HomeMy WebLinkAbout540032_30-Day Plan of Action_20190222PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 54-32 Date: 9/18/2018 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker b. Designed 25 yr/24 hr. storm & structural freeboard c. Line b - line a (inches in red zone) d. Top of dike surface area according to design (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft3) 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design g. Volume of waste produced according to design h. Actual waste produced= (current herd #/certified herd #) x line g current herd: 3550 certified herdF 3600 i. Volume of wash water according to structural design j. Excess rainfall over evaporation according to design k. (line h + line i +line j) x 7.48 x (30 days/line f) _ 4. Total PAN to be land applied during draw down period I. Current waste analysis dated MM/DD/YYYY 9/5/2018 m. (lines e + k)/1000 x (line I) _ REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE NCState Unix A&T State COO EXTI Empowenr 18 25.5 F- 7.5 1 79200 370260.0 383400 0 46200 F-535568 1.34 1213.80952 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: line m= 1213.80952 2. structure ID: line m = 3. structure ID: line m = 4. structure ID: line m = 5. structure ID: line m = 6. structure ID: line m = n. lines1+2+3+4+5+6 = 1213.80952 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application (lb/acre) column r x s window 2589 1 BGH 16 41.6 SEPT-MAY 2589 2 BGH 0 0 SEPT-MAY 2589 4 BGH 3.2 50 SEPT-MAY 2589 3 FESCUE 3.9 200 SEPT-MAY total from all risers 9864 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 1213.80952 9864 -8650.1905 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump anc depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based c information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAP balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted fa provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: This reflects the rainfall from Hurricane Florence. The lagoon was back in compliance by October 8 2018. PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 12/31/2018 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES dersity THIRTY (30) DAY DRAW DOWN PERIOD University VERATIVE ENSION ng People • Providing Solutions inches inches inches ft2 gallons days W W W W gallons Ib/1000 gal lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN total lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I haul, )n new icility