Loading...
HomeMy WebLinkAbout20140090 Ver 5_U2579B Sites 3a and 3b restoration_20190228yo�aAA1Ya� d}' � ; ����� STATE OF NORTH CAROLINA DEPARTN�NT OF TRANSPORTATION PAT MCCRORY GOVERNOR DATE: May 22, 2015 TO: John Thomas, US Army Corps of Engineers Dave Wanucha, NC Division of Water Resources ANTHONY J. TATA SECRETARY FROM: Amy Euliss, NCDOT Division 9 Division Environmental Officer SUBJECT: Restoration plan for temporary impacts at permit sites 3a and 3b on the Winston-Salem Northern Beltway (Eastern Section, Future I-74; From US 158 to I-40 BUS/LTS 421) (STIP #U-2579B) in Forsyth County. The attached restoration plans have been internally approved by NCDOT Forsyth Resident Engineer's office, Randy Griffin and Byron Moore (PDEA's Natural Environment Engineering Group), Phil Suggs (Roadside Environmental), and me. Below is a discussion of the permit sites, restoration plans, and the conditions of the plans. In the 404 and 401 permits issued for the project, 545 linear feet of temporary impacts were permitted for permit site 3A, and 1941inear feet of temporary impacts were permitted for permit site 3B. Per the plans, approximately 4241inear feet of stream will be restored at site 3a and 1941inear feet of stream will be stored at site 3b. Based on earlier discussions with you, we are not proposing mitigation for the differences in linear feet, because of the severe channel instability prior to construction. Tributaries 3A and 3B are the subject streams that will be temporarily impacted by the construction of the Y1 detour road. These tributaries will be piped and filled during roadway construction but returned to stable condition upon removal of the detour road and restoration of the site. Tributaries 3A and 3B are in poor existing condition. These streams are currently in a transition between a higher headwater position in the valley and a lower position in the valley, where they come together and flow towards higher order streams. This transition zone is steep, and the urbanizing drainage has moved these streams towards a condition of greater instability. The planform for both streams is unstable and at times torturous. This has resulted in poor conditions of the outer banks, with mass wasting and unstable undercut banks. Some of the banks are stabilized by a covering of invasive shrubs and vines, but the overall condition of these banks is poor. The streams are characterized by low width-to-depth ratios and minimal access to a bench or floodplain. Because of the presence of existing grade control provided by a riprap pad installed by others to protect a sanitary sewer line, Tributary 3B (above the rip rap) has better channel condition than other reaches. Below the riprap pad however, there is a two to three foot drop in the bed elevation where the stream becomes more incised. Without DIVISION OF HIGHWAYS DIVISION NINE DIVISION OFFICE 375 SILAS CREEK PARKWAY, WINSTON-SALEM, NC 27127 PHONE (336) 747-7800 FAX (336) 703-6693 this stabilization, the stream would likely have headcut up through the existing valley. These current conditions are typical of poorly functioning, unstable stream that have been impacted by urbanization within the Piedmont of North Carolina. The post-construction stream will be stable and improve the function of this stream system. The channel cross- section is designed to tie-in to the existing channel with a similar width-to-depth ratio, but will be constructed with a bankfull bench to provide out of bank access for larger flows. The constructed riffles and step pools that will be built will ensure that the profile remains stable. By reducing the slope of the riffles and losing elevation in small increments at the step pools, this steep slope will be spread throughout the stream and not concentrated in a few areas. These structures will also promote bed form diversity, which is lacking in the existing channel. This design, paired with the live staking of the banks, will create a channel that has bench/floodplain access, habitat heterogeneity, a stable planform, and intact banks. Water will be released into the channel as soon as it's lined with coir fiber matting and seeded with native seed mix. As-builts will be submitted to you after construction is complete. NCDOT will visually monitor using Level II monitoring (i.e. vegetation success and stability). We will initiate twice yearly visual monitoring for stability and percent vegetative cover for one year after the water is released into the newly restored channels. Since success of the live stakes isn't imperative to meet permit conditions and site success, we plan to begin monitoring prior to live stake planting. After the live stakes are planted, NCDOT will monitor their survival for one year. If survival of the live stakes is less than 50%, we will replant during the planting season. Please note the monitoring of the temporary impact restorations were not required in the permits. As previously discussed, the streams are in temporary drainage and construction easements. Since the easements are temporary, the NCDOT will not be able to maintain the restorations (and any planted buffer) in perpetuity, as we do in on-site mitigation proj ects. Please review the plans at your earliest convenience, and let me know if you have any questions or concerns. I can be reached at (336) 747-7802 or aeuliss@ncdot.gov. Attachments: Restoration plans Morphological table cc: Randy Griffin, NCDOT PDEA Environmental Engineering Group, e-copy Jeremy Guy, NCDOT Forsyth Resident Engineer, e-copy Phil Suggs, NCDOT Roadside Environmental, e-copy Angel Crespo, Dragados, inc, e-copy Tim Morris, KCI, e-copy 0 � � 0 N � 0 � U x STATE PROJECTREFERENCE NUMBER SHEET TOTAL NO. SHEETS ���Co U-2579B � � BEGIN SITE 3A WI1�ST01� SALEM 1�ORTHERI� BELTWAY (1�C DOT PROJECT # U-2�798) STREAM RESTORATI01� SITE #3 FORSYTH , \ 5� �� Q� � -------''- . . . . �� . . i / i I ♦ �� ALL COORDINATES AND ELEVATIONS BASED ON SURVEY FILE "PERM 3 ASBUILT.DWG" PROVIDED TO KCI ASSOCIATES OF NC BY DRAGADOS USA ON 2015-04-17. l i 3 4-5 6-7 8 I11iDEX OF SHEETS TITLE SHEET SITE PLA1Y PROFILES A1VD CROSS-SECTI0I�S PLANTING PLA1V DETAILS SITE STABILIZATION PLAN DIRECTIONS TO SITE FROM RALEIGH, TAKE I-40 WEST TO OLD GREEIVSBORO ROAD NE IlY WINSTON- SALEM. TAKE EXIST l0 FROM I-40 BUS WEST /US-421 1VORTH. TAKE US-158 E/ REIDSVILLE ROAD TO FREEMAlY PARK COURT, WHICH IS THE ACCESS TO THE SITE. COU11tTY,1�4RTH CAROLI11tA PROIECT DATA SITE 3A RESTORATION LENGTH = 424 FEET SITE 3B RESTORATION LEIYGTH = 170 FEET Prepo�ep for: ANGELCRESPO DEPUTY AROJECT MANAGER Prepo�ed In the Offlce of: � �� �� ,�5���„�:5 �, �� ENGINEERS•PLANNERS•ECOLOGISTS SUITE 220 LANDMARK CENTER II 4601 SIX FORKS RD., RALEIGH, NC P�eppre0 Dy: TIM MORRIS PROJECT MANAGER ALEXFRENCH PROJECT DES7GNER VICINITY MAP 11iOT TO SCALE � . � . . . � . � . . . .� h`b � PO. �O ��� J� O�' Q��• PROPOSED STEP POOL. SEE DETAIL SHEET 6. (TYP. OF 8) Q'� ♦ i ♦ I ♦ ♦ i i � . � . . . i i i i . . , . . - i , i � ♦ � i i i i • r, k �Q- �O ,� i PROPOSED RIFFLE � WITH ROCK SILL. SEE DETAIL SHEET 6. (TYP. OF 20) � i ♦ � � i i i i I I END SITE 3A � i . _-� : � L � �� ��/ \! --'�� �< ----r --- ♦ � i � i i EXISTING � STREAM ♦� I I EXISTING i WINGWALL �� i �� I i i i i ♦ i , i i � i � / � r i i o �3X�o r / / ,__� i _ �= i� �� c `— END SITE 3B ��� i PROPOSED 8" �� �,� SEWER PIPE � i i CONTRACTOR TO TAKE CARE NOT TO DAMAGE SEWER PIPE AT RIFFLE CROSSING � TEMPORARY ROAD TO BE INSTALLED FOR THE Y1 DETOUR. i� ROAD TO BE REMOVED PRIOR TO � STREAM RESTORATION ACTIVITIES. . i i � i i i i i ♦ I I I / P� �O �� �.P QO ��`s / PROPOSED 4' DIA UTILITY MANHOLE . . �` � � / �� ��i i� i � �i A i m -- / � �� �� i k i i �/ � �/ � � i i �, . � - � � � � - �� � � . � � � + ; v �i 00 �� i� • �, . Q 54" CMP TO BE INSTALLED i� � DURING TEMPORARY ROAD � � Y1 DETOUR CONSTRUCTION. � i� TO BE REMOVED PRIOR TO �� i STREAM RESTORATION i � ACTIVITIES. �� � / . � . � . � i � i � i � , � , � i � i � i � i / i � i � i � i � / � / � i � � � i � / � / � _ ,. _________ ___ ,, �o� MANHOLE TO BE REMOVED � � i i / / 54" CMP TO BE INSTALLED � � DURING TEMPORARY ROAD i� i� Y1 DETOUR CONSTRUCTION i i TO BE REMOVED PRIOR TO�� �� STREAM RESTORATION ACTIVITIES. i� i� i i �.` i i ��� . � o0 0 � /� i i / — 8" SANITARY SEWER �� LINE TO BE REMOVED � i i i i � i Q i � , , � � � � �C . � �\ � i � i� \�� � � �i i i / / / / / / �'�l� , . . . � � . / . �� BEGIN SITE 3A O 0 + 0 / ___ �i \ � / i N / i i � i / i i / loo —20' —10' 0' 20' 40' GRAPHIC SCALE LEGEND: ROCK SILL ............................. STEP POOL ........................... PROPOSED STREAM .................. BEGIN SITE 3B � �0 T�— + 0 a h � H� 0 a � a � 0 � N u H 1� z Z W �a N �o � Z �����i � � w Q M J m � m � � Z N N � j Z _ � O � W � z�0 W � � Z � W U O Z � � � z � onTe. MAY 2015 scue: GRAPHIC SITE PLAN � z 0 � � �N �Z �� oa a� OU fY = Y~ �� oa Z x= �� �w a� Q Z O � U x � � O z � � 0 U x H r � � 0 � 89� gg� 89C 88E 88� 87� g7� 87C PROFILE - SITE 3A REACH - SITE 3A STATION 10+00 TO 14+24 TIE BACK TO EXISTING 10.0' , GRADE AT 2:1 SLOPE � (TYPICAL) 5.0' MIN. I 27' + 2.3' 1 2.3' I 27' I 5.0' MIN. i II iya Oiya II II i II i aim �im i i i i - -�-----��--��-�I��rt---+------t--� I -- I-- I VWkf I--- � I� i � � i � - � -_-_- _---- p TYPICAL RIFFLE 0 = THALWEG LOCATION 5.0' MIN. 9.0' 5.0' 5.0' MIN. � --I�--1----------- ��a----t------t--� \ � I ---------+��--- I I � � �I -- I N � -----------� TYPICAL POOL - RIGHT MEANDER 0 = THALWEG LOCATION TIE BACK TO EXISTING GRADE AT 2:1 SLOPE (TYPICAL) 5.0' MIN. 5.0' 9.0' 5.0' MIN. I I W�a I I --�------+---- ----------�--�- - `� Wbkf I I � m N TYPICAL POOL - RIGHT MEANDER 0 = THALWEG LOCATION PROPOSED PROFILE REACH - SITE 3B STATION 20+00 TO 21+70 PROFILE - SITE 3B TIE BACK TO EXISTING 10.0' , GRADE AT 2:1 SLOPE � (TYPICAL) 5.0' MIN. I 2J' + 2.3' 1 2.3' I 2J' I 5.0' MIN. i II II¢ OII¢ II i II II i aim �im i i i i - -�-----OI�--��-�I��7---+------�--� I---II -_ II Wbkf� __ � I�i � I - M ----- ----- p TYPICAL RIFFLE 0 = THALWEG LOCATION 5.0' MIN. 9.0' 5.0' 5.0' MIN. � � �\\-i --i----------- I� a----fi------r--� ---------+��--- � � �. � I N I TYPICAL POOL - RIGHT MEANDER 0 = THALWEG LOCATION TIE BACK TO EXISTING GRADE AT 2:1 SLOPE (TYPICAL) 5.0' MIN. 5.0' 9.0' 5.0' MIN. --�------+----'nrc�'a --------r--�I- - � Wbkf � I � m N TYPICAL POOL - RIGHT MEANDER 0 = THALWEG LOCATION STRUCTURES - SITE 3A STATION ELEVATION STRUCTURE 10+00.00 887.20 ROCK SILL-BEGIN 10+12.62 887.06 ROCK SILL-END 10+Z0.49 887.06 ROCK SILL-BEGIN 10+35.70 886.89 ROCK SILL-END 10+48.07 886.89 ROCK SILL-BEGIN 10+62.40 886.74 ROCK SILL-END 10+62.40 856.74 STEP POOL-SILL 10+77.65 88626 ROCK SILL-BEGIN 10+gg.gZ 856.13 ROCK SILL-END 11+04.99 886.13 ROCK SILL-BEGIN 11+20.98 885.95 ROCK SILL-END 11+Z0.98 885.95 STEP POOL-SILL 11+35.97 855.49 ROCK SILL-BEGIN 11+51.15 885.32 ROCK SILL-END 11+58.92 855.32 ROCK SILL-BEGIN 11+70.21 88520 ROCK SILL-END 11+g0.45 85520 ROCK SILL-BEGIN 11+93.81 885.05 ROCK SILL-END 11+g3.81 855.05 STEP POOL-SILL 12+04.79 884.61 ROCK SILL-BEGIN 12+20.64 854.44 ROCK SILL-END 12+31.26 884.44 ROCK SILL-BEGIN 12+4g.58 85425 ROCK SILL-END 12+55.28 88425 ROCK SILL-BEGIN 12+72.53 854.06 ROCK SILL-END 12+g1.13 884.06 ROCK SILL-BEGIN 12+g7.93 853.87 ROCK SILL-END 12+g7.93 883.87 STEP POOL-SILL 13+15.26 853.37 ROCK SILL-BEGIN 13+30.89 88320 ROCK SILL-END 13+40.64 85320 ROCK SILL-BEGIN 13+72.60 882.85 ROCK SILL-END STRUCTURES - SITE 3B STATION ELEVATION STRUCTURE 20+00.00 886.60 ROCK SILL-BEGIN 20+11.89 886.47 ROCK SILL-END 20+22.05 886.47 ROCK SILL-BEGIN 20+37.00 886.30 ROCK SILL-END 20+37.00 886.30 STEP POOL-SILL 20+51.94 885.70 ROCK SILL-BEGIN 20+65.97 885.55 ROCK SILL-END 20+72.72 885.55 ROCK SILL-BEGIN 20+g4.31 885.42 ROCK SILL-END 20+84.31 885.42 STEP POOL-SILL 20+g4.33 884.83 ROCK SILL-BEGIN 21+08.24 884.68 ROCK SILL-END 21+08.24 884.68 STEP POOL-SILL 21+18.38 884.09 ROCK SILL-BEGIN 21+34.67 883.91 ROCK SILL-END 21+34.67 883.91 STEP POOL-SILL 21+48.41 883.31 ROCK SILL-BEGIN 21+69.53 883.00 ROCK SILL-END � z 0 � > w � a � _ h � 0 a � a�/ i� 0 � � � �� = w �o U �, � xa w z 1����� � � w wN � �z �� o� oa a, U �n = Y� �o oZ x= w� �w a� Q M J m � W rn W m � � Z N � � j Z _ � � H � W � Z � � � � � �.�..� J � � Z � W U O Z � � � Z � � � PROFILES AND CROSS- SECTIONS Q Z 0 � Q U 2 F � O Z � z � O U _ r � � O � SHEET 3 OF 8 1���� 11�4� 22��� 2��D� 24�D� 26�D� 2�.�� 22 ��� z2.�� a H� � H O � a c� a cc 0 � � � F � z Z W � ¢ N � p � Z ������ � 2 W � Q M # W � W m � � Z N � � j Z _ � 0 � � W � Z � � � � � W J � � Z � W U OZ� � � z � onTe�. MAV 2015 PLANTING PLAN W N F Q � 2 f/1 J �� 0 ¢ a, U f� _ Y ~ �� O� Z XS �� � W V� Q z J � � Q U 2 F � O Z Z � O U x � � � � 0 � PLANTING DETAILS ❑ TYPE 1 STREAMBANK REFORESTATION SHALL BE PLANTED 3 FT. TO 5 FT. LIVE STAKES PLANTING DETAIL BAREROOT PLANTING DETAIL � DIBBLE PI.ANTING METHOD ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER, s > USING THE KBC PLANTING BAR APPROXIMATELY 2724 PLANTS PER ACRE. � LIVE STAKE ❑ TYPE 2 STRF.AMBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. �iI ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER, �� �� � 2 inch APPROXIMATELY 680 PLANTS PER ACRE. S�IJARE CUT � � � I I� I- I � I-I � I-� I I I � I-I I I- I �-I I I-I � I I I � I- �l I I I — � �_� � � � � � �� � �_� � � �_� � � � � �_� � � � �L �l�i i i ❑ NOTE: TYPE 1 AND TYPE 2 STREAMBANK REFORESTATION SHALL BE iT�� ��� i � �—� � �—�I � � �=�I=� � � i=�I=� � � i W— -1 I— I I— I I C—I I I—I —I I I—I I I_ I I I—I I�I I I H I_ II LLI 1-1 I I— — II— I III I— —��l � Buos cFnciNc uPwaRm �� i T�—�—�Ti��� �i� ���G��li—��--I�—III�� ��T�����TiIl�TI�—�Ti� PAID FOR AS "STREAMBANK REFORESTATION" y 1. Insert planting bar 2. Remove planting bar 3. Insert planting bar � as shown and pull handle and place seedling at 2 inches toward planter toward planter. correct depth. from seedliug. y LIVE CUTTING � (I/2'-2" DIAMETERI 2 - 3 Feet STREAMBANK REFORESTATION TYPICAL a a ANGLE CIJT 30°-45° � 0 ,�. 1► I TI'PE II I � � � I TYPE I ~= Z W� w �Q U �Z �a N �� I� I— II I�II� II II—� II�III I I—�II I�III—I� x� W �a � � �—�_� � I= � I � I—� I I—� I I I I I �—I I � I—I I I a Z tn = � ��L���� � u=�� ���—��� �� ��—��� ����—�� g�K � I -,� � � I I=� -� I I-� I I I I I-I � I � I-I I I I g FT, I a p z III I I Jl� I--I11�1 I I I-ll I I I-1 I�I I 1=1I j����� Z � W II II II I I FI I 1-1 I-1I I- I I 111=11_I=1�1�-1=1 I�l�l I I— I I-1 I I-1 I I � x= I-1 I I-1 I I-1 I I_ --� I I I- I —_ = w N� 6 Leave compac6on � a 4. Pull handle of bar 5. Push handle forward � a� toward planter, firming firming soil at top. hole open. Water I� I w soil at bottom. thoroughly. � - - COIR FIBER MAT STRFAM � LIVE STAKES� Q PLANTING NOTES: �m * Q wrnw z PI,AN1'ING BAG m r� J During planting, seedlings � Z N� � shall be kept iu a moiat �/ � Q canvas bag or similar � I I w� Z U = coata�aer to pre�eot t6e STR�AMBANK REFORESTATION =*k � � root systems from drying. � � EXISTING/PROPOSED � cRauNo MIXTURE, TYPE, SIZE, AND FiJRNISH SIIAI,I. CONFORM TO THE FOLLOWING: � IU � z � TYPE 1 Z p � � �� �c r�rriNc sax 50% SALIX 1VIGRA BLACK WILLOW 2 ft — 3 ft LIVE STAI�S w� w � Planting bar shall have a J��' � U biaae �;� a�i��i� 50% CORNUS AMOMUM SILKY DOGWOOD 2 ft — 3 ft LIVE STAI�S Z� w } EXISTMG/PROPOSED cross secdon, and shall STREAMBED be 12 iuchealong, 4 inches wide and "�'p�+ 2 � Z� O 1 inch thick at center. BANK sraBiuzaTioN wirH uvE srAKEs 25% FRAXINUS PENNSYLVANICA GREEN ASH 12 in — 18 in BR ��� " z NOTE: n,��,� n� j LNE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET 25% PLATANUS OCCIDENTALIS SYIw[i1V1O1LL. 12 111 - iH 111 BR � ON CENTER il��Iiii LIVE STAKES SHALL BE DRIVEN 11NTIL APPROXIMATELY %q ROOT PRLi1VING 25/o QUERCUS PHELLOS �'�'1LLOW OL-1[� 12 111 - iH 111 BR OF LNE STAKE IS WITHIN GROl1ND All seedlings sha�� be root � onre: MAY 2015 pruued, if necessary, so that SCALE: na �oots exte�a more �� 25% QUERCUS NIGRA WATER OAK 12 in — 18 in BR 10 inches below the root collar. PLANTING PLAN SHEET 5 OF 6 FILTER FABRIC TOP OF BANK 3� ELEVATION POINT � (SEE PROFILE SHEET) LL I BOULDERS 1 (SEE NOTE � FOR SIZE) � I C � 1 I I I FILTER � FABRIC I ROCKSILL � (USEDOUBLE YLA ER SILL FOR STEP POOLS, I SEE DETAIL BELOV� � I I I � ELEVATION POINT — (SEE PROFILE SHEET) PLAN VIEW REACH 3A & 3B Wbkf (ft) 10.0' Dmax (k) 1.7' q TOE OF � BANK HEAD OF 18" NOM. THICKNESS WELL RIFFLE GRADED MIX OF (60%) CLASS "1", � (20 % ) CLASS "B", (10 % ) CLASS "A", AN� (10%) N0. 57 STONE V "'� ��/ �o� "'- t ROCKSILL // //A// / 8� (usE oous�E �nvER ����� � � SILL FOR STEP POOLS, SEE �ETAIL BELOV� 3' MINIMUM GEOTEXTILE SECTION A-A COIR FIBER Dmax MATTING (NP.) � 1/3 Dmax � CENTER BOULDER 2"-4" LOWER THAN ABUTTING BOULDER TO ENCOURAGE FLOW THROUGH CENTER OF CHANNEL DURING LOW FLOWS. � TOE OF � RIFFLE I � ROCK SILL DETAIL NOT TO SCALE SECTION B-B 18"NOM.THICKNESS WELL GRADED MIX OF (60%) CLASS "1", COIR FIBER (20%) CLASS "B", (10%) CLASS "A", MATTING (NP) AND (10%) NO. 57 STONE 1/3 Dmax �� ° ��°� o � TOE OF SECTION C—C BANK NOTE: 1. BOULDERS SHOULD BE NATIVE STONES OR SHOT ROCK, ANGULAR AND OBLONG, WITH AN AXIS APPROXIMATELY 3'Lx2'Wx1.5'D STONE BOULDER SILL (NJO LAYERS) � Cw7 Q w I N I � � I � 13 y �O z m I I O I� o � ~ I I I I I HEAD OF I RIFFLE � I I I I I RIFFLE � I I I I W J � Y z m a 0 18" NOM. THICKNESS WELL P I I GRADED MIX OF (60%) CLASS "1", � O 6' MIN AND�(10o)N0.57�STONEASS"A", �Oo � / � STONETOE: � / START ROCK2FT � BELOW WATERS EDGE � AND EXTEND TO 0 SFT � ABOVE WATERSEDGE � / � O� ��� / �/ QO f F��N1 o�� � R�FF�� PLAN VIEW NOTES: 1. BOULDERS SHOULD BE NATIVE STONES OR SHOT ROCK, ANGULAR AND OBLONG, WITH AN AXIS APPROXIMATELY 3'Lx2'Wx1.5'D 2. BOULDER SILLS TO EXTEND 5' MINIMUM INTO STREAM BANKS FOR STEP POOL STRUCTURES. FILTERJ STONE� FABRIC BOULDERS STEP POOL DETAIL NOT TO SCALE SEE PROFILE SHEETS FOR STATIONS AND ELEVATIONS BASEFLOW FINISHED '�--�--�r GRADE _m�_�_ _ ]1�� --III � I=1 I 1=� � �_� � _ =�=1J1=I I I—I I I—I I I— IIIII���III���II ���—���=���III �� I ���_���=���=III=���=�� 18" NOM. THICKNESS FILTER FABRIC WELL GRADED MIX (KEY IN UNDER OF (60%) CLASS "1", STREAM BED) (20 % ) CLASS "B", (10 % ) CLASS "A", AND (10%) N0.57STONE PROFILE VIEW `\ / SILT BAG WITH UTILIZEASTABILIZED _ ` a OUTLET FOR THE �� ROCK PAD DISCHARGE OF I r CLEAN WATER I\ 1 DEWATERING IMPERVIOUS DIKE I PUMP � I ` I EXISTING � CHANNEL I I TEMPORARV � ' IMPERVIOUS DIKE FLEXIBLE HOSE I � I I � I CONTRACTOR MAY UTILIZE I � 1 ACCEPTABLE MATERIALS TO 1 INCLUDE SHEET PILES, SANDBAGS, I I I FLOW INLET FOR CLEAN AND/OR THE PLACEMENT OF AN ' WATER TO BE RAISED ACCEPTABLE STONE LINED WITH I � OFF OF STREAM POLYPROPOLENE OR OTHER BOTTOM.THIS MAV IMPERVIOUS FABRIC. EARTH I REQUIRE PLACEMENT MATERIALS SHALL NOT BE USED I ` OF GRAVEL UNDER TO CONSTRUCT THE IMPERVIOUS INTAKE. DIKES. , � � \ ` 1 ` 1 � f �. ��� � �-1 � � PUMP-AROUND \ � PUMP � � �� SEQUENCE OF DEWATERING OPERATIONS� � � � � � ' ANY DEVIATION FROM ABOVE DEWATERING PLAN WILL REQUIRE DESIGNERAPPROVAL. 1. INSTALL SILT BAGS(S) AND ROCK PAD(S). 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS �IKE AND PUMPING APPARATUS. DEWATERENTRAPPEDAREA. 5. PERFORM REPAIR WORK IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE (DOWNSTREAM IMPERVIOUS DIKES FIRST). 7. REMOVE SILT BAG(S) AND STABILIZE DISTURBED AREA WITH SEED AND MULCH. EXAMPLE OF PUMP-AROUND OPERATION NOT TO SCALE STILLING BASIN MAINTENANCE: 1. SEDIMENT BAGS SHOULD BE REPLACED WHEN THE CAPACITV OF THE SEDIMENT BAG HAS EXCEEDED 50%. 2. ACCUMULATED SEDIMENT SHOULD BE DISPOSED OF IN A DESIGNATED DISPOSAL AREA. 3. SPENT BAGS SHOULD BE DISPOSED OF PROPERLY AND NOT BURIED. 4. GRAVEL PADS SHOULD BE CHECKED DAILY DURING USE TO ENSURE THAT GRAVEL HAS NOT BEEN WASHED AWAY OR BEEN CHOKED BY EXCESSIVE SEDIMENTATION. 5. REPLACE PAD WITH CLEAN GRAVEL, AS NEEDED. EXISTING TERRAIN SILT BAG � s.o - zo.o n. FILTER FABRIC STREAMBANK S.O IN., STONE FOR EROSION CONTROL, CLASS A NOTE: PROVIDE STABILIZED OUTLET DOWN BANK TO STREAM SPECIAL STILLING BASIN (SILT BAG) WITH ROCK PAD NOT TO SCALE O � � y � O a � a 0 F F �= W �o U m � �¢ w ¢ ������ Z C7 z w Q M � w � W m � � Z N � � � Z _ � � � � U � Z O � � � � W J � Q' Z � W U � Z � � � Z > wN � �z �� o� Oa �U N= Y � �O OZ xx �� �J v� Q Z J � � Q U 2 F � � Z H Z 7 � U 2 � � � O � � DETAILS LAY FILTER FABRIC OVER UPSTREAM - TOP EDGE OF SILL ROCK(S); BEHIND RLTER FABRIC, BACKFILL WITH #57 STONE, CLASS A OR B STONE AND/OR NATURAL STREAM MATERIALS. PROPOSED � PROFILE TEMPORARY AND PERMANENT SEED MIXES: THE CONTRACTOR SHALL UTILIZE LINE ITEMS 317, 318 & 336 OF THE CONTRACT FOR SEED/FERTILIZER/MULCH IN ALL DISTURBED AREAS WITHIN THE STREAM PROJECT LIMITS. SEE TABLE BELOW. LINE ITEM DESCRIPTION UNIT 312 TEMPORARY SILT FENCE LF 317 SEED FOR TEMP SEEDING LB 318 FERT FOR TEMP SEEDING TON 336 SEEDING AND MULCHING ACR GROUND STABILIZATION SITE AREA STABILIZATION DESCRIPTION TIME FRAME PERIMETER DIKES, SWALES, DITCHES 7 DAYS AND SLOPES HIGH QUALITY WATER (HQV� 7 DAYS ZONES SLOPES STEEPER 7 DAYS THAN 3:1 SLOPES 3:1 OR 7 DAYS FLATTER ALL OTHER AREAS WITH SLOPES FLATTER 7 DAYS THAN 4:1 INSPECTIONS WEEKLY INSPECTIONS REQUIRED. RAIN GAUGE MUST BE PRESENT AT SITE. INSPECTIONS REQUIRED AFTER 0.5" RAIN EVENTS. INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS". INSPECTION REPORTS MUST BE AVAILABLE ON-SITE DURING BUSINESS HOURS UNLESS A SITE SPECIFIC EXEMPTION IS APPROVED. RECORD MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. ELECTRONICALLY-AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. NOTES: 1. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONSTRUCTION OF THE PROJECT TO PREVENT EROSION 6. SEE NCDOT STANDARD SPECIFICATIONS, SECTION 1605 FOR SILT FENCE SPECIFICATIONS. AND SILTATION. EROSION CONTROL MEASURES SHALL BE INSTALLED AND SILT FENCE SHALL BE INSTALLED APPROXIMATELY 8' FROM THE TOP OF BANK MAINTAINED IN ACCORDANCE WITH THE PROJECT PLANS, NORTH CAROLINA FOR THE PROJECT STREAM PRIOR TO THE COMMENCEMENT OF DISTURBANCE SEDIMENT AND EROSION CONTROL GUIDELINES AND AS DIRECTED BY ACTIVITIES. SILT FENCE SHALL BE TEMPORARILY REMOVED IN EACH ISOLATED THE DESIGNER. WORK AREA TO PERMIT GRADING OF THE RESTORED STREAM. IMMEDIATELY 2. ALL REPAIR WORK SHALL BE PERFORMED IN DRY OR ISOLATED AREAS, WITH FOLLOWING THE COMPLETION OF STABILIZATION MEASURES FOR EACH ISOLATED NO STANDING WATER OR WATER FLOWING THROUGH THE WORK AREA. AREA AND PRIOR TO THE INITIATION OF WORK ON ANOTHER SECTION, THE SILT 3. ALL EXCAVATED MATERIAL SHALL BE STOCKPILED WITHIN THE LIMITS OF FENCE SHALL BE REINSTALLED AT ITS ORIGINAL LOCATION. SILT FENCE SHALL BE DISTURBANCE FOR LATER REUSE OR DISPOSAL. THE CONTRACTOR IS MAINTAINED HEREAFTER AND SHALL NOT BE REMOVED UNTIL GROUND COVER RESPONSIBLE FOR INSTALLING APPROPRIATE STABILIZATION MEASURES HAS BEEN FULL ESTABLISHED WITHIN THE LIMITS OF DISTURBANCE. SILT FENCE AROUND THE STOCKPILE AREA(S) AND ANY TEMPORARY OR PERMANENT SHALL ALSO BE INSTALLED ON THE LOW SIDE OF ANY TEMPORARY STOCKPILES OF SPOIL AND TOPSOIL PILES TO PREVENT EROSION AND SEDIMENTATION. ALL EXCAVATED MATERIAL. PERMANENT OR TEMPORARY SPOIL PILES SHALL HAVE SILT FENCE INSTALLED 7. ALL DISTURBED SOILS WILL BE SEEDED FOR VEGETATIVE STABILIZATION ON THE LOW SIDE OF THE SPOIL PILES. FOLLOWING THE GUIDELINES DESCRIBED ON THIS SHEET AND ACCORDING 4. A TEMPORARY PUMP-AROUND SHALL BE UTILIZED BY THE CONTRACTOR TO THE FOLLOWING SCHEDULE: TEMPORARY OR PERMANENT SEEDING DURING WORK ON THE STREAM TO DIVERT FLOW FROM AND DEWATER MUST BE APPLIED ON ALL GRADED SLOPES AND FILL WITHIN 7 CALENDAR THE DESIGNATED AREA IN ORDER TO WORK. THE TEMPORARY DAYS, PERMANENT SEEDING MUST BE APPLIED TO ALL DISTURBED AREAS PUMP-AROUND USED BY THE CONTRACTOR SHALL MEET ALL REQUIREMENTS WITHIN 15 WORKING DAYS OR 90 CALENDER DAYS. SPECIFIED IN THESE PLANS. THE TEMPORARY PUMP-AROUND SHALL BE 8. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR INSTALLED AND REMOVED IN ACCORDANCE WITH THE MANUFACTURER'S STABILITY AND FUNCTIONAL OPERATION FOLLOWING EVERY RUNOFF GUIDELINES. TWENTY-FOUR (24) HOURS PRIOR TO THE INITIATION OF PUMP-AROUND PRODUCING RAIN EVENT AND/OR AT LEAST ONCE PER WEEK. ANY NEEDED ACTIVITIES, THE CONTRACTOR SHALL MEASURE THE APPROXIMATE FLOW MAINTENANCE OR REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL RATE AT THE PUMP-AROUND LOCATION. THE FLOW RATE SHALL BE SUBMITTED MEASURES AS DESIGNED. ACCUMULATED SEDIMENT SHALL BE REMOVED FROM TO THE DESIGNER FOR APPROVAL. THE CONTRACTOR SHALL, THEREAFTER, CONTROL MEASURES WHEN THEY REACH APPROXIMATELY 50°/a OF THEIR UTILIZE A PUMP(S) SUFFICIENT TO ACCOMODATE 120% (1.2 TIMES) THE APPROVED FUNCTIONAL CAPACITY. THESE MEASURES SHALL BE REPAIRED IF DISTURBED FLOW RATE. DURING MAINTENANCE. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED 5. IN THE EVENT OF A STORM, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE AND MULCHED, AS NECESSARY, TO PROMOTE THE ESTABLISHMENT OF REMOVAL OR PROTECTION OF ANY EQUIPMENT, TOOLS, MATERIALS OR VEGETATION COVER. OTHER ITEMS NEEDED TO COMPLETE THE WORK THAT COULD BE AFFECTED BY STORM FLOWS. CONSTRUCTION SEQUENCE: THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE SEQUENCE OF CONSTRUCTION IN ACCORDANCE WITH THE PLANS, AS DIRECTED BY THE DESIGNER. CONSTRUCTION SHALL PROCEED IN THE SPECIFIED MANNER UNLESS OTHERWISE DIRECTED OR APPROVED BY THE DESIGNER. THE FOLLOWING PROVISIONS, ALONG WITH THE INSTRUCTIONS CONTAINED IN THE PLANS, CONSTITUTE THE SEQUENCE OF CONSTRUCTION. GENERAL SITE NOTES: - ALL PUMP AROUND OPERATIONS SHALL BE INSTALLED IN A MANNER THAT IT WILL BE ALLOWED TO RUN 24 HOURS A DAY UNLESS CHANNEL WITHIN THE PUMP AROUND LOCATION CAN BE STABILIZED WITHIN THE WORK DAY. - UPON APPROVAL FROM THE DESIGNER, PHASES 2 THROUGH 4 MAY BE CONSTRUCTED IN A DIFFERENT SEQUENCE THAN INDICATED BELOW OR CONCURRENTLY. PHASE 1: INITIAL SITE PREPARATION. 1. INSTALL EROSION CONTROL DEVICES IN ACCORDANCE WITH THE SITE STABILIZATION PLAN AND AS DIRECTED BY THE DESIGNER. PHASE 2: COMPLETE STREAM RESTORATION OF SITE 3A - STA 10+00 TO 13+50 2. BEFORE CONSTRUCTION ACTIVITIES START, INSTALL PUMP AROUND OPERATIONS AS DESCRIBED IN THESE PLANS. 3. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT. 4. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM. PHASE 3: COMPLETE STREAM RESTORATION OF SITE 3B 5. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT. 6. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM. PHASE 4: COMPLETE STREAM RESTORATION OF SITE 3A - STA 13+50 TO 14+00 7. BEFORE CONSTRUCTION ACTIVITIES START, INSTALL PUMP AROUND OPERATIONS AS DESCRIBED IN THESE PLANS. THIS MAY REQUIRE SIMULTANEOUSLY PUMPING AROUND THE UPSTREAM PORTION OF SITE 3A AND SITE 3B. 8. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT. 9. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM(S). PHASE 5: PLANTING 10. INSTALLING LIVE STAKES AND BARE ROOT TREES CAN BE INITIATED PRIOR TO, AFTER, OR CONCURRENTLY AS PHASES 2-4 ARE COMPLETED, AS LONG AS THE PLANTING OCCURS AFTER DISTRUBANCE IS COMPLETE AND STABILIZATION IS INITIATED. LIVE STAKES AND BARE ROOT TREES SHALL BE INSTALLED DURING THE DORMANT SEASON (NOVEMBER 6- MARCH 24). PREPARE AND INSTALL LIVE STAKES AND BARE ROOT TREES IN ACCORDANCE WITH THESE PLANS AND AS DIRECTED BY THE DESIGNER. **' IF CONSTRUCTION OCCURS OUTSIDE OF THE DORMANT SEASON, UPON APPROVAL OF THE DESIGNER, PHASE 5 SHALL BE COMPLETED IN THE DORMANT SEASON, AFTER PHASE 6. PHASE 6: COMPLETION OF PROJECT SITE 11. REMOVE ALL REMAINING WASTE MATERIALS AND RESTORE THE REMAINING DISTURBED AREAS TO THEIR PRIOR CONDITION. SEED AND MULCH ALL DISTURBED AREAS UTILIZING THE SEED AND MULCH MIXES SPECIFIED IN THE PLANS. a N� � � 0 � a c� a oc � � F �= w � o U � m �¢ � W Z z ������ � � z w Q M J C� � m � H Z N � � j Z =�0 H � W � Z O O � � � W J � � Z � W U � z � Z � N� w� � sZ �� 00 aQ �U �� Y� �o oZ x= m� �w v� Q z O � U x � � 0 z � � O U x � � � � O � SCALE: SITE STABILIZATION PLAN SHEET 8 OF 8 Site 3a/b Existing Existing Reference Reference proposed Proposed Variables (common (common Tl T2 design design Tl T2 ratios) ratios) Rosgen Stream Type E4 E4 B4 streams C,E4 streams E4 E4b Mitigation Type Restoration Restoration Restoration Restoration Restoration Restoration Drainage Area (mi�) 012 0.14 n/a n/a 012 0.14 Bankfull Width (Wbke) (ft) 8.2 11.4 10.0 10.0 Bankfull Mean Depth (db�) (ft) 13 1 1.1 11 Bankfull Cross-Sectional area (Ab�) (ft�) 10.9 10.9 10.9 10.9 Width/depth Rario (Wb�1de�) 6.2 12 12.0-18.0 10.0-14.0 9.2 9.2 Maximum Depth (dmbkf) (ft) 2 13 1.7 1.7 Width of flood prone area (W�,a) (ft) >18 >20 27 27 Entrenchment Ratio (ER) >2.2 >2.2 2.7 2.7 Sinuosity (stream length/valley length) (K) 1.2 11 11-1.2 1.2-1.6 1.1 11 Pool Depth - mean (ft) - - 1.5 1.5 Riffle Depth - mean (ft) 13 1 1.1 11 Pool Depth - max (ft) - - 2.9 2.9 Pool Width (ft) - - 14.0 14.0 � Riffle Width (ft) 8.2 11.4 10.0 10.0 0 '� Pool XS Area (s fl - - 20.7 20.7 � � Riffle XS Area (s� 10.9 10.9 10.9 10.9 Q Pool depth/mean riffle depth - - 1.4 1.4 Pool width/riffle width - - 1.1-1.5 1.3-1.7 1.4 1.4 Pool area/riffle area - - 1.9 1.9 Max pool depth/dbkf - - 2.0-3.5 2.0-3.5 2.6 2.6 Bank Height Ratio (BHR) 1.8 1.6 1.0 1.0 1.0 1.0 Meander length (L,,,) (ft) - - 42-56 42-50 Radius of curvature (R�) (ft) - - 15-25 13-25 � Belt width (Wb1t) (ft) - - 19-22 15-26 � Meander width rario (Wbi�/We�) - - n/a 3.5-8.0 1.9-2.2 1.5-2.6 Radius of curvature/bankfull width - - n/a 2.0-3.0 1.5-2.5 13-2.5 Meander length/bankfull width - - na 7.0-12.0 4.2-5.6 4.2-5.0 Valley slope 0.0141 O.0113 0.0114 0.0222 Average water surface slope 0.0108 0.0172 0.0110 0.0212 Riffle slope 0.011 0.0028 O.011 0.011 Pool slope - - 0 0 Pool to pool spacing - - 20-30 20-28 ti' Poollength - - 7-17 7-15 0 � � Riffle slope/avg water surface slope 1.02 0.16 11-1.8 1.5-2.0 1.00 0.52 Pool slope/avg water surface slope - - 0.0-0.40 0.0-0.20 0 0 Pool length/bankfull width - - 0.7-1.7 0.7-1.5 Pool to pool spacing/bankfull width - - 1.5-5.0 4.0-7.0 2.0-3.0 2.0-2.8 <-- with low sinuosity <--- We did not meander our stream, tried to keep it near existing path, so ended up lower ratio �--- We did not meander our stream, tried to keep it near existing path, so ended up lower ratio <-- high because of 4 drops, new floodplain, riffle slopes at 0.011 <-- high because of drop after sewer line, proposed higher due to added pools, riffle slopes at 0.011 <-- very low slope up top where cross section taken, has not incised yet like bottom section <-- low because of 4 drops, high water slope �<-- �,��ry Ir�v�� slc���� up io� vuhere �rc�ss s�cti�n taken, i�as nat inuis�rJ yet like bottorn s�ctian T1 and T2 do not have distinct bed features, therefore no pattern data were collected and only limited dimension and profile data were collected.