Loading...
HomeMy WebLinkAboutRaleigh Regional Office - 72175082 Complete Farmville Library Geotech ReportGeotechnical Engineering Report Farmville Library 4276 West Church Street Farmville, North Carolina October 17, 2017 Project No. 72175082 Prepared for: Town of Farmville Farmville, North Carolina Prepared by: Terracon Consultants, Inc. Winterville, North Carolina Terracon Consultants, Inc. 314 Beacon Drive Winterville, North Carolina 28590 P [252] 353 1600 F [252] 353 0002 Terracon.com NC Registration Number F-0869 Terracon Consultants, Inc.314 Beacon Drive Winterville,North Carolina 28590 P [252] 353 1600 F [252] 353 0002 Terracon.com NC Registration Number F-0869 October 17, 2017 Town of Farmville 3672 North Main Street Farmville, North Carolina 27828 Attn:Mr. David Hodgkins, ICMA-CM Town Manager Re: Geotechnical Engineering Report Farmville Library 4276 West Church Street Farmville, North Carolina Terracon Project No. 72175082 Dear Mr. Hodgkins: Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. This study was performed in general accordance with our proposal P72177082 dated September 15, 2017. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs and pavements for the proposed building expansions. We appreciate the opportunity to be of service to you on this project. Materials testing services are provided by Terracon. We would be pleased to discuss these services with you. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Carl F. Bonner, P.E.Philip C Lambe, P.E. Principal / Office Manager Senior Geotechnical Engineer Registered NC 16252 Enclosures Responsive ■Resourceful ■Reliable TABLE OF CONTENTS Page EXECUTIVE SUMMARY ....................................................................................................................... i INTRODUCTION ...................................................................................................................... 1 PROJECT INFORMATION ...................................................................................................... 1 2.1 Project Description ...............................................................................................1 2.2 Site Location and Description...............................................................................2 SUBSURFACE CONDITIONS................................................................................................. 2 3.1 Typical Profile ......................................................................................................2 3.2 Groundwater ........................................................................................................3 3.3 Site Geology ........................................................................................................3 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ........................................... 3 4.1 Geotechnical Considerations ...............................................................................3 4.2 Earthwork.............................................................................................................5 Compaction and Material Requirements ...................................................5 Grading, Slopes, and Drainage ................................................................6 Construction Considerations.....................................................................6 4.3 Foundation Recommendations ............................................................................7 Shallow Foundations ................................................................................7 Construction Considerations.....................................................................8 4.4 Seismic Considerations........................................................................................8 4.5 Floor Slabs...........................................................................................................9 Design Recommendations........................................................................9 Construction Considerations.....................................................................9 GENERAL COMMENTS .......................................................................................................... 9 APPENDIX A – FIELD EXPLORATION Exhibit A-1 Site Location Plan Exhibit A-2 Boring Location Plan Exhibit A-3 Field Exploration Description Exhibits A-4 thru A-9 Boring Logs APPENDIX B – LABORATORY TESTING Exhibit B-1 Laboratory Testing Explanation Exhibits B-2 thru B-3 Soils Laboratory Results APPENDIX C – SUPPORTING DOCUMENTS Exhibit C-1 General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 Sanborn Maps Exhibit C-4 Storm Sewer Replacement Responsive ■Resourceful ■Reliable i EXECUTIVE SUMMARY The following items represent a brief summary of the findings of our subsurface exploration, our conclusions and recommendations for the proposed library building to be located at 4276 West Church Street in Farmville, North Carolina. Four borings and two hand auger borings were performed to depths of approximately 3 to 20 feet below the existing ground surface. Two additional hand auger borings were performed diagonally under the footings of the 1954 portion of the existing library. n The project included evaluating the observed distress of the existing building, brick veneer, floor slabs and foundations for potential building addition that will adjoin the southeast side of the existing building. The new library building, or building addition, will be two story, with shallow foundations and a concrete slab on grade. n At the time of our site exploration, the site was developed with the existing library and a paved parking lot. n Fill with debris and native deposits of clayey sand, lean clay, fat clay and poorly graded sand were encountered in the borings. n Based on the condition of the existing library, the history of the site and the soils encountered under the existing footings, trying to rehabilitate the existing building would likely be cost prohibitive. Rehabilitation could include foundation underpinning and jacking/straightening the walls, leveling the floor slabs using pressure grouting, repointing the brick veneer and patching the interior wall cracking. Additional structural evaluation would be required prior to preparing rehabilitation plans. n Support of footings, floor slabs, and pavements on or above existing fill soils is discussed in this report. However, even with the recommended construction testing services, there is an inherent risk for the owner that compressible fill or unsuitable material within or buried by the fill will not be discovered. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill, but can be reduced by performing additional testing and evaluation. n We recommend supporting the proposed building on shallow foundations after excavating and replacing the existing uncontrolled fill and unsuitable soils under the building footprint. Shallow foundations are expected to bear on new engineered fill compacted as recommended. Foundations bearing on these suitable materials could be designed using a maximum net allowable soil bearing pressure of 2,000 psf. n The surficial clayey sands and lean clays are moisture sensitive and will be difficult to work when wet. Performing earthwork operations during warmer periods of the year (May through October) will reduce the potential for problems associated with unstable subgrades. Site drying Responsive ■Resourceful ■Reliable ii conditions are typically enhanced when it is warm. The moisture sensitivity of the on-site soils does not preclude performing earthwork at other times of the year, but does lead to an increased potential for having to perform over-excavation and replacement or some other form of remedial work. n An IBC seismic site classification of “D” is appropriate for this site. n We recommend Terracon be retained to observe and test the foundation bearing materials as well as other construction materials at the site. This summary should be used in conjunction with the entire report for design purposes. Details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of report limitations. Responsive ■Resourceful ■Reliable 1 GEOTECHNICAL ENGINEERING REPORT FARMVILLE LIBRARY FARMVILLE, NORTH CAROLINA Terracon Project No. 72175082 October 17, 2017 INTRODUCTION We have completed the geotechnical engineering report for the proposed building located at 4276 West Church Street in Farmville, North Carolina. Four borings and two hand auger borings were performed to depths of approximately 3 to 20 feet below the existing ground surface. Two additional hand auger borings were performed diagonally under the footings of the 1954 portion of the existing library. Logs of the borings along with a site location plan and a boring location plan are included in Appendix A of this report. The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: n subsurface soil conditions n foundation design and construction n groundwater conditions n seismic considerations n earthwork n pavements n floor slab design and construction PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site Location See Appendix A, Exhibit A-1, Site Location Plan Site layout See Appendix A, Exhibit A-2, Boring Location Plan Site Coordinates Latitude: 35.59697°Longitude: -77.58725° Structures The project includes evaluating the condition of the existing building and foundations for a potential building addition that will adjoin the southeast side of the existing building. The new library building, or building addition, will be two story, with shallow foundations and a concrete slab on grade. Building Construction Steel framed with a concrete slab on grade on shallow foundations. Maximum loads Columns: Up to 50 kips (assumed) Walls: Up to 3 kips per linear foot (assumed) Floor: 100 psf (assumed) Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 2 ITEM DESCRIPTION Finished floor elevation Not provided, assumed to match existing. Maximum Allowable Settlement Up to 1 inch total and up to ¾-inch differential along 40 feet of wall (assumed) Grading Less than 2 feet of fill (assumed) 2.2 Site Location and Description ITEM DESCRIPTION Location The library will be located at 4276 West Church Street in Farmville, North Carolina. Existing improvements The site is developed with an existing building and parking lots. The existing library was built in two phases, an initial building constructed in 1954 and a building addition in 1996. The 1954 portion of the building displayed evidence of foundation settlement. Current ground cover Paved parking where not developed with the existing library building. Existing topography Relatively level. SUBSURFACE CONDITIONS 3.1 Typical Profile Based on the results of the borings, subsurface conditions on the project site can be generalized as follows: Description Approximate Depth to Bottom of Stratum (feet)Material Encountered Consistency/Density Surface 0.75 to 1 Grass/Topsoil/Rootmat or asphalt and stone base N/A Stratum 1 13 Clayey Sand (SC), Lean Clay (CL) and Fat Clay (CH) Very Loose to Loose (Sand) Soft to Medium Stiff (Clay) Stratum 2 20 Poorly Graded Sand with Silt (SP-SM) and Silty Sand (SM) Loose to Medium Dense Laboratory tests for water content, Atterberg limits, and grain size were conducted on selected soil samples. The test results are presented on the boring logs and in the Appendix B of this report. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 3 Conditions encountered at the boring locations are indicated on the boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. For a comprehensive description of the conditions encountered in the borings, refer to the boring logs in Appendix A of this report. 3.2 Groundwater A mixture of water and “drilling mud” was used to advance the borings. The fluid used in this process can obscure the measurements of groundwater levels. However, after a period of time the fluid typically stabilizes at a depth near the groundwater level. The boreholes were observed while drilling and after completion for the presence and level of groundwater. Groundwater levels were observed at a depth of approximately 8 feet below the ground surface during drilling. Groundwater was encountered at a depth of approximately 3 to 4 feet in our hand auger borings. The moisture condition of the soil samples supported the groundwater levels of 3 to 4 feet below the ground surface. The groundwater level can change due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 3.3 Site Geology The subject site is located in the Coastal Plain Physiographic Province. The Coastal Plain soils consist mainly of marine sediments that were deposited during successive periods of fluctuating sea level and moving shoreline. The soils include sands, silts, and clays with irregular deposits of shells, which are typical of those lain down in a shallow sloping sea bottom. Recent alluvial sands, silts, and clays are typically present near rivers and creeks. According to the 1985 Geologic Map of North Carolina, the site is mapped within the Yorktown and Duplin Formation, Undivided. RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations In order to evaluate potential cause(s) of the observed building distress on the existing library, we performed hand auger borings, did research on the building and site history and interviewed persons knowledgeable about the site. Hand auger borings advanced diagonally under the footings on the east and west sides of the 1954 portion of the existing library building encountered brick fragments and wet, soft clayey soils. Hand auger boring HA-1, at the southwest corner of the building, encountered gravel fill. Hand auger boring HA-2, on the west side of the building also encountered wet, clayey soils. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 4 Historical research included interviews of library personnel, local civil engineers, construction firms and a review of historical Sanborn maps. We understand that the library was constructed in the footprint of former structures that included a building and a storm sewer system. The site was developed prior to 1915, shown to be developed through at least 1929, undeveloped in 1945 and developed with the library in 1955. A storm sewer, that extended parallel to the western property line and Walnut Street, was installed in the 1930s. The 1954 portion of the existing library was built over that storm sewer. See Appendix C for the Sanborn drawings. Due to cracking and settlement observed in the library, the old storm sewer in the building footprint was abandoned in place and rerouted in approximately 1982. The gravel fill encountered in Boring HA-1 is likely from this project. See Appendix C for a drawing from this project. When the library addition was constructed in 1996, the existing 1954 portion of the library was reported to have out of level floors with out of plumb walls where the contractor had difficultly matching the floors and walls of the addition to the original building. Based on the condition of the existing library, the history of the site and the soils encountered under the existing footings, trying to rehabilitate the existing library building would likely be cost prohibitive. Rehabilitation could include foundation underpinning and jacking/straightening the walls, leveling the floor slabs using pressure grouting, repointing the brick veneer and patching the interior wall cracking. Additional structural evaluation would be required prior to preparing rehabilitation plans. Fill with debris and native deposits of clayey sand, lean clay, fat clay and poorly graded sand were encountered in the borings. Support of footings, floor slabs, and pavements on or above existing fill soils is discussed in this report. However, even with the recommended construction testing services, there is an inherent risk for the owner that compressible fill or unsuitable material within or buried by the fill will not be discovered. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill, but can be reduced by performing additional testing and evaluation. We recommend supporting the proposed building on shallow foundations after excavating and replacing the existing uncontrolled fill and unsuitable soils under the building footprint. Shallow foundations are expected to bear on new engineered fill compacted as recommended. Foundations bearing on these suitable materials could be designed using a maximum net allowable soil bearing pressure of 2,000 psf. The surficial clayey sands and lean clays are moisture sensitive and will be difficult to work when wet. Performing earthwork operations during warmer periods of the year (May through October) will reduce the potential for problems associated with unstable subgrades. Site drying conditions are typically enhanced when it is warm. The moisture sensitivity of the on-site soils does not preclude Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 5 performing earthwork at other times of the year, but does lead to an increased potential for having to perform over-excavation and replacement or some other form of remedial work. 4.2 Earthwork The scope of earthwork will depend upon the decision regarding whether to demolish the existing building. If the existing building will be demolished site preparation should begin with its complete removal including footings, utilities and pavements in the proposed new building footprint. Due to the debris and uncontrolled fill encountered in our borings, we recommend that the upper 3 feet of existing soil be removed and replaced with offsite fill. If required, the site grades should be raised with additional off site fill. The purpose of removing and replacing the uncontrolled fill is to potentially reduce the chance of settlement in the new building by removing compressible fill or unsuitable material within or buried by the existing fill. If the existing parking lot is to be reused, it can remain in place. Existing utilities that are to be abandoned should be removed and the excavations filled with compacted structural fill. Utilities that are to remain in service should be accurately located horizontally and vertically to minimize conflict with new foundation construction. The formerly abandoned in place storm sewer should be removed. Compaction and Material Requirements Engineered fill should meet the following material property requirements: Fill Type 1 USCS Classification Acceptable Location for Placement Imported Soil >15% fines SC, SM All locations and elevations 1. Controlled, compacted fill should consist of approved materials that are free of deleterious material such as organic matter and debris. A sample of each material type should be submitted to the geotechnical engineer for evaluation. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 6 We recommend that the fill be placed as recommended in the following table. ITEM DESCRIPTION Fill Lift Thickness 9-inches or less in loose thickness (4” to 6” lifts when hand- operated equipment is used). Compaction Requirements 1, 2 Compact to a minimum of 95% of the materials standard Proctor maximum dry density (ASTM D 698). Moisture Content – Structural Fill Within the range of -2% to +2% of optimum moisture content as determined by the standard Proctor test at the time of placement and compaction. 1. Engineered fill should be tested for moisture content and compaction during placement. If in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the tests should be reworked and retested as required until the specified moisture and compaction requirements are achieved. Grading, Slopes, and Drainage During construction, grades should be sloped to promote runoff away from the construction area. Final surrounding grades should be sloped away from the structures on all sides to prevent ponding of water. If gutters / downspouts do not discharge directly onto pavement, they should not discharge directly adjacent to the building. This can be accomplished through the use of splash- blocks, downspout extensions and flexible pipes that are designed to attach to the end of the downspout. Flexible pipe should only be used if it is daylighted in such a manner that it gravity- drains collected water. Splash-blocks should also be considered below hose bibs and water spigots. Construction Considerations Performing earthwork operations during warmer periods of the year (May through October) will reduce the potential for problems associated with unstable subgrades. Site drying conditions are typically enhanced when it is warm. The moisture sensitivity of the on-site soils does not preclude performing earthwork at other times of the year, but does lead to an increased potential for having to perform overexcavation and replacement or some other form of remedial work. The site should be graded to prevent ponding of surface water on the prepared subgrades or in excavations. If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted. As a minimum, all temporary excavations should be sloped or braced as required by Occupational Safety and Health Administration (OSHA) regulations to provide stability and safe working conditions. Temporary excavations will most likely be required during grading operations. The grading contractor, by his contract, is usually responsible for designing and constructing stable, Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 7 temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. The geotechnical engineer should be retained during the construction phase of the project to observe earthwork and to perform necessary tests and observations during subgrade preparation; placement and compaction of controlled compacted fills; and backfilling of excavations. 4.3 Foundation Recommendations Shallow Foundations In our opinion, the proposed structure can be supported by a shallow foundation system after the recommended removal and replacement of the existing uncontrolled fill. The shallow foundations can consist of either isolated column and wall footings or thickened portions of a monolithic slab. Design recommendations for a shallow foundation system are presented in the following table and paragraphs. DESCRIPTION VALUE Maximum Net allowable bearing pressure 1 2,000 psf Minimum embedment below lowest adjacent finished grade for frost protection and protective embedment 2 12 inches Minimum width for continuous wall footings 16 inches Minimum width for isolated column footings 24 inches Approximate total settlement 3 Up to 1 inch Estimated differential settlement 3 Up to 1/2 inch between columns Ultimate coefficient of sliding friction 4 0.35 1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. 2. For perimeter footings and footings beneath unheated areas. 3. The actual magnitude of settlement that will occur beneath the foundations will depend upon the variations within the subsurface soil profile, the structural loading conditions and the quality of the foundation excavation. The estimated total and differential settlements listed assume that the foundation related earthwork and the foundation design are completed in accordance with our recommendations. 4. For uplift resistance, use the weight of the foundation concrete plus the weight of the soil over the plan area of the footings. 105 pounds per cubic foot should be used for the density of the soil. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 8 Construction Considerations The foundation bearing materials should be evaluated at the time of the foundation excavation. This is an essential part of the construction process. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. DCP testing should be performed to a depth of 3 to 5 feet below the bottom of footing excavation. Excessively soft, loose or wet bearing soils should be overexcavated to a depth recommended by the geotechnical engineer. The excavated soils should be replaced with compacted soil fill or washed, crushed stone (NCDOT No. 57) wrapped in a geotextile fabric (Mirafi 140 N or equivalent). The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Should the soils at bearing level become excessively disturbed or saturated, the affected soil should be removed prior to placing concrete. 4.4 Seismic Considerations Code Used Seismic Parameters1 2012 North Carolina Building Code Seismic Site Class D Ss = 0.168 S1 = 0.068 Sms = 0.269 Sm1 = 0.163 SDS = 0.180 SD1 = 0.109 1) Seismic parameters are based off of the 2009 International Building Code (IBC) referenced in the 2012 NC Building Code. Based on our experience with the geology of the area and the results of the borings, it is our opinion that the subsurface characteristics reflect those of Site Class D as described in the 2012 North Carolina State Building Code. Liquefaction is not expected based on its fines content and the relatively low level of ground motions projected for a seismic event. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 9 4.5 Floor Slabs Design Recommendations ITEM DESCRIPTION Floor slab support New engineered fill Modulus of subgrade reaction 100 pounds per square inch per inch (psi/in) for point loading conditions Base Course 4 inches of washed crushed stone (NCDOT No. 57) Saw-cut control joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations refer to the ACI Design Manual. The use of a vapor retarder should be considered beneath concrete slabs on grade that will be covered with wood, tile, carpet or other moisture sensitive or impervious coverings. The slab designer should refer to ACI 302 and/or ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder. Construction Considerations On most project sites, the site grading is generally accomplished early in the construction phase. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, rainfall, etc. If such disturbance occurs, the floor slab subgrade may not be suitable for placement of the stone sub base and concrete and corrective action will be required. We recommend the area underlying the structure footprint be rough graded and evaluated for stability prior to the placement of the stone base course layer. Particular attention should be paid to high traffic areas that were rutted and disturbed by construction activities and to areas where backfilled trenches are located. Areas where unsuitable conditions are located should be repaired by removing and replacing the affected material with properly compacted fill. Floor slab subgrade areas should be moisture conditioned and properly compacted to the recommendations in this report immediately prior to placement of the aggregate base course and concrete. GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project. Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable 10 The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either expressed or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. APPENDIX A FIELD EXPLORATION 7.5 MINUTE SERIES (TOPOGRAPHIC) Drawn By: Checked By: Approved By: Project Mngr: File No. Date: Scale: Project No. Consulting Engineers and Scientists EXHIBITSITE LOCATION PLAN A-1 GEOTECHNICAL ENGINEERING REPORT FARMVILLE LIBRARY 4276 W CHURCH STREET FARMVILLE, NC CB JSL MRF/CB CB 72175082 AS SHOWN GEO72175082-A1 OCT. 2017 314 Beacon Drive Winterville, NC 28590 (252) 353-1600 (252) 353-0002 SITE THIS DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSESLEGENDSITEProject Mngr:Approved By:Checked By:Drawn By:Project No.Scale:Date:File No.Consulting Engineers and ScientistsEXHIBITBORING LOCATION PLANA-2GEOTECHNICAL ENGINEERING REPORTFARMVILLE LIBRARY4276 W CHURCH STREETFARMVILLE, NCCBJSLMRF/CBCB72175082AS SHOWNGEO72175082-A2OCT. 2017314 Beacon DriveWinterville, NC 28590(252) 353-1600(252) 353-0002APPROXIMATE BORINGLOCATIONApproximate Scale0(Feet)60HAND AUGERB-1S W A L N U T S T W CHURCH STHA-1HA-2B-3B-2B-4FARMVILLELIBRARYCOMMERCIALBUILDINGSCOMMERCIALBUILDINGSPARKINGLOTPARKINGLOT Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable Exhibit A-3 Field Exploration Description Coordinates of the borings were determined by referencing site features on aerial photography. The boring locations were marked by representatives of Terracon using a measuring wheel and referencing site features. The locations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The soil test borings were performed by a trailer-mounted power drilling rig utilizing mud rotary drilling procedures to advance the boreholes. The drilling tools were removed from the borehole and representative soil samples were obtained at 2.5 to 5 foot intervals using split-barrel sampling procedures. In the split barrel sampling procedure, the number of blows required to advance a standard 2 inch O.D. split barrel sampler 12 inches after the first 6 inches by means of a 140 pound automatic hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT-N). This value is used to estimate the in-situ relative density of cohesionless soils and consistency of cohesive soils. An automatic SPT hammer was used to advance the split-barrel sampler in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count (N) value by increasing the penetration per hammer blow over what would be obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. Hand auger borings were also performed at the site and relative soil strength was determined using a Dynamic Cone Penetrometer. The samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further examination, testing, and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. A field log of each boring was prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller’s interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation and tests of the samples. Additional information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions 57 14 30 31 23 25 26 27-15-12 2-4-4 N=8 1-1-1 N=2 2-3-3 N=6 2-2-2 N=4 3-5-6 N=11 5-5-7 N=12 1 2 3 4 5 6 1.0 3.0 6.0 13.0 20.0 Topsoil FILL - SANDY LEAN CLAY (CL), with brick debris, medium stiff SANDY LEAN CLAY (CL), dark brownish gray, very soft LEAN CLAY WITH SAND (CL), light gray, soft to medium stiff POORLY GRADED SAND (SP), light tan, medium dense Boring Terminated at 20 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 15 20 SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Mud Rotary Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 72175082 Drill Rig: 45-17 Boring Started: 09-28-2017 BORING LOG NO. B-1 Town of FarmvilleCLIENT: Farmville, NC Driller: Carolina Drilling, Inc. Boring Completed: 09-28-2017 Exhibit:A-4 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC While drilling WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 612850-16-34 3-4-3 N=7 1-2-3 N=5 2-2-2 N=4 5-8-8 N=16 4-5-6 N=11 4-5-4 N=9 1 2 3 4 5 6 0.2 0.7 3.0 8.0 13.0 18.0 20.0 Asphalt Stone base FILL - SILTY SAND (SM), with brick debris, dark gray, loose SANDY FAT CLAY (CH), trace gravel, light gray, orange and red, soft to medium stiff CLAYEY SAND (SC), light gray, medium dense POORLY GRADED SAND WITH SILT (SP-SM), light tan, medium dense POORLY GRADED SAND (SP), light tan, medium dense Boring Terminated at 20 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 15 20 SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Mud Rotary Abandonment Method: Boring backfilled with Auger Cuttings and/or Bentonite Surface Capped with Asphalt Notes: Project No.: 72175082 Drill Rig: 45-17 Boring Started: 09-28-2017 BORING LOG NO. B-2 Town of FarmvilleCLIENT: Farmville, NC Driller: Carolina Drilling, Inc. Boring Completed: 09-28-2017 Exhibit:A-5 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC While drilling WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 4-2-3 N=5 1-2-2 N=4 2-2-3 N=5 5-6-5 N=11 4-5-7 N=12 5-7-8 N=15 1 2 3 4 5 6 0.2 0.7 3.0 13.0 18.0 20.0 Asphalt Stone base FILL - CLAYEY SAND (SC), with brick debris, loose CLAYEY SAND (SC), gray to light gray, loose to medium dense POORLY GRADED SAND WITH SILT (SP-SM), light tan, medium dense SILTY SAND (SM), orange to reddish orange, medium dense Boring Terminated at 20 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 15 20 SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Mud Rotary Abandonment Method: Boring backfilled with Auger Cuttings and/or Bentonite Surface Capped with Asphalt Notes: Project No.: 72175082 Drill Rig: 45-17 Boring Started: 09-28-2017 BORING LOG NO. B-3 Town of FarmvilleCLIENT: Farmville, NC Driller: Carolina Drilling, Inc. Boring Completed: 09-28-2017 Exhibit:A-6 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC While drilling WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 3-5-5 N=10 2-3-2 N=5 2-2-2 N=4 3-6-7 N=13 3-4-4 N=8 3-4-5 N=9 1 2 3 4 5 6 0.2 0.7 3.0 6.0 8.0 13.0 18.0 20.0 Asphalt Stone base FILL - CLAYEY SAND (SC), with brick debris, dark gray, medium dense LEAN CLAY WITH SAND (CL), light gray and orange, medium stiff SANDY LEAN CLAY (CL), light gray, soft to medium stiff CLAYEY SAND (SC), light gray, medium dense POORLY GRADED SAND WITH SILT (SP-SM), light tan, loose POORLY GRADED SAND (SP), light tan, loose Boring Terminated at 20 FeetGRAPHIC LOGHammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)5 10 15 20 SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Mud Rotary Abandonment Method: Boring backfilled with Auger Cuttings and/or Bentonite Surface Capped with Asphalt Notes: Project No.: 72175082 Drill Rig: 45-17 Boring Started: 09-28-2017 BORING LOG NO. B-4 Town of FarmvilleCLIENT: Farmville, NC Driller: Carolina Drilling, Inc. Boring Completed: 09-28-2017 Exhibit:A-7 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 DCP: 4-6-9 DCP: 5-5-6 DCP: 4-4-5 1 2 33.0 FILL - POORLY GRADED SAND WITH GRAVEL (SP), brown and gray Boring Terminated at 3 FeetGRAPHIC LOGStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Abandonment Method: Notes: Project No.: 72175082 Drill Rig: Boring Started: 09-28-2017 BORING LOG NO. HA-1 Town of FarmvilleCLIENT: Farmville, NC Driller: Boring Completed: 09-28-2017 Exhibit:A-8 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 DCP: 4-3-3 DCP: 1-1-1 DCP: 3-2-1 1 2 3 0.5 1.3 3.0 Topsoil SILTY SAND (SM), brown SANDY LEAN CLAY (CL), gray and black Boring Terminated at 3 FeetGRAPHIC LOGStratification lines are approximate. In-situ, the transition may be gradual.THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17PERCENT FINESWATERCONTENT (%)LL-PL-PI ATTERBERG LIMITS WATER LEVELOBSERVATIONSDEPTH (Ft.)SAMPLE TYPEFIELD TESTRESULTSSAMPLE 4276 W Church Street Famville, NC SITE: Page 1 of 1 Advancement Method: Abandonment Method: Notes: Project No.: 72175082 Drill Rig: Boring Started: 09-28-2017 BORING LOG NO. HA-2 Town of FarmvilleCLIENT: Farmville, NC Driller: Boring Completed: 09-28-2017 Exhibit:A-9 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Farmville Library 314 Beacon Dr Winterville, NC WATER LEVEL OBSERVATIONS DEPTH LOCATION Latitude: 35.596968° Longitude: -77.587249° See Exhibit A-2 APPENDIX B LABORATORY TESTING Geotechnical Engineering Report Farmville Library ■Farmville, North Carolina October 17, 2017 ■Terracon Project No. 72175082 Responsive ■Resourceful ■Reliable Exhibit B-1 Laboratory Testing Descriptive classifications of the soils indicated on the boring logs are in accordance with the enclosed General Notes and the Unified Soil Classification System. Also shown are estimated Unified Soil Classification Symbols. A brief description of this classification system is attached to this report. Soils laboratory testing was performed under the direction of a geotechnical engineer and included visual classification, moisture content, grain size analysis and Atterberg limits testing as appropriate. The results of the laboratory testing are shown on the borings logs, Appendix B. The laboratory test methods are described in the ASTM Standards listed below: ASTM D2216 Standard Test Method of Determination of Water Content of Soil and Rock by Mass ASTM D2487 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System) ASTM D2488 Standard Practice of Description and Identification of Soils (Visual Manual Method) ASTM D422 Standard Test Method for Particle Size Analysis of Soils ASTM D1140 Standard Test Methods for Determining the Amount of Material Finer than No. 200 Sieve in Soils by Washing ASTM D4318 Standard Test Method for Liquid Limit, Plastic Limit and Plasticity Index of Soils Procedural standards noted above are for reference to methodology in general. In some cases variations to methods are applied as a result of local practice or professional judgment. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 % FINES % CLAY USCS 0.0 0.0 43.4 0.082 GRAIN SIZE BORING ID SANDY LEAN CLAY (CL) 16 20 100 90 80 70 60 50 40 30 20 10 0 REMARKS SILT OR CLAYCOBBLESGRAVELSAND medium 56.6 GRAIN SIZE IN MILLIMETERS PERCENT FINER 3/4 1/2 3/8 SIEVE (size) D60 30 403 60 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 44 100632 fine coarse B-1 SOIL DESCRIPTION CU 10 14 506 2001.5 81 140 coarse fine COEFFICIENTS % COBBLES % GRAVEL % SAND D30 D10 CCPERCENT FINER BY WEIGHTPERCENT COARSER BY WEIGHT% SILT 1 1/2" 1" 3/4" 1/2" 3/8" #4 #10 #20 #40 #60 #100 #200 100.0 99.09 96.85 89.59 81.95 56.62 ___ GRAIN SIZE DISTRIBUTION ASTM D422 CL PROJECT NUMBER: 72175082PROJECT: Farmville Library SITE: 4276 W Church Street Famville, NC CLIENT: Town of Farmville Farmville, NC EXHIBIT: B-2 314 Beacon Dr Winterville, NC LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. 70131102-GRAIN SIZE RPT 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 % FINES % CLAY USCS 0.0 1.4 37.3 GRAIN SIZE BORING ID SANDY FAT CLAY (CH) 16 20 100 90 80 70 60 50 40 30 20 10 0 REMARKS SILT OR CLAYCOBBLESGRAVELSAND medium 61.3 GRAIN SIZE IN MILLIMETERS PERCENT FINER 3/4 1/2 3/8 SIEVE (size) D60 30 403 60 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 44 100632 fine coarse B-2 SOIL DESCRIPTION CU 10 14 506 2001.5 81 140 coarse fine COEFFICIENTS % COBBLES % GRAVEL % SAND D30 D10 CCPERCENT FINER BY WEIGHTPERCENT COARSER BY WEIGHT% SILT 1 1/2" 1" 3/4" 1/2" 3/8" #4 #10 #20 #40 #60 #100 #200 100.0 98.61 94.78 93.71 92.32 89.02 83.81 61.28 ___ GRAIN SIZE DISTRIBUTION ASTM D422 CH PROJECT NUMBER: 72175082PROJECT: Farmville Library SITE: 4276 W Church Street Famville, NC CLIENT: Town of Farmville Farmville, NC EXHIBIT: B-3 314 Beacon Dr Winterville, NC LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. 70131102-GRAIN SIZE RPT 72175082 FARMVILLE LIBRARY; FARMVILLE, NC.GPJ TERRACON_DATATEMPLATE.GDT 10/13/17 APPENDIX C SUPPORTING DOCUMENTS Trace With Modifier Water Level After a Specified Period of Time GRAIN SIZE TERMINOLOGYRELATIVE PROPORTIONS OF SAND AND GRAVEL Trace With Modifier Standard Penetration or N-Value Blows/Ft. Descriptive Term (Consistency) Loose Very Stiff Exhibit C-1 Standard Penetration or N-Value Blows/Ft. Ring Sampler Blows/Ft. Ring Sampler Blows/Ft. Medium Dense Dense Very Dense 0 - 1 < 3 4 - 9 2 - 4 3 - 4 Medium-Stiff 5 - 9 30 - 50 WATER LEVELAuger Shelby Tube Ring Sampler Grab Sample 8 - 15 Split Spoon Macro Core Rock Core PLASTICITY DESCRIPTION Term < 15 15 - 29 > 30 Descriptive Term(s) of other constituents Water Initially Encountered Water Level After a Specified Period of Time Major Component of SamplePercent of Dry Weight (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance Includes gravels, sands and silts. Hard Very Loose 0 - 3 0 - 6 Very Soft 7 - 18 Soft 10 - 29 19 - 58 59 - 98 Stiff less than 500 500 to 1,000 1,000 to 2,000 2,000 to 4,000 4,000 to 8,000> 99 LOCATION AND ELEVATION NOTESSAMPLING FIELD TESTS(HP) (T) (b/f) (PID) (OVA) DESCRIPTION OF SYMBOLS AND ABBREVIATIONS Descriptive Term (Density) Non-plastic Low Medium High Boulders Cobbles Gravel Sand Silt or Clay 10 - 18 > 50 15 - 30 19 - 42 > 30 > 42 _ Hand Penetrometer Torvane Standard Penetration Test (blows per foot) Photo-Ionization Detector Organic Vapor Analyzer Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. CONSISTENCY OF FINE-GRAINED SOILS (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance DESCRIPTIVE SOIL CLASSIFICATION > 8,000 Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. Plasticity Index 0 1 - 10 11 - 30 > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term(s) of other constituents Percent of Dry Weight < 5 5 - 12 > 12 No Recovery RELATIVE DENSITY OF COARSE-GRAINED SOILS Particle Size Over 12 in. (300 mm) 12 in. to 3 in. (300mm to 75mm) 3 in. to #4 sieve (75mm to 4.75 mm) #4 to #200 sieve (4.75mm to 0.075mm Passing #200 sieve (0.075mm)STRENGTH TERMSUnconfined Compressive Strength, Qu, psf 4 - 8 GENERAL NOTES Exhibit C-2 UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu  4 and 1  Cc  3 E GW Well-graded gravel F Cu  4 and/or 1  Cc  3 E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F,G,H Fines classify as CL or CH GC Clayey gravel F,G,H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu  6 and 1  Cc  3 E SW Well-graded sand I Cu  6 and/or 1  Cc  3 E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G,H,I Fines classify as CL or CH SC Clayey sand G,H,I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI  7 and plots on or above “A” line J CL Lean clay K,L,M PI  4 or plots below “A” line J ML Silt K,L,M Organic: Liquid limit - oven dried  0.75 OL Organic clay K,L,M,N Liquid limit - not dried Organic silt K,L,M,O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K,L,M PI plots below “A” line MH Elastic Silt K,L,M Organic: Liquid limit - oven dried  0.75 OH Organic clay K,L,M,P Liquid limit - not dried Organic silt K,L,M,Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW -GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW -SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay E Cu = D60/D10 Cc = 6010 2 30 DxD )(D F If soil contains  15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains  15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains  30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains  30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI  4 and plots on or above “A” line. O PI  4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. 0 Feet 150 300 600 Project Manager: Project No. Drawn by: Scale: Checked by: File Name: Approved by: Date: Certified Sanborn® Map page- 1955 Site Name: Address: City, ST, ZIP: Client:TAG/Terracon EDR Inquiry:5075277.1 Order Date:10/12/2017 Certification #1F82-45D4-89A91F82-45D4-89A9 Copyright 1955 Volume 1, Sheet 5 Volume 1, Sheet 4 Volume 1, Sheet 3 Volume 1, Sheet 2 1955 SANBORN MAP 1955 5075277 1 5 Farmville Library 4276 W Church Street Farmville, NC 27828 Appendix As Shown Farmville Library Farmville, NC 27828 C314 Beacon Drive 4276 W Church Street Winterville, NC 28590 0 Feet 150 300 600 Project Manager: Project No. Drawn by: Scale: Checked by: File Name: Approved by: Date: Certified Sanborn® Map page- 1945 Site Name: Address: City, ST, ZIP: Client:TAG/Terracon EDR Inquiry:5075277.1 Order Date:10/12/2017 Certification #1F82-45D4-89A91F82-45D4-89A9 Copyright 1945 Volume 1, Sheet 5 Volume 1, Sheet 4 Volume 1, Sheet 3 Volume 1, Sheet 2 1945 SANBORN MAP 1945 5075277 1 6 Farmville Library 4276 W Church Street Farmville, NC 27828 Appendix As Shown Farmville Library Farmville, NC 27828 C314 Beacon Drive 4276 W Church Street Winterville, NC 28590 0 Feet 150 300 600 Project Manager: Project No. Drawn by: Scale: Checked by: File Name: Approved by: Date: Certified Sanborn® Map page- 1929 Site Name: Address: City, ST, ZIP: Client:TAG/Terracon EDR Inquiry:5075277.1 Order Date:10/12/2017 Certification #1F82-45D4-89A91F82-45D4-89A9 Copyright 1929 Volume 1, Sheet 5 Volume 1, Sheet 4 Volume 1, Sheet 3 Volume 1, Sheet 2 Volume 1, Sheet Keymap/Sheet1 1929 SANBORN MAP 1929 5075277 1 7 Farmville Library 4276 W Church Street Farmville, NC 27828 Appendix As Shown Farmville Library Farmville, NC 27828 C314 Beacon Drive 4276 W Church Street Winterville, NC 28590 0 Feet 150 300 600 Project Manager: Project No. Drawn by: Scale: Checked by: File Name: Approved by: Date: Certified Sanborn® Map page- 1923 Site Name: Address: City, ST, ZIP: Client:TAG/Terracon EDR Inquiry:5075277.1 Order Date:10/12/2017 Certification #1F82-45D4-89A91F82-45D4-89A9 Copyright 1923 Volume 1, Sheet 3 Volume 1, Sheet 2 Volume 1, Sheet Keymap/Sheet1 1923 SANBORN MAP 1923 5075277 1 8 Farmville Library 4276 W Church Street Farmville, NC 27828 Appendix As Shown Farmville Library Farmville, NC 27828 C314 Beacon Drive 4276 W Church Street Winterville, NC 28590 0 Feet 150 300 600 Project Manager: Project No. Drawn by: Scale: Checked by: File Name: Approved by: Date: Certified Sanborn® Map page- 1915 Site Name: Address: City, ST, ZIP: Client:TAG/Terracon EDR Inquiry:5075277.1 Order Date:10/12/2017 Certification #1F82-45D4-89A91F82-45D4-89A9 Copyright 1915 Volume 1, Sheet 4 Volume 1, Sheet 3 Volume 1, Sheet Keymap/Sheet1 1915 SANBORN MAP 1915 5075277 1 9 Farmville Library 4276 W Church Street Farmville, NC 27828 Appendix As Shown Farmville Library Farmville, NC 27828 C314 Beacon Drive 4276 W Church Street Winterville, NC 28590 THIS DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSESProject Mngr:Approved By:Checked By:Drawn By:Project No.Scale:Date:File No.Consulting Engineers and ScientistsEXHIBITSTORM SEWER REPLACEMENTC-4GEOTECHNICAL ENGINEERING REPORTFARMVILLE LIBRARY4276 W CHURCH STREETFARMVILLE, NCCBJSLMRF/CBCB72175082AS SHOWNGEO72175082-C4OCT. 2017314 Beacon DriveWinterville, NC 28590(252) 353-1600(252) 353-0002Approximate Scale0(Feet)40