HomeMy WebLinkAbout540032_30-Day Plan of Action_20190222PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 54-32 Date:
9/18/2018
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker
b. Designed 25 yr/24 hr. storm & structural freeboard
c. Line b - line a (inches in red zone)
d. Top of dike surface area according to design
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft3)
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design
g. Volume of waste produced according to design
h. Actual waste produced=
(current herd #/certified herd #) x line g
current herd: 3550 certified herdF 3600
i. Volume of wash water according to structural design
j. Excess rainfall over evaporation according to design
k. (line h + line i +line j) x 7.48 x (30 days/line f) _
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated
MM/DD/YYYY 9/5/2018
m. (lines e + k)/1000 x (line I) _
REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE
NCState Unix
A&T State
COO
EXTI
Empowenr
18
25.5
F- 7.5
1 79200
370260.0
383400
0
46200
F-535568
1.34
1213.80952
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 H R. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
structure ID:
line m=
1213.80952
2.
structure ID:
line m =
3.
structure ID:
line m =
4.
structure ID:
line m =
5.
structure ID:
line m =
6.
structure ID:
line m =
n.
lines1+2+3+4+5+6 =
1213.80952
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application
(lb/acre) column r x s window
2589
1
BGH
16
41.6
SEPT-MAY
2589
2
BGH
0
0
SEPT-MAY
2589
4
BGH
3.2
50
SEPT-MAY
2589
3
FESCUE
3.9
200
SEPT-MAY
total from all risers
9864
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
1213.80952
9864
-8650.1905
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump anc
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based c
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAP
balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted fa
provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
This reflects the rainfall from Hurricane Florence. The lagoon was back in compliance by October 8 2018.
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 12/31/2018
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
dersity THIRTY (30) DAY DRAW DOWN PERIOD
University
VERATIVE
ENSION
ng People • Providing Solutions
inches
inches
inches
ft2
gallons
days
W
W
W
W
gallons
Ib/1000 gal
lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
total lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I haul,
)n new
icility