HomeMy WebLinkAbout20190260 Ver 1_SMP v2.01_64_20180523_Dec 2014 (2)_20190227k lif;f��i°�iti' North Carolina Department of Transportation
``�i[)1'illku%�t['r �'
. .... Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: 17BP.4.R.109 TIP No.: SF-970113 County(ies): Wilson Page 1 of 1
General Project Information
WBS Element: 17BP.4.R.109 TIP Number: SF-970113 Project Type: Bridge Replacement Date: 10/25/2018
NCDOT Contact: Chad Coggins Contractor / Designer: Wetherill Engineering, Inc. / Harminder Singh, PE
Address: Highway Divison 4 Address: 1223 Jones Franklin Rd.
509 Ward Blvd, PO BOX 3165
Wilson, NC 27895 Raleigh, NC 27606
Phone: 252-237-6164 Phone: 919-851-8077
Email: ccoqqins(a�ncdot.qov Email: hsinph(a�wetherillenq.com
CitylTown: N/A County(ies): Wilson
River Basin(s): Neuse CAMA County? No
Wetlands within Project Limits? Yes
Project Description
Project Length (lin. miles or feet): 0.1 mi Surrounding Land Use: Rural, Wooded, Agricultural, Light Residential
Proposed Project Existing Site
Project Built-Upon Area (ac.) 0.3 ac. 0.3 ac.
Typical Cross Section Description: (2) 11' lanes with grassed shoulders and up to 5.2' shoulders with guardrail. (2) 10' lanes with grassed shoulders
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 380 Year: 2018 Existing: Year:
General Project Narrative: Replace bridge no. 113 (length = 55') over White Oak Swamp on SR 1514 Holdens Cross Road. Use 1@65' 24" Cored Slab. No deck drains are required. The concrete flume
(Description of Minimization of Water outlets are outside the buffer zones which are offset from the herbaceous vegetation.
Quality Impacts)
Waterbody Information
Surface Water Body (1): White Oak Swamp NCDWR Stream Index No.: 27-86-11-7
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: Nutrient Sensitive Waters (NSW) Swamp Waters (Sw)
Other Stream Classification: None
Impairments: None
Threatened/Endangered Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)