Loading...
HomeMy WebLinkAboutNC0020184_NOD-2019-PC-0032 Response_20190219S AM TWO RIVERS4W} ;e UTI LIT1 E s ` We are TRU to our customers! February 19, 2019 Mr. Wes Bell Division of Water Resources, NC DEQ Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Re: Notice of Deficiency Pretreatment Compliance Inspection Two Rivers Utilities NPDES Permit No. NCO020184 Gaston County Tracking No. NOD-2019-PC-0032 Dear Mr. Bell: Thank you for your time during the January 18, 2019 inspection of TRU's pretreatment program and for promptly providing the report from the inspection. The report asked for a response by February 19", to the Notice of Deficiency concerning a lack of enforcement action for multiple instances of late reporting of flow volumes. The following actions have been taken to address this issue and to prevent its recurrence: • An NOV has been issued to Stabilus Inc. for violations of the flow reporting requirements. (A copy of the NOV is attached.) • Files have been reviewed for all other permitted industrial users for other instances of late reporting. Following this review, NOVs have been issued to CaroMont Regional Medical Center; Choice Beverage USA; Powder Coating Services, Inc.; Sunshine Uniform Services; and Valley Proteins. • All Significant Industrial Users have been contacted and informed that going forward, TRU will be enforcing all reporting deadlines stringently including the issuances of NOVs. • Pretreatment staff have been instructed to follow the Enforcement Response Plan and to issue NOVs when reporting deadlines are not met, except for extenuating circumstances. The reason for any exceptions is to be documented. Escalated responses shall be taken in accordance with the ERP for frequent repeat or more severe reporting violations. During the inspection and in the report, a concern was raised about the in -line pH monitoring system located at Sunshine Uniform Services and TRU's response to issues concerning the system. Following the inspection these actions have been taken: • Sunshine Uniform Services has been issued an NOV for failure to properly maintain its pH system. (A opy of the NOV is attached.) • Pretreatment staff from TRU have met with Sunshine Uniform Services staff concerning the short comings of the system, maintenance on it, and discrepancies between pH readings. System operation, calibration and maintenance were reviewed. • Sunshine Uniform Services has performed maintenance on the acid pump used for pH control, which they believe caused the pH excursions. • TRU will be conducting an evaluation of Sunshine Uniform Service's system by taking multiple pH readings over extended periods of time to verify the system's effectiveness. If adequate correlation and effectiveness of the system cannot be demonstrated, Sunshine Uniform Services will be required to modify or replace the pH control and adjustment system. • Pretreatment staff have been instructed to thoroughly review all received information for similar types of issues and to take appropriate actions where warranted. TRU strives to meet or exceed all compliance obligations, and appreciates NC DEQ's inspection and report. Please let me know if additional actions and/or documentation is needed. Sincerely, Stephanie Scheringer Division Manager Wastewater Treatment Attachments: NOV sent to Stabilus Inc. 1/29/19 NOV sent to Sunshine Uniform 1/29/19 Certified Mail: 7009 0820 0001 5806 2307 f l9TttaT1IS We are TRU to ourcustarners! January 29, 2019 Mr. Mike Ellington Stabilus . 1201 Tulip Dr. Gastonia, NC 28052 RE: NOTICE OF VIOLATIONS Dear Mr. Ellington: State and Federal Pretreatment Regulations require regular monitoring and issuing of Notices of Violations (NOV's) when permit conditions are not followed. As stated in Industrial User Permit #1021 Part H; General Conditions; (2) (b), "Monitoring results and flow information obtained by the permittee shall be reported on forms specified by the City. The laboratory data, Chain of Custody, and Industrial Flow Monitor forms must be postmarked no later than the tenth day of the month, or delivered by hand, fax, or email by the fifteenth day, following the month in which the samples were collected. If the penmittee fails to submit the reports on or before the due date, the results obtained from the sampling event may be excluded for surcharge proposes." According to TRU's Enforcement Response Plan, late reporting will result in the issuance of a Notice of Violation. The Industrial User Self -Monitoring Summary for the months of January, February, April, May, June, August, September, October, November, and December of 2018, were received after the 15' of the following months. Stabilus is required to submit in writing, within fourteen days, corrective action taken to achieve compliance. Sincerely, Two Rivers Utilities Cody Austin Pretreatment Coordinator Two Rivers Utilities Certified Mail: 7014 0150 0000 7611 8421 11T91.1T1 E f� We ore TRU to our customers! I January 29, 2019 Mr. Tommy Daniels Sunshine Uniform Service, Inc. P.O. Box 12632 Gastonia, NC 28053 RE: NOTICE OF VIOLATIONS Dear Mr. Daniels: State and Federal Pretreatment Regulations require regular monitoring and issuing of Notices of Violations (NOV's) when permit conditions are not followed. As stated in Industrial User Permit #1013 Part 11; General Conditions; (2) (b), "Monitoring results and flow information obtained by the permittee shall be reported on forms specified by the City. The laboratory data, Chain of Custody, and Industrial Flow Monitor forms must be postmarked no later than the tenth day of the month, or delivered by hand, fax, or email by the fifteenth day, following the month in which the samples were collected. If the permittee fails to submit the reports on or before the due date, the.results obtained from the sampling event may be excluded for surcharge purposes." The Industrial User Self -Monitoring Summary for the month of January 2018, which was due by February 15, 2018 was received on February 26, 2018. According to TRU's Enforcement Response Plan, late reporting will result in the issuance of a Notice of Violation. Part I Specific Conditions (G) (10) of Industrial User Permit #1013 states that "The continuous pH monitoring & recording system shall be maintained in proper operating condition at all times. All such devices shall be installed, calibrated, and maintained to ensure accuracy. Calibration of the system shall be performed per manufacturer's directions as often as necessary to maintain correct pH readings at all times, with a minimum calibration frequency of once per month." On November 6, 2018 Sunshine's pH meter was reading more than 1 s.u. different from TRU's reading. This suggests that the pH meter and the alarm system is not being maintained in proper operating condition at all times. Sunshine Uniform Service, Inc. is required to submit in writing, within fourteen days, corrective action taken to achieve compliance regarding both of these issues. Sincerely, Two ers Uti 'ties Cody Austin Pretreatment Coordinator Two Rivers Utilities Certified Mail: 7014 0150 0000 7611 5512 r