Loading...
HomeMy WebLinkAbout20190260 Ver 1_970113_hyd_wet_combined 10 30 2018 (2)_20190227� � 0 rn 3 � � o Y ao � O N �m- LL L 0 � . � . cl` � �i� '� ., � V W � � � � .� •� � V � � O V PROJECT LENGTH ����� �� ����� ��1������ �������� �� �������� WILS�1� CO U1�TY LOCATI0111: BRIDGE 1V0. 970113 OVER WHITE OAK SWAMP ON SR 1514 (HOLDE11lS CROSS RD.) TYPE OF WORK GRADI11lG, DRAI11lAGE, PAVI11tG � STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT NOTE: NO DECK DRAINS BEGIN NCDOT PROJECT 17BP.4.R.109 —L— POT STA.13+21.00 TO PT RS RD — —L = � SR 1514 (HOLDE11lS CROSS RD) r � N oQ� 2� � u END NCDOT PROJECT 17BP.4.R.109 —L— POC STA. l7 + 21.00 w � x 30� � � END BRIDGE —Ir STA.15 + 51.00 ---- —� NC-111 �---- T� � � �� CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. GRAPHIC SCALES 30 15 0 30 60 PLANS 30 15 0 30 60 PROFILE (HORIZONTAL) DESIG11i DATA ADT 2018 = 380 T = 6 % * V = 55 MPH * (TTST = 3°/a + DUAL =3%) FUNC CLASS = MINOR COLLECTOR SUBREGIONAL TIER LENGTH ROADWAY PROJECT 17BP.4.R.109 = LENGTH STRUCTURE PROJECT 17BP.4.R.109 = TOTAL LENGTH PROJECT 17BP.4.R.109 = NCDOT CONTACT.• 0.064 MILES p0/8 STANDARD SPECIF1CATlONS 0.012 MILES EDWARD G, WETHERILL, PE RIGHT OF WAY DATE: 0.076 MILES DECEMBER 2018 PROJECT ENGlNEER LETTING DATE: GREG S. PURVIS, PE RACHEL C. EVANS, PE APRIL 2019 PROJECT DESIGN ENGlNELR DN7SION 4 PROJECT ENGlNEER S]'ATE E PROJECT REPERENCE NO. ���� 17BP.4.R.109 176P.4.R.109 178P.4.R.109 SHE�ET TMAL SHEETS � , UTIL., fLW CONST. 1223 lones Rankl'����. Ralelqh, N.C. 21�.. . � «�« N� F TRANSPoRTATiON PLANN/NG/DESIGN - BRiDGE/STRUCTURE DESIGN CNIL/S?E DESIGN - C/5/GPS - CONSTRUCTiON OBSERVATiON BRIDGE #970113 PRELIM. RDWY PLAIVS PERMIT DRAWING SHEET 1 OF 4 BNC��'i[Il�]LlE'Il"]E ]�1LAN� DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HI'DRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. DIVISION OF HIGHWAYS DIVISION FOUR 509 Ward Boulevard, Wilson NC, 27895 See Sheet 9-A For Index of Sheets See Sheet 1-B For Conventlonal Symbo/s See Sheet 1 C- 9 TO 9C-2 For Survey Control Sheets - � I �u � 7�T�T^ � C ��I � �����ii���L���� �■fi,�i■�■III�I■ � � ir..�rr�� �.: ��i � � � ior u74T�T��E F�I �7 �����Iii���L���� �■f�����l�l�l■ ���� �_'.�/;I�I�J�Y_i�:f^nT WETLAND PERMIT IMPACT SUMMARY Hand Existing Existing Surface Permanent Excavation Mechanized Clearing Permanent Temp. Channel Channel Water Site Station Structure Fillln in Clearing in SW SW Impacts Impacts Impacts No. (From/To) Size / Type Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. (Pond) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ac) -L- 14+g6 to 15+51 65' 'Bridge < 0.01 0.02 < 0.01 65 TOTALS*: < 0.01 0.02 < 0.01 65 0 0 *Rounded totals are sum of actual impacts NOTES: Hand Clearing in Wetlands: 324 sq feet Temp Surface Water Impacts: 122 sq feet 2013 10 24