Loading...
HomeMy WebLinkAboutMayo Coal Pile Assessment Comments Letter_20190214ROY COOPER Governor HCHAEL S. REGAN Secretary LINDA CULPEPPER Director Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 NORTH CAROLINA Environmental Qualtty February 14, 2019 Subject: Mayo Steam Electric Plant Coal Pile Groundwater Assessment Plan Comments Dear Mr. Draovitch: On January 24, 2019, the North Carolina Department of Environmental Quality Division of Water Resources (Division) received the proposed Groundwater Assessment Plan for the Coal Pile at the Mayo Steam Electric Plant. The Division has reviewed and hereby approves the proposed assessment activities under the condition that the following items are addressed as part of the plan implementation and the results reported in the facilities updated Corrective Action Plan (CAP). • If the physical well locations of the proposed monitoring wells deviate by approximately one hundred (100) feet from the original proposed locations, please contact the Raleigh Regional Office prior to boring/well installation. If applicable, the results should also be incorporated into the updated CAP's revised geochemical and groundwater fate and transport models. If the results of the modeling show current or future impacts to groundwater and/or surface water from this area, then appropriate remedial strategies shall be proposed in the CAP. If you have any questions, please contact Eric Rice (Raleigh Regional Office) at (919) 791-4200 or Steve Lanter (Central Office) at (919) 707-3667. OPO 'A North Carolina Department of Environmental Quality Division of Water Resources Q512 North Salisbury Street 1 1636 Mail Service Center Raleigh, North Carolina 27699-1636 W,*ua;= a.r.r.Ww.++r....ti+m+a 919.707.9000 Sincerely, Jon Ri ard, Chief Animal Feeding Operations and Groundwater Section cc: RRO WQROS Regional Office WQROS Central File Copy