Loading...
HomeMy WebLinkAbout20190293 Ver 1_PCN Form Submission_20190301DXR , pbblen of wMer Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r, Yes C No Is this project a public transportation project?* O Yes O No Charge only if needed. BIMS # Assigned* Version#* 20190293 1 Is a payment required for this project? C No payment required What amout is owed?* C Fee received C $240.00 6 Fee needed - send electronic notification C $570.00 Reviewing Office* Select Project Reviewer* Asheville Regional Office - (828) 296-4500 Zan Price:eads\gaprice Information for Initial Review 1a. Name of project: Robert Lake Park 1a. Who is the Primary Contact?* Gary D. Davis, P.E. 1 b. Primary Contact Email:* gary@daviscivilsolutions.com Date Submitted 311/2019 Nearest Body of Water Flat Creek Basin French Broad Water Classification C Site Coordinates Latitude: 35.6456 Longitude: -82.3006 tc. Primary Contact Phone:* (828)299-9449 A. Processing Information W County (or Counties) where the project is located: Buncombe Is this project a public transportation project?* O Yes G No 1a. Type(s) of approval sought from the Corps: V Section 404 Permit (wetlands, streams and waters, Clean Water Act) r- Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (MNP) r- Regional General Permit (RGP) r- Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes f No Nationwide Permit (NWP) Number: 03 - Maintenance Nationwide Permit (NWP) Number: 13 - Bank Stabilization Nationwide Permit (NWP) Number: 33 - Temporary Construction NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - E)press I— Non -404 Jurisdictional General Permit r Riparian Buffer Authorization F Individual Permit 1e. Is this notification solely for the record because written approval is not required? For the record onlyfor DWR 401 Certification: C Yes O No For the record onlyfor Corps Permit: C Yes O No 1f. Is this an after -the -fact permit application?* C Yes 0 No tg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? d Yes M No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? C Yes C No Acceptance Letter Attachment 1h. lathe project located in any of NC's twenty coastal counties? C Yes M. No 1j. Is the project located in a designated trout watershed? C Yes C No B. Applicant Information C^) 1d. Who is applying for the permit? ❑ Owner CJ Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? C Yes 6 No 2. Owner Information 2a. Name(s) on recorded deed: Mountain Retreat Association 2b. Deed book and page no.: 1285/648 2c. Responsible party: 2d.Address Street Address 407 Kentucky Road Address Line 2 City Montreat Postal / Zip Code 28757 2e. Telephone Number: (828)545-4551 2g. Email Address:* johnq@montreat.org 3. Applicant Information (if different from owner) Slate / FYwince / I3gim NC Country United States 2f. Fax Number: 3a. Name: Gary D. Davis, P.E. 3b. Business Name: Davis CivilSolutions, P.A. 3c.Address Street Address 135-A Charlotte Highway Address Lire 2 Qty Asheville F stal / Zip Code 28803 3d. Telephone Number: (828)299-9449 3f. Email Address:* gary@daviscivilsolutions.com State / Fravince / legion NC United States 3e. Fax Number: C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Montreat, NC 2. Project Identification 2a. Property Identification Number: 0710-96-8414 2c. Project Address Street Address 327 Texas Road Address Line 2 Qty Montreat Postal / Zip Code 28757 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Flat Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12 -digit HUC in which the project is located. 060101050602 4. Project Description and History 2b. Property size: 26.92 Sate i Frovin / l3:giw NC Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use is recreational serving as a public access playground. Existing conditions include eroded stream banks and displaced stone and sediment in the stream channel. Footbridges collapsed or removed by flooding. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* t7 Yes O No rF Unknown 4d. Attach an 81/2 X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Robert Lake Park USGS.pdf 3.76MB 4e. Attach an 81/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 5,208 4h. Explain the purpose of the proposed project:* Restore and stabilize stream edge and channel locations to previous conditions. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Relocate on-site stone and sediments to restore flood damaged stream banks. Replace undermined footbridge abutments. Equipment to be used will have rubber tires and includes backhoe, skid steer, walk -behind motorized equipment, and hand tools. 4j. Please upload project drawings for the proposed project. Robert Lake Park Plan Set.pdf 10.73MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? O Yes 6 No O Unknown Comments: Delineation was not made for the restoration project. Delianeation may have been made at parks initial construction. 5b. If the Corps made a jurisdictional determination, what type of determination was made? O Preliminary d Approved O Not Verified O Unknown d WA Corps AID Number 5c. If 5a is ves. who delineated the iurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* O Yes 4 No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): ❑ Wetlands ® Streams -tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact (?) Jurisdiction* length* ��Restoration Permanent Bank Stabilization :E� S1 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 336 0 31 k Perennial Both 14 Average (feet) 213 (ir�rfeet) g2 Restoration Permanent Bank Stabilization Puncheon Branch Perennial Both 10 Average (feet) 123 (ir�rfeet) . Total stream and ditch impacts: 336 3j. Comments: E. Impact Justification and Mitigation CA) 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Utilizg epsting stone and sediment found on site adjacent to restoration areas. Disturbed areas are targeted and well defined on the plans. Not define excavation in stream channel shall be no deeper than found in the eAsting stream bed within fifteen feet of the proposed excavation sites. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction equipment Wil have rubber tires within reason. Any tracked equipment will use surface protection along the vehicle's path. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C Yes F No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? O Yes M No If no, explain why: No stormwater BMP is required for the project. The project is not vdthin a protected riparian buffer. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? GYes M,No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? C Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state approved local government stormwater program? (' Yes f No 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters.* C Stormwater Management (•7 Antidegradation Plan Calculations 3b. Stormwater Management Plan 3c. Antidegradation Calculations: Robert Lake Park Antidegradation Calculations.pdf 277.99KB Comments: No change will occur in the amount of impervious surface or built upon area. There will be no change in stormomter runoff quantity or quality. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* a Yes O No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* O Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. No change will occur in the amount of impervious surface or built upon area. There will be no change in stormwater runoff quantity or quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor NIA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No O Unknown 5e. Is this a DOT project located within Division's 1-8? G Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? M Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Critical Habitat for Threatened & Endangered Species - Critical Habitat Mapper - USFWS Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA- Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* North Carolina Historic Preservation Office - HPOWEB GIS Service 7c. Historic or Prehistoric Information Upload NC State Historic Preservation HPOWEB GIS Map.pdf 1.05MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: No new structures or impervious surfaces will be constructed. All earthen material will be relocated within the flood zone from which is originated. 8c. What source(s) did you use to make the floodplain determination?* NC Flood Risk Information System Miscellaneous Comments Miscellaneous attachments not previously requested. Signature m By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Gary D. Davis, P.E. Signature 6 A A-1 t3,a s Date 311/2019 4 MOUNTAIN RETREAT iASSOCIATION - D/B/A Montreat, Conference Center February 28, 2019 NC Dept. of Water Quality PO Box 969 Montreat, NC 28757 P: 828.669.2911 F: 828.669.1178 montreat.org The Mountain Retreat Association d/b/a Montreat Conference Center hereby designates Gary D. Davis, P.E. of Davis CivilSolutions, P.A. as the Authorized Agent for the Robert lake Park Restoration Project. Sincerely, MOUNTAIN RETREAT ASSOCIATION Richard Sills, CFO Encountering God through A Conference Center serving relationships, renewal, recreation, and rest. the Presbyterian Church (U. S. A.)T j el P,tiak3-3T"a of, V t q11''! C� 4 d BN5971 House I "5970 House 13"5974 House BNI73A0 Community Build'ng s>{� . 9980 ■ BN5973 'The Hlernbrks" BN59139 'Menius untainhaus" 131%15963 House BM5376 "Niter's House" BN5977 House BN5979 "MrCallum HFLand" BN5985 Robert Lake B"5987 Ho BUNCOMBE Park BN597S House BN8010 Montreat Hstaric 13"5988 "Edgemont" BN5%O Chestnut House District 1953 2014 BN5975 House 131%15931 "Bonnie BFa4' 16 06 BN5965 "Bit -0- Heaven" 13" 3 "Hewkhavenr BNINW2 House 13"5958 Texas Road fr13"5984 Houseidge � f#525) BN5962 "The Barn Loft" 13"5 134 Welch Park BN5953 Hous F' 13"59131 House 131%15958 House i x � 13"5959 'Mnnehaha713"5986 "The Rodes" ext L°°jkaL# ca m w � 4 BN0222 MlontreatAnderson Auditarium MO ntre at Go Ile ge rJ �. rf � Ar v Buncombe County, NC, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA, USGS Davis CivilSolutions,PA Site/Infrastructure • Engineering/Planning 1JSA Chubac ItiRhwayAshM110, \orifi Caml u 8]8.299.9449 ri I • bfo%3deviscivilmluU.ns.mm Date: March 1, 2019 Proiect No.: 18172 Description: Antidegradation Calculations Prepared by: David Newton Sheet No.: 1 of 1 12298DEA i9'py�'yGl NEgP;'S`"� Pre-Constuction SF AC % Project Area 49566 1.138 100.0% Existing Impervious 2596 0.060 5.2% Existing Pervious 46970 1.078 94.8% Coefficient {C} 0.1 25 yr. Precipitation intensity {i} 8.08 Area (Al (ac.) 1.138 Rate of Runoff {Q} (cfs) 0.9194061 12298DEA i9'py�'yGl NEgP;'S`"� Post-Constuction SF AC % Project Area 49566 1.138 100.0% Existing Impervious 2596 0.060 5.2% Existing Pervious 46970 1.078 94.8% Coefficient {C} 0.1 25 yr. Precipitation Intensi {i} 8.08 Area {A} (ac.) 1.138 Rate of Runoff {Q} (cfs) 0.9194061 12298DEA i9'py�'yGl NEgP;'S`"�