Loading...
HomeMy WebLinkAbout400150_SR.POA.12.31.18_20181231PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State University A&T State Univers NCCOOPES I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENS Empowering Peoph 1. Structure Name/Identifier (ID): Sandy Ridge Date: 12/31/2018 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker 16 inches b. Designed 25 yr/24 hr. storm &structural freeboard 19 inches c. Line b - line a (inches in red zone) 31 inches d. Top of dike surface area according to design 182400 ftZ (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft3) 341088.0 1 gallons 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural del 180 1 days g. Volume of waste produced according to design 1 242116 ft3 h. Actual waste produced= (current herd #/certified herd #) x line g 25276.0005 ft3 current herd: 900 certified herdF 8621 i. Volume of wash water according to structural desigq 0 ft3 j. Excess rainfall over evaporation according to design 106400 ft3 k. (line h + line i +line j) x 7.48 x (30 days/line f) = 164156.081 gallons 4. Total PAN to be land applied during draw down period I. Current waste analysis dated 1.39 Ib/1000 gal MM/DD/YYYY 9/26/2018 m. (lines e + k)/1000 x (line I) = F702.289272 lb PAN REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACI LIT 1. structure ID: line m= I 702.289272 Ib PAN 2. structure ID: line m= ilb PAN 3. structure ID: line m= ilb PAN 4. structure ID: line m= ilb PAN 5. structure ID: line m= ilb PAN 6. structure ID: line m= ilb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 702.289272 1 total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII o. tract # p. field # q. crop r. acres s. PAN balang t. total PAN u. application (lb/acre) cnlumn r x s windnw 2084 1 A SG 31.38 79 24791 Mar -Oct 2084 E SG 2.43 100 243 mar -Oct 3170 D SG 21.8 100 2180 mar -Oct 3552 F SG 2.8 100 280 mar -Oct 3552 G Fescue 5.5 216 1188 AUG-JULY 3552 H Fescue 1.7 120 204 AUG-JULY 877 B SG 12.7 64 812 mar -Oct 877 C ISG 3.041 1001 304 mar -Oct State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) 7690 IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) 702.289272 X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) 7690 Y. OVERALL PAN BALANCE (W-X)-6987.7107 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 12/31/2018 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES ,sty THIRTY (30) DAY DRAW DOWN PERIOD UTIVE iION e • Providing Solutions PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD