Loading...
HomeMy WebLinkAbout400131_Plan of Action_20180917PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State Universi NCA&T State Un COOPI I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTEP Empowering 8 1. Structure Name/Identifier (ID): Piney Bottom Date: 8/13/2018 40-161 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker 10 b. Designed 25 yr/24 hr. storm &structural freeboard 19 c. Line b - line a (inches in red zone) 9 d. Top of dike surface area according to design 151079 (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft3) 847553.2 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design 180 g. Volume of waste produced according to design 123709 h. Actual waste produced (current herd #/certified herd #) x line g 0 current herd: 0 certified herdF 4310 i. Volume of wash water according to structural design 0 j. Excess rainfall over evaporation according to design 88129 k. (line h + line i +line j) x 7.48 x (30 days/line f) = 1 109867.487 4. Total PAN to be land applied during draw down period I. Current waste analysis dated 1.56 MM/DD/YYYY 7/12/2018 m. (lines e + k)/1000 x (line I) = F1493.57626 REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACI LIT 1. structure ID: line m= 1 1493.57626 2. structure ID: line m = 3. structure ID: line m = 4. structure ID: line m = 5. structure ID: line m = 6. structure ID: line m = n. lines1+2+3+4+5+6 1 1493.57626 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII o. tract # p. field # q. crop r. acres s. PAN balang t. total PAN u. application (lb/acre) cnlumn r x s windnw State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 7591 1493.57626 F- 7591 -6097.4237 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAf based on new information. If new fields are to be included as an option for lowering lagoon level, add the! fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels ; receiving facility. NARRATIVE: Hurricane Florence This report was delayed due to widespread flooding and power outages. PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 10/1/2018 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES ity THIRTY (30) DAY DRAW DOWN PERIOD iiversity ERATIVE MON 'eople • Providing Solutions inches inches inches ft2 gallons days W W W W gallons Ib/1000 gal lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN total lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD and se at the