Loading...
HomeMy WebLinkAboutWQCS00171_NOV-2019-PC-0073 Response_20190220L STANLY COUNTY W ter Al< Lard, facc"r, February 20, 2018 Barry Love P.E. NCDEQ Mooresville Regional Office 610 East Center Drive Suite 301 Mooresville, NC 28115 Re: Plan of Action NOC-2019-PC-0073 Dear Mr Love: RECEIVED/NCDENR/DWR FEB 2 5 2019 WQROS MOORESVILLE REGIONAL OFFICE We appreciated the opportunity to speak with you concerning the non -compliant issues related to the recent inspection of the Greater Badin Sewer Collection System. Pursuant to that conversation, Stanly County will proceed with the following plan of action to address the noted non -compliant items noted from the inspection: 3,308 linear feet of sewer main was cleaned this past year, which is 5.7% of the total gravity sewer listed in the permit. The permit requires 10% to be cleaned. Response: We have performed an initial GIS Mapping query of the sewer main in the Greater Badin system and currently have approximately 81,101 linear feet of sanitary sewer mains. This number will probably increase as more lines are noted and added to the mapping system. Our crews within the next 45 days are committed to cleaning 7,000 linear feet of gravity sanitary sewer mains to exceed the 10% minimum. Moving forward they will be taking a more routine and accurate documented accounting of the total linear footage of sewer mains cleaned before the next inspection. We will notify you when the 7,000 linear feet has been inspected and cleaned. Utilities Department 1000 N. First Street, Suite 12, Albemarle, NC28001 P/ 704.986.3686 wwwstan& ounVncaov F/ 704.986.3711 L STANLY COUNTY {Na4e..,41/`. lora. Acome. 2. Maps were available but lacked information. Pipe size, pipe materials, flow direction, pipe age and service taps were not listed on the maps. The operator said they were working on getting computer -based mapping system going but this may be 2 to 3 years out. In the mean -time extra information should be added to the maps. Response: We have been working developing the platform for an intelligent.GIS Mapping system. In light of the non-compliance, I have prioritised completing the Greater Badin Sewer Collection System Mapping. We have met with our GIS Department, and they have printed large aerial scale base maps of the sewer mains and have added manholes. Our staff are currently reviewing these maps and making the noted changes for accurate representation. Per our conversation, I expect to have an acceptable and generally accurate sewer collection system map of the Greater Badin Sewer Collection System within the next 60 days or by April 18, 2019. I have also been meeting with GIS consultants to begin the process of building the ARCGIS platform for intelligent mapping of our water and sewer systems throughout the county. 3. Educational information is mailed out once a year, along with being included in the Annual Report, which is available to customers. A grease control program has been written up including businesses, which would fall under the program but the program has not yet been implemented. This needs to be done. Response: I have located all pertinent materials related to the Fats Oil and Grease Program and I am in the process of reviewing these materials as well as our existing Sewer Use Ordinances to determine if they are compatible. It appears much of the program was developed in 2014. After I determine the current materials are sufficient to meet our operations and regulatory requirements, I will begin field implementation. I may need to resubmit these items to the Stanly County Board of Commissioners for approval if there are changes required , if so, it will be done at one of the April 2019 Board of Commissioner Meetings. Utilities Department 1000 N. First Street Suite 12, Albemarle, NC28001 P1704.986,3686 www.stanlycounWnc.gov F1704.986.3711 STANLY COUNTY w A;k, 41afal Saoe",s. The FOG Brochure will be included in the next Sewer Annual Report that is mailed to all customers. If you need us to send it sooner, please confirm and we will get it accomplished. I have enclosed all currently prepared materials related to the FOG program for your review. In my opinion, any effective program will require mandated self -monitoring with sampling. It will also include regular auditing of our food establishments including small stores in strip malls, gas stations and other businesses that cook or prepare food. Many of these may not be listed in the Food Service Establishment List. Varying levels of grease trap requirements and allowable variances from the standard 1,000 gallon grease trap will also need to be considered and applied where applicable. One challenge will the communication with the building inspections department and the town to flag and review any applicable plumbing permit for food establishments so that we can review and enforce grease trap guidelines and ordinances. I have started this conversation and hope to have it procedures in place soon. If you have any additional questions or concerns, please call me at the number listed below. Respectfully, Duane Wingo, PE Stanly County Utilities Director 1000 N. First Street Suite 12 Albemarle, NC 28001 Phone: (704) 986-3691 Cell: (704) 221-4291 dwin¢o(a)stanlycountync.eov Cc: Andy Lucas, County Manager File: S:AUtilites\611 Greater Badin Operating\Violations\Februan11 2019 Violation Response Utilities Department 1000 N. First Street, Suite 12, Albemarle, NC 28001 P1704,986.3686 www.stanlycounWncaoy F/ 704,986.3711