HomeMy WebLinkAboutNC0026271_Authorization to Construct_20190304 ,. surf
. •yr„i ra y,•.
ROY COOPER i"1 # "
t c 9 ; a
Governor , r
MICHAEL S.REGAN
' ' '
Secretory .,' .,-, •
LINDA CULPEPPER NORTH CAROLINA
Director Environmental Quality
March 4, 2019
Mr. David Odom
Town Manager
Town of Taylorsville
67 Main Avenue Drive
Taylorsville,North Carolina 28681
SUBJECT: Authorization to Construct
A to C No. 026271A04
Town of Taylorsville
Taylorsville WWTP
NPDES Permit No. NC0026271
Dear Mr. Odom:
A letter of request for an Authorization to Construct was received on November 1, 2018,
by the Division of Water Resources (Division), and final plans and specifications for the subject
project have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 0.83 MGD Taylorsville WWTP, with discharge of
treated wastewater into the Lower Little River in the Catawba River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
Installation of a new mechanical spiral screen capable of treating 2.5 MGD at peak hourly
flow and a new channel grinder with piping, automatic controls, and monitoring; in
conformity with the project plans, specifications, and other supporting documentation
comprising the ATC Permit Application package submitted to the Department of
Environmental Quality.
This ATC is issued in accordance with Part III, Paragraph- A of NPDES Permit No.
NC0026271 issued effective July 1,2015, and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in
Permit No.NC0026271.
It is the Owner's responsibility to ensure that the as-constructed project meets the
requirements of all applicable regulations and statutes, the ATC Permit Application package, and
all of the requirements contained herein. Failure to comply may result in penalties in accordance
with North Carolina General Statute §143-215.6A through §143-215.6C.
.,_ North Carolina Department of Environmental Quality 1 Division of Water Resources
-"if) 512 North Salisbury Street I 1617 Mail Service Center 1 Raleigh.North Carolina 27699 1617
JJ ti4
919.707.9000
Mr.David Odom,Town Manager
March 4, 2019
Page 2 of 3
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a Professional Engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit and the ATC Permit Application package.
Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail
Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the project plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the Permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Mr.David Odom,Town Manager
March 4, 2019
Page 3 of 3
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and
all statutes,rules,regulations, or ordinances which maybe imposed by other government agencies
(local, state, and federal) which have jurisdiction.
If you have any questions or need additional information,please contact Cassidy Kurtz at
telephone number(919) 707-3613.
Sincerely,
Braet.1
if Linda Culpepper
Director, Division of Water Resources
With Engineer's Certificate attached:
cc: DWR Mooresville Regional Office, Water Quality Programs
Central Files
ecopy: Benjamin B. Thomas,P.E.
West Consultants, PLLC.
Email: bthomas@west-consultants.com
NPDES File
Without Engineer's Certificate attached:
cc: Alexander County Health
DWI/ Steve Tsadwa, steve.tsadwa@ncdenr.gov
Town of Taylorsville
Taylorsville WWTP
Authorization to Construct No. 026271A04
Issued March 4, 2019
NPDES Permit No.NC0026271
Engineer's Certification
I, ,as a duly registered Professional Engineer in
the State of North Carolina,having been authorized to'observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Taylorsville Wastewater
Treatment Plant, located in Alexander County,hereby state that,to the best of my abilities, due
care and diligence was used in the observation of the following construction:
Installation of a new mechanical spiral screen capable of treating 2.5 MGD at
peak hourly flow and a new channel grinder with piping, automatic controls,and
monitoring; in conformity with the project plans, specifications,and other
supporting documentation comprising the ATC Permit Application package
submitted to the Department of Environmental Quality.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance,intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature Registration No.
Date /
Mail this Certification to: Attn: Bing Bai SEAL
Complex Permitting Unit
DEQ/DWR/Water Quality Programs
1617 Mail Service Center
Raleigh,NC 27699-1617