HomeMy WebLinkAbout540141_Compliance Evaluation Inspection_20190212Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 540141
Inspection Type: Compliance Inspection
Reason for Visit: Routine
Date of Visit: 02/12/2019 Entry Time
Farm Name: Clarence Smith Finishing
Owner: Clarence L Smith
Mailing Address: 2422 Nathan Hill Rd
Physical Address: 2604 Arbie Ln
Facility Status: Active
County: Lenoir
10:30 am Exit Time: 12:00 pm
Permit: AWS540141 ❑ Denied Access
Inactive Or Closed Date:
Region: Washington
Incident #:
Owner Email:
Phone: 252-568-4715
Deep Run NC 285252422
Deep Run NC 28525
Facility Status: 0Compliant ❑ Not Compliant Integrator: J C Howard Farms
Location of Farm: Latitude: 35' 07' Longitude: 77' 40' 26"
From Deep Run take SR 1141 east approx. 2 miles to SR 1130, turn right and go approx. 3/10 mile to farm road on right and then
go approx. 1/2 mile to site.
Question Areas:
Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application
Records and Documents Other Issues
Certified Operator: Clarence L Smith Operator Certification Number: 17292
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name David Duane Anderson
On -site representative Clarence Smith
Primary Inspector:
Inspector Signature:
Secondary Inspector(s):
Megan H Stilley
Inspection Summary:
Freeboard & Rainfall complete and correspond w/ irrigation
Crop yield complete
Waste Analysis 10-20-18 .62
6-27-18 1.46
2-26-18 1.75
"Just sent off new waste sample
Soil Test 5-10-18 w/ highest lime .9 tons
Cu & Zn values Win range
Sludge Survey 12-8-19 #1 Thick-3.4'
LTZ-5.3'
Pump intake-6'
#2 Thick-1.0'
Phone:
Date:
Page 1 of 6
Permit: AWS540141 Owner: Clarence L Smith Facility Number: 540141
Inspection Date: 02/12/19 Inspection Type: Compliance Inspection Reason for Visit: Routine
LTZ-5.7'
Pump intake-6.2'
Calibration complete 11-3-18
Page 2 of 6
Permit: AWS540141 Owner: Clarence L Smith Facility Number: 540141
Inspection Date: 02/12/19 Inspection Type: Compliance Inspection Reason for Visit: Routine
Regulated Operations
Design Capacity
Current promotions
Swine
Swine - Feeder to Finish 7,040 I 7,363
Total Design Capacity: 7,040
Total SSLW: 950,400
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Lagoon
1
03/21 /2005
19.40
30.00
Lagoon
2
03/21/2005
19.40
30.00
Page 3 of 6
Permit: AWS540141 Owner: Clarence L Smith
Facility Number:
540141
Inspection Date: 02/12/19 Inspection Type: Compliance Inspection
Reason for Visit:
Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
MEIEI
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters
of the ❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
MEI
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicable
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
0 ❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Crop Type 1
Page 4 of 6
Permit: AWS540141 Owner: Clarence L Smith
Inspection Date: 02/12/19 Inspection Type: Compliance Inspection
Facility Number:
Reason for Visit:
540141
Routine
Waste Application
Yes
No NA NE
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
❑
0 ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑
❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑
❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
❑
❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Stocking?
❑
Crop yields?
❑
Page 5 of 6
Permit: AWS540141 Owner: Clarence L Smith Facility Number:
Inspection Date: 02/12/19 Inspection Type: Compliance Inspection Reason for Visit:
540141
Routine
Records and Documents
Yes
No NA NE
120 Minute inspections?
❑
Monthly and 1" Rainfall Inspections
❑
Sludge Survey
❑
22. Did the facility fail to install and maintain a rain gauge?
❑
0 ❑
❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment
❑
❑ 0
❑
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑
0 ❑
❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
❑
❑
❑
appropriate box(es) below:
Failure to complete annual sludge survey
❑
Failure to develop a POA for sludge levels
❑
Non -compliant sludge levels in any lagoon
❑
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑
❑
❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
❑
❑
❑
Other Issues
Yes
No NA NE
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
❑
0 ❑
❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
❑
❑ ❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit?
❑
0 ❑
❑
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
❑
0 ❑
❑
If yes, check the appropriate box below.
Application Field
❑
Lagoon / Storage Pond
❑
Other
❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
❑
0 ❑
❑
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
❑
0 ❑
❑
34. Does the facility require a follow-up visit by same agency?
❑
0 ❑
❑
Page 6 of 6