State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Environmental Staff Report
Quality
February 28, 2019
To: ❑ NPDES Unit ® Non -Discharge Unit Application No.: WQ0018525
Attn: Troy Doby Facility name: Barnes Environmental Waste and
Hauling, Inc.
From: Geoff Kegley
Wilmington Regional Office
Note: This form has been adapted from the non -discharge fg acili , staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete all sections as they are qpplicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ❑ Yes or ® No
a. Date of site visit:
b. Site visit conducted by:
c. Inspection report attached? ❑ Yes or ® No
d. Person contacted: and their contact information: ext.
e. Driving directions:
2. Discharge Point(s): N/A
Latitude: Longitude:
Latitude: Longitude:
3. Receiving stream or affected surface waters: N/A
Classification:
River Basin and Subbasin No.
Describe receiving stream features and pertinent downstream uses:
II. PROPOSED FACILITIES: NEW APPLICATIONS: N/A
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A
ORC: Michael Piner Certificate #: 27174 Backup ORC: Martin Mabe Certificate #:22753
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
If no, please explain:
Description of existing facilities: Existing permit: 110 DT/yr Class B residuals on 45 acres. Proposal to add two
new sources (Harker's Island Sewer Co. WWTP — 5 DT and (Kin sg bridge II WWTP — 5 DT).
FORM: WQROSSR 04-14 Page 1 of 4
DocuSign Envelope ID: C120F96B-1285-48AA-9C72-lFC8A7C55639
3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately
assimilating the waste? ® Yes or ❑ No
If no, please explain:
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
If yes, please explain:
5. Is the residuals O&M plan adequate? ® Yes or ❑ No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
If no, please explain:
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A
If no, explain and recommend any changes to the groundwater monitoring program:
8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No
If yes, attach a map showing conflict areas.
9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No
If no, please explain:
10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A
If no, please explain:
I t . Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A
If no, please complete the following ex and table if necessary):
Monitoring Well
Latitude
Longitude
O / //
O / 11
O / //
O I II
O I //
O I /I
O I //
O I It
O / //
O I If
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No
Please summarize any findings resulting from this review: 2017 Annual report was compliant.
Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable.
13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
If yes, please explain:
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been
working with the Permittee? Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A
If no, please explain:
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ®No❑N/A
If yes, please explain:
16. Possible toxic impacts to surface waters: none
17. Pretreatment Program (POTWs only): N/A
FORM: WQROSSR 04-14 Page 2 of 4
DocuSign Envelope ID: C120F966-1285-48AA-9C72-1 FC8A7C55639
IV. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
If yes, please explain:
2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
Item Reason
3. List specific permit conditions recommended to be removed from the permit when issued:
Condition Reason
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition Reason
5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
® Issue
❑ Deny-PIga% AWp reasons: )
6. Signature of report preparer: J
Signature of regional supervisor::
Date: 3/4/2019
e
=5103B417...
V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
14AC7DC434...
This review was conducted for a request by Barnes Environmental Waste & Hauling, Inc. to renew and
modify their land application of residuals permit. The permit modification requests the addition of two
FORM: WQROSSR 04-14 Page 3 of 4
DocuSign Envelope ID: C120F96B-1285-48AA-9C72-lFC8A7C55639
additional sources (Harker's Island Sewer Co — 5 DT/yr and Kingsbridge II — 5 DT/yr) to bring the
total amount of residuals to be certified to 120 dry tons/year.
The sludge analysis for the new sources indicate metals are below ceiling concentration limits and
sodium adsorption rates (SAR) results were below 10. Pathogen and vector attraction reduction
requirements will be met by lime stabilization. In 2018, only 31.07 total dry tons were land
applied to 24.7 of 45 available acres. Field loading rates for metals and PAN are being calculated,
along with cumulative pollutant loading rates and they are compliant.
The WiRO recommends issuance of the permit modification and renewal.