Loading...
HomeMy WebLinkAbout250039_30-Day Plan of Action_20190225@i�2312P15 14026 25234b9215 NCDENR D49 Pr1GE 01la4 PLAN OF ACTION (PoA) FORMIGH FPEESOARD AT ANIMAL FACILMES Facility Number' Faulllty erne:"— } Certifiers Operator Narn � �� � �per�tc� �- `i, Current liquid ielvel(S) in irlc e§j as measured from the n.urrent liquid ie%,el in the lagoon to the Ivue st point on the top of the dal' for lagoons without spillWays; and from the curvent iiquld le in the lagoon to the bo#toM of the spillway for lagoons with spliNvays. Sfructu e I structure 2 Structwe 3 Structure 4 Structure 5 Structure 8 La[geort Narnelldentifier (ll7) w — — Spiliway (Yes or NO)' - Level (Inches): 2. Check all appOoabte items Liquid )evel is Othin thejdesigned structural freeboard elevations of one or more structures. Five and 30 day Plans cf Actian ara attached. hydr uiic and agronomic 16818mces are wlth n acceptable ranges. Liquid level is within the 26 year 24 hour storm Oevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balnrlCe Is Within acceptable range. VV9ste is to be pumped and hauled to off Bite io,c�atiuns. volume and PAN r-ontent of waste to pumped and hauled is reflected in section III fables. lnclijsd6 d 'ofith&n IN% pls is a list of the proposed sites with related fadlity number(s), number acres and receiving cop information. Contact and secure a PrOval from the Division Of VV2W ResOvrresfor to transfar of waste to a Site riot olive ed in the facility's certified animal waSte MnagOr' ant pla?" Operatiun wili be Parkiaily Or fully c!spepulated. attaun a compie'te schedjs e with corresponding aniMal units and dates for depopuiat�on if animals are to be moved to anath-er perMitteci facility, provide facility number, W900n freeboard levels and herd population for tyre receiving facility 3. Earliest possible date to begin land applirAt3On Of waste-' Included in the ed above and t hem -by certify that l have revle reel t � i�f � tnd abisijonll ttl a information its accurate�and correct. attached Plan Aclioz�, sold to the beatf xn icnwiedgs Phone, Dateo paA Cover page 2121100 Z d 6619E9C97 ilepuAl eaga(j dCo:: ,o c f 87 oar PLA14 OF ACTION (PAA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Alum Springs LLC ASF-1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18 inches b. designed 25 yr./24 hr, storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) — 257,300 ft2 e. fine c x line d x 7.48 allons - 12 fF 159,742� gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days s Y g. volume of waste produced according to structural design _.310,395.8 ft3 h. actual waste produced = current herd # x line g = 310 395.8 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated m. lines e + k x line I = 1000 0 ft3 150,091.7 ft3 571,778.1 gallons ib/1000 gal. I PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121100 1 1. structure ID. ASF-1 line m = lb PAN 2. structure ID: line m = lb PAN I structure ID; fine m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines'1 +2-r3+4+S+g = U _a6f_ lb PAN lll. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT DURING 30 DAYDRAW DOWN o. tract # p. field # BE APPLIES DURING THIS 30 DAY PERIOD. q. crop r. acres s. remaining t, TOTAL PAN U. IRR-2 PAN BALANCE application balance FOR FIELD window' (lb/acre) (lbs.) 5327 Ala Oats column r x s 9 5327 Alb 5327 A2 Oats Z 33 A ril 5327 Bl O1 Oats Oats 2.5 - Aril - Oats -.ov '{�• s� Aril Oats -- - - Aril Oats Aril - Oats - Aril - -- Oats A ril - - Oats Aril 5327 E1 5327 C1 Oats 2.75 -- � � � 7b ` �� A ril Aril 5327 C2 Oats 5.5 Oats 5.5 - -) 1.�'% 6 Aril 3 8. 7a- / 7 .54 Aril Oats 6604 P1 Oats 44 - 31 s Aril -36 .d 9 123.3 -a1 April Oats Oats A rif Oats A ril 6604 L1 Oats 5.1 �%, �/ /,�/, � April Aril 6604 L2 Oats 1.25 .J/ A ril 6604 L3 Oats 1.36 /'k1 A ril 6604 L4 Oats 1.28 a 7.0 3 S 6-1 Aril 6604 L5 6604 Oats 0.69 2 55 a2 7, 6-7 Aril L6 Oats 0.19 12� Ste. Aril State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _Q 7�Ib. PAN 1 _ POA (30 Day) 2121/00 2 1V. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = / 4-/,o Q x. Crop's remaining PAN balance (line v from section 111) _ ,0 � lb. PAN - y. Overall PAN balance (w - x) = r lb. PAN lb. PAN Line y must show as a deficit. If line y does not show as a deficit, lre ist course of action he including pump and haul, depopulation, herd reduction, etc. For pump &haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2121/00 3