HomeMy WebLinkAbout20190197 Ver 1_Staff Report_20190305Water Resources
ENVIRONMENTAL �UPLITV
*
Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all
mandatory questions are ans�red.
Date Information Received: 02/13/2019
Project Information
ID#: Version:
20190197 1
Project Name: Arlington Boulevard Improvements
County(ies):
Pitt
Contact Emails:
LKirby@GREENVILLENC.GOV
todd.tripp@eastgroup.com
LKirby@GREENVILLENC.GOV
todd.tripp@eastgroup.com
samir.dumpor@ncdenr.gov
garcy.ward@ncdenr.gov
Project Folder Web Access
Click here to log in to see the project information submitted.
Staff Review Documentation
Decision:* No Written Concurrence
Date decision letterwritten* 3/5/2019
Check all agencies that need to � DCM
receive notification of your decision. r WRC
� DMS
Has your decision letter been uploaded into Laserfiche?*
�' Yes - Uploaded separately
l' Yes - Attaching it to this form
�' No - Sent for signature (TPB Unit Only)
l•' �UA
Staff Comments and Documentation
Staff review documentation: (�) F�Forjpg only
Staff Comments: These activities are covered under Water Quality General
Certification No. 4132. GC 4132 can be found at the following link:
https://edocs.deq.nc.gov/WaterResources/DocView.asp�C?
dbid=0&id=613092&page=1 &cr=1
Written approval is not required provided all the thresholds and
conditions are met. Pay particular attention to Condition # 9 which
prohibits excavation in flowing water. A separate Buffer
Authorization is not required provided the stream impacts at the
crossings remain below 40 linear feet.