Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout540004_Compliance Evaluation Inspection_20190129Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 540004 Facility Status: Active Permit: AWS540004 ❑ Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine County: Lenoir Region: Washington
Date of Visit: 01/29/2019 Entry Time: 01:30 pm Exit Time: 3:30 pm Incident #:
Farm Name: The Pig Ranch Owner Email:
Owner: Collier Holding LLC Phone: 910-289-2111
Mailing Address: PO Box 759 Rose Hill NC 284580759
Physical Address: 1433 Watering Pond Rd Pink Hill NC 28572
Facility Status: 0Compliant ❑ Not Compliant Integrator:
Location of Farm: Latitude: 35' 02'
Between Hwy. 258 and Hwy. 11 on Watering Pond Rd. SR 1118 near Toner Co. Line
Longitude: 77' 41' 14"
Question Areas:
Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application
Records and Documents Other Issues
Certified Operator: Danny R Grant Operator Certification Number: 17676
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name Danny Grant
On -site representative Danny Grant
Primary Inspector: Megan H Stilley Phone:
Inspector Signature: Date:
Secondary Inspector(s):
Inspection Summary:
Calibration 7-20-18 w/ 214 gpm, 232 gpm, 416 gpm, 398 gpm
Sludge Survey till 2022
Waste Analysis 9-17-18 .51 .51
5-9-18 .74 .52
1-12-18 .56 .49
Freeboard & Rainfall complete & correspond w/ irrigation
Crop yield complete
Waiting on soil sample to return
Page 1 of 5
Permit: AWS540004 Owner: Collier Holding LLC Facility Number: 540004
Inspection Date: 01/29/19 Inspection Type: Compliance Inspection Reason for Visit: Routine
Regulated Operations
Design Capacity
Current promotions
Swine
Swine - Feeder to Finish 20,009 I 19,899
Total Design Capacity: 20,009
Total SSLW: 2,701,215
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Lagoon
PHS 1
02/18/2005
25.00
Lagoon
PHS 2
02/18/2005
25.00
Lagoon
PHS 3
02/18/2005
25.00
Lagoon
PHS 4
02/18/2005
19.00
25.00
Lagoon
PHT 1
02/18/2005
24.00
Lagoon
PHT 2
02/18/2005
19.00
24.00
Page 2 of 5
Permit: AWS540004 Owner: Collier Holding LLC
Facility Number:
540004
Inspection Date: 01/29/19 Inspection Type: Compliance Inspection
Reason for Visit:
Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
MEIEI
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters
of the ❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (Le./ large
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
MEI
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicable
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
0 ❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Crop Type 1
Small Grain Overseed
Page 3 of 5
Permit: AWS540004 Owner: Collier Holding LLC
Inspection Date: 01/29/19 Inspection Type: Compliance Inspection
Facility Number: 540004
Reason for Visit: Routine
Waste Application
Yes
No NA NE
Crop Type 2
Coastal Bermuda Grass
(Pasture)
Crop Type 3
Corn, Wheat,
Soybeans
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Pocalla
Soil Type 2
Blanton
Soil Type 3
Stallings
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
❑
0 ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑
❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑
❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
❑
❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Stocking?
❑
Page 4 of 5
Permit: AWS540004 Owner: Collier Holding LLC Facility Number:
Inspection Date: 01/29/19 Inspection Type: Compliance Inspection Reason for Visit:
540004
Routine
Records and Documents
Yes
No NA NE
Crop yields?
❑
120 Minute inspections?
❑
Monthly and 1" Rainfall Inspections
❑
Sludge Survey
❑
22. Did the facility fail to install and maintain a rain gauge?
❑
0 ❑
❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipment
❑
❑ 0
❑
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑
❑
❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
❑
❑
❑
appropriate box(es) below:
Failure to complete annual sludge survey
❑
Failure to develop a POA for sludge levels
❑
Non -compliant sludge levels in any lagoon
❑
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑
❑
❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
❑
❑ 0
❑
Other Issues
Yes
No NA NE
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
❑
❑
❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
❑
❑ ❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit?
❑
0 ❑
❑
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
❑
0 ❑
❑
If yes, check the appropriate box below.
Application Field
❑
Lagoon / Storage Pond
❑
Other
❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
❑
0 ❑
❑
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
❑
0 ❑
❑
34. Does the facility require a follow-up visit by same agency?
❑
0 ❑
❑
Page 5 of 5