HomeMy WebLinkAbout20110213 Ver 1_Year 5 Monitoring Report_20190305ID#* 20110213
Select Reviewer:*
Mac Haupt
Initial Review
Completed Date
03/05/2019
Mitigation Project Submittal - 3/5/2019
Version* 1
Is this a Prospectus, Technical Proposal or a New Site?*
Type of Mitigation Project:*
W Stream W Wetlands r Buffer r Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Corey Novak
Project Information
r Yes r No
Email Address:*
cnovak@lmgroup.net
Existing 20110213 Existing 1
(DWR) (nunbersonly ...nodash) Version: (nun-bersonly)
I D#: *
Project Type: f DMS r Mitigation Bank
Project Name: NE Cape Fear Umbrella Bank: Holly Shelter
Bay Mitigation Site
County: Pender
Document Information
Mitigation Document Type:*
Mitigation Monitoring Report
File Upload: NECFUMB Year 5 AMR Complete.pdf 57.61 MB
Rease upload only one RDF of the complete file that needs to be subnitted...
Signature
Print Name:* Corey S. Novak
Signature:*
001� �5'
NORTHEAST CAPE FEAR UMBRELLA MITIGATION BANK
HOLLY SHELTER BAY TRACT
PENDER COUNTY, NORTH CAROLINA
YEAR 5 ANNUAL MONITORING REPORT
HOLLY SHELTER BAY TRACT
Prepared For:
U.S. Army Corps of Engineers. Wilmington District
and
Inter -Agency Review Team (IRT)
Prepared By:
Wetlands Resource Center
3970 Bowen Road
Canal Winchester, Ohio 43110
and
Land Management Group
Wilmington, NC
www.lmgroup.net
February 2019
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY
2.0. PROJECT OVERVIEW ......................
A. Introduction .................................
B. Mitigation Goals and Objectives
C. Project Implementation ..............
3.0. MONITORING REQUIREMENTS
4.0 MONITORING RESULTS
A. Vegetative Monitoring ......................
B. Hydrologic Monitoring .....................
1. Summary of Precipitation ..........
2. Pocosin Restoration Areas........
3. Wet Pine Flat Restoration Areas
4. Wet Pine Savanna Restoration Areas..........................................................................
5. Enhancement Areas.....................................................................................................
6. Riparian Headwater Forest Restoration......................................................................
7. Zero -Order Stream.......................................................................................................
5.0 CONCLUSION
LIST OF FIGURES, TABLES, AND APPENDICES
.9
.9
10
11
12
14
14
17
17
19
20
Figure 1................................................................................................... Holly Shelter Bay Tract Vicinity Map
Figure 2....................................................................................................... Holly Shelter Bay Tract Boundary
Figure 3A...............................................................................................Aerial Photograph with Well Overlay
Figure 3B.............................................................. Aerial Photograph with Zero Order Well and Plot Overlay
Figure 4A................................................................................................................. Restoration Habitat Type
Figure 4B........................................................................ Restoration Habitat Type Zero Order Stream Detail
Table 1 ................................................. Holly Shelter Bay Tract Restoration Project Planting List (April 2014)
Table 2................................................................................ Vegetation Plots and Wells by Community Type
Table 3................................................................................. Summary of Year 5 Vegetative Monitoring Data
Table 4................................................................ Summary of Year 0 (Baseline) Vegetative Monitoring Data
Table 5 ............................................. Summary of Year 5 Hydrologic Monitoring Data (Pocosin Restoration)
Table 6 ..................................... Summary of Year 5 Hydrologic Monitoring Data (Wet Pine Flat Restoration)
Table 7 ............................ Summary of Year 5 Hydrologic Monitoring Data (Wet Pine Savanna Restoration)
Table 8 ..............................................Summary of Year 5 Hydrologic Monitoring Data (Enhancement Wells)
Table 9 ................Summary of Year 5 Hydrologic Monitoring Data (Riparian Headwater Forest Restoration)
Northeast Cape Fear Umbrella Mitigation Bank
Holly Shelter Bay Tract
Year 5 Annual Monitoring Report (February 2019)
Appendix A............................................................................................................... Site Photographs (2018)
Appendix B............................................................................................................ Individual Plot Data (2018)
Appendix C....................................................................................... Palmer Hydrologic Drought Index Maps
Appendix D............................................................................................ North Carolina Drought Status Maps
AppendixE....................................................................................................................... Hydrographs (2018)
Northeast Cape Fear Umbrella Mitigation Bank
Holly Shelter Bay Tract
Year 5 Annual Monitoring Report (February 2019)
1.0 EXECUTIVE SUMMARY
Shaw Hwy Properties LLC (Bank Sponsor), has completed Year 5 annual monitoring of the Holly
Shelter Bay Tract of the Northeast Cape Fear Umbrella Mitigation Bank. The Holly Shelter Bay
Tract encompasses 1,273 acres, including 836 acres of non -riparian (i.e. pocosin, wet pine flat and
wet pine savanna) wetland restoration. In addition, 1,167 If of zero -order stream valley have been
restored near the down -gradient section of the site. An additional 255 acres of wetland
enhancement and preservation (both riparian and non -riparian wetlands) were included in the Bank
project. Over 2,184 linear feet of first -order stream (UT to the Northeast Cape Fear River) was also
preserved. A total of 1,153 acres have been placed into a perpetual conservation easement for the
long-term protection of the site.
Restoration activities included roadway removal and back -filling road -side collector canals,
installing reinforced clay plugs at prescribed locations within lateral and collector canals, and the
grading of a shallow zero -order stream valley. Approximately 16 acres of former roadbeds and 4
acres of zero -order valley area were planted with characteristic wetland trees corresponding to the
targeted community type (pocosin and riparian headwater forest). All restoration work (including
earthwork and plantings) was completed in April 2014. (Refer to the As -Built Report submitted
September 2014 for more detailed information regarding the implementation of the Holly Shelter
Bay Tract).
The approved restoration plan stipulates seven years of vegetation monitoring and five years of
hydrologic monitoring. Following the completion of the earthwork, a total of three (3) 0.05 acre
plots were established in the riparian headwater forest planted area. A total of fifty-nine (59)
shallow groundwater monitoring wells were installed throughout the site (including 12 gauges
within the zero -order valleys).
Hydrologic monitoring was conducted throughout the year (through December 31, 2018). The
annual vegetation monitoring was conducted in October 2018. Based upon the data collected,
planted areas exhibit a high rate of survivorship of characteristic wetland tree and shrub seedlings.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract t
Year 5 Annual Monitoring Report (February 2019)
The hydrologic response to restoration efforts is also evident via groundwater and surface water
data collected that illustrate prolonged periods of wetland hydrology.
2.0 PROJECT OVERVIEW
A. Introduction
Construction of the Holly Shelter Bay Tract (1,153 acre project area) portion of the Northeast Cape
Fear Umbrella Mitigation Bank was initiated in March 2014. The overall tract boundary is depicted
in Figures 1 and 2. The project includes approximately 836 acres of non -riparian (i.e. pocosin, wet
pine flat, and wet savanna) wetland restoration and 1,167 linear feet of zero -order stream
restoration. The project also includes 255 acres of wetland enhancement and preservation (both
riparian and non -riparian wetlands) and 2,184 linear feet of first -order stream preservation.
Restoration activities included earthwork (roadway removal and back -filling road -side collector
canals, installing reinforced clay plugs at prescribed locations within lateral and collector canals,
and the grading of a shallow zero -order stream valley); planting of characteristic non -riparian and
riparian wetland vegetation; and the installation of monitoring devices. Placement of fill material
within existing ditches/canals was authorized under Nationwide Permit 27 issued by the U.S. Army
Corps of Engineers (USACE) with attached conditions (issued February 28, 2013), and the NC
Division of Water Quality (DWQ) 401 Water Quality Certification with attached conditions (issued
March 12, 2013). The Holly Shelter Bay Tract Restoration Project is intended to provide suitable,
high-quality wetland mitigation for authorized impacts within the Northeast Cape Fear River Basin
(Cataloging Unit 03030007).
B. Mitigation Goals and Objectives
The objective of the Holly Shelter Bay Restoration project is to provide for the functional restoration
and ecological up -lift of wetland and stream habitat via the re-establishment of characteristic
hydrologic conditions and vegetative assemblages. It is anticipated that a number of key wetland
functions and values will be restored including floodwater retention/abatement, sediment retention,
nutrient transformation, and increased habitat connectivity. The project offers the unique
opportunity to restore, enhance, and preserve riparian and non -riparian wetland and stream habitat
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 2
Year 5 Annual Monitoring Report (February 2019)
and provide for protected habitat connectivity between the Northeast Cape Fear River and state -
protected refuge (Holly Shelter Game Lands).
C. Project Implementation
Restoration activities were initiated in March 2014. Earthwork consisted of roadway removal and
back -filling road -side collector canals, installing reinforced clay plugs at prescribed locations within
lateral and collector canals, and the grading of a shallow zero -order stream valley. Clay material
for the plugs was brought in from an off-site source. The plug material was placed within the lateral
ditches and canals between March 2014 and April 2014.
The restoration effort also included the grading of two zero -order stream valleys. Both valleys
originate within the area of the restored headwater forest wetland areas and slope gradually to the
existing branch of the riverine swamp forest. The northern valley is identified as Stream Valley "A"
while the southern valley is identified as Stream Valley "B". Valley A was constructed in the
general location of the former outlet canal. The canal was first backfilled with the use of adjacent
roadbed material and clay plugs at prescribed locations. After backfilling, the valley was contoured
and graded to an approximate 2% slope. Valley B follows a natural headwater valley that had
been previously impacted by logging activities near its origin (which included the re -direction of
surface flow and groundwater discharge that would otherwise have provided inflow to the head of
the zero -order valley). In addition, the lower end of the valley was bisected by the presence of a
forestry road installed in the 1970s. Grading within Valley B was limited to the removal of the road
bed and minor grading near its origin (where material had been pushed across the valley for
logging access). In addition, plugs were installed within the lateral ditch at the upper limits of the
valley to help restore groundwater baseflow and surface water inflow.
Maintenance inspections of the armored ditch plugs within the Bank were performed during Year 5
monitoring. All of the ditch plugs appear to be stable with little or no evidence of bank or plug
erosion. Note that many of the plugs were covered with root mat and live shrubs at the time of
construction. These plugs have performed very well and appear to provide better stability than that
of armored stone (i.e. rip -rap). One plug that was proposed in the restoration plan (near Well 30)
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 3
Year 5 Annual Monitoring Report (February 2019)
was not installed during initial construction. This plug was installed in August 2016 and has
recently been inspected. Maintenance inspections will continue to be performed to determine if
any contingency measures are recommended in future monitoring years.
Planting of the 16 -ac removed roadbed restoration area and 4 -ac zero -order valley area was
conducted by Bruton Natural Systems, Inc. from April 7, 2014 through April 8, 2014. All planting
activities were supervised by environmental scientists from Land Management Group. Plant
material was provided by Arborgen Nursery (Blenheim, SC). Per the restoration plan, one non -
riparian vegetative community (pocosin) and one riparian vegetative community (zero order
stream) were established throughout the 20 -ac planting areas.
Species planted in the non -riparian wetland restoration areas included Atlantic white cedar
(Chamaecyparis thyoides), bald cypress (Taxodium distichum), and black gum (Nyssa sylvatica).
The restored zero -order valleys (approximately 4 acres) were planted with characteristic species of
small headwater streams of the outer Coastal Plain. Species of this community type included bald
cypress, swamp chestnut oak (Quercus michauxii), swamp black gum (Nyssa biflora), and river
birch (Betula nigra). The planting list is provided in Table 1.
As part of the implementation of the restoration project, LMG installed a total of 60 automated
shallow groundwater monitoring wells (RDS, Inc. WM-20s & WM-40s) within the 1,091 -ac
restoration area (Figure 3A). One well was installed in uplands and has since been removed. Of
the existing (59) monitoring wells, twelve (12) are located within four (4) arrays situated across the
restored valleys. In addition, a total of six (6) automated wells have been installed within the
identified enhancement wetland areas on the mitigation site. Refer to Figures 3A & 3B for maps
depicting the location of on-site wells. In addition to the groundwater monitoring wells, three (3)
permanent 0.05 -ac vegetation plots were randomly established within the 4 -ac zero order stream
valleys. The four (4) corners of each plot are marked with rebar and flagged PVC, and GPS
coordinates are provided in Figure 3B. The number of wells and vegetation plots by community
type are provided in Table 2.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 4
Year 5 Annual Monitoring Report (February 2019)
Table 1. Holly Shelter Bay Tract Restoration Project Planting List (April 2014)
Non -Riparian Restoration
Pocosin
16 -ac
Common Name
Scientific Name
562
Bald Cypress
Taxodium distichum
5,350
Black Gum
Nyssa sylvatica
2,800
Atlantic White Cedar
Chamaecyparis thyoides
2,730
10
Total
10,880
Riparian Restoration
Zero Order Stream
4 -ac
Common Name
Scientific Name
0
Bald Cypress
Taxodium distichum
1,150
River Birch
Betula nigra
500
Swamp Black Gum
Nyssa Mora
300
Atlantic White Cedar
Chamaecyparis thyoides
770
Swamp Chestnut Oak
Quercus michauxii
300
Total
3,020
Grand Total
13,900
Table 2. Vegetation Plots and Wells by Community Type
Community Type
Acreage
Vegetation Plots
Monitoring Wells
Wet Pine Flat Restoration
562
0
22
Wet Pine Savannah
213
0
15
Pocosin
239
0
10
Small Stream (Zero Order)
3
3
12 (4 well arrays)
Upland Not in Easement
120
0
0
TOTAL
1,137
3
59
3.0 MONITORING REQUIREMENTS
Annual vegetation monitoring is being conducted near the end of each growing season for a period
of seven years. Hydrology monitoring has been conducted for five years. The vegetative
component includes an assessment of the conditions within each of the three 0.05 -ac permanent
plots monitoring plots that have been established in the stream restoration area. Hydrologic
monitoring is conducted via the 59 wells/gauges installed throughout the site.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 5
Year 5 Annual Monitoring Report (February 2019)
The following are the specific success criteria for both the vegetation and hydrologic monitoring of
the restoration and enhancement areas.
(1) Demonstrated density of planted species of the riparian/headwater forest
wetland and zero -order valley areas (totaling 4 acres) to meet or exceed 320
trees per acre at the end of three years (post planting); 260 trees per acre at
the end of five years; and 210 (seven-year old) character canopy tree species
per acre at the end of seven years. The Interagency Review Team (IRT) may
allow for the accounting of acceptable volunteer species toward the 210 -tree
per acre density upon the review and evaluation of the annual monitoring
report.
(2) If, within the first three years, any species exhibits greater than 50% mortality
within the 4 -acre riparian/headwater forest wetland and zero -order valley, the
species will either be re planted or an acceptable replacement species will be
planted in its place.
No single volunteer species (most notably, red maple, loblolly pine, and sweet
gum) within the 4 -acre riparian/headwater forest wetland and zero -order
valley will comprise more than 50% of the total composition at Year 3 or 5. If
this occurs, remedial action, as approved by the IRT may be required. During
Year 3 and 5, no single volunteer species, comprising over 50% of the total
composition, may be more than twice the height of the planted trees. If this
occurs, remedial action, as approved by the IRT may be required. The need
to conduct additional volunteer sampling after Year 5 will be determined by
the IRT.
(3) Planted tree stems within the 4.0 -acre riparian/headwater forest wetland and
zero -order valley must average 10 feet in height (at 7 -years old) in each plot
at Year 7. If this performance standard is met by Year 5, and stem density is
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 6
Year 5 Annual Monitoring Report (February 2019)
trending toward success (i. e., no less than 260 five year old stems per acre),
monitoring of vegetation on the site may be terminated provided written
approval is provided by the USA CE in consultation with the IRT.
(4) The hydrologic criterion is premised on the specific community to be restored
(refer to Figure 4 for the location and extent of the wetland communities):
a. for the non -riparian wet pine savanna community (mineral soils), the
hydrologic criterion will be the establishment of the water table at or
within 12 " of the soil surface for 6% of the growing season under normal
precipitation conditions. Hydrology monitoring shall be undertaken from
OIFeb through 30Nov of each monitoring year. On OIFeb, soil
temperature at a minimum of three locations will be measured at 12
inches below the soil surface and documented within the monitoring
report. Should earlier monitoring be considered, the project sponsor must
also document biological activity on the site pursuant to the applicable
Regional Supplement to the 1987 Wetland Delineation Manual. Earlier
monitoring must be approved by the U.S. Army Corps of Engineers prior
to commencement.
b. for the non -riparian wet pine flat community (mineral soils), the
hydrologic criterion will be the establishment of the water table at or
within 12 " of the soil surface for 8% of the growing season under normal
precipitation conditions. Hydrology monitoring shall be undertaken from
OIFeb through 30Nov of each monitoring year. On OIFeb, soil
temperature at a minimum of three locations will be measured at 12
inches below the soil surface and documented within the monitoring
report. Should earlier monitoring be considered, the project sponsor must
also document biological activity on the site pursuant to the applicable
Regional Supplement to the 1987 Wetland Delineation Manual. Earlier
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 7
Year 5 Annual Monitoring Report (February 2019)
monitoring must be approved by the U.S. Army Corps of Engineers prior
to commencement.
c. for the non -riparian pocosin community (organic soils), the hydrologic
criterion will be the establishment of the water table at, or within, 12 " of
the soil surface for 12.5% of the growing season under normal
precipitation conditions. Hydrology monitoring shall be undertaken from
OIFeb through 30Nov of each monitoring year. On OIFeb, soil
temperature at a minimum of three locations will be measured at 12
inches below the soil surface and documented within the monitoring
report. Should earlier monitoring be considered, the project sponsor must
also document biological activity on the site pursuant to the applicable
Regional Supplement to the 1987 Wetland Delineation Manual. Earlier
monitoring must be approved by the U.S. Army Corps of Engineers prior
to commencement.
d. for the riparian headwater forest (associated with the zero -order stream
valley), the hydrologic criterion will be the establishment of the water
table at, or within, 12" of the soil surface for 15% of the growing season
under normal precipitation conditions. Hydrology monitoring shall be
undertaken from OIFeb through 30Nov of each monitoring year. On
OIFeb, soil temperature at a minimum of three locations will be measured
at 12 inches below the soil surface and documented within the monitoring
report. Should earlier monitoring be considered, the project sponsor must
also document biological activity on the site pursuant to the applicable
Regional Supplement to the 1987 Wetland Delineation Manual. Earlier
monitoring must be approved by the U.S. Army Corps of Engineers prior
to commencement.
For the zero -order stream valleys, the primary success criterion is:
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract g
Year 5 Annual Monitoring Report (February 2019)
"Documentation of 2 flow events using techniques discussed above within a
normal rainfall year in 3 of the S years of monitoring"
Note that documentation of flow is achieved via the use of gauge transects (three gauges per
transect) installed perpendicular to the valley as well as through the use of physical indicators of
flow (e.g. ordinary high water mark indicators) and photo/video-documentation.
4.0 MONITORING RESULTS (YEAR 5
A. Vegetation Monitoring
A total of 192 planted stems were enumerated throughout the three 0.05 -ac plots. For planted
species, the total number of stems identified corresponds to an average density of 1,280 stems per
acre (64 stems per 0.05 -ac plot) within the stream restoration area (Table 3)1. Bald cypress was
the most abundant woody species, with a total of 159 individuals identified. Other planted species
such as swamp black gum, river birch, and Atlantic white cedar were also prevalent within the
monitored plots. The survival rate among planted species has been relatively high during the first
five years of monitoring (85%). Refer to table 4 for a summary of Year 0 (baseline) vegetative
monitoring data. Note that river birch has exhibited a mortality rate of 74% (with much of the
mortality occurring over the first year post -planting). Atlantic white cedar has exhibited a mortality
rate of 63% (with much of the mortality occurring over the first two years post -planting). Given the
overall high rate of survivorship and the presence of desirable (characteristic) wetland volunteer
species, it is believed that replanting or supplemental planting is not warranted.
Several woody volunteers, including inkberry (Ilex glabra), sweet pepperbush (Clethra alnifolia),
fetterbush (Lyonia lucida), and redbay (Persea borbonia) were identified; however, these species
are not being counted towards the success of the site at this time. Note that per the success
' Note that seedling quantities utilized for the planting were based upon an approximate 20 -acre disturbed
area. During construction, disturbance was minimized within the south zero -order valley resulting in a
reduction in the size of the area that needed to be re -planted. In addition, large portions of the 16 -acre
roadbed removal area were inundated during the time of planting. The net result was a decrease in the area
to be planted and a proportional increase in the planting density (i.e. excess seedlings were interspersed
within the planting zones).
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 9
Year 5 Annual Monitoring Report (February 2019)
criteria established in the restoration plan, the IRT may allow for the accounting of acceptable
volunteer species toward the Year 7 success criterion of 210 trees per acre upon the review and
evaluation of the annual monitoring report. No single volunteer species comprised more than 50%
of the total composition during Year 5 monitoring. All of the plots far exceeded the Year 5
minimum of 13 stems (260 trees per acre). In addition, the plots exhibited a diverse assemblage of
the shrubs and trees indicative of the target community type. Refer to Appendix A for photographs
of current site conditions. A comprehensive plot data table is provided in Appendix B.
Table 3. Summary of Year 5 Vegetative Monitoring Data
Species
Common Name
Planted
(P) or
Volunteer
(V)
Total Stems
# plots
Average # Stems
Taxodium distichum
bald cypress
P
159
3
53.0
N ssa biflora
swamp black gum
P
18
3
6.0
Chamaec paris th oides
Atlantic white cedar
P
7
2
3.5
Quercus michauxii
swamp chestnut oak
P
1
1
1.0
Betula nigra
river birch
I P
7
2
3.5
Total Planted Stems (3 Plots)
192
1
64.0
Table 4. Summary of Year 0 (Baseline) Vegetative Monitoring Data
Species
Common Name
Planted
(P) or
Volunteer
(V)
Total Stems
# plots
Average # Stems
Taxodium distichum
bald cypress
P
150
3
50.0
Nyssa biflora
swamp black gum
P
28
3
9.3
Chamaec paris th oides
Atlantic white cedar
P
19
3
6.3
Quercus michauxii
swamp chestnut oak
P
2
1
2.0
Betula nigra
river birch
I P
1 27
1 3
9.0
Total Planted Stems (3 Plots)
226
1
75.3
B. Hydrologic Monitoring
As indicated above, a total of 59 hydrologic monitoring wells/gauges are being monitored
throughout the site. The number of wells installed within three of the restoration community types
(pocosin, wet pine flat, and wet pine savanna) was proportional to the acreage of each community
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 10
Year 5 Annual Monitoring Report (February 2019)
type. A higher density of gauges was utilized within the riparian headwater forest/zero-order
stream given the nature of the monitoring requirements for this wetland type.
1. Summary of Precipitation
Regional drought indices, including the Palmer Drought Index and the North Carolina Division of
Water Resources (DWR) Drought Status Maps, were examined to interpret precipitation patterns
and predicted subsurface water storage conditions relative to long-term climatic data. In particular,
the Palmer Hydrological Drought Index maps depict hydrological (long-term cumulative) drought
and wet conditions, which more accurately reflect groundwater conditions. Based upon the 2018
index maps, the Pender County area of North Carolina exhibited normal groundwater conditions in
January through August. Very moist conditions were documented in September. Extremely moist
conditions were exhibited in October through December. The Palmer Hydrologic Drought Index
maps for 2018 are included in Appendix C.
The NC Drought Status Monitoring Program compares existing data to long-term (1965-2015)
climatic conditions for well data, stream baseflow data, and combined well and baseflow data.
Contoured percentile data (30th/70th percentiles) are graphically displayed on monthly drought
images. Based upon these maps, subsurface storage (i.e. groundwater) conditions were
considered above normal during January. Groundwater conditions were considered normal during
February and March. Subsurface storage conditions were considered above normal in April
through July. Groundwater conditions were considered normal in August and above normal in
September. Subsurface storage conditions were considered normal in October and above normal
during November and December. The NC DWR Drought Status Maps for 2018 are included in
Appendix D.
The on-site rain gauge documented normal to above normal rainfall conditions throughout the year.
Rainfall conditions were generally normal in early January and late January through mid-April.
Precipitation was considered to be above normal (>70th percentile) in mid-January, late April, and
mid-May through mid-August. Rainfall conditions were generally normal in late August and early
September before returning to above normal in mid-September through early December.
Precipitation was considered to be normal in mid and late December. Total on-site rainfall for the
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 1 1
Year 5 Annual Monitoring Report (February 2019)
year was 83.58 inches2. Site-specific rainfall data are included on the hydrographs in Appendix E.
The nearest CRONOS station (Horticultural Crops Research Station in Castle Hayne, NC)
recorded 89.43 inches for the year (with data substituted from Wilmington International Airport
during data gaps from early August through mid-October). According to the WETS long-term
climatic data, mean annual rainfall for Willard, NC is 54.20 inches (with a 30% of having less than
49.84 inches of annual precipitation and a 30% chance of having more than 58.00 inches of annual
precipitation). As a result, the 2018 calendar year is considered above normal for total annual
precipitation based upon the on-site rain gauge data and data from the Willard (NC) WETS station.
2. Pocosin Restoration Areas
Within the areas targeted for pocosin restoration, all of the five (5) wells exhibited hydroperiods of
greater than 12.5% of the growing season (the hydrologic success criterion for pocosin). The
observed mean length of the hydroperiod during the growing season (February 1 through
November 30) for these wells was 243 days (equivalent to 80.2% of the growing season). The
observed hydroperiods ranged between 48.2% (146 days) of the growing season (Well 16) and
100% (303 days) of the growing season (Wells 1, 2, and 20). Note that Well 16 malfunctioned
during the middle part of the growing season, but still far exceeded the hydrologic criterion (despite
the reduced period of data collection). The longest consecutive hydroperiods of these wells
included periods of above normal precipitation. However, all of these wells exhibited hydroperiods
during an 82 -day period of normal rainfall during the early growing season. Refer to Table 5 for a
summary of the hydrologic data for the pocosin restoration wells. Hydrographs are provided in
Appendix E.
2 Total rainfall reported includes use of precipitation data from nearest CRONOS station in Castle Hayne
during periods of rain gauge malfunction. Note that this total includes a recorded 23.02 inches over a 4 -day
period associated with Hurricane Florence (Sept 13 through Sept 16).
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 12
Year 5 Annual Monitoring Report (February 2019)
Table 5. Summary of Year 5 Hydrologic Monitoring (Pocosin Restoration)
2018 Growing Season February 1 - November 30
1 Well malfunction Jun 27 — July 17
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 13
Year 5 Annual Monitoring Report (February 2019)
Longest
Dates of
Total Number
Number Of
Longest Number
Percentage
of days
Consecutive
of Consecutive
of Growing
12.5%
Success
Well Number
within 12"
Days Meeting
Days Meeting
Season
>6 -12.5%
12.5-25%
25-75%
>75%
(Jan 1 — Dec
Wetland
Wetland
(Feb 1—
Criteria (38
Days)
31)
Hydrology
Hydrology
Nov 30)
Criteria
Criteria
1
365
303
Feb 1— Nov 30
100.0
Yes
"
--
"
X
2
365
303
Feb 1— Nov 30
100.0
Yes
"
--
"
X
161
333
146
Feb 1— Jun 26
48.2
Yes
X
19
339
1 159
1 Feb 1— Jul 9
52.5
Yes
X
20
365
1 303
1 Feb 1— Nov 30
100.0
Yes
X
1 Well malfunction Jun 27 — July 17
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 13
Year 5 Annual Monitoring Report (February 2019)
I Wet Pine Flat Restoration Areas
All of the twenty-one (21) wells in the wet pine flat restoration areas exhibited hydroperiods greater
than 8% of the growing season (the hydrologic success criterion for wet pine flat). The observed
mean length of the hydroperiod during the growing season (February 1 through November 30) for
these wells was 222 days (equivalent to 73.3% of the growing season). The observed
hydroperiods ranged between 15.2% (46 days) of the growing season (Well 24) and 100% (303
days) of the growing season (Wells 3, 4, 8, 9, 10, 11, 12, 13, 14, 15, and 22). Well 30
malfunctioned throughout the middle and late portions of the growing season, but still met the
hydrologic criterion (despite the reduced period of data collection). All of these wells met the
success criterion during the early growing season under normal precipitation conditions. Refer to
Table 6 for a summary of the hydrologic data for the wet pine flat restoration wells. Hydrographs
are provided in Appendix E.
4. Wet Pine Savanna Restoration Areas
All of the fifteen (15) wells in the wet pine savanna restoration areas exhibited hydroperiods greater
than 6% of the growing season (the hydrologic success criterion for wet pine savanna). The
observed mean length of the hydroperiod during the growing season (February 1 through
November 30) for these wells was 139 days (equivalent to 45.9% of the growing season). The
observed hydroperiods ranged between 9.9% (30 days) of the growing season (Well 39) and 100%
(303 days) of the growing season (Well 6). The longest consecutive hydroperiods of these wells
(with the exception of Well 38) included periods of above normal precipitation. However, all of
these wells also exceeded the success criterion during a period of normal rainfall during the early
growing season. Refer to Table 7 for a summary of the hydrologic data for the wet pine savanna
restoration wells. Hydrographs are provided in Appendix E.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 14
Year 5 Annual Monitoring Report (February 2019)
Table 6. Summary of Year 5 Hydrologic Monitoring (Wet Pine Flat Restoration)
2018 Growing Season February 1 - November 30
Total Number
of days within
Well Number
12" (Jan 1 -
Dec 31)
Longest Number Of
Dates of Longest Number of
Consecutive Days
Consecutive Days Meeting
Meeting Wetland Wetland Hydrology Criteria
Hydrology Criteria
Percentage of
Growing
Season
(Feb 1 -
Nov 30)
°
8% Success
Criteria (25
Days)
12.5
>6 -
-
12.5% 25%
25-
75%
>75%
3 365
303 Feb 1- Nov 30
100.0
Yes
-- --
--
X
4 365
303 Feb 1- Nov 30
100.0
Yes
-- --
--
X
7 351
165 Feb 1 - Jul 15
54.5
Yes
-- --
X
--
8 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
9 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
10 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
11 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
12 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
13 365
303 Feb 1- Nov 30
100.0
Yes
-- --
--
X
14 365
303 Feb 1- Nov 30
100.0
Yes
-- --
--
X
15 365
303 Feb 1- Nov 30
100.0
Yes
-- --
--
X
17 353
169 Feb 1- Jul 19
55.8
Yes
-- --
X
--
18 352
168 Feb 1- Jul 18
55.4
Yes
-- --
X
--
21 335
157 Feb 1- Jul 7
51.8
Yes
-- --
X
--
22 365
303 Feb 1 - Nov 30
100.0
Yes
-- --
--
X
23 311
103 Feb 1 - May 14
34.0
Yes
-- --
X
--
24 276
46 Feb 1 - Mar 18
15.2
Yes
-- X
--
--
28 319
154 Feb 1 - Jul 4
50.8
Yes
-- --
X
--
29 322
104 Feb 1 - May 15
34.3
Yes
-- --
X
--
301 208
103 Feb 1 - May 14
34.0
Yes
-- --
X
--
42 333
156 Feb 1 -Jul 6
51.5
Yes
-- --
X
--
1 Well malfunctions Jul 20 - Dec 4
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 15
Year 5 Annual Monitoring Report (February 2019)
Table 7. Summary of Year 5 Hydrologic Monitoring (Wet Pine Savanna Restoration)
2018 Growing Season February 1 — Nov 30
Well Number
Total Number of
days within 12"
(Jan 1 - Dec 31)
Longest Number Of
Consecutive Days
Meeting Wetland
Hydrology Criteria (in
growing season)
Dates of Longest Number of
Consecutive Days Meeting
Wetland Hydrology Criteria
Percentage of
Growing
Season
(Feb 1 —
Nov 30)
°
/0
success
Criteria (19
Days)
>6-
12.5%
125
.
-
25%
25 -
75%
>75%
5
314
104
Feb 1 - May 15
34.3
Yes
--
--
X
--
6
365
303
Feb 1- Nov 30
100.0
Yes
--
--
--
X
25
314
154
Feb 1 - Jul 4
50.8
Yes
--
--
X
--
26
346
164
Feb 1 -Jul 14
54.1
Yes
--
--
X
--
27
352
167
Feb 1- Jul 17
55.1
Yes
--
--
X
--
31
298
101
Feb 1- May 12
33.3
Yes
--
--
X
--
32
339
160
Feb 1- Jul 10
52.8
Yes
--
--
X
--
33
329
156
Feb 1- Jul 6
51.5
Yes
--
--
X
--
34
319
153
Feb 1- Jul 3
50.5
Yes
--
--
X
--
35
303
102
Feb 1- May 13
33.7
Yes
--
--
X
--
36
359
217
Feb 1- Sep 5
71.6
Yes
--
--
X
--
38
289
65
Feb 1- Apr 6
21.5
Yes
--
X
--
--
39
243
30
May 20 -Jun 18
9.9
Yes
X
--
--
--
40
277
46
Feb 1 - Mar 18
15.2
Yes
--
X
--
--
41
331
155
Feb 1 - Jul 5
51.2
Yes
--
--
X
--
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 16
Year 5 Annual Monitoring Report (February 2019)
5. Enhancement Areas
Wells were installed in both pocosin and wet pine flat enhancement areas. The hydrologic success criteria
for enhancement are identical to those for restoration. All of the five (5) wells in the pocosin enhancement
areas exhibited hydroperiods greater than 12.5% of the growing season (the hydrologic success criterion
for pocosin). The observed mean length of the hydroperiod during the growing season (February 1 through
November 30) for these wells was 188 days (equivalent to 62.0% of the growing season). The observed
hydroperiods ranged between 34.3% (104 days) of the growing season (Well E6) and 100% (303 days) of
the growing season (Well E1). The one well in the wet pine flat enhancement area exhibited a hydroperiod
of 167 days (55.1 % of the growing season). The hydrologic success criterion for wet pine flat is 8%. The
longest consecutive hydroperiods of these wells included periods of above normal precipitation. However,
all of the enhancement wells exhibited hydroperiods during an 82 -day period of normal rainfall during the
early growing season. Refer to Table 8 for a summary of the hydrologic data for the enhancement wells.
Hydrographs are provided in Appendix E.
6. Riparian Headwater Forest Restoration
All of the twelve (12) wells in the riparian headwater forest restoration area exhibited hydroperiods greater
than 15% of the growing season (the hydrologic success criterion for headwater forest restoration). The
observed mean length of the hydroperiod during the growing season (February 1 through November 30) for
these wells was 128 days (equivalent to 42.2% of the growing season). The observed hydroperiods ranged
between 21.1% (64 days) of the growing season (Wells B3 and D1) and 54.1% (164 days) of the growing
season (Well A2). The longest consecutive hydroperiods of these wells included periods of above normal
precipitation. However, all of these wells also exceeded the success criterion during a period of normal
rainfall during the early growing season. Refer to Table 9 for a summary of the hydrologic data for the
riparian headwater forest restoration wells. Hydrographs are provided in Appendix E.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 17
Year 5 Annual Monitoring Report (February 2019)
Table 8. Summary of Year 5 Hydrologic Monitoring (Enhancement Wells)
2018 Growing Season February 1 - November 30
Well Number
Community
Type
Total Number of days within 12"
(Jan 1 -Dec 31)
Longest Number Of Consecutive
Days Meeting Wetland Hydrology
Criteria (in growing season)
Dates of Longest Number of Consecutive Days
Meeting Wetland Hydrology Criteria (in
growing season)
Percentage of
Growing Season
(Feb 1 - Nov 30)
Success Criteria
>6 -
12.5%
12.5 -
25%
25-
75%
>75%
8%
(25 Days)
12.5%
(38 Days)
E1
Pocosin
365
303
Feb 1 - Nov 30
100.0
N/A
Yes
""
""
""
X
E2
Pocosin
355
215
Feb 1 - Sep 3
71.0
N/A
Yes
""
""
X
--
E3
Pocosin
339
160
Feb 1 - Jul 10
52.8
N/A
Yes
""
--
X
X
E4
Pocosin
330
156
Feb 1 -Jul 6
51.5
N/A
Yes
""
--
X
B3
E5
Wet Pine Flat
353
167
Feb 1 - Jul 17
55.1
Yes
N/A
""
""
X
152
E6
Pocosin
326
104
Feb 1 - May 15
34.3
N/A
Yes
""
""
X
52.1%
Table 9. Summary of Year 5 Hydrologic Monitoring (Riparian Headwater Forest Restoration)
2018 Growin Season February 1 — Nov 30
Well Number
Total Number of days within 12"
(Jan 1 - Dec 31)
Longest Number Of Consecutive Days Meeting Wetland
Hydrology Criteria (in growing season)
Dates of Longest Number of Consecutive Days Meeting
Wetland Hydrology Criteria
Percentage of Growing
Season
(Feb 1 -
Nov 30)
15% Success Criteria
(46 Days)
>6 -
12.5%
12.5-
25%
25-
75%
°
>75/°
Al
305
102
Feb 1 - May 13
33.7%
Yes
--
--
X
--
A2
344
164
Feb 1 -Jul 14
54.1%
Yes
--
--
X
--
A3
312
104
Feb 1 - May 15
34.3%
Yes
--
--
X
--
B1
330
156
Feb 1 - Jul 6
51.5%
Yes
--
--
X
--
B2
333
157
Feb 1 - Jul 7
51.8%
Yes
--
--
X
--
B3
293
64
Feb 1 - Apr 5
21.1%
Yes
--
X
--
--
C1
314
152
Feb 1 -Jul 2
50.2%
Yes
--
--
X
--
C2
334
158
Feb 1 - Jul 8
52.1%
Yes
--
--
X
--
C3
330
156
Feb 1 - Jul 6
51.5%
Yes
--
--
X
--
D1
289
64
Feb 1 - Apr 5
21.1%
Yes
--
X
--
--
D2
327
156
Feb 1 - Jul 6
51.5%
Yes
--
--
X
--
D3
296
101
Feb 1 - May 12
33.3%
Yes
--
--
X
--
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 18
Year 5 Annual Monitoring Report (February 2019)
7. Zero -Order Stream
As indicated above, the zero -order streams occur within two distinct valleys that originate in the riparian
headwater forest restoration area and slope gradually toward the existing branch of the riverine swamp
forest. The two valleys are identified as Valley "A" (to the north) and Valley "B" (to the south). A total of
four (4) gauge transects (three gauges per transect) were installed in the zero -order streams to document
the presence of surface water. There are two transects in each valley. Refer to Figure 3B for a map
depicting the location of zero-order/riparian wetland gauges. Indicators of Ordinary High Water Mark
(OHWM) and video documentation were also used to identify the presence of surface water flow.
Valley A:
Surface water was documented in the center of each transect over several periods during the monitoring
year. The valley exhibits a very gradual slope (-2%) from its upper origin to the existing tributary at its
down -gradient terminus. Refer to the As -Built Report for the longitudinal profile of the center of the valley.
The duration and amplitude of the surface water was similar between the two transects. Both transects
exhibited surface water on January 1, 2018. Gauges located at both transects continued to record surface
flow through early July, with the exception of a brief pause at Gauge B2 in mid-May. Flow resumed at both
transects in mid-July and continued through mid-August. Both transects resumed flow in mid-September
and continued to flow through the remainder of the calendar year, with the exception of a brief pause at
both gauges in late October. During periods of surface inundation, water depths in the center of the valley
ranged from 0.3 inch to 16.1 inches. Refer to Appendix E for graphs of duration and amplitude of surface
water in Valley A.
Observed physical indicators of an ordinary high water mark (OHWM) within Valley A consisted of the
following: (1) wracking; (2) vegetation matted down, bent, or absent; (3) deposition; (4) and multiple
observed flow events. Video evidence of flow is provided on the attached DVD. Photographs of the zero -
order valley are provided in Appendix A.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 19
Year 5 Annual Monitoring Report (February 2019)
Valley B:
Surface water was documented in the center of each transect over several periods during the monitoring
year. The slope of the valley over the length of the monitoring section is approximately 0.8%. Refer to the
As -Built Report for the longitudinal profile of the center of the valley. The duration and amplitude of the
surface water was similar to Valley A. However, there was a general trend of surface water conditions
consisting of briefer periods of inundation near the valley origin and increased duration of surface water in
the lower section of the valley. During periods of surface inundation, water depths in the center of the
valley ranged from 0.2 inch to 15.0 inches. Refer to Appendix E for graphs of duration and amplitude of
surface water in Valley B.
Observed physical indicators of an ordinary high water mark (OHWM) within Valley B consisted of the
following: (1) wracking; (2) vegetation matted down, bent, or absent; (3) deposition; (4) and multiple
observed flow events. Video evidence of flow is provided on the attached DVD. Photographs of the zero -
order valley are provided in Appendix A.
5.0 CONCLUSION
Hydrologic data indicate the re-establishment of hydrology characteristic of the target habitats across the
site as a result of the earthwork completed. Removal of large outlet canals and the re -contouring of the
headwater valleys has resulted in the connection of vast headwater wetland areas to the existing branch of
the riverine swamp forest. There has been a discernible hydrologic response indicating the restoration of
key hydrologic functions relating to water storage and groundwater recharge within the system.
Vegetation and hydrologic monitoring of the project area indicate that the site is progressing well during the
fifth year following the implementation of the restoration activities. Vegetation data document high rates of
survivorship among the planted species (R stem density = 1,280 stems per acre). While river birch and
Atlantic white cedar exhibited mortality greater than 50% during the first five years, the overall rate of
survivorship of planted species and the occurrence of desirable volunteer wetland species indicate that the
restored valleys are comprised of the target vegetative assemblage. No other vegetation issues were
noted. All of the wells met the hydrologic success criterion for their respective wetland types. Surface flow
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 20
Year 5 Annual Monitoring Report (February 2019)
in the zero order stream valleys has been documented during every monitoring year. These flow events
include periods of normal and below normal precipitation.
Overall, the site appears to be performing very well. The restoration site is already providing key wetland
functions via the reduction of sediment runoff (that formerly drained directly from vast areas of intensively
managed silvicultural lands); increased nutrient retention/transformation; increased floodwater storage; and
the enhancement and protection of wildlife habitat. Upon review and concurrence by the Interagency
Review Team, this report will conclude the fifth and final year of hydrologic monitoring of the site. The
vegetation on the site will be continued to be monitored over the next two years (through Year 7), and the
findings of such will be provided in subsequent annual monitoring reports for agency review and
concurrence.
Northeast Cape Fear Umbrella Mitigation Bank - Holly Shelter Bay Tract 21
Year 5 Annual Monitoring Report (February 2019)
FIGURES
40 - ----� Valuers
r�
L
e rup t ..
reek
4,.
;a�iiiJ �l ■
JR OPT, -
t1
- — Landing
�.�
Strip
i±.
Stag P1k
H0LL.
*Boundaries are approximate and are
not meant to be absolute.
Map Source: North Carolina Atlas & Gazetteer. Pg 84. zuu.s
Wetlands Resource Center
Holly Shelter Bay Tract
ILMG
Northeast Cape Fear
Umbrella Mitigation Bank
LAND MANAGEMENT GROUP
Pender County, NC
i
a DIIYEYT. company
www.LMGroup.net
Phone: 910.452.0001 •1.866.LMG.1078
Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 28402
SCALE 1" = 1 Mile
Figure 1
Vicinity Map
*Boundaries are approximate and are
not meant to be absolute.
Map Source: 2009 NAPP aerial photography
SCALE 1" = 1500'
Wetlands Resource Center www.LMGroup.net
Holly Shelter Bay Tract 4LMG
Phone: 910.452.0001 •1.866.LMG.1078 Figure 2
Northeast Cape Fear Boll Shelter Ba
Umbrella Mitigation Bank LAND MANAGEMENT GROUP Fax: 910.452.0060 Y Y
Fender County, NCI DMIEY#- company P.O. Box 2522, Wilmington, NC 28402 Tract Boundary
-27 \/
28 29
E6
`30 NC 210
J \
*Boundaries are approximate and are
not meant to be absolute.
Map Source: 2012 NAPP Orthophoto N SCALE 1" = 100'
Wetland Resource Center www.LMGroup.net Figure 3B: Aerial
NE Cape Fear Umbrella Phone: 910.452.0001 •1.866.LMG.1078 Photography with
Mitigation Bank - Holly Shelter Fax: 910.452.0060
Bay Tract LAND MANAGEMENT GROUP Zero Order Well &
Fender County, NC P.O. Box 2522, Wilmington, NC 28402
a DAIW � company Plot Overlay
Property Boundary (1273 ac.)
404 Wetland Line
First -Order Stream Preservation
(2184 Ift.)
\�
First -Order Stream Channel
(1 ac. )
Zero -Order Stream Restoration
(1427 Ift.)
Zero -Order Stream Channel
(3 ac.)
Riparian (Non-Riverine)
Swamp Forest Restoration
(1 ac.)
Riparian (Non-Riverine)
Swamp Forest Preservation
(5 ac.)
Headwater Forest Preservation
(1 ac.)
Wet Pine Savanna Restoration
(213 ac.)
rT7�
Non-Riverine Swamp Forest Preservation
(69 ac.)
Remaining Upland
(43 ac.)
Upland Not in Easement
(120 ac.)
1 11 11 X11
V
PRELIMINARY
NOTE: This Is Not An Engineered, Survey, or Architectural Drawing.
NOTE: Parcel Boundaries From Pender County GIS.
LM G Project: Date: Revision Date:
NE Cape Fear 1/29/2013 3/22/2013
Mitigation Bank
LAND MANAGEMENT GROUP Scale: Job Number:
40ber: 06
a DA EA company Title: 1 ��-200
Post Office Box 2522 Restoration Habitat Type Drawn By: Figure:
Wilmington, North Carolina 28402 Zero Order Stream Detail GSF 4B
Telephone: 910-452-0001
APPENDIX A.
SITE PHOTOGRAPHS (2018)
(1) View of bald cypress at Plot 3
E.
V
'oil
.
(2) View of River birch at Plot 2
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
4LMG
LAND MANAGEMENT GROUP
a DAVEY#- company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(3) View of Atlantic white cedar at Plot 1
(4) View of bald cypress at Plot 1
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
4�LMG
I.ANP MANAG£M£NT GROUP
a DAVEYI company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(7) View of flow in Valley B at Plot 3
I I"'t-:JIA►11. x. i"'S� r ' R'74 MIL [i 41 N! 1
(8) View of flow in Valley A at Transect A
5F i e flf
�
.K` f
-XIN a
d �
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
tLMG
LAND MANAGEMENT GROUP
a DAVEY#— company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
1 ehh
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
tLMG
LAND MANAGEMENT GROUP
a DAVEY#— company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(9) View of flow in Valley A at Transect B
(10) View of flow in Valley B at Transect C
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
4LMG
LAND MANAGEMENT GROUP
a DAVEY#- company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(12) Aerial view of confluence of restored zero -order stream reach of
Valley A and Valley B
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
4LMG
LAND MANAGEMENT GROUP
a DAVEY#— company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(13) View of upper zero -order reach of Valley B
(14) View of downstream reach of Valley B
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
0
4�LMG
I.ANP MANAG£M£NT GROUP
a DAVEYI company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
i=
,jr W*
M
e
R
4
i
S
(14) View of downstream reach of Valley B
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
0
4�LMG
I.ANP MANAG£M£NT GROUP
a DAVEYI company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
(15) View of redfin pickerel , Esox americanus, observed near Well 11
(16) View of plug near Well 9
Northeast Cape Fear Umbrella
Mitigation Bank
Holly Shelter Bay Tract
tLMG
LAND MANAGEMENT GROUP
a DAVEY#- company
Appendix A.
Site Photographs
Annual Monitoring
(Year 5)
APPENDIX B.
INDIVIDUAL PLOT DATA (YEAR 5)
Northeast Cape Fear Umbrella Mitigation Bank
Holly Shelter Bay Tract
Appendix B. Vegetation Data by Plot
Year 5
Species
Common Name
Planted (P) or
Volunteer (V)
o
a
N
0
a
r>
0
a
Chamaecyparis thyoides
Atlantic white cedar
P
5
2
0
Taxodium distichum
bald cypress
P
45
38
76
Nyssa biflora
swamp black gum
P
5
12
1
Betula nigra
river birch
P
4
3
0
Quercus michauxii
swamp chestnut oak
P
0
0
1
TOTAL 1
591
551
78
Year 0 (Baseline)
Species
Common Name
Planted (P) or
Volunteer (V)
o
a
N
0
a
r>
0
a
Chamaecyparis thyoides
atlantic white cedar
P
9
4
6
Taxodium distichum
bald cypress
P
47
35
68
Nyssa biflora
swamp black gum
P
13
8
7
Betula nigra
river birch
P
7
12
8
Quercus michauxii
Iswamp chestnut oak
P
0
0
2
TOTAL
76
59
91
APPENDIX C.
PALMER HYDROLOGIC DROUGHT INDEX MAPS
Palmer Hydrological Draught Index
January, 2018
4X -3.94 4.04 -1.90 +200
an6
to b b t8 10 ane
¢fpr -3.94 -2$3 +1.99 +299 +399 OM
Palmer Hydrological Drought Index
February, 2018
&*It
.ca -au4
4.uD -1.99 +lou+3.%
W6 m b b m 10
W- -3.94 -2.99 +1.99 +299 +3.94
MUM
M
+a.na
am
aw"
Palmer Hydrological Drought Index
March, 2018
In 10+a ADQ
and
+299 +3.99 9"
Palmer Hydrological Drought Index
April, 2018
4M -a.90 4.00 -1.94 A.00
and to 10 to Uo b 9nd
Wkw -He -2.98 +1.98 +289 +388 24V�
dfGCMp t
df fJ *1
&OLq"
rap
-00
DO
-1.99
and
"W
Eo-
-3-W
b
-2.99
16
+1.98
In 10+a ADQ
and
+299 +3.99 9"
Palmer Hydrological Drought Index
April, 2018
4M -a.90 4.00 -1.94 A.00
and to 10 to Uo b 9nd
Wkw -He -2.98 +1.98 +289 +388 24V�
Palmer Hydrological Draught Index
May, 2018
d cupt
&-v
"nu
Ng19
U00
lIIW
woo
-440
-400
-2.16
-1.99
+2A0
+396
+4.16
ane
0100
b
41$
la
-2.39
10
+1.99
18
+7.99
b
+3.94
and
Om
Palmer Hydrological Drought Index
June, 2018
AW -3C4 4.11 -1+2A +3.16 +a.11
and b 10 Aa b Eo W
b*- -3.94 4.94 +1.94 +2.99 +3.94 Atmm
Palmer Hydrological Drought Index
July, 2018
-4J09 -390 -2.DD -1.99 +200 +3.90 ADD
9 a am
4e" mag -2.99 +18 +tea +$y 44"
Palmer Hydrological Draught Index
August, 2018
M ME--] —I L--1 )�
-4JDG -3.90 -2.10 -1.99 +2W +3.90 ADD
AM ba W b to 10 and
WOW -3.94 -2.50 +1.99 +2.99 +3.94 ato*
Palmer Hydrological Drought Index
September, 2018
AM -ac9 -2.60 —1.99 +200 40 ABU
ane to 10 to in 10 MW
wow -3.16 -2.99 +1.94 +2.99 *3.$9 a4M6
Palmer Hydrological Drought Index
October, 2416
� � M F--1 M M
4Jp6 -3.0¢ -2.6d -1.94 4-1M 400 +A.60
ani b 10 10 in 16 Wd
4014 -3.93 -2.99 +1.94 +2.99 +3.99 aw*
Palmer Hydrological Drought Index
November, 2018
M M M M M
4.00 400 4A -1.99 .200 +3.00 .1.00
and b 10 10 to 10 Wd
below 99 -2.99 .1.99 .299 .3.99 al)OW
Palmer Hydrological Drought Index
December, 2018
drought
4.00 -3.00 -2.00 -1.99 .2.00 +3.00 +4.00
and to 10 10 10 10 wd
W" -399 -2.99 .1.99 +2.99 +3.99 abo*
moderxe
draught
APPENDIX D.
NORTH CAROLINA DROUGHT STATUS MAPS
North Carolina Division of Water Resources January 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources February 28, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources March 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources April 30, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources May 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources June 30, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources July 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources August 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
North Carolina Division of Water Resources September 30, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
D1
10
D2
D3
D4 n
North Carolina Division of Water Resources October 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
D1
10
D2
D3
D4 n
North Carolina Division of Water Resources November 30, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
D1
10
D2
D3
D4 n
North Carolina Division of Water Resources December 31, 2018
DWR Drought Image
Percentile
100
90
80
70
60
50
40
30
DO
20
Dl
10
D2
D3
D4 0
APPENDIX E.
HYDROGRAPHS (2018)
March 2018
90 day Precipitation Assessment
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
0
�a a ti� ti� at ti� ,ti`s ar ti�
�a� >a� �a� �a� >a° ��� �c�•a �ffat fjai
� Onsite Raingauge � CAST Raingauge 90 Day Onsite Total 30% 70%
LMGPrecipitation Data Obtained from: Onsite Raingauge and Comparison Station CAST (www.nc-climate.ncsu.edu)
LAND M aEMWE S.compNT company
30% and 70% precipitation normals obtained from: WETS Station WILLARD 4 SW, NC9423 1971-2000 (wcc.nres.usda.gov)
a DAVEY�'. company
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
90 day Precipitation Assessment
June 2018
,201_ J... h _ . _. 6 .
ybaa� �y� �y�
�1� bti
AI
ti ti� 1y AVA 3 do yN
Onsite Raingauge CAST Raingauge 90 Day Onsite Total 30% 70%
LM G Precipitation Data Obtained from: Onsite Raingauge and Comparison Station CAST (www.nc-climate.ncsu.edu)
LAND MANAGEME
NT
—comp=P 30% and 70% precipitation normals obtained from: WETS Station WILLARD 4 SW, NC9423 1971-2000 (wcc.nres.usda.gov)
a DJrIEY� company
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
September 2018
90 day Precipitation Assessment
`tip `tip `tip ti� ti� 1.110ti� ti� ti�
ti ti ti
Onsite Raingauge CAST Raingauge 90 Day Onsite Total 30% 70%
LM G Precipitation Data Obtained from: Onsite Raingauge and Comparison Station CAST (www.nc-climate.ncsu.edu)
LAND MANAGEME
NT
—comp=P 30% and 70% precipitation normals obtained from: WETS Station WILLARD 4 SW, NC9423 1971-2000 (wcc.nres.usda.gov)
a DJrIEY� company
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
ti
O
December 2018
90 day Precipitation Assessment
N N N ti00 00 oo� ti� ti� ti� ti� ti� ti00 ti00 ti00
Ove OLS
0L1 OLS' OJ OJ OJ OJ e�
ti� yti� yob ti��' 'b° tip°
Onsite Raingauge CAST Raingauge 90 Day Onsite Total 30% 70%
LMGPrecipitation Data Obtained from: Onsite Raingauge and Comparison Station CAST (www.nc-climate.ncsu.edu)
LAND M aEMWE S.compNT company
30% and 70% precipitation normals obtained from: WETS Station WILLARD 4 SW, NC9423 1971-2000 (wcc.nres.usda.gov)
a DAVEY�'. company
March 2018
Hydrology Assessment
12 12
6
10
8
18
4
2
-24 .I .I __ ■■ II_ . I I I .._.I .1 .I I_ II 0
.tip ti� ti� ti� .tiw .tiw ti� ti� .tip ti� ti� ti� ti�
Sao �a� Sao INV Sao
ti� titi ti°� h' titi ,yO'
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 1 (138BDBD5) --w-Well 2 (11313BF6) o Well 3 (EBDCDAO) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 1, 2, 3 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
12
6
June 2018
Hydrology Assessment
12
10
8
M,
-18
-24 ■ 1I■ I� ■ ■ ■I I ■ _ I 1 I
ti� ti� ti� N
�aA �aA
ti 4f ,y�i ,yti ,yO �o ti3 ,yO ,ti's'
Date
111111111111111IOnsite Raingauge Well 1 (138BDBD5) —a --Well 2 (11313BF6) Well 3 (EBDCDAO) —
4
2
_ I_ 11 I, I 0
00 00 00
ti� ti1 tib`
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAI"#—omp=y Wells 1, 2, 3 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
12
6
O
t
U
= 0
September 2018
Hydrology Assessment
12
10
8
C
-12
-18
24 - ---- --- -
I N N 'N ti� ti� NO N, til
N 06
Date
111111111111111111IOnsite Raingauge Well 1 (138BDBD5) (Well 2 (11313BF6) - Well 3 (EBDCDAO)
N
0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 1, 2, 3 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
12
6
7
d
s
u
c 0
December 2018
Hydrology Assessment
12
10
8
C
-12
-18
-24 ■. .1_■�__I ■ ■ .I 1
ti� IN : ti� IN ti�
OLc OL't op, OLSop*
y+0
J OJ °J
ti ti titiff ti°'
Date
MOnsite Raingauge Well 1 (138BDBD5) (Well 2 (11313BF6)
4
2
_ 1_ I1■ 1,_ I. .1_1
0
ti0 ti0 ti0 ti0 ti00
°J O�� Oen Oen Oen O��
ti�r
Well 3 (EBDCDAO) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 1, 2, 3 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
12
6
March 2018
Hydrology Assessment
12
10
8
lVJ
4
18 1 2
-24 .� ■ __ ■■ I I_ . I I I .._■ I .I .I I _ II p
ti� ti� ti� ti� ti�
Sao �a� Sao o >aR• lea fie•° �e� ��•° `Say `Sar `Sa,�, `Sat
ti by titi ti°' h tip' -Ic
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge +Well 4 (1130E45C) (Well 5 (11313AEB) Well 6 (1130EC94) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 4, 5, 6 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
12
6
June 2018
Hydrology Assessment
12
10
8
U
-18
-24 �I■ 1■ . _ ■I
ti � tih tip' ti� �� ti3
4
2
_■_ 1-11 ■ -1 11 - 0
�00 ti0 ti00
1111111111111111111111IOnsite Raingauge --Well 4 (1130E45C) --w-Well 5 (11313AEB) A Well 6 (1130EC94) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAI"#—omp=y Wells 4, 5, 6 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
12
6
7
GJ
t
U
= 0
September 2018
Hydrology Assessment
12
1
10
8
h
-12
-18
4
2
-24 ■ ■_
.. ■■■■■■■■■.■■.■■.■ ■■ .■- -
- - ■ ■ _
_■■■■■_■ ■ ■- 0
oo
1110ti�
ti� ti�
-tip -tip
sly �� �J
IV w
-tip -tip -tip -tip
�J �� �� �� ��
,y'V ,y�
��
ti�
-tip
e� eQ
��
y�
�.P yti.P y�.P
��P
y�5 ��5 X05
Date
111111111111111IOnsite Raingauge
Well 4 (1130E45C) -*--Well 5 (11313AEB) Well 6 (1130EC94)
0" Ground Surface -12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#—omp=y
Wells 4, 5, 6 - Ecotone WM20
- July 1, 2018 to September
30, 2018 - One reading per day at 7:00 am
12-
6
December 2018
Hydrology Assessment
J4,'
18
12
10
8
0
CU
U
U
i
6 0
to
Q
'u
v
L
a
4
2
___ ■. .1_��__I ■ ■ I I I _ I_ II■ II_ I■ .I_■
24 � 0
ti00 00 Ib
N by N ti� IN N, ti� ti� ti� IN
.Ov,�� Ove: Ove Ove, a�J, ! pp +0 �oJ Oe` Oen Ow, O�� Oen
ti � ti`' I ,yr � 1ti, Aor tico
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge --a—Well 4 (1130E45C) Well 5 (11313AEB) Well 6 (1130EC94) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 4, 5, 6 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
March 2018
Hydrology Assessment
12 12
6 10
N
s
v
0
8
a,
J
i
v
L
v
C
i -6
6 2
v
+f6+
3
N
�c7
N
L
C
CL
C -12
4
-18 2
-24 .� ■ __ ■■ I_ I I .._■ ■� .I _ I� 0
.tip ti� ti� .tip ti� ti� .tip ti� ti� .tip ti� ti� ti�
>aR, NIP .NIP e� "k lea ��a bac bac �a� fat
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 7 (EBDDCAC) -0--Well 8 (EBDEOES) Well 9 (18BA1330) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 7, 8, 9 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
12
6
June 2018
Hydrology Assessment
12
10
8
M,
-18
aA aA
w tiff tiff ti� �� y�� tion AVA 3'
Date
4
2
_._ L 11 _I�� _
.tiw .tiw ti00
1111111111111111111IOnsite Raingauge Well 7 (EBDDCAC) —0 --Well 8 (EBDEOES) Well 9 (18BAB30) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAI"#—omp=y Wells 7, 8, 9 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
12
6
O
t
U
C 0
September 2018
Hydrology Assessment
12
10
8
C
-12
18
4
2
-24 ■ ■—
.. ■ z w 0 0 0 E 0 0. E 0. E 0.0 0 . 0 - -
- _ ■ ■ _
-■0000_■ ■ ■— 0
ti00 ti00
ti� ti� NO tiY
-100ti�
ti� ti� ti�
.tip
'y Ri
.tip
C
tih
titi ti� �Q' ytiQ' ��P
��P ti�
Date
1111111111111111111IOnsite Raingauge
Well 7 (EBDDCAC) --m—Well 8 (EBDEOES) Well 9 (18BAB3C3)
0" Ground Surface -12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#—omp=y
Wells 7, 8, 9 - Ecotone WM20
- July 1, 2018 to September
30, 2018 - One reading per day at 7:00 am
12
6
v
s
v
__ 0
Hydrology Assessment
December 2018
— 12
10
8
C
-12
18
4
2
-24 0
ti� ti� ti� N ti� ti� ti� ti� ti� N N ti� ti�
0� 00c� of o� 0 o� e� eC e�
v ti� tib' ti°� IV yti� y�� ,1�r ,yO yOO -A,'
Date
MOnsite Raingauge --*--Well 7 (EBDDCAC) --m—Well 8 (EBDEOES) Well 9 (18BAB30) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 7, 8, 9 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
March 2018
Hydrology Assessment
12 12
6
10
N
s
v
0 8
� H
> N
� s
v
L
2�
-6 6
L
3 'v
� d
L
� a
C
-12 4
3
O
IL^
V
-18 2
-24 .� ■ __ ■■ I_ I I .._■ .� .I _ I� 0
00 0 p' ti� ti00
tiSa�
Date
Onsite Raingauge Well 10 (14E1AC62) tWell 11 (13D4D134) Well 12 (18BAB3C3) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 10, 11, 12 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
June 2018
Hydrology Assessment
12 12
6 - 10
N
s
v
0 8
> N
� s
v
L
2�
-6 6
v M
.2-
L 'v
3 �
N L
� a
C
-12 4
3
O
/L^
V
-18 2
-24 �I• I� ■ ■I �I _I I _ _�_ I_ �I _I�I - 0
ti0 ti0 ti0 ti0 ti00 ti� ti(b
��
If,
AVA 3� 4j IVAa
Date
MOnsite Raingauge Well 10 (14E1AC62) -a--Well 11 (13D4D134) Well 12 (18BAB30) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 10, 11, 12 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
September 2018
Hydrology Assessment
12 12
6 10
O
t
v
= 0
8
-12
18
24 - -- --------------- --- -
00 0
00 p p `tip p ti(b N yy, NO y�
NN sJ �J �J IVY pyo J4o Jao J¢o �Q
Ci
Date
111111111111111111IOnsite Raingauge Well 10 (14E1AC62) -a--Well 11 (13D4D134) Well 12 (18BAB30)
ti0 ti00
�eQ
N
4
2
0
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 10, 11, 12 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
12 —
6
v
s
U
December 2018
Hydrology Assessment
12
10
v 0
8
>
Gl
U
v
L
c6
-6
C
6 G
L
3
'v
L
�
a
4
C -12
18 2
■. _I_.I__I ■ I mI I I _ I_ II■ II_ I. _I_,
24 0
ti�
0�1 ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti�
0�1 0� °J °J °J °J peg peg peg peg peg
,y� c; titi N�r 'Or
Date
111111111111111111IOnsite Raingauge Well 10 (14E1AC62) —*--Well 11 (13D4D134) Well 12 (18BAB30) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 10, 11, 12 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
March 2018
12
10
a�
s
v
0 8
� H
> N
� s
v
L
2�
-6 6
v M
Q
L
3 'v
N d
L
� a
C
-12 4
3
O
IL^
V
-18 2
-24 .� ■ __ 0 I_ I I .._■ .� .I _ I� 0
�00 ti0 ti0 ti00
�aR, �aK. ��.p hep lea lea �a� ��c' jai' bac
ti w by tiff ti� �, titi ti� ti� y tiff ti� ti�
Date
111111111111111111IOnsite Raingauge Well 13 (EBD82EF) --w-Well 14 (11310460) *—Well 15 (113130B5) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 13, 14, 15 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
12
6
N
s
v
C 0
_ -12
3
O
/L^
V
June 2018
Hydrology Assessment
-18
-24 �I■ I1 ■ ■I oil. _I I I I
a�N a�N a��N .?
AVIV tipP (C�3�
Date
1111111111111111111111111IOnsite Raingauge Well 13 (EBD82EF) —*--Well 14 (11310460) Well 15 (113130B5) -
12
10
s
4
2
I_ II _III _ 0
N til
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 13, 14, 15 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
12
6
N
s
v
C_ 0
September 2018
Hydrology Assessment
12
10
8
-12
18
4
2
-24 ■ ■_ .. ■■■■■■■■■.■■.■■.■ ■■ .■- - - - ■ ■ _ _■■■■■_■ ■ ■_ 0
ti00 ti00 �00 �00 ti� ti00 ti00 ti00
�tiQti��
1c eoP
bJ�e�ti
�
C -
Date
MOnsite Raingauge Well 13 (EBD82EF) tWell 14 (11310460) }Well 15 (113130B5) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 13, 14, 15 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
12
6
18
December 2018
Hydrology Assessment
-24 - -- ■. .1_.�__I ■ ■ .I 1 I _ 1_
N.% op ti� N, op ti� ti� N,
0�1
ti`' tip' ti°' 3
Date
MOnsite Raingauge --*--Well 13 (EBD82EF) --m—Well 14 (11310460) }Well 15 (11313065)
12
10
8
4
2
II■ I._ I. _1_. 0
ti0 ti0 ti0 ti00
Oe° Oe° Oe° Oe°
,yo til' tib` �ti
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 13, 14, 15 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
March 2018
12
10
8
U
4
-18 2
-24 .� ■ __ ■■ I_ I I .._■ ■� .I _ I� 0
00 00 Ib 00 00 00
e�
titi`` titi
Date
IIIIIIIINIOnsiteRaingauge +Well 16 (14E16876) +Well 17 (138B9F0B) (Well 18 (13D4ACCB) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 16, 17, 18 - Ecotone WM20 - January 1, 2018, to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Well 16 malfunction - data gap June 27 to July 17
12
6
June 2018
Hydrology Assessment
12
10
8
L4
-18
-24 �I■ I■ . _ ■I ■I _I I
til til til ti115 ti1b
P�� Pic ,,PQM
IV ' tih AVIV ti� ti� If AVIV
Date
MOnsite Raingauge Well 16 (14E16876) —0 --Well 17 (138B9FOB) Well 18 (13D4ACCB)
4
2
_._ 1-11 1 _111 - 0
'IV ti�
y1 SP �b*
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 16, 17, 18 - Ecotone WM20 - April 1, 2018, to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Well 16 malfunction - data gap June 27 to July 17
12
6
September 2018
Hydrology Assessment
12
10
8
4
2
-24 ■ ■_ ■. ■■■■■■■■■.■■.■■.■ ■■ ■■- - - _ ■ ■ _ _■■■■■_■ ■ ■_ 0
,tip ti00 ti00 ti00 ti00 ti00 ti� ti� -10ti� � � � �
titititi
w tiff tip' ti� ti' tip' ti� ti� I:
Date
IIIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 16 (14E16876) --*—Well 17 (138B9FOB) Well 18 (13D4ACCB) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND "`AT GROUP
aCOMEY -mmp=y Wells 16, 17, 18 - Ecotone WM20 - July 1, 2018, to September 30, 2018 - One reading per day at 7:00 am
a DpIEY� company
Hydrology Assessment
12
6
December 2018
12
10
8
U
-18
-24 ■. .1_.�__I ■ ■ .I 1 I _ I_
01 01 01 01 e�
�� ti� tiff ti� y� yti� 11 �
Date
MOnsite Raingauge —*--Well 16 (14E16876) —*--Well 17 (138B9FOB) Well 18 (13D4ACCB)
MEN ■ 1 _ ■ ■
ti0 ti0 ti00
yo0ec; y10ec;
4
2
0
0
Oe
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy Wells 16, 17, 18 - Ecotone WM20 - October 1, 2018, to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
March 2018
Hydrology Assessment
12 12
6 10
8
-18
-24 .� ■ __ ■■ I_ I I .._■ .� .I _ I�
ti00 ti� ti00 ti� ti� ti� ti� ti1b
��a� h�a� 'L�a�. ����. ��•p hep �e� hep ��c' bac bac jai
hy
Date
4
2
0
1111111111111111111IOnsite Raingauge Well 19 (EBD77B1) --w—Well 20 (14E14CF8) Well 21 (A28BE59) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 19, 20, 21 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
June 2018
12
10
8
-18
-24 _ �I■ 1■
ti� ti� ti�
PQt PQt PQi
.I oil. _1 I _
PQj PQi �aJ >Sa� �a� �a�
IV ti�- 3
Date
_III _
ti00
111111111111111111IOnsite Raingauge Well 19 (EBD77B1) --w–Well 20 (14E14CF8) }Well 21 (A28BE59) —0" Ground Surface -12" Threshold
4
2
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy Wells 19, 20, 21 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
September 2018
Hydrology Assessment
12
10
8
-12
-18
4
2
-24 ■ J- �rlrifEIIIIIIII.II.■I.I ■I .■- - - _ I I -I-A,-• `.-JLN111.■ ■ ■_ 0
.tip ti� .tip ti� .tip .tip .tip .tiw ti� ti� ti� ti� ti� ti�
>`�� QJ�O Q�°O PJB Q��O 0eQ �eQ ��Q gel ceQ
Date
IIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 19 (EBD77B1) -*--Well 20 (14E14CF8) Well 21 (A28BE59) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 19, 20, 21 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
December 2018
Hydrology Assessment
12 — 12
6 — 10
8
4
-18 — 2
24 ___
■.
_I_.I__1
■
� I
1 _ I_ II■ II_ I■ _I_. 0
ti�
ti� ti� ti�
ti�
ti� ti� N,00N ti� ti ti�
v O��
ti
O�� O�� °J
°J °J °J peg peg peg peg peg
3
y�
I ,yam h
tib' N�r
No til
T
Date
IIIIIIIIIIIIIIIIIIINOnsiteRaingauge
Well 19 (EBD77B1) --w— Well
20 (14E14CF8)
}Well 21 (A28BE59) 0" Ground Surface -12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy
a DAVEY�'. company
Wells 19, 20, 21
- Ecotone WM20
- October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
12
6
March 2018
Hydrology Assessment
12
10
8
-18
-24 _1 ■ __ ■■ I_ I I ■._■ ■� ■I _ I�
�0•p lea ��•p �e•P jai mat far jai
y tib' ti°' ti�
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge --*--Well 22 (14E1A34B) --m—Well 23 (14E17A3D) Well 24 (14E1571D) —0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 22, 23, 24 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
June 2018
12
10
8
u
-18
-24 �I■ I■ ■ ■I ■I _I 1 _ _■_ I_ �I ■ _I■1 _
til til ti% ti% ti% ti1b
X�o�a� ���a� SIN y IN 'NIP
� 1
Date
MOnsite Raingauge tWell 22 (14E1A34B) tWell 23 (14E17A3D) (Well 24(14E15711)) —0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy Wells 22, 23, 24 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
September 2018
Hydrology Assessment
12
10
8
U
18
-24
`tip `y� `tip `1� `tip ti� ti� ti0 ti0 ti� ti� ti� ti� ,tip
ti -Y tip'ti� y tiff ti� ti� C
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge --*--Well 22 (14E1A34B) –a --Well 23 (14E17A3D) Well 24 (14E1571D) —0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 22, 23, 24 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
December 2018
12
10
8
18
4
2
___ ■_ _1_.1__1 ■ .I 1 I _ I_ 1I■ II_ �. _I_,
24 0
Ib 00 Oti� GY tip' Gtic; �� tiN N ti
G o �o �o
w 1OG %o ti� Oti� Oe ti� Qe ti� Qe ti� Qe
ti� 4r�
Date
111111111111111111IOnsiteRaingauge --*--Well 22 (14E1A34B) +Well 23 (14E17A3D) (Well 24 (14E1571D) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 22, 23, 24 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12 -
6
March 2018
Hydrology Assessment
12
10
8
18
-24 .� ■ __ ■■ I_ I I .._■ .� .I _ I�
Date
4
2
0
MOnsite Raingauge Well 25 (14E1570F) —*--Well 26 (14E14D4C) Well 27 (18BA7B36) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 25, 26, 27 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
June 2018
12
10
8
18
-24 1 11. I
0
PQM PQi Phi'
.1 _ .I .I . _1 . I _
Pit' Pit as aX
tiff ti� �`s tip`s tio`s ti�� 3
Date
ti� ti� ti�
doSIP
IIIIIIIIIIIIIIIIIIIIOnsiteRaingauge --0-- Well 25 (14E1570F) +Well 26 (14EAD4C) (Well 27 (18BA7B36) 0" Ground Surface -12" Threshold
4
2
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 25, 26, 27 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
12 12
6 10
= 0
8
C
-12
18
4
2
-24 ■ ■- .. ■ 0 0 w w w w w 0. 0 E. 0 E.■ E .N - - - - ■ ■ _ -00000_■ ■ ■- 0
00 -tip �-ti� -tip �-ti� by, 00 N by, ti� ti� ti� ti� ti� ti�
�J �o �.> >o J¢°
C
Date
Onsite Raingauge Well 25 (14E1570F) +Well 26 (14E14D4C) (Well 27 (18BA7B36) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 25, 26, 27 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
= 0
8
C
-12
18
4
2
-24 ■ ■- .. ■ 0 0 w w w w w 0. 0 E. 0 E.■ E .N - - - - ■ ■ _ -00000_■ ■ ■- 0
00 -tip �-ti� -tip �-ti� by, 00 N by, ti� ti� ti� ti� ti� ti�
�J �o �.> >o J¢°
C
Date
Onsite Raingauge Well 25 (14E1570F) +Well 26 (14E14D4C) (Well 27 (18BA7B36) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 25, 26, 27 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
Hydrology Assessment
12
6
December 2018
__ 0
12
10
8
C
-12
18
4
2
-24 _ _ — ■ . ■ mo—ME-0 ■ ■ ■ m ■ ■ ■ _ ■ _ MEN 00— ■ ■ _ ■ _ ■ 0
tiooti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti�
0�1 0� °J °J °J °J peg peg peg peg peg
,y� N�r 'O 3 do ,y1
Date
MOnsite Raingauge --*--Well 25 (14E1570F) +Well 26 (14E14D4C) }Well 27 (18BA7B36) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 25, 26, 27 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
March 2018
Hydrology Assessment
12 12
6 10
8
R
-18
-24 _� ■ __ ■■ I_ _ I I .._■
tiIb
ti ti ti y tiff ti� ti� ��
Date
MOnsite Raingauge Well 28 (14E16089) --*--Well 29 (14E1AB7F) Well 30 (138BD659) —
ti� ti� ti�
fat bac
titi ti°' ti�
0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 28, 29, 30 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
June 2018
12
10
8
4
2
-24 _ MEMO ■ ■ . ■ _ ■ ■ OEM. _ ■ MEN _ ■ _ 0 _ ■ _ ■ ■ ■ ■ —MEN — 0
tiY ti� ti� ti� ti� ti� ti�
P,�t P,�t Pit Pit Pit aJ as as as �J� �J� �J� �J�
tiff
Date
111111111111111111IOnsite Raingauge Well 28 (14E16089) --*--Well 29 (14E1AB7F) Well 30 (138BD659) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 28, 29, 30 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Well 30 malfunction - data gap July 20 to Dec 4
Hydrology Assessment
12
6
September 2018
12
10
8
4 4
2
-24 ■ ■ _ .. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ .0— _ _ — ■ ■ _ —00000-0 ■ ■ _ 0
>>>oI >�� � y � � ti�
.N V S10titibti-100ti
� ��
>�� QJ¢O QJaO Pp4o QJ¢O 5eQ ge9 eq geQ geq
11 by
Date
IIIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 28 (14E16089) --m—Well 29 (14E1AB7F) Well 30 (138BD659) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 28, 29, 30 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Well 30 malfunction - data gap July 20 to Dec 4
Hydrology Assessment
12
6
December 2018
12
10
8
Ltp�
4
-18 2
S. - 0
ti0 ti0 ti0 ti0 ti00 ti� ti� ti� ti� ti00 ti� ti� ti0 ti00
4�'hti �i'`�, �oJ �oJ �oJ,
op, 0
�oJ, Oen, Oen, Oen, Oen Oen
ti ti ti ti yti tib' by
Date
1111111111111111111111111IOnsite Raingauge --*--Well 28 (14E16089) –0 --Well 29 (14E1AB7F) Well 30 (138BD659) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 28, 29, 30 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
March 2018
Hydrology Assessment
12 12
6 10
8
.Vi
18
-24 _i .I __01 II_ . I I I .■_.I ■
ti00 ti� ti� ti� ti� ti�
Sao �a�, am IN Igo
N
Date
MOnsite Raingauge Well 31 (14E1795E) --w-Well 32 (14E1ABF4) - Well 33 (14E173B1)
.I _ I.
Ib Ib
Baty �ajy �a,�,ti
titi ti°' ,yam
0" Ground Surface -12" Threshold
4
2
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 31, 32, 33 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
June 2018
Hydrology Assessment
12 12
6 10
8
18
.I .I. _I 1I_
1
ti00 N, ti� ti� 00
N
��aJ 3�a�
e o�aJ 1IS��
ti ti ti
Date
4
2
_._ 1-11 . _Ill _ 0
ti00
,yp , I I ,LOC
1111111111111111111IOnsite Raingauge —*--Well 31 (14E1795E) --m—Well 32 (14E1ABF4) Well 33 (14E173B1) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 31, 32, 33 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
ti�
ti�
ti�
ti�
titi
ti�
.I .I. _I 1I_
1
ti00 N, ti� ti� 00
N
��aJ 3�a�
e o�aJ 1IS��
ti ti ti
Date
4
2
_._ 1-11 . _Ill _ 0
ti00
,yp , I I ,LOC
1111111111111111111IOnsite Raingauge —*--Well 31 (14E1795E) --m—Well 32 (14E1ABF4) Well 33 (14E173B1) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 31, 32, 33 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
GJ
t
U
= 0
September 2018
Hydrology Assessment
12
10
8
C
-12
-18
24 - -- -- ----- ---
I N ti� 'N ti� ti� NO ti�
vy
N y�
Date
Onsite Raingauge Well 31 (14E1795E) (Well 32 (14E1ABF4) (Well 33 (14E173B1)
ti� ,
�eQ , Sed
4
L
0
1p
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 31, 32, 33 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
Hydrology Assessment
12
6
December 2018
__ 0
12
10
8
C
-12
18
4
2
-24 _ _ — ■ . ■ . ■ _ . ■ _ _ ■ ■ 00.0 ■ ■ _ ■ _ MEN ■ ■ _ ■ ■ . ■ _ ■ 0
tiooti� ti0 ti0 ti� ti� ti� ti� ti� ti0 ti� ti0 ti0 ti00
°J °J °J°J pe° peg peg peg peg
ti ti� titi ti� c,- tib; N�r 11�y
Date
MOnsite Raingauge Well 31 (14E1795E) --w-Well 32 (14E1ABF4) Well 33 (14E173B1) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 31, 32, 33 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
March 2018
12
10
8
18
-24 .� ■ __ ■■ I_ I I .._■ .� .I _ I�
,a.� ,ate ,ate ,�� ,�� ��•p hep lea lea jai �a� mac bac
Date
4
2
0
IIIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 34 (14E1B019) --w-Well 35 (13D4939B) -Well 36 (14E16073) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 34, 35, 36 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12 -
6
H
d
s
U
S. 0
June 2018
Hydrology Assessment
12
10
8
_ -12
-18
-24 �I■ I■ . ■I oil. _I I I I
ti� ti� ti� 00
N
Pit Phi Pit' Pyr PQr a� aJ aJ aI N�
ti ti� AVIV ti�r tion tiY� 3
Date
Onsite Raingauge Well 34 (14E1B019) +Well 35 (13D4939B) Well 36 (14E16073)
4
2
_■_ I_ II ■ 1 _I■I - 0
ti0 ti00
NIP
,yo ,y1' tib`
0" Ground Surface -12" Threshold
4LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MnaDAVEY company
Wells 34, 35, 36 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
12
6
September 2018
Hydrology Assessment
12
10
8
.Vi
18
4
2
-24 ■ ■_ _. ■■■■■■■■■.■■.■■.■ ■■ .■_ - - . ■ ■ _ _■■■■■_■ ■ ■_ 0
ti� ti� ,ti`s p p ti� ti� ti� N100ti� ti� `s p' p'
,sly I Ian 1$) �a� PJ¢o PJQo PJao PJB g�Q g�Q �e� g�Q y�Q
ti � y� 'lti �
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 34 (14E1B019) tWell 35 (13D4939B) --*—Well 36 (14E16073) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 34, 35, 36 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
L
v
s
U
F 0
December 2018
Hydrology Assessment
12
10
8
_ -12
18
4
2
-24 --- ■. .1_.�__I ■ ■ .I I _ 1_
00 4s Ib lb Ib % lb 4
�' w tih ti'L ,yam tip' 11 ti� 3
Date
IIIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 34 (14E1B019) --w-Well 35 (13D4939B) Well 36 (14E16073)
MEN ■ 1 _ ■ ■
0 ti0 ti00
OAC OAC OAC
do "IV
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 34, 35, 36 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12 —
6 —
March 2018
12
10
8
-18
4
2
-24 -I ■ 1 0 I_ I I .._■ .� .I _ 11 0
ti0 ti0 ti0 ti00 ti� ti� ti� ti� ti� ti� ti� ti0 ti00
ti ti ti titi ti� ti� titi y� by
Date
MOnsite Raingauge (Well 38 (14E1AFB8) Well 39 (14E1A37A) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 38, 39 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
LA
v
U
U
0
d
O1
J
L
3 -6
U
U
f6
L
3
N
-12
3
O
ILn
V
-18
June 2018
Hydrology Assessment
12
10
4
2
-24 MEMO ■ ■
■ ■ ■ ■
ENE. _ ■ ENE
_ ■ _ ■ _
■ _ ■ ■ ■ ■ —ENE — 0
tioo
ti00
ti� ti�
tiN
ti� ti�
J J
'iI
INS,I
,Lo�a00
yoIs
Date
Onsite Raingauge
--m—Well 38 (14E1AFB8)
Well 39 (14E1A37A) —0"
Ground Surface
--12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy
a DAVEY�'. company
Wells 38, 39 -
Ecotone WM20 - April 1,
2018 to June 30,
2018 - One reading per day at 7:00 am
12
6
N
t
v
__ 0
September 2018
Hydrology Assessment
12
10
8
_ -12
-18
4
2
-24 ■ ■ — .. ■ 0 0 0 0 0 0 0 0 . 0 w . 0 0 . ■
■ ■ . 0 — — — —
■ ■ —
— ■ 0 E 0 0 _ ■ ■ ■ — 0
ti� ti00 ti00
ti� ti00
ti� ti� ti�
ti� ti�
ti� ti� ti�
,tip
t:(
ti�
Date
MOnsite Raingauge
--w-Well 38 (14E1AFB8)
(Well 39 (14E1A37A)
—0" Ground Surface
-12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#—omp=y
Wells 38, 39 - Ecotone WM20 - July 1, 2018 to September 30,
2018 - One reading per day at 7:00 am
Hydrology Assessment
12
6
December 2018
12
10
8
-18
4
2
■. 1 ■ ■ _I 1 _ II■ II_ I. _I_.
24 0
I00
N IV 00 00N N ti� ti� ti� ti� IV I ti$ ti� I
Oen Oe1 0�1 O�� O�� °J °J °J °J peg peg peg peg pew
ti w ti� tip' ti� tiff N� tiY 3 do y�, ti°` 3y
Date
MOnsite Raingauge --*--Well 38 (14E1AFB8) Well 39 (14E1A37A) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 38, 39 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
Hydrology Assessment
12
6
March 2018
12
10
8
MR
-18
4
2
-24 .I ■I __ on I_ . I I I .._.I ■� .I I_ I1 0
ti0 ti00 ti� ti0 ti00 ti� ti� ti� ti� ti� ti00 ti� ti00
NZ SIP %ab ,�4. hep lea hep lea bac bac jai �a�
ti ti� tip' ti� titi ti� ti� h tiff N�r 4
Date
IIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well 40 (14E1A275) –*--Well 41 (EBD822C) Well 42 (14E1A0A1) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells 40, 41, 42 - Ecotone WM20 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
June 2018
Hydrology Assessment
12
10
8
u
-18
ti3 ,yo ti� 3
Date
_._ I. 11 0 1 _I.1 _
ti00 ti� 00
N
1p
4
2
1111111111111111111IOnsite Raingauge Well 40 (14E1A275) –*--Well 41 (EBD822C) Well 42 (14E1AOA1) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 40, 41, 42 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
ti�
ti�
ti�
by
titi
ti�
ti3 ,yo ti� 3
Date
_._ I. 11 0 1 _I.1 _
ti00 ti� 00
N
1p
4
2
1111111111111111111IOnsite Raingauge Well 40 (14E1A275) –*--Well 41 (EBD822C) Well 42 (14E1AOA1) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells 40, 41, 42 - Ecotone WM20 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
12
6
September 2018
Hydrology Assessment
12
10
8
Ltp�
18
4
2
-24 ■ . _ NNE NNE ■ ■ ■ . ■ ■ . ■ ■ . ■ ■ ■ .0- - - - ■ ■ _ _ ■ ■ ■ ■ ■ _ ■ ■ ■ - 0
.tip ti0 tiV ti� .tiw .tip .tip .tip ti� ti� ti� .,yob ti0
>oy >oi N%Y >�N >J� P��y09 �eQ �e'q �eQ �eQ
ti 06,y3
Date
111111111111111111IOnsiteRaingauge Well 40 (14E1A275) +Well 41 (EBD822C) Well 42 (14E1A0A1) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 40, 41, 42 - Ecotone WM20 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
Hydrology Assessment
12
6
December 2018
12
10
8
�40�
-18
4
2
--- ■. .1_.�__I ■ ■ .I I I _ I_ II■ II_ I■ .1_,
24 0
ti0 IN' ti0 ti� ti� ti� ti� ti� ti� ti� ti� ti�
O�+c' O`� �oJ' �oJ �oJ �oJ OAC O�c: ' OAC O�c:
,'� `b
Date
MOnsite Raingauge Well 40 (14E1A275) –*--Well 41 (EBD822C) Well 42 (14E1A0A1) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells 40, 41, 42 - Ecotone WM20 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
March 2018
Hydrology Assessment
18 10
12 9
6
N
s
v 0
C
8
7
H
N
30
-36
-42 .1 ■� __ ■■ _ .■_■ .� .I _ I�
ti00 ti� ti� ti� ti� ti� ti� p ti� ti� ti0 ti00
,�� Sao Sao ,ate ,ate hep lea hep �e•0 fat mat bac jai
Date
111111111111111111IOnsite Raingauge --*--Well E1 (1130CB40) (Well E2 (11310412) Well E3 (AB35E22) — 0" Ground Surface -12" Threshold
3
2
1
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I.i1ND MANAGEMENT a DAV"#- omp=y Wells E1, E2, E3 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
June 2018
Hydrology Assessment
18 10
12 9
6
8
7
V
-30
-36
-42 1I■ I� ■ _ ■I �I _I I
ti0 ti0 ti00
Date
MOnsite Raingauge Well E1 (1130CB40) —*--Well E2 (11310412) Well E3 (AB35E22) -
_._ I. 11 . I _III _
ti0 ti00
sp
do til' ,tiv
0" Ground Surface -12" Threshold
3
2
1
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells E1, E2, E3 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
18 10
12 9
6 8
IA
O
t
v 0 7
C
O
-6 6
L
C
-12 S Q
U }I
F CL
N -18 4
L
� a
_ 24 3
3
O
/L^
V
-30 2
-36 1
1_ �II I�1. �_1 _� ■� .■- _ _ _ _ _I _� ■ 1_
42 0
.tip ti� ti� .tip .tip 'y� 'y� IN 7� ti� N
e ��� �o� ,�J� �J� PJ�c QJ4O PJ�o PJ4o Sed �e� �e� 5e� 5eQ
'1'L IC
Date
MOnsite Raingauge Well E1 (1130CB40) --m—Well E2 (11310412) Well E3 (AB35E22) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Wells E1, E2, E3 - Ecotone WM40 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
18
12
6
December 2018
Hydrology Assessment
-12
-30
-36
42
---
■. .1_.�__I ■ ■ .I 1 I _ I_
ti� ti� ti� ti� ti� ti�
0& CPI e*-O�O- �°J �O- �O-
Date
111111111111111111IOnsite Raingauge Well E1 (1130CB40) --w—Well E2 (11310412) Well E3 (AB35E22)
LMG
LAND MANAGEMENT GROUP
a DAVEYI.. company
■■■ 0I - 0
ti0 ti00
yo tiV
10
9
8
7
6
C
5 G
Q
4
L
a
3
2
1
0
00
ey
0" Ground Surface -12" Threshold
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
Wells E1, E2, E3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
March 2018
Hydrology Assessment
18 10
12 9
6 8
v
s
= 0 7
d �
> - Gl
J 6 6 v
L
c6 C
-12 5 C
Q
3 -18 4
N L
� a
_ -24 3
3
O
`Ln
V
-30 - 2
-36 1
-42 ■1 ■ __ �■ I_ I I .■_■ ■� .I _ I� 0
ti0 til ti0 �00
S112P �a� �a� ,a�. NIIP ��w ��a ��a bac mac bac jai
tip' ' tiro � tip' ,yo; ti�
Date
Onsite Raingauge Well E4 (A28B92Q +Well E5 (EBD8D83) —Well E6 (9DE65BF) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells E4, E5, E6 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
.Vi
-30
-36
Hydrology Assessment
-42
III• I� ■ ■I wI _I 0 I
aAy� aJy� aJ,ti� Ri ti�
tiP �P y�P AVIV 11 it 11pr�
Date
Onsite Raingauge Well E4 (A28B92C) --w-Well E5 (EBD8D83) Well E6 (9DE65BF) —
June 2018
10
9
8
7
3
2
1
_I_ I. 11 I I _III _ 0
ti00 ti00 00N
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells E4, E5, E6 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
18 10
12 9
6 8
v
s
v 0 7
CArK
dN
-6 6
L
c6 C
-12 5 C
a-+
3 -18 4
N%-
24
24 — 3
3
O
`Ln
V
-30 2
-36 II 1
�_ �II I�1. I_� _I ■I .■- - - - - -II _� ■ �_
42 0
tilb
�J �O �.? �O �O PJ¢c Pao PJB PJae �eQ yeQ .91 19, 1
ti w� ti� tip' ti� IV ti� ti� �r ti� ti� o
Date
MOnsite Raingauge Well E4 (A28B92C) --w-Well E5 (EBD8D83) Well E6 (9DE65BF) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Wells E4, E5, E6 - Ecotone WM40 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
s
v 0
C
d
-6
L
M
-12
U
U
f6
7 -18
H
3 24
O
/L^
V
-30
December 2018
Hydrology Assessment
-36
42
--- ■. .1_.�__I ■ ■ .I 1 I _ I
�
O�* O�1 op,O�� tJOJ �oJ �oJ 01;,
ti y� ti'L � I tip' tio, ti� 3
Date
1111111111111111111IOnsite Raingauge Well E4 (A281392C) --w—Well E5 (EBD8D83) Well E6 (9DE6513F)
10
9
8
7
OJ
6
C
5 C
.Q
4
L
a
3
2
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells E4, E5, E6 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
1
110
1
I
1
1 -
.
.
-1 0
ti0
ti0
ti0
ti00
do
y�,
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Wells E4, E5, E6 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
H
d
s
U 0
C
March 2018
Hydrology Assessment
10
9
8
7
d
We
36
1
-42 -- I_ _ I I
ti0 ti0 ti0 ti00
>a�
NIP
ti 4i tih ti'L 'L°' � ti'L ti°'
Date
MOnsite Raingauge --*--Well Al (EBD1791) --m— Well A2 (1314EBAB) Well A3 (EBDBBF7) —0" Ground Surface -12" Threshold
ti00
Cep a'� at
LMG
LAND MANAGEMENT GROUP
a DAVEYI.. company
3
2
1
0
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
Stream Wells Al, A2, A3 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
18
12
6
U
s
U 0
C
June 2018
Hydrology Assessment
-30
-36
-42
10
9
8
7
1
N
6
C
C
5 G
41
a.,
.Q
4
L
a
3
2
1
II. I. _ ■� .I . _I I I _ I_ II _I,I _ 0
ti� ti� ti� ti� til ti0 IN ti0 IN ti0 ti0 00
� � aI yo��, y1��� ��ti
Date
Onsite Raingauge Well Al (EBD1791) --w- Well A2 (1314EBAB) }Well A3 (EBDBBF7) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy Stream Wells Al, A2, A3 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
18 10
12 9
r -,an
6 8
s
C
07
> N
-6 6 t
L
-12 5 2
41
3 -18 4
N L
� a
_ -24 3
3
O
C7
-30 2
-36 w ON 1
�_ ISI . I_� _I .I .._ _ _ _ _ �_
42 0
ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti� ti�
>`?� � >J� >J� >J� Q�¢°�e9 yeQ
ti by tip' ti� tip' tip• T
Date
MOnsite Raingauge --*--Well Al (EBD1791) --m— Well A2 (1314EBAB) —Well A3 (EBDBBF7) —0" Ground Surface -12" Threshold
L M G Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Stream Wells Al, A2, A3 - Ecotone WM40 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
December 2018
Hydrology Assessment
30
10
9
8
7
fA
O
6 s
v
C
C
5 C
Q
4
L
CL
3
2
-36 1
--- ■. .I_��__I ■ ■ .I 1 I _ I_ I ■ 1_ I■ _�
42 0
N. ti� ti� ti� ti� ti� ti� ti� ti� ti� N
pG pG pG pG pG �o �o �o �o Qe Qe O� De �e
ti 4f ti� titi ti� h titi ti°� ,titc l ,y0' -IYV
Date
MOnsite Raingauge Well Al (EBD1791) +Well A2 (1314EBAB) }Well A3 (EBDBBF7) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Stream Wells Al, A2, A3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
fA
N
s
v 0
C
GJ
N -6
J
L
2�
-12
4)
U
f6
3 -18
N
-24
O
IL^
V
-30 - -
-36
-42 .1 __ ■■ I I - . I I I .._■
.tip ti� ti� ti� ti� ti� ti� ti� ti� ti� .,y�
N >a° NIP fat `Sat �at� �at
Date
111111111111111111IOnsite Raingauge Well B1 (A286DAC) –0 --Well B2 (A3BF21D) Well B3 (EBDC442) —0" Ground Surface -12" Threshold
March 2018
Hydrology Assessment
10
9
8
7
H
CU
6
i
5 O
.Q
4
L
CL
3
2
1
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Stream Wells B1, B2, B3 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
June 2018
Hydrology Assessment
18 10
12 9
6
8
7
tit,,
-36
-42
tio1 A1� 3
Date
1111111111111111111IOnsite Raingauge Well B1 (A286DAC) -*--Well B2 (A3BF21D) Well B3 (EBDC442) -
ti00
y0 y1' ,y0r
0" Ground Surface -12" Threshold
3
2
1
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEA.comoUy Stream Wells B1, B2, B3 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
18
10
12
9
6
8
I
O
t
v 0
7
C
6
O
6
L
-12
C
S Q
U
F
}I
N -18
I
4 U
�
a
_ 24
3
O
3
V ~
-30
2
-36
I
1
42 �_
.. III
IIS.
I.�
.I ■I .■_ -
-
-
_II
�� ■ �_ 0
ti� ti�
ti� ti� ti� ti� ti�
ti� ti�
ti� ti� ti�
.tip
�J� �J� �J�
N 4i
� � P�� PJ¢o P�I
Qom¢° �eQ
.tip
ye'Q ��Q �eQ geQ
Date
111111111111111111IOnsiteRaingauge
—*—Well B1 (A286DAC) —*--Well B2 (A3BF21D)
Well B3 (EBDC442)
0" Ground Surface -12" Threshold
LMG
Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#—omp=y
Stream Wells B1, B2, B3 - Ecotone WM40
- July 1, 2018 to September
30, 2018 - One reading per day at 7:00 am
18
12
6
fA
N
s
v 0
C
December 2018
Hydrology Assessment
10
9
8
7
4A
d
-30
-36
4■I_■�I ■ ■ .I I I _ I
2 --- M.
ti00 �00 ti00 ti� ti� ti� NO
C'cf c'C �'tf L'�� C'tf pJ pJ pA' pJ eC
Date
111111111111111111111111IOnsite Raingauge Well B1 (A286DAC) tWell 132 (A313F21D) (Well B3 (EBDC442)
3
2
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Stream Wells B1, B2, B3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
1
■
I I_
I .
_I 0
ti00
ti�
ti�
ti00
Oen
O��
Oen
Oen
,y0
y1'
,yR
�ti
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Stream Wells B1, B2, B3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
18
12
6
O
t
U 0
C
March 2018
Hydrology Assessment
10
9
8
7
N
-30
-36
-42 .1 ■ __ �■ I_ I I .._■ .� .I _ I�
ti `` �;ti°' 4
Date
3
2
1
0
11111111111111IOnsiteRaingauge Well C1 (EBDODCC) +Well C2 (EBDAEBE) Well C3 (A3BF3CF) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAV"#- omp=y Stream Wells C1, C2, C3 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
18
12
6
June 2018
Hydrology Assessment
10
9
8
7
V
-30
-36
-42
IIIE I� ■ ■I 0I _I I
ti� ti� N00
ti� ti�
Pit Phi Pit' Pyr PQr aA aA aJ
ti ti� AVIV ti�r tion tiY� 3
Date
3
2
1
_I_ I. 11 I I _III _ 0
ti00 ti00 00N
,yo til' tip`
Onsite Raingauge Well C1 (EBDODCC) --m—Well C2 (EBDAEBE) Well C3 (A3BF3CF) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Stream Wells C1, C2, C3 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
September 2018
Hydrology Assessment
18 10
12 9
6 8
O
s A*,r
v 0 7
C
N in
> G1
J -6 — 6
L
-12 5 0
Q
.� Q.
3 -18 4
N L
� a
_ -24 3
3
O
`Ln
V
-30 2
-36 1
42 0
y00 ti00 yw ti110 ti00 yw y� yw 00N
5e'Q 5e'Q 5e'Q
Date
Onsite Raingauge Well C1 (EBDODCC) –*--Well C2 (EBDAEBE) Well C3 (A3BF3CF) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Stream Wells C1, C2, C3 - Ecotone WM40 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
d
s
U 0
C
December 2018
Hydrology Assessment
10
9
8
7
fA
N
3 -24
O
`Ln
V
-30
-36
42
■. .1—■�—_I ■ 0 .I 1 I —
ti00 ti� ti0 ti0 ti00- ti� ti� ti0 ti0 ti00
O� �� (3 op, �°J �O�.°J ioJ peg peg peg peg
ti � ti� "O l titi ,yontiro b do -A
Date
3
2
1
—� 0
00
ey
11111111111111IOnsiteRaingauge --*--Well C1 (EBDODCC) tWell C2 (EBDAEBE) (Well C3 (A3BF3CF) —0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Stream Wells C1, C2, C3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
s
v 0
C
d
J
-6
L
M
-12
v
3 -18
-24
O
`Ln
V
-30
-36
-42 _1 ■ __ �■ I_ I I .�_■ ■� .I _ I�
til til tiIb
NIP �a� �a� slate SIP ��a ��� bac mac bac jai
tip' sc tiro tip' ,yo; ti�
Date
IIIIIIIIIIIIIIIIIIIIIIIIIIOnsite Raingauge Well D1 (14E16358) --w—Well D2 (AC327E3) Well D3 (14E1ADB1) 0" Ground Surface -12" Threshold
March 2018
Hydrology Assessment
10
9
8
7
d
6 s
v
c
C
5 C
++
co
a..
.Q
4
L
a
3
2
1
0
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Stream Wells D1, D2, D3 - Ecotone WM40 - January 1, 2018 to March 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
June 2018
Hydrology Assessment
18 10
12 9
6
8
-12
-30
-36
-42 �I■ I� ■ _ ■I �I _I I
Date
111111111111111111IOnsite Raingauge Well D1 (14E16358) -0--Well D2 (AC327E3) Well D3 (14E1ADB1)
N,
00 IV
Ngo p
0" Ground Surface -12" Threshold
3
2
1
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
I,i1ND MANAGEMENT a DAMY1 omp=y Stream Wells D1, D2, D3 - Ecotone WM40 - April 1, 2018 to June 30, 2018 - One reading per day at 7:00 am
September 2018
Hydrology Assessment
18 10
12 9
6 8
v
s
v 0 7
1
d 1
> Gl
-6 6 s
L
c6 C
-12 5 C
� >Z
3 -18 4
_ 24 3
3
O
`Ln
V
-30 2
-36 1
�_ �II I�1. I.� .I ■I .■- - - - - -I -� ■ �-
42 0
`tip `tip \tip `tip \tip ti� ti� ti� IN ti� ti� ti� ti�
�O �O S13 1.� �O PJ¢c Pao P�¢v PJae �eQ yeQ �eQ C7, �0Q
ti w ti� tip' ti� tiff ti� ti� �: �r
Date
MOnsite Raingauge Well D1 (14E16358) —*--Well D2 (AC327E3) Well D3 (14E1ADB1) 0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND M a[MWE I.comp cNT ompany
Stream Wells D1, D2, D3 - Ecotone WM40 - July 1, 2018 to September 30, 2018 - One reading per day at 7:00 am
a DAVEY�'. company
18
12
6
December 2018
Hydrology Assessment
-12
-30
-36
42
1b 1b lb 1b
Date
1111111111111111111111111IOnsite Raingauge Well D1 (14E16358) --w-Well D2 (AC327E3) Well D3 (14E1ADB1)
10
9
8
7
H
6
C
5 G
Q
4
L
a
3
2
10
ti� ti� ti� ti�
do ti� 11` 31
0" Ground Surface -12" Threshold
LMG Northeast Cape Fear Umbrella Mitigation Bank (40-09-190b)
LAND MANAGEMENT
aEMWEYI.comoUy Stream Wells D1, D2, D3 - Ecotone WM40 - October 1, 2018 to December 31, 2018 - One reading per day at 7:00 am
a DAVEY�'. company