Loading...
HomeMy WebLinkAbout310160_3972 SG 18-19_20190308Form IRR-1 Farm: Carter & Sons 1&2 Facility #: 31-160 Year: 2018 - 2019 Pull Date Start End Total Crop Weather Code -Lagoon 3 3 10/24/2018 8:00 AM 11:00 AM 180 Small Grain C 1 14 11/1/2018 10:00 AM 2:00 PM 240 Small Grain C 1 15 11/1/2018 2:00 PM 3:30 PM 90 Small Grain C 2 11 11/2/2018 10:00 AM 12:00 PM 120 Small Grain C 2 13 11/2/2018 10:00 AM 12:00 PM 120 Small Grain C 1 14 11/29/2018 9:00 AM 1:00 PM 240 Small Grain C 1 15 11/29/2018 1:00 PM 2:30 PM 90 Small Grain C 2 12 11/30/2018 9:00 AM 1:30 PM 270 Small Grain C 1 12 12/19/2018 9:00 AM 1:30 PM 270 Small Grain C 2 13 12/26/2018 11:00 AM 2:00 PM 180 Small Grain C 1 14 1 /16/2019 12:00 PM 3:00 PM 180 Small Grain C 1 14 2/7/2019 11:00 AM 12:00 PM 60 Small Grain C 1 15 2/7/2019 1:00 PM 2:00 PM 60 Small Grain C 1 16 2/8/2019 1:00 PM 2:30 PM 90 Small Grain C 3 3 2/11/2019 9:30 AM 12:00 PM 150 Small Grain C 3 4 2/11/2019 12:00 PM 5:00 PM 300 Small Grain C 1 12 2/13/2019 9:30 AM 1:00 PM 210 Small Grain C 1 11 2/14/2019 9:00 AM 11:00 AM 120 Small Grain C 2 16 2/15/2019 10:00 AM 12:00 PM 120 Small Grain C By signing this form, you certify that all of the information on this form is true, provided by you, and complete to the best of your knowledge, and that inspections were completed at least every 120 minutes. Owner Signature: Operator's Signature: Operator's Cert. No.: AWA 994541 Lagoon Liquid Irrigation Fields Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 3 Field # 3972 F2 Field Size (wetted acres) = (A) 2.9 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 1 1011 - 3/31 Facility Number 31 160 Irrigation Operator Clay K. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operators Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (lb/acre) = (B) i�1 (a1 17% 181 (9) (101 0 1) Pull: 3 "'Nutrient Source Date (mm/dd/yr) III rri ation Waste Analysis PAN* (Ib/1000 pal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance" Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 3 10/24/2018 8:00 AM 11:00 AM 180 1 115 20,700 7,138 3.88 27.70 22.30 2.42 0.21 3 2/11/2019 9:30 AM 12:00 PM 150 1 115 17,250 5,948 3.38 20.11 2.20 0.27 0.02 ,I Crop Cycle Totals 37,950 I 1 47.80 Owner's SignatureOperator's Signature Certified Operator (Print) K. Carter Operator's Certification No. AWA 994541 ` NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. " Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event —Enter nutrient source (ie. Lagoon/Storage Pond ID. commerical fertilizer, dry litter etc.) IRR-2 Form 813rz012 Lagoon Liquid Irrigation Fields Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 4 Field # 3972 F2 Field Size (wetted acres) = (A) 2.87 Flow Rate: 115 Farm Owner Clay Carter Owners Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 10/1 - 3/31 2 (3) Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (Ib/acre) = (B) (51 (61 (7) (a) (9) (10) (11) Pull: 4 —Nutrient Source tl Date (mm/dd/yr) ( ) Irrigation Waste Analysis PAN- (lb/1000 gal) PAN Applied (Ib/acre) 8 x 9 1000 Nitrogen Balance" ( Ib/acre ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 3 2/11/2019 12:00 PM 5:00 PM 300 1 115 34,500 12,021 3.38 40.63 9.37 1.15 0.10 Crop Cycle Totals 34,500 j 40.63 1 Owner's Signature � �zy Operator's Signature 1 �rvTT� Certified Operator (Print) Clay K Carter Operator's Certification No AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting cclumn (10) from (13). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source lie. Lagoon/Storage Pond ID, commerical fertilizer. dry litter, etc.) IRR-2 worm 8/3/2012 Lagoon Liquid Irrigation Fieicis Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 11 Field # 3972 F4 Field Size (wetted acres) = (A) 1.07 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 1 10/1 - 3/31 Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operators 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan —7771 Recommended PAN 50 Loading (lb/acre) = (B) r�1 ra1 171 (R) (91 (101 0 1) Pull: 11 —Nutrient Source iv Date (mm/dd/yr) Irrigation - Waste Analysis PAN* (Ib/1000 qaq PAN Applied (lb/acre) 8 x 9 1000 Nitrogen Balance" Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operatinq Flow Rate (gattmin) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 2 11/2/2018 10:00 AM 12:00 PM 120 1 115 13,800 12,897 1.41 18.19 31.81 3.50 0.83 1 2/14/2019 9:00 AM 11:00 AM 120 1 115 13,800 12,897 1.75 22.57 9.24 0.82 0.19 //JJ Crop Cycle Totals 27,600 40.76 Owner's Signature 1�w 4— Operator's Signature_ F 7--;K Certified Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 ' NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. "'Enter nutrient source (ie Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) ERR-2 Fo— 8/312012 Lagoon Liquid Irrigation Fieids Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 12 Field # 3972 F4 Field Size (wetted acres) = (A) 2.68 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace. NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 1 10/1 - 3/31 Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operators 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (lb/acre) = (B) 15) (61 (71 (8) (9) (10) 01) Pull: 12 —Nutrient Source Date (mmlddtyr) Irriclation Waste Analysis PAN. (Ib/1000 qal) PAN Applied (lb/acre) ( ) g( ) x (9) 1000 Nitrogen Balance" Ib/acre ( ) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operatinq Flow Rate (gat/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 2 11/30/2018 9:00 AM 1:30 PM 270 1 115 31,050 11,586 1.4 16.22 33.78 9.37 0.89 1 12/19/2018 9:00 AM 1:30 PM 270 1 115 31,050 11,586 1.41 16.34 17.44 4.81 0.46 1 2/13/2019 9:30 AM 1:00 PM 210 1 115 24,150 9,011 1.75 15.77 1.67 0.37 0.04 Crop Cycle Totals 86,250 j 1 48.33 Owner's Signature rim Operator's Signature Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. " Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter. etc.) IRR-2 Fom 8!312012 Lagoon Liquid Irrigation Fields Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 13 Field # 3972 F4 Field Size (wetted acres) = (A) 1.33 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 10/1 - 3/31 r11 121 (31 Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (lb/acre) = (B) (51 (6) (71 (8) (9) (10) 0 1) Pull: 13 `""Nutrient Source Date (mm/dd/yr) Irri anon Waste Analysis PAN' (lb/1000 pap PAN Applied (lb/acre) g x 9 (1 ( ) 1000 Nitrogen Balance" Ib/acre ( ) IB) - (10) Hours Remaining on Field Inches Remaining Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gat/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 2 11/2/2018 10:OOAM 12:OOPM 120 1 115 13,800 10,376 1.41 14.63 35.37 4.84 0.92 2 12/26/2018 11:00 AM 2:00 PM 180 1 115 20,700 15,564 1.41 21.95 13.42 1.84 0.35 Crop Cycle Totals 34,500 j 1 36.58 Owner's Signature �� � Operators Signature _ Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. "'Enter nutrient source (ie. Lagoon/Storage Pond !D. commerical fertilizer, dry litter, etc.) IRR-2 Form 813.2012 Lagoon Liquid Irrigation Fields Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 14 Field # 3972 F4 Field Size (wetted acres) = (A) 2.57 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 1 10/1 - 3/31 Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (Ib/acre) = (B) rc1 ra1 n1 181 (91 (101 01) Pull: 14 "'Nutrient Source Date (mm/dd/yr) Irrigation Waste Analysis PAN' (lb/1000 gal) PAN Applied (Ib/acre ) 8 x 9 1000 Nitrogen Balance" ( Ib/acre ) (B) - (10) Hours Remaining on Field Inches erlAcre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) m / (A) B= 50 1 11/1/2018 10:00 AM 2:00 PM 240 1 115 27,600 10,739 1.41 15.14 34.86 9.21 0.91 1 11/29/2018 9:00 AM 1:00 PM 240 1 115 27,600 10,739 1.41 15.14 19.72 5.21 0.51 1 1/16/2019 12:00 PM 3:00 PM 180 1 115 20,700 8,054 1.75 14.10 5.62 1.20 0.12 1 2/7/2019 11:00 AM 12:00 PM 60 1 115 6,900 2.685 1.75 4.70 0.92 0.20 0.02 / Crop Cycle Totals 82,800 j 49.08 Owner's Signature ` i [ — Operator's Signature �� � Certified Operator (Print) Clay K. Carter Operator's Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. •' Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/ W012 Lagoon Liquid Irrigation Fieids Record FORM IRR-2 One Form for Each Field per Crop Cycle 2018 - 2019 Hydrant # 15 Field # 3972 F4 Field Size (wetted acres) = (A) 0.83 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owner's Phone # 910 285-8720 Crop Type Small Grian Applic. Period 10/1 - 3/31 zs Facility Number 31 160 Irrigation Operator ClayK. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operators Phone # 910 -285-8720 From Waste Utilization Plan -71 Recommended PAN 50 Loading (lb/acre) = (B) i 7 rC% 17% (A) (9) (101 (11) Pull: 15 —Nutrient Source Date (mm/dd/yr) Irrigation Waste Analysis PAN' (lb/1000 qal) PAN Applied (lb/acre) g x 9 (1 ( ) 1000 Nitrogen Balance" Ib/acre ( ) (B) (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gaUmin) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7)/(A) B= 50 1 11/1/2018 2:00 PM 3:30 PM 90 1 115 10,350 12,470 1.41 17.58 32.42 2.77 0.85 1 11/29/2018 1:00 PM 2:30 PM 90 1 115 10,350 12,470 1.41 17.58 14.83 1.27 0.39 1 2/7/2019 1:00 PM 2:00 PM 60 1 115 6,900 8,313 1.75 14.55 0.29 0.02 0.01 Crop Cycle Totals 27,600 j 1 /J 49.71 Owners Signature_ Operator's Signature 16 Certified Operator (Print) Clay K. Carter Operators Certification No. AWA 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012 FORM IRR-2 Hydrant # 16 Field # 3972 F4 Field Size (wetted acres) = (A) 1.05 Flow Rate: 115 Farm Owner Clay Carter Owner's Address 668 Rivenbark Town Road Wallace, NC 28466 Owners Phone # 910 285-8720 Crop Type Small Grian Applic. Period 10/1 - 3/31 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Facility Number 31 160 Irrigation Operator Clay K. Carter Irrigation Operator's 681 Cedar Lk Ln Address Clinton, NC 28328 Operator's Phone # 910 -285-8720 From Waste Utilization Plan Recommended PAN 50 Loading (lb/acre) = (B) l - I 7 181 l9) 110) 0 1) 2018 - 2019 Pull: 16 "'Nutrient Source Ili Date (mm/dd/yr) V) P) M ill Irrigation Waste Analysis PANS (lb/1000 gal) PAN Applied (lb/acre) ( ) t3 x 9 1000 Nitrogen Balance" (lb/acre) (B) - (10) Hours Remaining on Field Inches Per/Acre Remaining Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume r Acre (gaVacre) (7) / (A) B= 50 1 2/8/2019 1:00 PM 2:30 PM 90 1 115 10,350 9,857 1.75 17.25 32.75 2.85 0.69 2 2/15/2019 10:00 AM 12:00 PM 120 1 115 13,800 13,143 2.28 29.97 2.78 0.19 0.04 Crop Cycle Totals 24,150 1 1 41.ZZ Owner's Signature �- ,�—� Operator's Signature Certified Operator (Print) Clay K. Carter Operators Certification No. AW 994541 NCDA Waste Anaylsis or Equivalent. At a minimum, waste analysis is required within 60 days of land application events. Enter the value received by subtracting column (10) from (B). Continue subtracting column (10) from column (11) following each irrigation event. —Enter nutrient source (ie. Lagoon/Storage Pond ID, commerical fertilizer, dry litter, etc.) IRR-2 Form 8/3/2012