Loading...
HomeMy WebLinkAboutSW1180402_Calcs_201903071.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Highlighted Storm is Design Storm 32.50 acres 1.11 acres 0.00 acres 60% 0.00 acres Complete the breakdown of impervious area for the project No 2-yr, 24-hr Storm Event 10-yr, 24-hr 25-yr, 24-hr(Minimum Design Storm = P90 for non-SA, 1-yr, 24-hr for SA) Loaded Rainfall: 0 0 Entire Site Total Impervious Area Project % impervious area ALL AREAS ARE IN SQUARE FEET 100-yr, 24-hr PROJECT INFORMATION RAINFALL & CALCULATION DATA Rainfall Source: Project County: Project City: MADISON Mars Hill Asheville Design Storm: Asheville 1-yr, 24-hr Jo Ellen Ammons Fieldhouse for Mars Hill University Mars Hill, NC MADISON County French Broad River Basin Depth (inches) First Flush / WQV First Flush / WQV P90 P95 50-yr, 24-hr Total Property Area Total Coastal Wetlands Area Total Surface Water Area Gabriel Creek C Use Worksheet Data? Total Drainage Area On-Site Drainage Area (sf) 6-96-12 81,116 81,116 Proposed Impervious Area (sf) % Impervious Area (total) 0 48,287 60% On-Site Buildings/Lots (sf) On-Site Streets (sf) 11,715 0 Other On-Site (sf) 17,535 12,197 0 On-Site Parking (sf) On-Site Sidewalks (sf) Future (sf) Off-site (sf) Existing BUA (sf) 48,287Total 6,840 Impervious Surface Area Offsite Drainage Area (sf) Stream Index Number Stream Class Receiving Stream name Basin Information Entire Site NOTE: Please use the Storm-EZ calculation sheets to document the stormwater design and create the O&M Agreement. Discrete SCS Method, Pre - PostCalculation Method STORM-EZ Version 1.4 Project Data 1/14/2019 Page 5 of 13 1 of 1 Pre-Development Land Use: HSG CN % A 39 76.17% A 98 23.83% Note: Enter BUA Draining to Permeable Pavement Below HSG 0.00 0.00% 1.86 23.83% Existing Permeable Pavement (Infiltration): Pavement Area Additional BUA Soil Infiltratio n Rate Gravel Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf) (sf) (in/hr) (%) (in) (in) (in) 100 DSD PAW Dgr (in) (%) (in) (sf) (acres) 150 1.00 0.00 1.86 acres 0.00 acres 0.00 acres 0.00 acres 0.00 acres 1.86 acres Pre-Development SCMs: Imp. Open (sf) (sf) (cf) HSG 19327 61789 200 Rainfall Volume =1.86 cf Natural Infiltration & ET =-1.51 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =0.00 cf Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =0.00 cf Total Runoff Reduction =-1.51 cf Treated SCM Outflow =0.00 cf Untreated Surface Runoff =0.35 cf 81,116 0 0 -5,486 -5,486 0 0 0 SCM Treatment: acre-inches =1,274 The Pre-Development project area contains 19327 sf of built upon area, resulting in an overall density of 23.83%. 0 acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = BUA % SCM # SCM # From Land Use Tables: 81,116 Preserved Surface Waters & Non-Coastal Wetlands : Runoff Reduction Components: acre-inches = 6,760acre-inches = acre-inches = Design Storm Runoff Fate Summary: 81,116 Subtotal: Jo Ellen Ammons Fieldhouse for Mars Hill University (acres) 0.44Impervious Pasture or Open Space 61,789 19,327 Mars Hill, NC MADISON County French Broad River Basin PRE-DEVELOPMENT LAND USE CALCULATIONS Drainage Area # (sf)Land-use 1.42 Area User Defined Drainage Areas:Comp. CNDescription Area (ac.)Area (sf.) Subtotal: Area (sf.) WQ Volume Provided % Imp Drainage Area 81,116 1.86 0 Downstream SCM Description Total Site Area: Land Use Summary: Description Preserved Coastal Wetlands : NotesSCM # Area DS SCM # Has Synthetic Liner? Permeable Pavement + Additional BUA: Green Roofs : 0 Existing Green Roofs: HSG SCM Type D.S. BMP STORM-EZ Version 1.4 Pre-Development 1/14/2019 Page 6 of 13 1 of 1 Permeable Pavement: Infiltration Rate Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf) (acres) (sf) (acres) (in/hr) (%) (in) (in) (in) 500 0.00 0.00 No DSD PAW Dgr (in) (%) (in) (sf) (acres) 600 1.00 0.00 No Residential Lot CN Calculator (Excluding R/W and dedicated open spaces): Max Imp / Lot Woods / Lot (ac.) (sf) (sf) 0.00 Remaining Land Use: HSG CN (sf) (acres) % A 39.0 32,829 0.75 40.47% A 98.0 48,287 1.11 59.53% N/A 0 0.00 0.00% N/A 0 0.00 0.00% 81,116 1.86 100.00% Land Excluded, or Partially Excluded, from Volume Calculations:(sf.) (ac.) 00.00 00.00 81,116 1.86 Rainfall Volume =1.86 cf Natural Infiltration & ET =-0.99 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =-0.59 cf Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =0.00 cf Total Runoff Reduction =-1.57 cf Treated SCM Outflow =0.00 cf Untreated Surface Runoff =0.29 cf Pre-Development Runoff =0.35 cf Difference =-0.06 cf CommentsRetrofit? Drainage Area # Down- stream SCM Additional BUA SCM # Downstream SCM # HSG Avg Lot Size Pavement Area % Imp.(sf.) Permeable Pavement + BUA: Sub-Total: Green Roofs: # of Lots Land-Use Impervious Lot Area Open Space (Managed Open Space) Total Site Area: Surface Waters & Non-Coastal Wetlands : Green Roofs : Coastal Wetlands : acre-inches = -2,132 0 -5,709 Jo Ellen Ammons Fieldhouse for Mars Hill University Mars Hill, NC MADISON County French Broad River Basin Detention Check Has Synthetic Liner? Infiltration Check POST-DEVELOPMENT LAND USE CALCULATIONS Pvmt Type SCM # Area Runoff Reduction Components: Design Storm Runoff Fate Summary: acre-inches = acre-inches = acre-inches = acre-inches = -3,577 acre-inches = 0 acre-inches = 0 acre-inches =0 acre-inches = 0 SCM Treatment: 1,051 acre-inches =-223 acre-inches =1,274 The Post-Development project area contains 48287 sf of built upon area, resulting in an overall density of 59.53%. Area Open Space / Lot (sf) 6,760 acre-inches = STORM-EZ Version 1.4 Post Development 1/14/2019 Page 7 of 13 1 of 1 Impervious (sf) 48,287 (cf) (cf) (cf) (cf) (cf) (cf) 700 Bio. Cell Bioretention w/ IWS A 32,345 67% 74%1125 2132 2132 2132 0 0 100% Rainfall Volume =1.86 acre-inches =cf Natural Infiltration & ET =-0.99 acre-inches = cf Disconnected Impervious Area =0.00 acre-inches = cf SCM Infiltration =-0.59 acre-inches = cf Permeable Pavement Infiltration =0.00 acre-inches = cf Green Roof ET =0.00 acre-inches = cf Post Filtration Discharge =0.00 acre-inches = cf Total Runoff Reduction =-1.57 acre-inches =cf SCM Treatment: Treated SCM Outflow =0.00 acre-inches =cf Untreated Surface Runoff =0.29 acre-inches =cf 0.35 acre-inches =cf -0.06 acre-inches =cf STORMWATER CONTROL MEASURES % of SCM Volume Utilized Post Filtration Outflow Treated Outflow Type of Device SCM # Name / Location Contributing Area HSG 24,283 % of Total Impervious Area % of Total Pervious Area Storage Volume Offsite Impervious Area Treated Infiltration & ET 0 sf Total Inflow Volume Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional volume provided in devices should not be entered in this worksheet. Drawdown time requirement applies to all storm events. Drainage Area # PROPOSED SIPs & STRUCTURAL RUNOFF VOLUME CONTROLS Jo Ellen Ammons Fieldhouse for Mars Hill University Mars Hill, NC MADISON County French Broad River Basin 0 24283 sf open space entered compared to 32829 sf total open space. Pervious (sf) 32,829 1,274 Warnings: Design Storm Runoff Fate Summary: The Post-Development project area contains 48287 sf of built upon area, resulting in an overall density of 59.53%. 0 0 **VOLUME MATCHING ACHIEVED** Difference = Pre-Development Runoff = 0 1,051 67% of total impervious area. 74% of total pervious area. Runoff Reduction Components: -3,577 32345 sf impervious area entered compared to 48287 sf total impervious. Down- stream SCM # Drainage Area Inflow Volume -223 -5,709 -2,132 0 6,760 STORM-EZ Version 1.4 Stormwater Controls 1/14/2019 Page 8 of 13 1 of 1 Compliance Storm = First Flush Storm - Rainfall Depth = 1 inch Drainage Area # FATE OF RAINFALL Select Storm: The"Fate of Rainfall" charts display the hydrologic processes to which rainfall volumes are subjected based on the combinations of land use, soil type, and stormwater controls entered by the user. The charts are designed to display the stormwater plan in a form which illustrates changes to the hydrologic cycle which result from urbanization and various stormwater management strategies. Mars Hill, NC MADISON County French Broad River Basin First Flush Jo Ellen Ammons Fieldhouse for Mars Hill University First Flush Storm - Rainfall Depth = 1 inch VOLUME MATCHING SCALE Volume Matching Threshold Basic Treatment Threshold BASIC TREATMENT SCALE 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Infiltration and ET ‐ 5709 cf Treated Outflow from BMPs ‐ 0 cf Untreated Surface Runoff ‐ 1051 cf% of Total Rainfall VolumePost Development Fates Post Filtration Outflow ‐ 0 cf Other Infiltration by BMPs ‐ 2132 cf Permeable Pavement Infiltration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Green Roof Evapotranspiration ‐ 0 cf Infiltration and ET ‐ 3577 cf 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Infiltration and ET ‐ 5486 cf Treated Outflow from BMPs ‐ 0 cf Untreated Surface Runoff ‐ 1274 cf% of Total Rainfall VolumePre Development Fates Infiltration and ET ‐ 5486 cf Green Roof Evapotranspiration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Permeable Pavement Infiltration ‐ 0 cf Infiltration by BMPs ‐ 0 cf Other Post Filtration Outflow ‐ 0 cf FATE OF RAINFALL GRAPHS STORM-EZ Version 1.4 Rainfall Fate Graph 1/14/2019 Page 9 of 13 1 of 1 TIME OF CONCENTRATION CALCULATIONS: Pre-Development Length (ft) Slope (ft/ft)Tt (hrs) 400 0.015 0.06 Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow: Channel Flow: Pre-development Tc =5.00 min (Minimum 5 minutes) Post Development Length (ft) Slope (ft/ft)Tt (hrs) 60 0.015 0.02 Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow:380 0.01 0.012 1.5 0.01 Channel Flow: Post-development Tc =5.00 min (Minimum 5 minutes) ADJUSTED CURVE NUMBER CALCULATIONS: Pre-Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Q*(in) =0.19 0.28 0.39 0.47 0.58 0.87 1.09 1.30 1.53 CNadj =86 82 77 74 71 64 61 60 58 Post Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.39 1.88 2.22 2.66 3.79 4.48 5.03 5.58 Q*(in) =0.16 0.38 0.67 0.87 1.13 1.81 2.25 2.62 3.00 CNadj =84 85 84 83 82 79 78 77 76 PEAK FLOW CALCULATIONS: F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Pre-Development Q* (in) 0.19 0.28 0.39 0.47 0.58 0.87 1.09 1.30 1.53 qu (csm/in)809.52 931.69 931.69 931.69 931.69 931.69 931.69 931.69 931.69 Q (cfs) 0.44 0.76 1.07 1.29 1.57 2.35 2.96 3.52 4.14 Post Development Q* (in) 0.16 0.38 0.67 0.87 1.13 1.81 2.25 2.62 3.00 qu (csm/in)666.59 931.69 931.69 1165.98 1165.98 1165.98 1165.98 1165.98 1165.98 Q (cfs) 0.30 1.03 1.81 2.95 3.83 6.14 7.65 8.89 10.17 -31.8% 35.5% 69.2% 128.7% 144.3% 161.3% 158.0% 152.4% 145.9% Analysis Area = 1.86 Acres (0.003 sq. miles) Sheet Flow: Shallow Flow: Sheet Flow: Shallow Flow: Wetted Perimeter (ft) 2.4 Sheet Flow: Shallow Flow: **Note: To decrease Post-development peak flows - increase storage volume being drawdown or infiltrated or lengthen post- development time of concentration. See LID HELP for more information. Wetted Perimeter (ft) Sheet Flow: Paved or Bare Soil Surface Cover Analysis Area = 1.86 Acres (0.003 sq. miles) Jo Ellen Ammons Fieldhouse for Mars Hill University Mars Hill, NC MADISON County Shallow Flow: Drainage Area # Surface Cover Unpaved French Broad River Basin ADDITIONAL CALCULATIONS STORM-EZ Version 1.4 Peak Flow Calcs 1/14/2019 Page 10 of 13 BIORETENTION CELL1Drainage area numberEntire SiteTotal coastal wetlands area (sq ft)N/A - Parking / driveway (sq ft)17535 sfTotal surface water area (sq ft)N/A - Sidewalk (sq ft)12197 sfTotal drainage area (sq ft)81116 sf - Roof (sq ft)11715 sfBUA associated with existing development (sq ft) 193277 sf - Roadway (sq ft) sfProposed new BUA (sq ft)48287 sf - Other, please specify in the comment box below (sq ft) 6840 sfPercent BUA of drainage area59.5 percentTotal BUA (sq ft)48287 sfDesign rainfall depth (in)1.0 inMinimum volume required (cu ft)-Design volume of SCM (cu ft)1125 cf#1 Is the SCM sized to treat the SW from all surfaces at build-out? Yes#7 If applicable, with the SCM be cleaned out after construction?Yes#2 Is the SCM located on or near contaminated soils? No#8 Does the mainetenance access comply with General MDC (8)?Yes#3 What are the side slopes of the SCM (H:V)? 3:1#9 Does the drainage easement comply with General MDC (9)?No#3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No#10 If the SCM is on a single family lot, does the plat comply with General MDC (10)?#4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes#11 Is there an O&M Agreement that complies with General MDC (11)?Yes#5 Is there a a bypass for flows in excess of the design flow?Yes#12 Is there an O&M Plan that complies with General MDC (12)?Yes#6 What is the method for dewatering the SCM for maintenance?Other#13 Was the SCM designed by an NC licensed professional?Yes#1 SHWT elevation (fmsl)< 2220.5 ft. #6 Percentage of medium to coarse washed sand by volume 75-85%#1 Bottom of the bioretention cell (fmsl) 2225.32 ft. #6 Percentage of fines (silt and clay) by volume 8-15%#1 Distance from bottom to SHWT (feet) > 2 ft. #6 Percentage of organic matter by volume 5-10%#2 Surface area of the bioretention cell (square feet) 1930 sf#6 Type of organic materialPine bark fines#2 Design volume of the bioretention cell (cubic feet) 1125 cf#7 Phosphorus Index (P-Index) of media (unitless) <50#2 Ponding depth of the design storm (inches) 7 in#8 Will compaction be avoided during construction?Yes#3 Is the bioretention cell used for peak attenuation? No#9 Will cell be maintained to a one inch/hour standard? Yes#3 Depth of peak attenuation over planting surface (in)7 in #10 Describe the planting plan:#3 Height of peak attenuation outlet above the planting surface (in)7 in#4 Infiltration rate of the in situ soil (inch/hour)See Note Below#4 Diameter of the underdrain pipes (if applicable)6 in#4 Does the design include Internal Water Storage (IWS)? Yes #11 Depth of mulch, if applicable (inches) N/A#4 if so, elevation of the top of the IWS (fmsl) 2227 ft #11 Type of mulch, if applicableN/A#4 Elevation of the planting surface (fmsl) 2228.5 ft #12 How many clean out pipes are being installed? 2#5 Will the cell contain trees and shrubs? No#12 Briefly describe the pretreatment that will be used:#5 Media depth (inches)30 inTHE DRAINAGE AREABIORETENTION CELL MDC FROM 02H .1052Per the USGS Soil Survey the in-situ soils are categorized as somewhat excessively drained and hydrologic soil group A.Break down of BUA in the drainage area (both new and existing):COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAMStormwater program(s) that apply (please specify):NCDEQ Phase II MSI or UA Post Construction StormwaterGENERAL MDC FROM 02H .1050ADDITIONAL INFORMATIONPlease use this space to provide any additional information about this bioretention cell that you think is relevant to the review:The bioretention cell will be soded with a non-clumping, deep rooted species that are NOT grown from a soil with an impenetrable layer (like clay).No pretreatment devices were designed as part of this bioretention cellJo Ellen Ammons Fieldhouse at Mars Hill UniversityBioretention210:59 AM 1/14/2019 2 inches per hour q = K * dH/L 2 = K = hydraulic conductivity of media (inch per hour) 3 = dH = change in head (height of water) (ft) q = 2.4 inch per hour per unit area 2.5 = L = thickness of soil layer (ft) Q = q * A/12 inches per foot/3600 seconds Q = flow rate (cfs) 1930 = A = surface area Q = 0.107222 D = 16 * (Q * n / (s^0.5))^(3/8) D =  diameter of pipes (inches) D = 6.512183 0.536111 = Q = flow rate w/ 5x safety factor (cfs) 0.012 = n = manning coefficient 0.005 = s = slope of pipe (assume 0.5%) Number of 6" Pipes Required in the Underdrain per NCDEQ Stormwater Design Manual = 2 reference:https://files.nc.gov/ncdeq/Energy%20Mineral%20and%20Land%20Resources/Stormwater/BMP%20Manual/A‐5%20%20Common%20Structures%20and%20Materials.pdf Infiltration Rate of Media (1‐6 inches per hour required, 1‐2 inches per hour preferred) User Input Data Calculated Value Reference Data Designed By:ZPR Date:1.10.2019 Checked By:CB Date:1.10.2019 Company:McGill Associates Project Name:MHU Fieldhouse Project No.:16.00164 Site Location (City/Town)Mars Hill, NC Rip Rap I.D.Pipe #2 outlet Total Drainage Area (acres)- Rational Method for Flow Outlet pipe diameter, Do (in.)6 Tailwater depth (in.)6 Minimum/Maximum tailwater?Max TW (Fig. 8.06b) Discharge (cfs)1.4 Velocity (ft./s)7.85 Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.)-0.25 Minimum apron length, La (ft.)-3 Apron width at pipe outlet (ft.)-1.5 Apron shape - trapezoid Apron width at outlet end (ft.)-3.5 Minimum TW Maximum TW Max Stone Diameter, dmax (ft.)- 0.375 Minimum TW Maximum TW Apron Thickness(ft.)- 0.5625 User Input Data Calculated Value Reference Data Designed By:ZPR Date:1.10.2019 Checked By:CB Date:1.10.2019 Company:McGill Associates Project Name:MHU Fieldhouse Project No.:16.00164 Site Location (City/Town)Mars Hill, NC Rip Rap I.D.Pipe #3 outlet Total Drainage Area (acres)- Rational Method for Flow Outlet pipe diameter, Do (in.)12 Tailwater depth (in.)6 Minimum/Maximum tailwater?Max TW (Fig. 8.06b) Discharge (cfs)3.1 Velocity (ft./s)5.3 Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.)-0.25 Minimum apron length, La (ft.)-6 Apron width at pipe outlet (ft.)-3 Apron shape - trapezoid Apron width at outlet end (ft.)-7 Minimum TW Maximum TW Max Stone Diameter, dmax (ft.)- 0.375 Minimum TW Maximum TW Apron Thickness(ft.)- 0.5625 Return to Main Worksheet Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<0.5 diameter) Return to Main Worksheet Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter)