Loading...
HomeMy WebLinkAbout20160233 Ver 1_Year 2 Monitoring Report 2018_20190304ID#* 20160233 Select Reviewer:* Katie Merritt Initial Review Completed Date 03/04/2019 Mitigation Project Submittal - 3/4/2019 Version* 1 Is this a Prospectus, Technical Proposal or a New Site? * Type of Mitigation Project:* r Stream r Wetlands W Buffer V Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Lindsay Crocker Project Information Existing 20160233 (DWR) (nunbersonly ...nodash) ID#:* Project Type: F DMS r Mitigation Bank Project Name: Tar River Headwaters Buffer County: Person Document Information (- Yes (-- Email Address:* lindsay.crocker@ncdenr.gov Existing Version: (nurnbersonly) Mitigation Document Type:* Mitigation Monitoring Report File Upload: TarRiverBuffer 97071 MY2_2018.pdf 3.61 MB Rease upload only one RDF of the corrplete file that needs to be subnitted... Signature Print Name:* Lindsay Crocker Signature: Table 1. Project Components and Mitigation Assets Tar River Headwaters Stream and Ditch Buffer, DMS # 97071 NUTRIENT OFFSET RIPARIAN BUFFER (15A NCAC 02B.0295) (15A NCAC 0213.0240) Conservation Easement Recorded NA Oct -16 Mitigation Plan Initial Nov -16 Fencing and Construction NA Jan -17 Planting and Vegetation Plots Installed NA Feb -17 Buffer Creditab Apr -17 Year 1 Monitoring Mitigation Nov -19 Nutrient Nutrient Reach ID or Restoratio Credit o % Full Year 5 Monitoring Width le Area Credits Offset: Offset: Component n Level Ratio Credit (ft) (sf)* (BMU) N (Ibs) P (Ibs) (x:1) 0-30 29,621 1 100% 29,621 Ditch TOB -50' Restoration OR 2,571 165 30-50 19,655 1 100% 19,655 0-30 4,787 1 100% 4,787 Stream TOB - Restoration N/A 50' 30-50 1,697 1 100% 1,697 55,760 * Creditable buffer areas are at least 30 ft wide. **Creditable nutrient offset areas are at least 50 ft wide. Table 2. Project Activity and Reporting History Tar River Headwaters Stream and Ditch Buffer DMS # 97071 Activity or Deliverable Data Collection Complete Completion or Delivery Conservation Easement Recorded NA Oct -16 Mitigation Plan NA Nov -16 Fencing and Construction NA Jan -17 Planting and Vegetation Plots Installed NA Feb -17 As -Built MYO Baseline Monitoring Feb -17 Apr -17 Year 1 Monitoring Oct -19 Nov -19 Year 2 Monitoring Oct -19 Nov -19 Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring AMTar River Headwaters Stream and Ditch Buffer Mo�nsNMR ^ten. MY2 Fall Monitoring Report - October 2018 �� - & ■�. z'� � �'--$tA � -, 29 . � Legend , --o� Photo Point 9. C2Conservanon Easement noe 2 ` Vegetation Plots _ Top Bank ]$30IftBuf�r R troaUn F� 30-0ftOufrRm■m , 0 40 m 160 240 320 ^. � § eq r 2