Loading...
HomeMy WebLinkAboutWQ0032909_Application (FTSE)_20190304 February 5, 2019 Mr. Matt S. Blackmon Alfred Benesch & Company 2359 Perimeter Pointe Parkway Suite 350 Charlotte, NC 28208 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE HARDING UNIVERSITY HIGH SCHOOL ADDITIONS & RENOVATIONS 2001 ALLEGHANY STREET, CHARLOTTE, NC CLTWATER TRACKING# 2019862 After an analysis of the sanitary sewer associated with the proposed design of 2019862, HARDING UNIVERSITY HIGH SCHOOL ADDITIONS & RENOVATIONS, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 17,368 gallons per day (34,735 sf x 50 gal/100 sf) at the connection point(s) indicated on the submitted utility plan for transmission to the Irwin Creek Wastewater Treatment Plant; NPDES permit number NC0024945, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatment works. Please see the attached FTSE form. CLTWater agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, PWS ID # 0160010, on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water and sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within two (2) years of issuance of this flow acceptance letter; and payment for any service connection(s) has not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded and a new flow acceptance study must be made. If you have any questions, you may contact me at (704) 432- 5801. Sincerely, Guillermo Anzola Guillermo Anzola Engineering Assistant Page 1 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Project Name for which flow is being requested: More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a.WWTP Facility Name: b.WWTP Facility Permit #: All flows are in MGD c.WWTP facility’s permitted flow d.Estimated obligated flow not yet tributary to the WWTP e.WWTP facility’s actual avg. flow f.Total flow for this specific request g.Total actual and obligated flows to the facility h.Percent of permitted flow used II.Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C)(D)=(B+C)(E)=(A-D) Pump Station (Name or Number) Pump Station Permit No. Firm Capacity, * MGD Design Average Daily Flow** (Firm / pf), MGD Approx. Current Avg. Daily Flow, MGD Obligated, Not Yet Tributary Daily Flow, MGD Total Current Flow Plus Obligated Flow Available Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Project Area