HomeMy WebLinkAbout20190300 Ver 1_PCN Form Submission_20190306D1�VR
�irlslan af Water Resources
Initial Review
Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned *
20190300
Is a payment required for this project?*
f• No payment required
f Fee received
f Fee needed - send electronic notification
Select Project Reviewer"
Joanne Steenhuis:eads\jhsteenhuis
Information for Initial Review
1a. Name of project:
Geotechnical soil borings in Northeast Creek (LL5741)
1a. Who is the PrimaryContact?*
NC Department of Transportation
1b. PrimaryContact Email:*
ajames10@ncdot.gov
Date Submitted
3/6/2019
Nearest Body of Water
Northeast Creek
Basin
White Oak
Water Classification
SC;NSW (upstream of NC 24) and SC;HQW, NSW (downstream of NC 24)
Site Coordinates
Latitude:
34.734661
A. Processing Information
County (or Counties) where the project is located:
Onslow
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
G Yes r No
(NCDOT only) T.I.P. or state project number:
U-5741
WBS # (�)
54030.1.1
1a. Type(s) of approval sought from the Corps:
Longitude:
-77.353834
Ve rsion# *
1
Reviewing Office *
Wilmington Regional Office - (910) 796-7215
1c. PrimaryContact Phone:*
(919)707-6129
::
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
F Yes r No
Nationwide Permit (NWP) Number:
6 - Survey Activities
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
r' Non-404 Jurisdictional General Permit
r Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
Forthe record onlyfor DWR401 Certification:
For the record onlyfor Corps Permit:
1f. Is this an after-the-fact permit application?*
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
C' Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
1h. Is the project located in any of NC's twenty coastal counties?
� Yes r No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
� Yes r No r Unknown
1j. Is the project located in a designated trout watershed?
C' Yes r No
B. Applicant Information
1d. Who is applying for the permit?
fJ Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
C' Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
WA
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
1000 Birch Ridge Drive
Address Line 2
�ty
Raleigh
Postal / Zip Code
27610
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
S[ate / Awince I Region
NC
Country
USA
x
C•' Yes C' No
C' Yes G No
2e. Telephone Number:
(919)707-6123
2g. Email Address:*
pharris@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(rf appropriate)
1 c. Nearest municipality / town:
Jacksonville
2. Project Identification
2a. Propertyldentification Number:
2c. Project Address
Street Address
Address Line 2
�ty
Postal / Zip Code
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:"
Northeast Creek
3b. Water Resources Classification of nearest receiving water:*
SC;NSW (upstream of NC 24) and SC;HQW, NSW (downstream of NC 24)
3c. What river basin(s) is your project located in?*
White Oak
3d. Please provide the 12-digit HUC in which the project is located.
03020302
4. Project Description and History
2f. Fax Number:
2b. Propertysize:
State / Fovince I Region
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The area surrounding the e�sting bridge is a mixof urban/suburban uses, with marshes and forests along stream corridors.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
C' Yes r No C' Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
0.93 acre (in vicinity of bridge only)
4g. List the total estimated linear feet of all existing streams on the property:
744 (in vicinity of bridge only)
4h. Explain the purpose of the proposed project:*
Geotechnical soil borings will be advanced in the streambed of Northeast Creek upstream of the exsting NC 24 bridge to determine what bent type to use in the replacement structure.
Impacts associated with access improvements to NC 24 and the replacement of bridge no. 7 as part of LL5741 are not authorized or included in this permit application.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Ten soil borings are proposed to be advanced in the streambed of Northeast Creek using a drill rig set on a barge. The borings will be advanced using the mud rotary method. This
method involves setting a piece of 4° or 6" diameter casing between the drill rig and the river bed to contain the drilling fluid and cutting returns. All soil samples, drilling fluid, and cutting
returns are disposed of off-site.
4j. Please upload project drawings for the proposed project.
U-5741 NW 6 drawing.pdf 1.19MB
5. Jurisdictional Determinations
_;
�
Sa. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
r Yes r No C' Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved C' Not Verified � Unknown r WA
Corps AID Number:
SAW-2017-00872
Sc. If Sa is yes, who delineated the jurisdictional areas7
Name (if known):
Agency/Consultant Company:
Other:
SEPI
Sd. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
The PJD was issued on January 26, 2018 by the Corps (resources v�re field verified by Corps and DWR personnel on 11/28/2017)
Sd1. Jurisdictional determination upload
U-5741 PJD all.pdf 301.S3KB
6. Future Project Plans
6a. Is this a phased project?"
� Yes r No
Ne any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
Permitting for U-5741 impacts associated with access improvements to NC 24 and replacement of bridge no. 7 over Northeast Creek will be permitted separately. Depending on the
chosen altemative, either a NW 14 or an Individual Permit will be required. Final discretion as to what permit will be required lies with the Corps.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands I� Streams-tributaries
,r! Open Waters I� Pond Construction
4. Open Water Impacts
Site # I4a1. Impact Reason
borings
Impact type II4c. Name of waterbody
Creek
JI
r Buffers
Activitytype 4e.Waterbodytype 4f.lmpactarea
4g. Total temporary open water Impacts: 4g. Total permanent open water impacts:
0.00 0.00
4g. Total open water impacts:
0.00
4h. Comments:
Actual impact is 0.67 sq ft. or 0.00002 acre for 10 borings, assuming that each boring has a diameter of 3.5 inches.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The drill will be encased and all soil, drill fluid, and cutting retums will be disposed of off-site.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
The USFWS'Guidelines for Avoiding Impacts to the West Indian Manatee, Precautionary Measures for Construction Activities in North Carolina
Waters' will be adhered to during boring activities.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
h
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
� Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
No permanent impacts to jurisdictional resources are anticipated for activities authorized by this permit.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
� Yes r No
If no, explain why:
No changes in diffuse floware anticipated for activities authorized by this permit.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
C' Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
� Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?*
F Yes r No
�
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environme ntal Policy Act (NEPAISEPA)? *
G Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
G Yes �' No
NEPAor SEPAFinal Approval Letter
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15ANCAC 2B .0200)? *
C' Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?"
� Yes r No
3b. If you answered "no," provide a short narrative description.
This application is for geotechnical borings only.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
C' Yes r No C' fWA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
Sa. Will this project occur in or near an area with federally protected species or habitat?*
� Yes r No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?"
� Yes r No
Sd. Is another Federal agency involved?"
� Yes r No
r Unknown
What Federal Agency is involved?
NOAA National Marine Fisheries Service
Se. Is this a DOT project located within Division's 1-8?
G Yes r No
S. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
NC Natural Heritage Program data. There is one occurrence each of West Indian manatee, and Atlantic and shortnose sturgeons within one mile of
the project.
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
� Yes r No
Are there submerged aquatic vegetation (SA� around the project vicinity?*
� Yes r No r Unknown
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS EFH viewer
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
C' Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCSHPO HPOWeb Mapping; a complete review of potential historic and archaeological resources on LL5741 will be conducted for inclusion in the
environmental document, which is anticipated to be a Categorical Exclusion. The document is scheduled for completion in April 2020.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?"
� Yes r No
8b. If yes, explain how project meets FEMA requirements:
NCDOT Hydraulics Unit coordination with FEMA. The activities authorized by this permit will take place in open water.
Sc. What source(s) did you use to make the floodplain determination?*
FEMA mapping (Map Number 3720439600J, Panel 4396; Effective Date 11/3/2005)
Miscellaneous
Comments
Northeast Creek is designated as a primary nursery area, and as such carries an in-water work moratorium between February 15 and September 30. The NC 24 bridge crossing of
Northeast Creek also marks the boundary between coastal and inland waters. In coordination with the NC Division of Marine Fisheries and the NC Wildlife Resources Commission, the
activities authorized by this permit are allow�d to be conducted during the in-water work moratorium (see attached email responses).
Miscellaneous attachments not previouslyrequested.
U-5741 NW 6 DMF WRC coord.pdf
1.36 MB
n �
Signature
*
�7 By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
. I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP');
. I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Mack Christopher Rivenbark, III
Signature
X� e. ���.111
Date
3/6/2019