HomeMy WebLinkAboutNCG140348_Response to NOV_20190227February 26, 2019
North Carolina DEQ Mooresville Office
610 East Center Ave, Suite 301
Mooresville NC 28115
oft
ce
RE: Argos USA (formerly Southern Equipment Co, Inc d.b.a. Ready Mixed Concrete)
Hebron St Concrete Plant
To Whom It May Concern:
On February 12, 2019, Argos received a Notice of Violation for high pH readings
from the settling basin discharge at our Hebron St plant. These exceedances resulted
from excess solids accumulation in the settling basin, reducing its holding capacity
and leading to discharge. We have since brought in excavation equipment to remove
the solids. The solids have not completely been removed, but enough material has
been taken out to eliminate the discharge. We are also using the opportunity to
perform maintenance on the basin's retaining wall. A photo of the work in progress
is included below. In addition to repairing the existing settling basin, we will be
installing an additional sediment pit to reduce the solids flowing into the basin. We
will be able to remove solids accumulation with our existing plant equipment, and to
treat the pH at this pit as necessary.
We believe the repair work will prevent future instances of discharge above
allowable pH limits. We also believe the previous discharge exceedances posed only
a slight environmental concern. As the second figure below shows, the pond is a
significant distance from the Kings Branch Creek that flows through the plant
property. There are several hundred feet of woodlands to absorb the discharge.
Please call me at 678-392-2130 or e-mail at ssimonsen@argos-us.com if you have
any questions or need additional information.
Sinor
crel y,
Step en L. Simonsen
Environmental Manager
a
r
':r,. r tk �4 Rt35gl�y'g.1.
� 'sT
Compliance Inspection Report
Permit: NCG140348 Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Equipment Company Inc
SOC: Effective: Expiration: Facility: Ready Mixed Concrete Co. - Hebron Road, Plant 10!
County: Mecklenburg 325 E Hebron St
Region: Mooresville
Charlotte NC 28273
Contact Person: Rick Alexander Title: Phone: 704-821-7475
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/26/2019
Primary Inspector: James D Moore
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 11:30AM Exit Time: 1150AM
Phone:
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm water
(See attachment summary)
Page: 1
Permit: NCG140348 Owner - Facility: Southern Equipment Company Inc
Inspection Date: 02/26/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
The inspection was a follow-up regarding a January 31, 2019 NOV. Based on the inspection work is in progress on the
stormwater / process water basin repairs. A follow-up inspection is recommended on March 26, 2019.