20190104 Ver 1_Revised 2 Wetland Impact Summary Sheet_20190304
WETLAND PERMIT IMPACT SUMMARY Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) -L- 11+38 LT TO 12+04 LT WETLAND FILL, < 0.01 � EXCAVATION DUE TO -L- 11+50 RT TO 15+36 RT ROADWAY, & PERMANENT 0.03 0.19 0.01 STREAM RELOCATION WETLAND FILL & < 0.01 < 0.01 < 0.01 2 -L- 15+g1 LT TO 16+26 LT EXCAVATION DUE TO ROADWAY BRIDGE #57 REPLACEMENT; < 0.01 0.11 3 -L- 15+35 CL TO 15+g5 CL 1@ 85' - 45" GIRDER; 40' CLEAR ROADWAY WIDTH 0.01 TOTALS": 0.04 0.31 0.02 0.00 0.00 0.01 0 0 0 'Rounded totals are sum of actual impacts NOTES: September2014