HomeMy WebLinkAbout20160233 Ver 1_Year 2 Monitoring Report 2018_20190304ID#* 20160233
Select Reviewer:*
Katie Merritt
Initial Review
Completed Date
03/04/2019
Mitigation Project Submittal - 3/4/2019
Version* 1
Is this a Prospectus, Technical Proposal or a New Site? *
Type of Mitigation Project:*
r Stream r Wetlands W Buffer V Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Lindsay Crocker
Project Information
Existing 20160233
(DWR) (nunbersonly ...nodash)
ID#:*
Project Type: F DMS r Mitigation Bank
Project Name: Tar River Headwaters Buffer
County: Person
Document Information
(- Yes (--
Email Address:*
lindsay.crocker@ncdenr.gov
Existing
Version: (nurnbersonly)
Mitigation Document Type:*
Mitigation Monitoring Report
File Upload: TarRiverBuffer 97071 MY2_2018.pdf 3.61 MB
Rease upload only one RDF of the corrplete file that needs to be subnitted...
Signature
Print Name:* Lindsay Crocker
Signature:
Table 1. Project Components and Mitigation Assets
Tar River Headwaters Stream and Ditch Buffer, DMS # 97071
NUTRIENT OFFSET
RIPARIAN BUFFER (15A NCAC 02B.0295) (15A NCAC
0213.0240)
Conservation Easement Recorded
NA
Oct -16
Mitigation Plan
Initial
Nov -16
Fencing and Construction
NA
Jan -17
Planting and Vegetation Plots Installed
NA
Feb -17
Buffer
Creditab
Apr -17
Year 1 Monitoring
Mitigation
Nov -19
Nutrient
Nutrient
Reach ID or
Restoratio
Credit
o
% Full
Year 5 Monitoring
Width
le Area
Credits
Offset:
Offset:
Component
n Level
Ratio
Credit
(ft)
(sf)*
(BMU)
N (Ibs)
P (Ibs)
(x:1)
0-30
29,621
1
100%
29,621
Ditch TOB -50'
Restoration
OR
2,571
165
30-50
19,655
1
100%
19,655
0-30
4,787
1
100%
4,787
Stream TOB -
Restoration
N/A
50'
30-50
1,697
1
100%
1,697
55,760
* Creditable buffer areas are at least 30 ft wide.
**Creditable nutrient offset areas are at least 50 ft wide.
Table 2. Project Activity and Reporting History
Tar River Headwaters Stream and Ditch Buffer DMS # 97071
Activity or Deliverable
Data Collection
Complete
Completion or
Delivery
Conservation Easement Recorded
NA
Oct -16
Mitigation Plan
NA
Nov -16
Fencing and Construction
NA
Jan -17
Planting and Vegetation Plots Installed
NA
Feb -17
As -Built MYO Baseline Monitoring
Feb -17
Apr -17
Year 1 Monitoring
Oct -19
Nov -19
Year 2 Monitoring
Oct -19
Nov -19
Year 3 Monitoring
Year 4 Monitoring
Year 5 Monitoring
AMTar River Headwaters Stream and Ditch Buffer
Mo�nsNMR ^ten. MY2 Fall Monitoring Report - October 2018
�� - & ■�. z'�
�
�'--$tA
�
-, 29
. �
Legend ,
--o� Photo Point 9.
C2Conservanon Easement
noe 2 `
Vegetation Plots _
Top Bank
]$30IftBuf�r R troaUn
F�
30-0ftOufrRm■m , 0 40 m 160 240 320 ^.
� §
eq r 2