermuda C 2 3 8/24/2018 7:00 AM 11:00 AM 240 Bermuda C 3 3 8/27/2018 9:00 AM 12:00 PM 180 Bermuda C 3 3 8/30/2018 8:00 AM 10:00 AM 120 Bermuda C 3 4 8/31/2018 7:00 AM 10:00 AM 180 Bermuda C 2 12 8/31/2018 8:00 AM 10:00 AM 120 Bermuda C 2 14 8/31/2018 8:00 AM 10:00 AM 120 Bermuda C 2 13 9/1/2018 9:00 AM 11:00 AM 120 Bermuda C 2 16 9/1/2018 9:00 AM 11:00 AM 120 Bermuda C 3 3 10/2/2018 9:00 AM 2:00 PM 300 Bermuda C 3 4 10/2/2018 9:00 AM 2:00 PM 300 Bermuda C 2 12 10/4/2018 2:00 PM 7:00 PM 300 Bermuda C 2 14 10/5/2018 9:00 AM 2:00 PM 300 Bermuda C 1 14 10/8/2018 8:00 AM 1 12:00 PM 240 Bermuda C 1 12 1 10/8/2018 8:00 AM 1 12:00 PM 1 240 Bermuda I C By signing this form, you certify that all of the information on this form is true, provided by you, and complete to the best of your knowledge, and that inspections were completed at least every 120 minutes. Owner Signature: �Ak)6 Operator's Signature: C , Operator's Cert. No.: AWA 994541 FORM IRR-2 Hydrant # 3 Field # 3972 F2 Field Size (wetted acres) = (A) 2.9 Flow Rate. 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 311 - 9/30 (Ext Til 10/20) Lagoon Liquid Irrigation Fielas Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 146 Loading (lb/acre) = (B) F I 2018 Pull: 3 -Nutrient Source lV Date (mm/dd/yr) l�l W1 hl i�r wr - irrigation - Waste Analysis PAN' (Ib/1000 pal) PAN Applied (lb/acre) ( ) (8) x (9) 1000 Nitrogen Balance" (lb/acre) (B) - (10) Hours Remaining 9 on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) B= 146 1 8/18/2018 9:00 AM 2:00 PM 300 1 115 34,500 11,897 1.85 22.01 123.99 28.17 2.47 2 8/24/2018 7:00 AM 11:00 AM 240 1 115 27,600 9,517 2.07 19.70 104.29 21.18 1.86 3 8/27/2018 9:00 AM 12:00 PM 180 1 115 20,700 7,138 2.53 18.06 86.23 14.33 1.26 3 8/30/2018 8:00 AM 10:00 AM 120 1 115 13,800 4,759 3.88 18.46 67.77 7.34 0.64 3 10/2/2018 9:00 AM 2:00 PM 300 1 115 34,500 11,897 3.88 46.16 21.61 2.34 0.21 3 10/19/2018 10:00 AM 12:00 PM 120 1 115 13,800 4,759 3.88 18.46 3.15 0.34 0.03 Crop Cycle Totals 144,900 j / /J142.85 Owners Signature /iRi%$�- Operator's Signature / //i,✓ /_�/� Certified Operator (Print) Clay K. Carter Operators Certification No. AWA 994541 ` NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. -Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 Lagoon Liquid Irrigation Fit,us Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 Hydrant # 4 Field # 3972 F2 Field Size (wetted acres) = (A) 2.87 Flow Rate. 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9/30 (Ext Til 10/20) Facility Number 31 - 1 160 !rogation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 146 Loading (lb/acre) = (B) 5 (e) 171 (8) (9) (10) (11) Pull: 4 —Nutrient Source Date (mm/dd/yr) ill rri ation Waste Analysis PAN' (Ib/1000 pap PAN Applied (lb/acre) 8 x 9 1000 Nitrogen Balance" Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) B= 146 1 8/18/2018 2:00 PM 5:00 PM 180 1 115 20,700 7,213 1.85 13.34 132.66 29.83 2.64 2 8/22/2018 10:00 AM 12:00 PM 120 1 115 13,800 4,808 2.07 9.95 122.70 24.66 2.18 3 8/31/2018 7:00 AM 10:00 AM 180 1 115 20,700 7,213 3.88 27.98 94.72 10.15 0.90 3 10/2/2018 9:00 AM 2:00 PM 300 1 115 34,500 12,021 3.88 46.64 48.08 5.15 0.46 3 10/19/2018 1:00 PM 6:00 PM 300 1 115 34,500 12,021 3.88 46.64 1.44 0.15 0.01 Crop Cycle Totals 124,200 j144.56 Owners Signature_ ���4li;� Operator's Signature Certified Operator (Print) Clay K. Carter Operators Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. " Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 FORM IRR-2 Hydrant # 11 Field # 3972 F4 Field Size (wetted acres) = (A) 1.07 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9/30 (Ext Til 10/20) Lagoon Liquid Irrigation Fielus Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 222 Loading (lb/acre) = (B) ,aan1 rat (91 (101 0 1) 2018 Pull: 11 —Nutrient Source t)) Date (mm/d l4) Nl %,l w, rv, - Irrigation Waste Analysis PAN (Ib/1000 gal) PAN Applied (lb/acre) 8 x 9 1000 Nitrogen Balance" Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Remaining Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 222 2 10/17/2018 8:00 AM 11:00 AM 180 1 115 20,700 19,346 1.4 27.08 194.92 21.59 5.13 2 10/18/2018 9:00 AM 12:00 PM 180 1 115 20,700 19,346 1.4 27.08 167.83 18.59 4.41 /J Crop Cycle Totatsj 41,400 j Owner's Signature Operator's Signature Certified Operator (Print) Clay K. Carter Operator's Certification No AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. " Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter. etc.) IRR-2 Fo— 8/3n012 FORM IRR-2 Hydrant # 12 Field # 3972 F4 Field Size (wetted acres) = (A) 2.68 Flow Rate 115 Farm Owner Clay Carter Owners Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic Period I 3/1 - 9/30 (Ext Til 10/20) Lagoon Liquid Irrigation Fiarus Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator 1. Clay K. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 222 Loading (lb/acre) = (B) 7 ru1 rom t (1rill 2018 Pull: 12 "`Nutrient Source Date (mm/dd/yr) Irrigation - Waste Analysis PAN* (Ib/1000 gal) PAN Applied (Ib/acre ) 8 x 9 1000 Nitrogen Balance" ( Ib/acre ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) B= 222 2 5/8/2018 9:00 AM 3:00 PM 360 1 115 41,400 15,448 2.06 31.82 190.18 35.86 3.40 1 5/12/2018 8:00 AM 2:00 PM 360 1 115 41,400 15,448 1.85 28.58 161.60 33.93 3.22 2 6/29/2018 10:00 AM 12:00 PM 120 1 115 13,800 5,149 2.06 10.61 150.99 28.47 2.70 2 6/30/2018 9:00 AM 11:00 AM 120 1 115 13,800 5,149 2.06 10.61 140.38 26.47 2.51 2 7/3/2018 11:00 AM 1:00 PM 120 1 115 13,800 5,149 2.06 10.61 129.78 24.47 2.32 2 8/2/2018 8:00 AM 1:30 PM 330 1 115 37,950 14,160 2.07 29.31 100.46 18.85 1.79 1 8/10/2018 8:00 AM 1:30 PM 330 1 115 37,950 14,160 1.85 26.20 74.27 15.59 1.48 1 8/15/2018 10:00 AM 3:00 PM 300 1 115 34,500 12,873 1.85 23.82 50.45 10.59 1.00 2 8/31/2018 8:00 AM 10:00 AM 120 1 115 13,800 5,149 1.4 7.21 43.24 12.00 1.14 2 10/4/2018 2:00 PM 7:00 PM 300 1 115 34,500 12,873 1.4 18.02 25.22 7.00 0.66 1 10/8/2018 8:00 AM 2:00 PM 360 1 115 41,400 15,448 1.41 21.78 3.44 0.95 0.09 Crop Cycle Totalsl 324,300 j 218.56 Owner's Signatures / 1f. Operator's Signature_ 924 Certified Operator (Print) Clay K. Carter Operators Certification No. AWA 994541 ` NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. **Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. -Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8rai2012 FORM IRR-2 Hydrant # 13 Field # 3972 F4 Field Size (wetted acres) _ (A) 1.33 Flow Rate 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9/30 Ext Til 10/20 Lagoon Liquid Irrigation Fieius Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irngation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 222 Loading (lb/acre) _ (B) 6 171 18) (9) (10) (11) 2018 Pull: 13 —Nutrient Source Date (mm/dd/A Irri ation Waste Analysis PAN, (Ib/1000 gal) PAN Applied (lb/acre) ( ) 8 x 9 1000 Nitrogen Balance — Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Remaining Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gaUmin) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) B= 222 2 5/8/2018 9:00 AM 12:00 PM 180 1 115 20,700 15,564 2.06 32.06 189.94 17.77 3.40 1 5/12/2018 8:00 AM 11:00 AM 180 1 115 20,700 15,564 1.85 28.79 161.15 16.79 3.21 1 8/14/2018 9:00 AM 12:00 PM 180 1 115 20,700 15,564 1.85 28.79 132.35 13.79 2.63 2 9/1/2018 9:00 AM 11:00 AM 120 1 115 13,800 10,376 1.4 14.53 117.83 16.22 3.10 2 10/18/2018 9:00 AM 12:00 PM 180 1 115 20,700 15,564 1.4 21.79 96.04 13.22 2.53 Crop Cycle Totals 96,600 j / 125.96 Owner's Signature Operator's Signature C f, Certified Operator (Print) CI K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. •` Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 FORM IRR-2 Hydrant # 14 Field # 3972 F4 Field Size (wetted acres) _ (A) 2.57 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9130 Ext Til 10/20 Lagoon Liquid Irrigation Fielus Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # F910 -285-8720 From Waste Utilization Plan - 7::�: Recommended PAN 222 Loading (lb/acre) = (B) F7 ru\ roi (10) 111) 2018 Pull: 14 -Nutrient Source Date (mm/dd/yr) III rri ation Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) 1000 Nitrogen Balance" (lb/acre) (B) - (10) Hours Remaining g on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 222 2 5/8/2018 9:00 AM 3:00 PM 360 1 115 41,400 16,109 2.06 33.18 188.82 34.14 3.38 1 5/12/2018 8:00 AM 2:00 PM 360 1 115 41,400 16,109 1.85 29.80 159.01 32.01 3.17 2 6/29/2018 10:00 AM 12:00 PM 120 1 115 13,800 5.370 2.06 11.06 14795 26.75 2.64 2 6/30/2018 9:00 AM 11:00 AM 120 1 115 13,800 5,370 2.06 11.06 136.89 24.75 2.45 2 7/3/2018 11:00 AM 1:00 PM 120 1 115 13,800 5,370 2.06 11.06 125.83 22.75 2.25 2 8/2/2018 8:00 AM 1:30 PM 330 1 115 37,950 14,767 2.07 30.57 95.26 17.14 1.69 1 8/10/2018 8:00 AM 1:30 PM 330 1 115 37,950 14,767 1.85 27.32 67.94 13.68 1.35 1 8/15/2018 10:00 AM 3:00 PM 300 1 115 34.500 13,424 1.85 24.83 43.11 8.68 0.86 2 8/31/2018 8:00 AM 10:00 AM 120 1 115 13,800 5,370 1.4 7.52 35.59 9.47 0.94 2 10/5/2018 9:00 AM 2:00 PM 300 1 115 34,500 13,424 1.4 18.79 16.80 4.47 0.44 1 10/8/2018 8:00 AM 12:00 PM 240 1 115 27.600 10,739 1.41 15.14 1.66 0.44 0.04 / Crop Cycle Totals 310.500 j ZZu. 14 Owner's Signature jam/0. Operator's Signature Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. "`Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 FORM IRR-2 Hydrant # 15 Field # 3972 F4 Field Size (wetted acres) = (A) 083 Flow Rate: 1 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9/30 Ext Til 10/20 Lagoon Liquid Irrigation Fielus Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator Clay K. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 222 Loading (lb/acre) = (B) l I (81 19) (10) It 1) 2018 Pull: 15 "'Nutrient Source 2 (1) Date (mm/dd/yr) 5/8/2018 (2) P) (4) t3l tom/ Irri ation v 1 Waste Analysis PAN' (Ib/1000 gal) PAN Applied Ib/acre ( ) 8 x 9 1000 Nitrogen Balance" (lb/acre) (B) - (10) Hours Remaining g on Field Inches Per/Acre Remaining Start Time 3:00 PM End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (pal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 222 5:00 PM ' 120 1 115 13,800 16,627 2.06 34.25 187.75 10.96 3.36 1 5/12/2018 2:00 PM 4:00 PM 120 1 115 13,800 16,627 1.85 30.76 156.99 10.21 3.13 1 8/10/2018 1:30 PM 3:30 PM 120 1 115 13,800 16,627 1.85 30.76 126.23 8.21 2.51 1 10/8/2018 3:00 PM 6:00 PM 180 1 115 20,700 24,940 1.4 34.92 91.32 7.85 2.40 2 10/9/2018 10:00 AM 1:00 PM 180 1 115 20,700 24,940 1.4 34.92 56.40 4.85 1.48 Crop Cycle Totals 82,800 1 1 165.60 Owner's Signature $Z- Operator's Signature Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 FORM IRR-2 Hydrant # 16 Field # 3972 F4 Field Size (wetted acres) = (A) 1.05 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # ` _ (910)285-8720 Crop Type Bermuda Pasture Applic. Period 3/1 - 9/30 Ext Til 10/20 Lagoon Liquid Irrigation FIc. s Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator Clav K. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # _ 910-285-8720 From Waste Utilization Plan Recommended PAN 222 Loading (lb/acre) = (B) 2018 Pull: 16 "`Nutrient Source 1 2 (t) Date (mm/dd/yr) 8/14/2018 ( 9/1/2018 _ (2) Start Time 9:00 AM 111:00 9:00 AM _ (3) _ End Time AM 11:00 AM (4) Total Minutes (3) - (2) 120 120 t.) Irri # of Sprinklers Operating 1 1 ation Flow Rate (gal/min) 115 115 Volume Total Volume (gallons) per Acre (gal/acre) (6) x (5) x (4) (7) / (A) 13,800 13,143 I 13,800 13,143 Waste Analysis PAN- (Ib/1000 gal) 1.85 1.4 PAN Applied (lb/acre) g x g 1000 24.31 18.40 Nitrogen Balance" (lb/acre) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining 8= 222 197.69 179.29 16.26 19.49 3.94 4.72 2 10/17/2018 8:00 AM 11:00 AM 180 1 115 20,700 19,714 1.4 27.60 151.69 16.49 3.99 Crop Cycle Totals 48,300 Owner's Signature Operator's Signatures/ Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. " Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. "'Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/312012