Loading...
HomeMy WebLinkAbout400131_RH.9.18.18POA30day_20180918PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State University A&T State University NL COOPERATIVE I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION Empowering People • Providing Solutions 1. Structure Name/Identifier (ID): Red Hill Date: 9/17/2018 40-131 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker b. Designed 25 yr/24 hr. storm & structural freeboard c. Line b - line a (inches in red zone) d. Top of dike surface area according to design (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft3) 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design g. Volume of waste produced according to design 14 inches 20 inches 6 inches 112125 ftZ 419347.5 gallons 180 days 121058 ft3 h. Actual waste produced= (current herd #/certified herd #) x line g 104093.027 ft3 current herd: 3706 certified herdF 4310 i. Volume of wash water according to structural design 0 ft3 j. Excess rainfall over evaporation according to design k. (line h + line i +line j) x 7.48 x (30 days/line f) _ 4. Total PAN to be land applied during draw down period I. Current waste analysis dated MM/DD/YYYY 7/12/2018 m. (lines e + k)/1000 x (line I) _ REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE 65406 ft3 211308.7871 gallons 2.17 Ib/1000 gal 1368.52414 lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: line m= I 1368.52414 Ib PAN 2. structure ID: line m= ilb PAN 3. structure ID: line m= ilb PAN 4. structure ID: line m= ilb PAN 5. structure ID: line m= ilb PAN 6. structure ID: line m= ilb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 1 1368.52414 total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application (lb/acre) cnlumn r x s windnw 3379 RHA cover 16.35 25 408 Oct -May 3379 RH D fescue 4.7 173 813 Aug -July 3379 RHE fescue 5.3 173 916 Aug -July 3379 RHC wheat 17.81 125 2226 Sept -Apr 3379 RHB wheat 20.31 125 2538 sept-Apr State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 6901 1368.52414 6901 -5532.4759 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Hurricane Florence This form was delayed due to widespread flooding and power outages. Cr PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 10/1/2018 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD