HomeMy WebLinkAbout400150_SR.POA.12.31.18_20181231PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD State University
A&T State Univers
NCCOOPES
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENS
Empowering Peoph
1. Structure Name/Identifier (ID): Sandy Ridge Date: 12/31/2018
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker 16 inches
b. Designed 25 yr/24 hr. storm &structural freeboard 19 inches
c. Line b - line a (inches in red zone) 31 inches
d. Top of dike surface area according to design 182400 ftZ
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft3) 341088.0 1 gallons
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural del 180 1 days
g. Volume of waste produced according to design 1 242116 ft3
h. Actual waste produced=
(current herd #/certified herd #) x line g 25276.0005 ft3
current herd: 900 certified herdF 8621
i. Volume of wash water according to structural desigq 0 ft3
j. Excess rainfall over evaporation according to design 106400 ft3
k. (line h + line i +line j) x 7.48 x (30 days/line f) = 164156.081 gallons
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated 1.39 Ib/1000 gal
MM/DD/YYYY 9/26/2018
m. (lines e + k)/1000 x (line I) = F702.289272 lb PAN
REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACI LIT
1.
structure ID:
line m=
I 702.289272 Ib PAN
2.
structure ID:
line m=
ilb PAN
3.
structure ID:
line m=
ilb PAN
4.
structure ID:
line m=
ilb PAN
5.
structure ID:
line m=
ilb PAN
6.
structure ID:
line m=
ilb PAN
n.
lines 1 + 2 + 3 + 4 + 5 + 6 =
702.289272 1 total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII
o. tract # p. field # q. crop r. acres s. PAN balang t. total PAN u. application
(lb/acre) cnlumn r x s windnw
2084
1 A
SG
31.38
79
24791
Mar -Oct
2084
E
SG
2.43
100
243
mar -Oct
3170
D
SG
21.8
100
2180
mar -Oct
3552
F
SG
2.8
100
280
mar -Oct
3552
G
Fescue
5.5
216
1188
AUG-JULY
3552
H
Fescue
1.7
120
204
AUG-JULY
877
B
SG
12.7
64
812
mar -Oct
877
C
ISG
3.041
1001
304
mar -Oct
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) 7690
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) 702.289272
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) 7690
Y. OVERALL PAN BALANCE (W-X)-6987.7107
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility
provide information regarding the herd population and lagoon freeboard levels at the receiving
facility.
NARRATIVE:
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 12/31/2018
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
,sty
THIRTY (30) DAY DRAW DOWN PERIOD
UTIVE
iION
e • Providing Solutions
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD