Loading...
HomeMy WebLinkAbout20190269 Ver 1_PCN Form Submission_20190304D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190269 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: SR-244S (Old Mine Road) 1a. Who is the PrimaryContact?* Joel Howard 1b. PrimaryContact Email:* jhoward@ncdot.gov Date Submitted 3/4/2019 Nearest Body of Water Little Buffalo Creek Basin Yadkin-PeeDee Water Classification Class C Site Coordinates Latitude: 35.487054 A. Processing Information County (or Counties) where the project is located: Cabarrus Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: Ve rsion# * 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 1c. PrimaryContact Phone:* (910)983-4400 Longitude: 80.373201 :: WBS # (�) 10C.013066 1a. Type(s) of approval sought from the Corps: fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? F Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): Nationwide 14 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 14 - Linear transportation 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner fJ Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Scott Cole, PE Division Engineer, Divison 10 (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: NCDOT, Division 10 2d. Address Street Address 716 West Main Street Address Line 2 �Y Albemarle Fbstal / Zip Code 28001 2e. Telephone Number: (704)983-4400 2g. Email Address:* r 401 Water Quality Certification - E�ress r Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: (704)982-3146 x C' Yes R No G Yes C' No scole@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Joel Howard, Environmental Specialist I 3b. Business Name: NCDOT 3c.Address Street Address 716 West Main Street Address Line 2 ary Albemarle Postal / Zip Code 28338 3d. Telephone Number: (704)983-4400 3f. Email Address:" jhoward@ncdotgov S[ate / Awince I Region NC Country USA 3e. Fax Number: (704)982-3146 C. Project Information and Prior Project History � 1. Project Information � 1b. Subdivision name: (rf appropriate) 1 c. Nearest municipality l town: Mt. PleasanL. NC 2. Project Identification 2a. Propertyldentification Number: 2c. Project Address Street Address SR-2448 (Old Mine Road) Address Line 2 �Y Fbstal I Zip Code 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Little Buffalo Creek 3b. Water Resources Classification of nearest receiving water:* Class C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050303 4. Project Description and History 2b. Property size: S[ate / Awince / Region Country Cabarrus 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* SR-2448 (Old Mine Road) is an unpaved secondary road in Cabarrus County. It has single family homes along the roadway mnth pasture lands that are fenced on both sides of the road. Some Parcels have Steams within the Pastures that have Conservation Easements for Stream protection/mitigation. This area of the County is heavily used for agriculture/cattle farming. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No C' Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Topo Map.pdf 1.25MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 20190107_10203310625_26_Soil_Map.pdf 437.97KB 4f. List the total estimated acreage of all existing wetlands on the property: 0' 4g. List the total estimated linear feet of all existing streams on the property: 60' 4h. Explain the purpose of the proposed project:* SR -2445 (Old Mine Road) is an unpaved secondary road in Cabarrus County that the NCDOT plans to widen and pave. By widening and paving Old Mine Road the safety and serviceability of the road will be improved for the traveling publia To obtain the necessary roadway width, NCDOT proposes to e#ended an exsting (60"x40')CMP with a new (60"x60')CMP. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Erosion control measures will be installed prior to any ground disturbing activities. As part of this project NCDOT will be replacing an ewsting (60"x40') CMP and replacing it with a new (60"x60') CMP. By adding the additional 20' of pipe at permit site 1 the Department will get the necessary road width and road shoulder to construct t�no 10' travel lanes. This vVnrk will be conducted in the dry by dewatering the permitted site prior to construction. The water will be pumped off site or into an approved sitt bad adhering to NCDOT's best management practices for pipe construction/replacement The equipment that is required to construct this project includes, but is not limited to: dewatering pump, trackhoe, dumptrucks, vibratory roller, motor grader and paving equipment. One of the Conservation Easements that was mentioned earlier in this application is adjacent to the Roadway at Permit Site I. However the Stream within the Conservation Easement will not be impacted due to our �,wrk at Permit Site 1. The only impact that we will have on the Conservation Easement is the moving of the Conservation Fence to It's proper place at the edge of NCDOT's right-a-way. This will only take place along the roadway. (There is only about a 5' difference from wfiere it is now to wfiere it will be placed. The stream will not be impacted inside the ebsting Conservation Easement due to our proposed work. 4j. Please upload project drawings for the proposed project. Permit Site 1 Pipe Profile.pdf Permit site 1.pdf Vicinity Map.pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* � Yes r No Comments: The USACE and NCDEQ reviewed this site with NCDOT personnel on the 3rd of January 2019 Sb. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved C' Not Verified C' Unknown r WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas7 Name (if known): Nicholle Brasspennickx Agency/Consultant Company: Other: Sd1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* C' Yes USACE r No r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): � Wetlands �J Streams-tributaries r Open Waters Ir Pond Construction 3. Stream Impacts 203.19K6 553.31 KB 303.03KB � Buffers Reason for impact (?) 3b.lmpact type" 3c. Type of impact" 3d. S. name" 3e. Stream Type" 3f. Type of 3g. S. width" 3h. Impact (') Jurisdiction* length* S1 20' of additonal CMP Permanent Culvert UT to Little Buffalo Creek Perennial Both 4 20 .4verage (feet) pinear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 20 3i. Total stream and ditch impacts: 20 3j. Comments: No impacts will occur within the aforementioned conservation areas. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: NCDOT's best management practices for the installation of culverts in jurisdictional waters will be adhered to throughout the life of the project. We are adjusting the placement of our pipe to avoid impacting the adjacent Conservation Easement at Permit Site 1. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: During the project all erosion control measures will be maintained. Permit site 1 will be dewatered prior to the beginning of construction and all work will be completed in the dry. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The additional 20' of Impacts does not meet the threshold for Compensatory Mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? � Yes r No If no, explain why: Little Buffalo Creek and ifs Unnamed Tributaries do not fall under any NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: NPDES records will be kept on site during the duration of this project. This project will have compliance inspections periodically that will be conducted by the Division 10 Environmental office and NCDOT's area Roadside Environmental Office. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* F Yes r No n 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environme ntal Policy Act (NEPAISEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* C' Yes r No Comments: * The project is State Funded and falls under the Minimum Criteria Checklist. 3i. Total temporary stream impacts: 0 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * � Yes r No 3b. If you answered "no," provide a short narrative description. This is a stand alone project. NCDOT does not anticipate any future impacts to the downstream water quality or any additional land development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No C' fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * f Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes r No Sd. Is another Federal agency involved?" � Yes r No Se. Is this a DOT project located within Division's 1-8? C' Yes r No Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.? � Yes r No Sg. Does this project involve bridge maintenance or removal? C' Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* � Yes r No � Unknown Si. Does this project involve (7) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? C' Yes r No Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The North Carolina Natural Heritage Program (NCNHP) Database Consultation Documentation Upload project_report_sr_2448_old_mine_road_17264_17264. pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * South AUantic Fishery Management Council 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 1.28 MB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?" � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT's Cultural Resources Staff 7c. Historic or Prehistoric Information Upload 17-12-0003_NoSu rvey. pdf AR17-12-0003 NoSu rvey. pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes r No 2.84MB 10.2MB Sc. What source(s) did you use to make the floodplain determination?* FEMA Floodplain Maps website. Miscellaneous Comments Miscellaneous attachments not previouslyrequested. Old Min e Rd_PlanSheetSet_2019. pdf 2.86MB Signature rJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Joel M. Howard Signature c7�r��`fP ��lk�rrt Date 3/4/2019