PROJECT LENGTH
����� �� ����� ��1������
�������� �� ��������
WILS�1� CO U1�TY
LOCATI0111: BRIDGE 1V0. 970113 OVER WHITE OAK SWAMP
ON SR 1514 (HOLDE11lS CROSS RD.)
TYPE OF WORK GRADI11lG, DRAI11lAGE, PAVI11tG � STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
NOTE: NO DECK DRAINS
BEGIN NCDOT
PROJECT 17BP.4.R.109
—L— POT STA.13+21.00
TO PT RS RD — —L = �
SR 1514 (HOLDE11lS CROSS RD)
r
� N
oQ�
2�
�
u
END NCDOT
PROJECT 17BP.4.R.109
—L— POC STA. l7 + 21.00
w �
x
30�
�
�
END BRIDGE
—Ir STA.15 + 51.00
---- —� NC-111
�---- T�
�
�
��
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
30 15 0 30 60
PLANS
30 15 0 30 60
PROFILE (HORIZONTAL)
DESIG11i DATA
ADT 2018 = 380
T = 6 % *
V = 55 MPH
* (TTST = 3°/a +
DUAL =3%)
FUNC CLASS =
MINOR COLLECTOR
SUBREGIONAL TIER
LENGTH ROADWAY PROJECT 17BP.4.R.109 =
LENGTH STRUCTURE PROJECT 17BP.4.R.109 =
TOTAL LENGTH PROJECT 17BP.4.R.109 =
NCDOT CONTACT.•
0.064 MILES p0/8 STANDARD SPECIF1CATlONS
0.012 MILES EDWARD G, WETHERILL, PE
RIGHT OF WAY DATE:
0.076 MILES DECEMBER 2018 PROJECT ENGlNEER
LETTING DATE: GREG S. PURVIS, PE
RACHEL C. EVANS, PE
APRIL 2019 PROJECT DESIGN ENGlNELR
DN7SION 4 PROJECT ENGlNEER
S]'ATE E PROJECT REPERENCE NO.
���� 17BP.4.R.109
176P.4.R.109
178P.4.R.109
SHE�ET TMAL
SHEETS
�
, UTIL., fLW
CONST.
1223 lones Rankl'����.
Ralelqh, N.C. 21�.. .
� «�« N� F
TRANSPoRTATiON PLANN/NG/DESIGN - BRiDGE/STRUCTURE DESIGN
CNIL/S?E DESIGN - C/5/GPS - CONSTRUCTiON OBSERVATiON
BRIDGE #970113
PRELIM. RDWY PLAIVS
PERMIT DRAWING
SHEET 1 OF 4
BNC��'i[Il�]LlE'Il"]E ]�1LAN�
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
HI'DRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
P.E.
DIVISION OF HIGHWAYS
DIVISION FOUR
509 Ward Boulevard, Wilson NC, 27895
See Sheet 9-A For Index of Sheets
See Sheet 1-B For Conventlonal Symbo/s
See Sheet 1 C- 9 TO 9C-2 For Survey Control Sheets
- � I �u � 7�T�T^ � C ��I �
�����ii���L����
�■fi,�i■�■III�I■
� � ir..�rr�� �.: ��i �
� � ior u74T�T��E F�I �7
�����Iii���L����
�■f�����l�l�l■
���� �_'.�/;I�I�J�Y_i�:f^nT
WETLAND PERMIT IMPACT SUMMARY
Hand Existing Existing Surface
Permanent Excavation Mechanized Clearing Permanent Temp. Channel Channel Water
Site Station Structure Fillln in Clearing in SW SW Impacts Impacts Impacts
No. (From/To) Size / Type Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. (Pond)
(ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ac)
-L- 14+g6 to 15+51 65' 'Bridge < 0.01 0.02 < 0.01 65
TOTALS*: < 0.01 0.02 < 0.01 65 0 0
*Rounded totals are sum of actual impacts
NOTES:
Hand Clearing in Wetlands: 324 sq feet
Temp Surface Water Impacts: 122 sq feet