Loading...
HomeMy WebLinkAbout20180198 Ver 2_Mitigation Evaluation_20190306Strickland, Bev From: Merritt, Katie Sent: Wednesday, March 06, 2019 3:06 PM To: Angela Allen Cc: 'Andrea Eckardt' Subject: RE: [External] Sassarixa Attachments: Sassarixa_PJDstreams_3_5_19.pdf Angela, I talked to Sam and looked at my notes from last year and will accept TIC and TIB as being intermittent streams without having to perform a site visit. I will issue a viability letter for those two streams using the attached map. I have some other letters in the Queue, so it may take a couple of weeks to get it to you. Thanks, Katie From: Merritt, Katie Sent: Wednesday, March 06, 2019 9:25 AM To: Angela Allen <aallen@wildlandseng.com> Subject: Re: [External] Sassarixa Hey Angela, let me take a look at everything you sent and what I have on file for this site and I will get back you. Get Outlook for iOS From: Angela Allen <aallen@wildlandseng.com> Sent: Tuesday, March 5, 2019 10:50 AM To: Merritt, Katie Subject: [External] Sassarixa External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Katie, Sorry for the lapse in time from my initial email. We just did the PJD walk with Sam from the Corps and finalized our stream calls at Sassarixa Swamp. I've attached a map for you. The additional stream calls on site are TIB and TIC. TIB was identified as a potential jurisdictional feature during the IRT walk that we went back and ran forms on. TIC was found during our extensive site visits post -IRT walk. If you would like to schedule a site walk to confirm these features as well please let me know. I am happy to also forward stream forms or any other information you'd need to see on these streams for a buffer viability letter. Most of TIC is in the Sassarixa Creek buffer, but the very upstream limit would have a small buffer (as you can see on the easement outline. I also wanted to verify something for the Sassarixa Creek buffers. Sassarixa Creek is an anabranching channel. There is a mainstem and a few smaller side channels throughout the floodplain. One is shown on the attached map. Am I correct in 1 assuming that the side channels will need to be removed from our square footage buffer calculations? This is the first time we've encountered such channels in a buffer project. Thanks, Angela Angela Allen, PE I Water Resources Engineer 0:919.851.9986 x106 M: 703-655-6110 Wildlands Engineering, Inc. 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Figure 3a Site Map - Sheet 1 Sassarixa Swamp Mitigation Site W I LD LAN D S 0 112.5 225 Feet Neuse River Basin (03020201) ENGINEERING I I I I I Johnston County, NC