HomeMy WebLinkAbout400131_Plan of Action_20180917PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD State Universi
NCA&T State Un
COOPI
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTEP
Empowering 8
1. Structure Name/Identifier (ID): Piney Bottom Date: 8/13/2018
40-161
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker 10
b. Designed 25 yr/24 hr. storm &structural freeboard 19
c. Line b - line a (inches in red zone) 9
d. Top of dike surface area according to design 151079
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft3) 847553.2
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design 180
g. Volume of waste produced according to design 123709
h. Actual waste produced
(current herd #/certified herd #) x line g 0
current herd: 0 certified herdF 4310
i. Volume of wash water according to structural design 0
j. Excess rainfall over evaporation according to design 88129
k. (line h + line i +line j) x 7.48 x (30 days/line f) = 1 109867.487
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated 1.56
MM/DD/YYYY 7/12/2018
m. (lines e + k)/1000 x (line I) = F1493.57626
REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACI LIT
1.
structure ID:
line m=
1 1493.57626
2.
structure ID:
line m =
3.
structure ID:
line m =
4.
structure ID:
line m =
5.
structure ID:
line m =
6.
structure ID:
line m =
n.
lines1+2+3+4+5+6
1 1493.57626
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII
o. tract # p. field # q. crop r. acres s. PAN balang t. total PAN u. application
(lb/acre) cnlumn r x s windnw
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
7591
1493.57626
F- 7591
-6097.4237
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAf
based on new information. If new fields are to be included as an option for lowering lagoon level, add the!
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility provide information regarding the herd population and lagoon freeboard levels ;
receiving facility.
NARRATIVE:
Hurricane Florence
This report was delayed due to widespread flooding and power outages.
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 10/1/2018
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
ity THIRTY (30) DAY DRAW DOWN PERIOD
iiversity
ERATIVE
MON
'eople • Providing Solutions
inches
inches
inches
ft2
gallons
days
W
W
W
W
gallons
Ib/1000 gal
lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
total lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
and
se
at the