HomeMy WebLinkAbout400131_Plan of Action_20181231PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD State University
A&T State University
NL COOPERATIVE
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION
Empowering People • Providing Solutions
1. Structure Name/Identifier (ID): Red Hill Date: 12.31.18
40-131
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker
b. Designed 25 yr/24 hr. storm & structural freeboard
c. Line b - line a (inches in red zone)
d. Top of dike surface area according to design
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft3)
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design
g. Volume of waste produced according to design
16 inches
20 inches
4 inches
112125 ftZ
279565.0 gallons
180 days
121058 ft3
h. Actual waste produced=
(current herd #/certified herd #) x line g 125310.855 ft3
current herd: 3801 certified herdF 3672
i. Volume of wash water according to structural design 0 ft3
j. Excess rainfall over evaporation according to design
k. (line h + line i +line j) x 7.48 x (30 days/line f) _
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated
MM/DD/YYYY 9/26/2018
m. (lines e + k)/1000 x (line I) _
REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE
65406 ft3
237760.3451 gallons
1.39 Ib/1000 gal
719.08223 lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
structure ID:
line m=
I 719.08223 Ib PAN
2.
structure ID:
line m=
ilb PAN
3.
structure ID:
line m=
ilb PAN
4.
structure ID:
line m=
ilb PAN
5.
structure ID:
line m=
ilb PAN
6.
structure ID:
line m=
ilb PAN
n.
lines 1 + 2 + 3 + 4 + 5 + 6
1 719.08223 total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application
(lb/acre) cnlumn r x s windnw
3379
RHA
SG hay
16.35
49.4
807
Oct -May
3379
RH D
fescue
4.7
173
813
Aug -July
3379
RHE
fescue
5.3
173
916
Aug -July
3379
RHC
SG Hay
17.81
51.9
924
Sept -Apr
3379
RH B
SG Hay
20.31
42
853
sept-Apr
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
4313
719.08223
4313
-3593.9178
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new
PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add
these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be
hauled to another permitted facility provide information regarding the herd population and lagoon
freeboard levels at the receiving facility.
NARRATIVE:
Cr
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 12/31/2018
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD