HomeMy WebLinkAbout250039_30-Day Plan of Action_20190225@i�2312P15 14026 25234b9215 NCDENR D49 Pr1GE 01la4
PLAN OF ACTION (PoA) FORMIGH FPEESOARD AT ANIMAL FACILMES
Facility Number'
Faulllty erne:"—
}
Certifiers Operator Narn � �� � �per�tc�
�-
`i, Current liquid ielvel(S) in irlc e§j as measured from the n.urrent liquid ie%,el in the lagoon to the
Ivue st point on the top of the dal' for lagoons without spillWays; and from the curvent iiquld le
in the lagoon to the bo#toM of the spillway for lagoons with spliNvays.
Sfructu e I structure 2 Structwe 3 Structure 4 Structure 5 Structure 8
La[geort Narnelldentifier (ll7) w — —
Spiliway (Yes or NO)' -
Level (Inches):
2. Check all appOoabte items
Liquid )evel is Othin thejdesigned structural freeboard elevations of one or more structures. Five
and 30 day Plans cf Actian ara attached. hydr uiic and agronomic 16818mces are wlth n
acceptable ranges.
Liquid level is within the 26 year 24 hour storm Oevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balnrlCe Is Within acceptable range.
VV9ste is to be pumped and hauled to off Bite io,c�atiuns. volume and PAN r-ontent of waste to
pumped and hauled is reflected in section III fables. lnclijsd6 d 'ofith&n IN% pls is a list of the
proposed sites with related fadlity number(s), number acres and receiving cop information.
Contact and secure a PrOval from the Division Of VV2W ResOvrresfor to transfar of
waste to a Site riot olive ed in the facility's certified animal waSte MnagOr' ant pla?"
Operatiun wili be Parkiaily Or fully c!spepulated.
attaun a compie'te schedjs e with corresponding aniMal units and dates for depopuiat�on
if animals are to be moved to anath-er perMitteci facility, provide facility number, W900n
freeboard levels and herd population for tyre receiving facility
3. Earliest possible date to begin land applirAt3On Of waste-' Included
in the
ed above and
t hem -by certify that l have revle reel t � i�f � tnd abisijonll ttl a information its accurate�and correct.
attached Plan
Aclioz�, sold to the beatf xn icnwiedgs
Phone,
Dateo
paA Cover page 2121100
Z d 6619E9C97 ilepuAl eaga(j dCo:: ,o c f 87 oar
PLA14 OF ACTION (PAA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Alum Springs LLC ASF-1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
18 inches
b. designed 25 yr./24 hr, storm & structural freeboard
19 inches
c. line b - line a (inches in red zone) =
1 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) — 257,300 ft2
e. fine c x line d x 7.48 allons -
12 fF 159,742� gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
s Y
g. volume of waste produced according to structural design _.310,395.8 ft3
h. actual waste produced = current herd # x line g = 310 395.8 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
1. current waste analysis dated
m. lines e + k x line I =
1000
0 ft3
150,091.7 ft3
571,778.1 gallons
ib/1000 gal.
I PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121100 1
1. structure ID.
ASF-1
line m =
lb PAN
2. structure ID:
line m =
lb PAN
I structure ID;
fine m =
lb PAN
4. structure ID:
line m =
lb PAN
5. structure ID:
line m =
lb PAN
6. structure ID:
line m =
lb PAN
n. lines'1 +2-r3+4+S+g =
U
_a6f_
lb PAN
lll. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT
DURING 30 DAYDRAW
DOWN
o. tract # p. field #
BE APPLIES DURING THIS 30 DAY PERIOD.
q. crop r. acres
s. remaining t, TOTAL PAN
U.
IRR-2 PAN BALANCE
application
balance FOR FIELD
window'
(lb/acre) (lbs.)
5327 Ala
Oats
column r x s
9
5327 Alb
5327 A2
Oats
Z 33
A ril
5327 Bl
O1
Oats
Oats 2.5
-
Aril
-
Oats
-.ov '{�• s�
Aril
Oats
-- - -
Aril
Oats
Aril
-
Oats
-
Aril
- --
Oats
A ril
- -
Oats
Aril
5327 E1
5327 C1
Oats 2.75
--
� � � 7b ` ��
A ril
Aril
5327 C2
Oats 5.5
Oats 5.5
- -) 1.�'% 6
Aril
3 8. 7a- / 7 .54
Aril
Oats
6604 P1
Oats 44 - 31
s
Aril
-36 .d 9 123.3 -a1
April
Oats
Oats
A rif
Oats
A ril
6604 L1
Oats 5.1
�%, �/ /,�/, �
April
Aril
6604 L2
Oats 1.25
.J/
A ril
6604 L3
Oats 1.36
/'k1
A ril
6604 L4
Oats 1.28
a 7.0 3 S 6-1
Aril
6604 L5
6604
Oats 0.69
2 55 a2 7, 6-7
Aril
L6
Oats 0.19
12� Ste.
Aril
State current crop ending application
date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _Q 7�Ib. PAN
1 _
POA (30 Day) 2121/00 2
1V. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = / 4-/,o Q
x. Crop's remaining PAN balance (line v from section 111) _ ,0 � lb. PAN
-
y. Overall PAN balance (w - x) = r lb. PAN
lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, lre
ist course of action he
including pump and haul, depopulation, herd reduction, etc. For pump &haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2121/00 3