Loading...
HomeMy WebLinkAbout20190270 Ver 1_09b_C-4928_Permit Drawings_(2019-03-04)_20190304Hl hW�l North Carolina Department of Transportation �Stormwater ,,,,,,.,,.� Highway Stormwater Program �^ STORMWATER MANAGEMENT PLAN -- (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: SR-1317 TIP No.: C-4928 County(ies): Durham Page 1 of 3 General Project Information WBS Element: SR-1317 TIP Number: C-4928 Pro"ect T e: Roadwa Widenin Date: 3/4/2019 NCDOT Contact: Chris Murra , PWS/Pro'ect En ineer Contractor / Desi ner: Kimle -Horn Address: NCDOT Hydraulics Address: 421 Fatteville Street 2612 North Duke Street Suite 600 Durham, NC 27704 Ralei h, NC 27601 Phone: 919 220-4600 Phone: 919 677-2126 Email: cmurra ncdot. ov Email: derrick.turner kimle -horn.com Cit /Town: Durham Count ies : Durham River Basin s: Ca e Fear CAMA County? No Wetlands within Project Limits? No Pro'ect Descri tion Pro'ect Len th lin. miles or feet : 1.60 Surroundin Land Use: Commercial and residential use. Pro osed Pro'ect Existin Site Pro'ect Built-U on Area ac. 6.4 ac. 7.4 ac. Typical Cross Section Description: For -L-Morreene Road: 2@ 11' Lanes (1 each way) with curb and gutter; 5' bike lane. For -L- Morreene Road: 2@ 11' Lanes (1 each way) with no shoulder. Retain bridge over US-501 Bridge over US-501 Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 34,100 Year: 2030 Existin : 14,800 Year: 2004 General Project Narrative: This is a Division 5 managed project. Existing drainage patterns to be maintained to the best extent practical. Drainage systems sized with future development taken into (Description of Minimization of Water account. The following items were incorporated for the Minimization of water quality Impacts: Quality Impacts) - Alignment was designed to minimize stream crossing impacts. - 2:1 Slopes were used to reduce structure length and limit wetland impacts. - Grassed swales utilized to the maximum extent practical. - System retained to the maximum extent practical. Waterbod Information Surface Water Bod 1: Mud Creek NCDWR Stream Index No.: 16-41-1-10 NCDWR Surface Water Classification for Water Body Primar Classification: Water Su I V WS-V Su lemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: None Im airments: None A uatic T&E S ecies? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: Jordan Lake Pro'ect Includes Brid e S annin Water Bod ? No Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? No Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) I li hW� North Carolina Department of Transportation � �Stormwater I� � ,� „<.,, Highway Stormwater Program �.;.Ti�� STORMWATER MANAGEMENT PLAN �"��< �°�`�"� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: SR-1317 TIP No.: C-4928 Count ies : Durham Pa e 2 of 3 Additional Waterbod Information Surface Water Bod 2: Sand Creek NCDWR Stream Index No.: 16-41-1-11 NCDWR Surface Water Classification for Water Body Prima Classification: Water Su I V WS-V Su lemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: None Im airments: None A uatic T8E S ecies? Comments: NRTR Stream ID: Sand Creek Buffer Rules in Effect: Jordan Lake Pro'ect Includes Brid e S annin Water Bod ? No Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? No Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) Hl hwcl North Carolina Department of Transportation ��� �Stormwater ''� j , ,,,�.,�,,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN --' (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: SR-1317 TIP No.: C-4928 County(ies): Durham Page 3 of 3 Swales Station & Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Pro'ects Bod it H:1 H:1 ac ft ft % cfs fps cfs fps Used Buffer Rules? 4 19+00 -L- RT Mud Creek 0.0 3.0 3.0 0.6 55 113 1.43% 1.4 1.9 1.8 2.1 No No 20+13 -L- RT 5 21+00 -L- RT Mud Creek 0.0 3.0 3.0 0.1 9 40 0.90% 0.1 0.9 0.2 0.9 No No 21 +40 -L- RT 5 22+10 -L- RT Mud Creek 0.0 3.0 3.0 0.1 8 40 0.52% 0.2 0.8 0.2 0.8 No No 22+50 -L- RT 6 33+40 -L- RT Mud Creek 0.0 3.0 3.0 0.3 31 60 2.08% 0.6 1.8 0.7 1.9 No No 34+00 -L- RT 6 36+15 -L- LT Mud Creek 0.0 3.0 3.0 0.5 52 110 0.91% 0.8 1.4 1.0 1.5 No No 37+25 -L- LT 6 37+25 -L- RT Mud Creek 0.0 3.0 3.0 0.4 36 75 2.60% 0.7 1.4 0.7 2.0 No No 38+00 -L- RT 6 38+00 -L- RT Mud Creek 0.0 3.0 3.0 0.4 36 75 2.60% 0.7 2.0 0.7 1.9 No No 38+75 -L- RT � 46+00 -L- RT Mud Creek 0.0 3.0 3.0 0.3 27 100 2.25% 0.4 1.7 0.6 1.7 No No 47+00 -L- RT � 47+00 -L- RT Mud Creek 0.0 3.0 3.0 0.3 25 65 2.02% 0.4 1.6 0.5 1.7 No No 47+65 -L- RT � 48+50 -L- RT Mud Creek 0.0 3.0 3.0 0.7 66 100 1.06% 1.3 1.7 1.7 1.8 No No 49+50 -L- RT � 50+56 -L- LT Mud Creek 0.0 3.0 3.0 1.0 100 0.50% 2.8 1.5 3.6 1.7 No No 50+56 -L- LT 9 69+50 -L- RT Sandy Creek 0.0 3.0 3.0 0.1 13 100 2.00% 0.2 1.3 0.2 1.4 No No 70+50 -L- RT 9 71+50 -L- RT Sandy Creek 0.0 3.0 3.0 0.5 50 70 0.50% 1.3 1.3 1.7 1.4 No No 72+20 -L- RT 10 �5+50 -L- LT Sandy Creek 0.0 3.0 3.0 0.2 20 50 3.20% 0.3 1.7 0.4 1.8 No No 76+00 -L- LT Additional Comments 0/1494/00 / � �O � ��P� e o BEGIN PROJECT o sos A A m z m �� � AMFRJCA� �R. � � i / � I � \ � � � � � �_� , I / , a, sP I so� � � � � c O h �' � � a � 0 0 � 0 � 0 � � � � �a. �� �a�� � P — _� � a�s � �I � MIDDLETON AVE NEWELL ST. I �_ �� �1� � � ��� �� END PROJECT CI T Y OF D URHAM MORREENE ROAD ( SR 1317 ) BI KE LANES v�c�N��' M� E: Nor ro scA� -L- POT Sta. 12+10.00 OWNER: CIN OF DURHAM 107 CITV HALL PLAZA SUITE 3100 DURHAM, NC 27701 ALLISON MOLLESON, E.I.T. 919.560.4326 EXT. 30296 al lison. molleson@durham nc.gov ENGINEER: KIMLEY-HORN AND ASSOCIATES, INC. 300 WEST MORGAN STREET SUITE 1500 DURHAM, NC 27701 CATHERINE M. KENNEDY, P.E. 918.678.4139 cathy. kennedy@kim ley-horn.com SURVEYOR: CH ENGWEERING, PLLC 3220 GLEN ROYAL ROAD RALEIGH, NC 27617 JEFF MUNN, PLS 919256b469 jmunn@ch2ngr.com GEOTECHNICAL: FALCON ENGINEERING, INC. 1210 TRINITY ROAD SUITE 110 RALEIGH, NC 27607 CHRISTOPHER V. NORVILLE, P.E. 919.871.0800 cnorville@falconengi neering. com °n� '�0 4 S � � , O � y� �.`�C ;`^fh� ,��OQ.'� 0 ^ � �� �p� ���h y0 � ,W � SITE 2 - THOMAS J. BONFIELD CITY MANAGER m 0 N � �., FROM NEAL ROAD TO SR 1320 (ERWIN ROAD) TI P PROJ ECT: C-492 8 CITY PROJECT: SW-47D INETLAND AND STREAM PERMIT PACKAGE MARCH 4, 2019 SITE 1 , �� �2 '�g�= �� ��,� � �' R� `^ ,�> � 6 M0� RE�3��) 7 %�p � � � ~ �W � � V , y�GP� ��� P� PREPARED IN THE OFFIGE OF: Kimle >>>Horn v 300 WEST MORGAN ST., SUITE I500, DURHAM, NC, 2770 I PHONEe (9 19) 682-3583 Pe No.F-oioz �C zo,a CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED EN�'NEER'N� °ATE STEVE SCHEWEL STORM WATER DATE TRANSPORTATION DATE DATE °ATE MAYO R �'� s-, 8�� O � �3 � B �p N C1 � Q � � w� >,� ,4 �� -L- POT Sta. 92+74.01 , � o� hv ,p ���ty`� ��00 9 Z ��� \h�/� / Y• �N :t � � Z �� � GRAPHIC SCALE � 20 0 40 � PLANS 20 0 40 � PROFILE (HORIZONTAL) 5 0 10 � PROFILE (VERTICAL) PERMIT DRAWING SHEET � OF 5 � �8 °eN \ \� —�V<�Z ;< 3 i �> � �� ��� �' �O� �� V►�+1 � �s'Q���o � ���?�� 9� Q� �� F� � 65% PLANS DOCUMENT NOT CONSIDERE� FINAL UNLESS ALL SIGNATURES COMPLETED LEGEND � oo��MENT NOT �oNs�oEREo F�NA� � UNLESS ALL SIGNATURES COMPLETE D SITE 1 - IMPACT ZOOM-IN �O �(SCALE 1-- = 50-� PERMIT DRAWING DENOTES TEMPORARY IMPACTS IN SURFACE WATER 3 5 --.— � � -__ _ - �83 DENOTES IMPACTS IN C � SURFACE WATER niN e � — - � � _ � �e��_ � � I I \ � V1 -Ta� \ snc r � �— � >a� � -- � \�r � W sra_sa.90 h 15" RCP-IV _ -�� � �_ � > � � - - .e. � SPECIAL LATERAL 'V' DITCH � j� � � «_. `�. \ � � SEE DETAIL LSHEET 2D-1 F � / lV '_�....� Z z F , , ��=� �� SITE 1 a � \ �� 1// PLUG , AND ABANDON � w ra; \ v � --z ze �� V z m � � � � � � `� \ \.. . eI � .� � � - _ _ _ (V � _ � ce-c 1 E\ \ �8„ � ~ y _ ` ` \�E \ 48" `\ 24„ ?SBK. � y� �� 4" RCP-IV � �� � �� � V 18 78" RCP-N � �� � �,�p�� � � � REMOV � � _ � 46" RCP- � l�J Q -- � � � � � — — _ a � REMOVE � E � � ,:,;o o �O,qREE � ,s-- RCP-i —— —_ ' PDE PDE E E E P E, PDE � PD��i - ca-F Rp�s�,�3/7 z PD— �----------- ---- � o E E----/ \ /\ E W v _ • � 1 za --35^�cP-ro < < �------� oi / �J �- F ----- ` _ __ � CB-F CB-f B- � � �\ C E 30" RCP IV � - � v CB-F ��' �` � 18" RCP-N + � ` � � G �0 CB-F CB-G REMOVE TO JB W/MH &-F _ � � �7 � 18" RCP-IV DI � O,� REMO15 � ` —_ CB-G REMOVE 18" RCP-I DI S 529' 12.9" E �► Q \Q 75" RCP-N =� i� 1 _ / __� —� � !� �O� I \ � REMOVE� � � /� _ % z 24" RCP-IV 1 � —EV� —/ _ _ � - - < _ - - _ - _ DI _ — _ - � �� B G J �`� LF � -� _- - -� DI � c - - _ � F c F-Y�/'- Fp I �� ppEc-- c � E E E C� W �� �1 0 �� 15 is hc _ DE� S-- J , S I T E 2 �E DI E �y- CB-G SPECIAL LATERAL 'V' DITCH I w GRADE TO ORAIN REMOVE SEE DETAIL 35HEET 2D-i = 24" RCP-IV �-Q- 2 REMOVE W 15" �5" EMOVE ¢ 24" RCP-IV � MOVE � � � 24" RCP-IV REMOVE / \ RE SPECIAL LATERAL 'V' DITCH �y� / SEE DETAIL LSHEET 2D-1 / " RE�10VE W W� REMOVE 16 � 54" . a �` SPECIAL CUT DITCH Q �(1p 'I SEE DETAIL MSHEET 2D-1 a 2N SPECIAL CUT DITCH � W lV � SEE DETAIL MSHEET 2D-1 CITY OF DURHAM � � 2� Pl1BLIC WORKS DEPARTMENT �� APPROVED �I � ENGWEERING DATE .-CLASS�IRIP RAP ON BANKS (�, �� STORM WATER DATE ..��.CLASS RIP RAP COUNTERSUNK �II` � TRANSPORTATION DATE I '"^'SUPPL�ENT WITH CLASS B TO � 1 I 410 ',' 400 �I � � 390 ��� 380 -- FILL V(�11DS AS NECESSARV SITE 2- IMPACT ZOOM-IN DATE �EST 8 tONS SCALE 1" = 50' DATE EST 12 'iSY GFD ( � SEE SH�`ET 2D-LDETAIL 7 � � ��' 410 � � — 400 � . ' RT CROWN PO/N7 � -- _ ���— 390 `�� ------ c+,szaz � ------- �+�377'� i , y� . � � —.-^:' E o s�ciAc 380 ...-+ � " 0/TCH G E T � � --- - �� � ' - -�?)2A0% - � - _ - BEGI SPEC/AC -L - STA 4i+5p - �+72fi0% � E[EV 389.42 - `-zv�sv�svLzv�zv�zv�zv�z-�� -"� ------- --- �+�5/ EOSPECiAL E��A3�� --------- 370 - --- i--- r-.naiz ---- �t���'� ci snEci 370 I i �5%""-------._ T CRO�'N POINT CH R L SP l CH R R l-�2 -L- STA 39f00 D8i �+�1�� EGl SP AL D� CH G/t -L- STA 4i+i5 ti �+�qpOY. �-- BEGI SP£CIAL ELEV = 3/665' -L- STA 40+75 ELEV = 38830' - GI P£C/ � - / CH R L � � ELEy = 387D7 � i H G �' -L- STA 36+�5 ~ -�- STA 37+25 ' 360 � -L- SrA 33+00 o DITCH CR / RT 54" RCP � E[EV - 37250' N� E�£V = 37430' .� — II� 360 ELEV = 37200' �i -L- STA 34+00 `� P� - Q — � � _ � i ,_� ._� �, _. �-�'— .,_ _ �i ' ti�� ELEV =.i6925' M D C/ —L 0/ C/i GR E RT ��;_ ,_�, __ .._ . -�� � � � � CH R L � „ �"� -L- STA .i8+75 - �� BEGI SPECIAL -L- STA 35+85 � ELEV =�75 . . � � � � � - � � �+� D/rCH G £ LT � - W � w + E�.EV = 37050' �� -L- STA 34 75 w � E[EV = 365.00' � �i �, 350 350 32 33 34 35 36 37 38 39 40 41 42 PREPAREU IN THE OFFIGE OF: H RIZ PRo�ECT: zo� REV�� REV���� ��'E �p�wNeY ��E�ttE�eY �I�I� >>> Horn PLAN/PROFILE SHEETS MORREENE ROAD (SR 1317) BIKE LANES � m�s aoo�me�t, roeetne� witn ina oo�oaPts a�a aasig�s orase�raa nere��, as a� i�str�me�r o ser�i�e. �s � VERT W Intended only for the speciflc purpose and cllent for whlch It was preparetl. Reuse of and irciproper 5 � 10 � rElianC2 On thiS dOCUm2nt withOUt w�ittEn QUthOriZatiOn and adOptiOn b Kiml2 HOrn and ASSOCiatBS, InC. � JOB NUuOEP: SHEEi NUMBEP: Q snauba wi+no�t nabnrty to Kimiay-Horr, a�a assootatas,i�o. y y 300 WEST MORGAN STREET, SUITE I500, DURHAM, NC, 27701 � coovr�ent K�miay-Hor� a�d nssomatas.i��..zois PHONEe (9 19) 682-3583 PE No.F-oioz 0 i i494 i00 6 LEGEND � oo��MENT NOT �oNs�oEREo F�NA� � UNLESS ALL SIGNATURES COMPLETE D - SITE 1 - IMPACT ZOOM-IN �O ,: `� _ cscn�e r- = 50-� PERMIT DRAWING �DENOTES TEMPORARY IMPACTS IN SURFACE WATER � � SHEET 4 OF rJ ---- .p.� � (J�C _ � � _', �NAD 83 DENOTES IMPACTS IN piN '- - _ _ ' ��� � SURFACE WATER - � � , e - _ . _ � ��;� �e�� � _ I I � � s c� = � sn _\ h� _. � � ra\\ \ \ �-\/ sra_s<G90 ___ - � '., r - i C� � � �/ , � h � 15" RCP IV .. , .. [//� � � - - - �� ----- \ � \.'°� � �✓' � � �� � SPECIAL LATERAL'V' DITCH � � : ,,. 1 � \ �' \ � e\' \ �` �\ - � -. '� � .. SEE DETAIL LSHEET 2D-1 - - f � 9 � � � � � �" , l \ � F � � ......, � �� �\ ♦ �, � � � � � � � � - - - � � � � � - � - - -,,,- ... Q A . � � � � J � � . � ����F� ��z ze � � � �� � � � � � 7- � � - ew� ,nwo'ne�uoH , � � � � � �S � � i ..:� � � - - , � � � � � � ,� �' � � � � �� _ - � � � � �, � _ _ � _ � E- - _ _ _ _ . � , � ' �, � F��� � `� , �``. `�� ei,, � ��� `_� ��-�° ___ __-— —_ - - . _ � ` �r� ---��{� � � _, i � CB-G 1 . � f = � \ � � ' � � V _ � � � - - � � _ 18" � � � % � � � S t _ � ` �� � - - -- � ' \�. � � i . - - _ - _ _ - ' . � , . � ) -r�� � � ./. / . ` � p a � �'��- �,,_ F ��� � � , � _ � � � a� . � � � ' � / 24��. i � �� � h � � � , � -_ � . � � - - � , /� `l, < 4" RCP-IV � -' � - , � ' � � ` _ � � / ' 78 R - � i Z �� - / , i � / I� � � � � _ � � ce iv � i _ ��P � � W „ � RE OV � � ` � 46�RL�P � .. - ��8" . � , � / . - , � W � � / / ' � � � � � - . __ -� .�' � � �, REMOVE � , . A , �� � . � . E � I Q ;: ,o , , �1 E � � � : ch �'4REE �s^ ecv-i - -_ PDE _� PDE ' y' E�DE � PD��i _ cn � ca.F � RQ �SR � ��fDE c _ —� � � - - - - — !- - - - - - � o E E � � � / A � E � W � „ . � /3/7/ z Ze - - 3s^ Rca-iv � � � � �r---�---� D1 ----/ �J �--------` _ __ vWi .. CB-F - CB-F B- . � -. � � \ CB E - - . 30" RCPlV ` � � � . � . . �� � v. � . CB-P CB�' �� � 18" RCP-N � I �{,. \`� � G �0 CB F �� CB-G REMOVE.' TO 1B W/MH e _ � � � ' � ,- . `O,� �. � REMOVE � _ .` 78" RCP-IV � DI � h �� ,�j 15„ � __ CB-G REMOVE 18"� RCP-I o� � S 9' 29' 12.9" E � �► Q \� 15" RCP-1V . ,�. . O � J/ 1 �_ ..... .. - _ .. . : . . . ~ � � � � � � t \ �� REMOVE� - � , _ _ ' , DI � W za�� RCP-iv �ove - - - � � � � .< < � _ - - _ - _ _ — _ _ _ _�/ ""-G � J \ � / \ ���I �F� E _� �- �. - -� � -�� / � - � , , - c _ F c i F-°' i \ � \ � � ' � � � �_ � Pp c -- DE E __ - E - ' E S„ � W _ F _ _ � e c � ��- , ��, ��� � - ����� ��; � � ITE 2 � � ° ; � � � �_� �8 � � � _ , , , , p _ � ` z � � �E � � oi E � � � - � i is�� � ce-c - � = '� SPPGIAL LATERAL 'V' DITCH J ' � � I � - � ` I' Ow .' ' ` GRA E TP DRAIN � � REMOVE - , � �� � � SEE DETA�L 35HEET ZD-1 i = `. 24� RC�P IV \ _ / ' . % , . � ' � . -n- i . I t `� / ' __ - _ � � : C� REMOYE ' / j � � EMOVE � �� j . � , / ._,' 15" 15" � Q ' ` � � � � � � ' � .� � � � � , .. ��� ' ( ,. " �, . .. ' / � � V 24' RCP-I � � � � ' � 1 R€MOVE /- . � RE OVE� , � _ 24" RCR I y , � � hPECIAL U(.TERAL 'V' DITCH ' . / ` - . / � i ' � 1 �, ��s I � ` � � � ' I � � � \ � � ' SEE DETAIL LSHEET 2D-1 � -�.' E �. � ' � W� � � - ) , � L w, " EfJIOV . � � � � / \ ' � � I � � _,. ! � / � REMOVE 16 � 54„ � . � � � � ' . � ,i SPEGIAL GU�T DITC�H ' � � ' - �io�p � � � / - / � �6EE DETAI} MSHEET 2D-1 , \ � ' �- I . � � � � � � � I , � � � / / � LL. �' - 'Z� � SPECIWL NT DITCH , �.)"� � � , \ � � ^� , ' � / � l�]b1 SEE CIETAIL 4i$HEET 20.1 CITY OF DURHAM � � � 1 � � � Q,� � Pl1BLIC WORKS DEPARTMENT � � � � 1 I -. ! � � �` �� �� � � � � �� � APPROVED \ � � � V � � 1 � � �� ENGWEERING DATE ' � ) � , � ,1 � � � -CLA55�1 RIP RAP ON BANKS (�, � � : STORM WATER DATE � .��.CLASS RIP RAP COUNTERSUNK �II` �� � TRANSPORTATION DATE I �'SUPPL�ENT WITH CLASS B TO � 1 I . �I �E6T B�t�ON5A5 NeCeSSnkv SITE 2- IMPACT ZOOM-W .. � �., DATE EST 12 ISY GFD (SCALE 1" = SO') � � . � .. i SEE SH�`ET 2D-LDETAIL 7 . , .. �� . ' � 410 400 390 380 370 360 Fa � 350 i- --- I t 32 -L- STA 33+IX ELEy = 37200' �= � L v ---- �-13.i5j -' _ " "I-�2 ' - D8% --- � �+kA_�1Y. � - - � � P � 54" RCP � � DITCH CR RT -C- STA 34+00 ti �� ELEV = .i6925' Q'R � BEGI SPECIAL �' ° i W D/rCH G E LT � -L- STA 34+75 E[EV = 365.00' -�- �i E�.EV = _ �� � ' "(?)Z00%-�---'_ _ _ = - (�72b0% - _ _ _ _t+�5� - - - - - f-X13%� - - - - - - - -�r1133Y. E 0 SPECiAL T CRO�'N POINT CH R L EGl SP AL -L- STA 39f00 / CH R � BEGI SP£CIAL � ELEV = 37665' -L- STA 36+�5 �` � E[EV ' 3/250' -L- STA 37+25 * � N� E�£y = 37430' N P I YAL .. -L - � 0/ CH GR E RT � � �� � �� -L- STA .i8+75 35+85 � � - . ELEV = �75' �050' �W 3 3 3 4 3 5 3 6 3 7 3 8 3 9 PREPAREU IN THE OFFIGE OF: acv. o., aEv:sioN, on*c: oanwN er: accxco ar: • >� � Th�s ao��me�t. ro ethe� w�th iha �o��aPt= a�d das� �s orase�rad here��. as a� ��str�me�t o se . �s Ki m I e> H o r n r9 o e v W Intended only fo the speciflc purpose and cllent f r whlch It was preparetl. Reuse of and irciproper � reliance on this document without wrltten Quthorization and adoptlon b Kimle Horn and Associates, Inc. Q snauba wi+no�t nabnrty to Kimiay-Horr, a�a assootatas,i�o y y 300 WEST MORGAN STREET, SUITE I500, DURHAM, NC, 27701 � coovr�ent K�miay-Hor� a�d nssomatas.i��..zois � PHONEe (919) 682-3583 PE No.F-oioz PLAN/PROFILE SHEETS - RT CROWN PO/N7 410 400 390 E o s�ci.ac 380 0/TCH G E T BEGI SPEC/AC -L- STA 4i+5p i Cif R R E[EV = 389.42 -L- STA 39+9�? ELEV = 38365' Gl SPEC/ 370 SP l CH R R D� CH G/t -L- STA 4�+�5 -L- STA 40+75 ELEV = 38830' ELEy = 387D7 �� i � '�, 360 i ;_ , ., ._� __.� �, . �-"— ' � i � � ' ' 350 40 41 42 HORIZ PRo�ECT: 20� MORREENE ROAD (SR 1317) BIKE LANES VERT 5 0 10 JOB NUuOEP: SNEE1 NUMBEF: 011494100 I 6 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (tt) 1 34+68 to 34+91 -L- 48" PIPE < 0.01 < 0.01 16 11 2 35+80 -L- 54" PIPE < 0.01 13 35+80 -L- CHANNEL IMPROVEMENTS < 0.01 < 0.01 10 5 TOTALS*: < 0.01 < 0.01 39 16 0 *Rounded totals are sum of actual impacts �[����•yi 2018 Feb