Loading...
HomeMy WebLinkAbout20070033 Ver 1_Approval Letter_20070129o~oF wa r~RQ~ ~~f ~~ off, ~,"~~p; , S ~. .-cab ~ ;. - w Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 29, 2007 Claude R. and Helen G. Nelon 270 Picnic Point Lake Lure, NC 28746 Subject Property: 270 Picnic Point Lake Lure, NC DWQ Project # 07-0033 Rutherford County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. & Mrs. Nelon: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact up to .004 acres of shoreline for the purpose of stabilization at the subject property, as requested within your application received by the N.C. Division of Water Quality (DWQ) on January 5, 2007. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3492 (GC3492). The Certification(s) allows you to use Permit(s) GP30 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project beyond what is authorized within, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Pf~one: 919-733-17861 FAX 919-733-6893 /Internet: www.ncwaterouality.orq o~,C NorthCarolina ~ll~lll'll~~lf An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper 1 Claude and Helen Nelon Page 2 of 5 January 28, 2007 Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Plan Location or Reference A proved (Units) Shoreline .004 (acres) A - rip-rap stabilization & patchwork 2 Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Claude and Helen Nelon Page 3 of 5 January 28, 2007 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401NVetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Riprap Installation All banks shall be laid back at a 2:1 (length :height) slope and riprap applied at the water /land interface (at full pool). Riprap shall be placed as a linear protective measure infront of the existing wall. Stone used in stabilization shall be at least Class B riprap in size with at least 2 boulders per 100 linear feet of up to 6 feet in diameter to provide additional wildlife habitat. The rip-rap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized area. All exposed soils, above the Riprap stabilized area, to a distance of 30 feet from the top of bank shall be replanted in accordance with the attached Guidelines for Riparian Buffer Restoration. This authorization shall in no way be construed as allowing the extension of the existing bulkhead or seawall. 7. Heavy Equipment Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. Claude and Helen Nelon Page 4 of 5 January 28, 2007 8. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before being discharged. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 9. Trout Buffer Tree Protection From the edge of the stabilization, back for a distance of 25 linear feet from the top of bank, woody vegetation in accordance with the Guidelines for Riparian Buffer Restoration shall be established where no woody vegetation currently exists. 10. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 12. Deed Restrictions Deed Restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Claude and Helen Nelon Page 5 of 5 January 28, 2007 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Mr. Kevin Barnett in the DWQ Asheville Regional Office at either Kevin.BarnettC~ncmail.net or at 828-296-4657. Sincerely, AW Klkhb ~~ p,~~~o Alan W. Klimek, P.E., Director Division of Water Quality Enclosures: GC 3492 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: .Town of Lake Lure USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office Ron Linville, NC Wildlife Resources Commission File Copy Central Files Filename: 07-0033. Nelon.WQ3492.Approval