Loading...
HomeMy WebLinkAbout310160_POA'S_20190308PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-160 County: Dupl i n Facility Name: Carter & Sons Farm Certified Operator Name: Clay Carter Operator #: 16359 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): 1 2 Spillway (Yes or No): No No Level (inches): 20" 18. 5" 2. Check all applicable items 3 No 20" Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation #NAME? 3. Earliest possible date to begin land application of waste: 3/1/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Clay Carter Facility Owner/Manager (print) Fdbility Owner/Manager (signature) Phone: Date: 2/27/2019 Cover Page Carter & Sons (31-160) PoA30day (2-27-19) Page I of 6 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID Carter & Sons #1 (31-160) line m = 264.4 -lb PAN 2. Structure ID: Carter & Sons #2 (31-160) line m = 499.7 lb PAN 3. Structure ID: Carter & Sons #3 (31-160) line m = 634.2 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1398.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN ocoinn nn ninT i IQT GIPt nc Tn VVWIrW PAN CANK10T IRF APPLIED DURING THIS 30 DAY PERIOD. o tract # p. field # q. crop r, acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s U. application window' 3972 1 Fescue 3.84 3.25 12.5 8/1 - 7/31 3972 2 Fescue 2.90 3.33 9.7 8/1 - 7/31 3972 3 Bermuda Pasture 3.32 146.00 484.7 3/1 - 9/30 3972 4 Bermuda Pasture 2.87 146.00 419.0 3/1 - 9/30 3972 5 Fescue 2.97 66.85 198.5 8/1 - 7/31 3972 6 Fescue 2.89 18.07 52.2 8/1 - 7/31 3972 PVT Fescue 26.30 47.74 1255.6 8/1 - 7/31 3972 11 Bermuda Pasture 1.07 222.00 237.5 3/1 - 9/30 _ 3972 12 Bermuda Pasture 2.68 222.00 595.0 3/1 - 9/30 3972 13 Bermuda Pasture 1.33 222.00 295.3 3/1 - 9/30 3972 14 Bermuda Pasture 2.57 222.00 570.5 3/1 - 9/30 3972 15 Bermuda Pasture 0.83 222.00 184.3 3/1 - 9/30 3972 16 Bermuda Pasture 1.05 222.00 233.1 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4547.9 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1398.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4547.9 lb. PAN y. Overall PAN balance (w - x) = -3150 lb. PAN Summary Carter & Sons (31-160) PoA30day (2-27-19) Page 2 of 6 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied as soon as weather permits. Summary Carter & Sons (31-160) PoA30day (2-27-19) Page 3 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Carter & Sons #1 31-160 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 20.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = -1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 82,836 ft' e. line c/12 x line d x 7.48 gallons/ft3-25,817 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80,706 ft3 h. current herd # 2,448 certified herd #1 2,448 actual waste produced = current herd # x line g = 80,706 ft3 certified herd # i. volume of wash water according to structural design 0lft3 j, excess rainfall over evaporation according to design 61,200 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 176,909 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 2/18/2019 1.75 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 264.4 Ibs PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Carter & Sons (31-160) PoA30day (2-27-19) Page 4 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Carter & Sons #2 (31-160) 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a. current liquid level according to marker 18.5 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 69,355 1ft2 e. line c/12 x line d x 7.48 gallons/ft' 43,231 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 1 80,7051 ft3 h. current herd # 2,448 certified herd #1 2,448 actual waste produced = current herd # x line g = 80,705 ft' certified herd # i. volume of wash water according to structural design O�ft3 j. excess rainfall over evaporation according to design 60,4331 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 175,952 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated I 2/18/2bigI 2.28 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 499.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 2 Carter & Sons (31-160) PoA30day (2-27-19) Page 5 of b PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Carter & Sons #3 31-160 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 20.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c, line b - line a (inches in red zone) = -1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 81696 ftz e, line c/12 x line d x 7.48 gallons/ft' -25462 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft' certified herd # i. volume of wash water according to structural design 0 ft3 j, excess rainfall over evaporation according to design I 49875 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 213096 gallons 4 Total PAN to be land applied during draw down period I. current waste analysis dated 2/18/2019 3.38 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 634.2 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 3 Carter & Sons (31-160) PoA30day (2-27-19) Page 6 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name: 31-160 County: Dupl i n Carter & Sons Farm clay Carter Operator #: 16359 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): 1 2 3 Spillway (Yes or No): No No No Level (inches): 1011 12" 10" 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/1/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Clay Carter Phone: Facility Owner/Manager (print) Date: 9/16/2018 Facility Own6r/Ma ger (signature) Cover Page Carter & Sons (31-160) PoA30day (9-16-18) Page 1 of 6 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Carter & Sons #1 (31-160) line m = 1234.8 lb PAN 2. Structure ID: Carter & Sons #2 (31-160) line m = 1035.4 lb PAN 3. Structure ID: Carter & Sons #3 (31-160) line m = 1763.1 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line rn = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 4033.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInD DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # P. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 3972 1 Fescue 3.84 69.48 266.8 8/1 - 7/31 3972 2 Fescue 2.90 95.64 277.4 8/1 - 7/31 3972 3 Bermuda Pasture 3.32 67.77 225.0 3/1 - 9/30 3972 4 Bermuda Pasture 2.87 94.72 271.8 3/1 - 9/30 3972 5 Fescue 2.97 66.89 198.7 8/1 - 7/31 3972 6 Fescue 2.89 92.18 266.4 8/1 - 7/31 3972 PVT Fescue 26.30 74.22 1952.0 8/1 - 7/31 3972 11 Bermuda Pasture 1.07 222.00 237.5 3/1 - 9/30 3972 12 Bermuda Pasture 2.68 43.24 115.9 3/1 - 9/30 3972 13 Bermuda Pasture 1.33 117.83 156.7 3/1 - 9/30 3972 14 Bermuda Pasture 2.57 35.59 91.5 3/1 - 9/30 3972 15 Bermuda Pasture 0.83 126.23 104.8 3/1 - 9/30 3972 16 Bermuda Pasture 1.05 179.29 188.3 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4352.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 4033.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4352.7 lb. PAN y. Overall PAN balance (w - x) = -319 lb. PAN Summary Carter & Sons (31-160) PoA30day (9-16-18) Page 2 of 6 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. In red from hurricane Florence. Waste, will be applied as soon as weadher permits. Summary Carter & Sons (31-160) PoA30day (9-16-18) Page 3 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 Carter & Sons #1 31-160 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 9.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 82,836 ftz e. line c/12 x line d x 7.48 gallons/ft, 490,527 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80,706 ft, h. current herd # 2,448 certified herd #1 2,448 actual waste produced = current herd # x line g = 80,706 ft, certified herd # i. volume of wash water according to structural design Oft, j. excess rainfall over evaporation according to design 61,200 ft, k. (lines h + i + j) x 7.48 x 30 days/line f= 176,909 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated I 6/28/2018 1 1.85 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1234.8 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Carter & Sons (31-160) PoA30day (9-16-18) Page 4 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Carter & Sons #2 (31-160) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 7.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 69,355 ftZ e. line c/12 x line d x 7.48 gallons/ft3 324,233 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 1 80,705 ft3 h. current herd # 2,448 certified herd ;-42,448 actual waste produced = current he-!-d ;r x lin-, ;a = 80,705 ft3 certified herd # i. volume of wash water according to structural design f 01 ft3 j. excess rainfall over evaporation according to design 1 60,433 Jft3 k. (lines h + i + j) x 7.48 x 30 days/line f = 175,952 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/23/?01? 2.07 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1035.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 2 Carter & Sons (31-160) PoA30ca� 16-18) Page 5 of 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD J!J ANIMAL FACILITIES 30 DAY DRAW DOWN PERK) i:) I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE:: 1. Structure Name/Identifier (ID): Carter & Sons #3 (31-160) 2. Current liquid volume in 25 yr./24 hr. storm storage & s; uul:,iral freeboard a. current liquid level according to marker C-10.0 inches b. designed 25 yr./24 hr. storm & structural fn -i: ,are 19.5 inches c. line b - line a (inches in red zone) --: 9.5 inches d. top of dike surface area according to desicin (area at below structural freeboard elevation) 81696 ftZ e, line c/12 x line d x 7.48 gallons/W 483776 gallons 3. Projected volume of waste liquid produced during draw ccjvnn period f. temporary storage period according to sn'uc;t 11-ai design 180 days g. volume of waste produced according to strucr":i aI design 121058 ft3 h. current herd # 3672 certific:l hUfd ;�,`� 3672 actual waste produced = current hE i,;._,:_ li; g = 121058 ft' certified hE:r(i it i. volume of wash water according to structure,- 1 Jesign 01 ft3 j. excess rainfall over evaporation according to dpsion 498751 ft3 k. (lines h + i + j) x 7.48 x 30 dayS/141F; i== 213096 gallons 4. Total PAN to be land applied during draw down periok; I. current waste analysis dated 6r. 1 < 2.53 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1763.1 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE 014 SITE. (Click on the next Structure tab shown below) Ctnirhirc Z r..Artpr R. Snnc (11-160) �5-18) Page 6 of 6