Loading...
HomeMy WebLinkAbout20190260 Ver 1_PCN Form Submission_20190227D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190260 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: Replace Br 113 on SR 1514 Wilson Co. 1a. Who is the PrimaryContact?* Chad Coggins 1b. PrimaryContact Email:* tccoggins@ncdot.gov Date Submitted 2/27/2019 Nearest Body of Water White Oak Swamp Basin Neuse Water Classification C;Sw,NSW Site Coordinates Latitude: 35.70699 Longitude: -77.75428 A. Processing Information County (or Counties) where the project is located: Wilson Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: BR 970113 (State funded project) WBS # (�) 17BP.4.R.109 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 Reviewing Office * Raleigh Regional Office - (919) 791-4200 1c. PrimaryContact Phone:* (252)717-8699 :: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? F Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner fJ Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of North Carolina (NCDOT) 2b. Deed book and page no.: 2c. Responsible party: NCDOT Div 4 2d. Address Street Address P.O. Box 3165 Address Line 2 �Y Wilson Fbstal / Zip Code 27548 2e. Telephone Number: (252)717-8699 2g. Email Address:* r 401 Water Quality Certification - E�ress rJ Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: x C' Yes R No C' Yes G No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: NCDOT Div 4 3c.Address Street Address P.O. Box 3165 Address Line 2 ary Wilson Postal / Zip Code 27828 3d. Telephone Number: (252)717-8699 3f. Email Address:" tccoggins@ncdot.gov S[ate / Awince I Region NC Country USA 3e. Fax Number: C. Project Information and Prior Project History � 1. Project Information � 1b. Subdivision name: (rf appropriate) 1 c. Nearest municipality l town: Wilson 2. Project Identification 2a. Propertyldentification Number: 2c. Project Address Street Address Address Line 2 ary Postal / Zip Code 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:" White Oak Swamp 3b. Water Resources Classification of nearest receiving water:* C;Sw,NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202030302 4. Project Description and History 2b. Property size: S[ate I Rovince I Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Forestry and Agriculture are the predominant land uses with some rural single-family residential housing in the vicinity of this project. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No C' Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Wilson 113 Topo map.pdf 1.6SMB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Wilson 113 Soils map.pdf 225MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.01 4g. List the total estimated linear feet of all existing streams on the property: 120 4h. Explain the purpose of the proposed project:" Replace Bridge 113 which is structurally deficient for current NCDOT standards. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Replace Bridge 113 wfiich is structurally deficient for current NCDOT standards with a new bridge meeting these current standards in the ewsting right-of-way. Heavy road and bridge building equipment will be used. 4j. Please upload project drawings for the proposed project. 970113_hyd_wet_combined 10 30 2018.pdf 129MB 970113_hyd_buf_combined 10 30 2018.pdf 830.57KB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: Chad Coggins, NCDOT Div 4 DEO conducted onsite jurisdictional delineation. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved C' Not Verified � Unknown C' WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas7 Name (if known): Agency/Consultant Company: Other: Sd1. Jurisdictional determination upload 6. Future Project Plans Chad Coggins NCDOT Div 4 DEO C' Unknown 6a. Is this a phased project?* C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�R No, single and complete linear transportation project with independent utility. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): CJ Wetlands II� Streams-tributaries rJ Open Waters Ir Pond Construction 2. Wetland Impacts 2a. Site #* (') 2a1 Reason ("?) Site 1 Bridge approach 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.000 2h. Comments: 0.01 acre of hand clearing Impact type * C') II2a Type of W. * Hardwood Forest W.name* te Oak Swamp 2g. Total Permanent Wetland Impact 0.000 rJ Buffers Forested* Zf.Typeof I2g.lmpact �Jurisdicition*(�) area* 000 (acres) 3. Stream Impacts Reason for impact (?) 3b.lmpact type * 3c. Type of impact* ae abutment fill Permanent Fill 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 65 3i. Total stream and ditch impacts: 65 3j. Comments: 4. Open Water Impacts S. name * 3e. Stream Type * 3f. Type of (J Jurisdiction* te Oak Swamp Perennial Both 3i. Total temporary stream impacts: 0 S. width* 3h. Impact '---"-* Average (feet) I� Qinear feet) 4a. Site # 4a7. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activitytype 4e. Waterbody type 4f. Impact area Site 1 bridge abutment fill P White Oak Swamp Bridge Tributary OA2 Site 1 impervious dike T White Oak Swamp Dewatering Tributary 0.01 4g. Total temporary open water Impacts: 0.01 4g. Total open water impacts: 0.03 4h. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all Ihat apply. �J Neuse � Catawba r Goose Creek r Other 6h. Total buffer impacts: Zone 1 Total Temporary impacts: 0.00 Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Zone 1 2,258.00 Zone 1 2,258.00 4g. Total permanent open water impacts: 0.02 � Tar-Pamlico � Randleman r Jordan Lake Zone 2 0.00 Zone 2 1, 716.00 Zone 2 1, 716.00 Supporting Documentation 970113_hyd_buf_wmbined 10 30 2018.pdf 830.57KB 970113_hyd_wet_combined 10 30 2018.pdf 129MB SMP v2.01_64_20180523_Dec 2014.pdf 81.05KB E. Impact Justification and Mitigation � 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replace in place bridge with offsite detours. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment will be staged and operated from upland areas. DOT will also install silt fencing to protect the streams and wetlands adjacent to the project. Safety fencing will be used to delineate jurisdictional and environmentaly sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? � Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Jurisdictional waters and wetlands impacts fall belowthresholds of significant impacts / requirement for compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? � Yes r No What type of SCM are you providing? r Level Spreader CJ Vegetated Conveyance (lower SMNT) � Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation SMP v2.01_64_20180523_Dec 2014.pdf 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* � Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 81.OSKB 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federal/state) land?* � Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* C' Yes r No Comments: * MCDC available on request. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 26.0200)?* � Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water qualit�/? * C' Yes r No 3b. If you answered "no," provide a short narrative description. Replacing exsting 2 lane bridge with new2 lane bridge. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?" r ves � No r wn 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * F Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?" � Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?" � Yes Se. Is this a DOT project located within Division's 1-8? r Yes r No � No � Unknown Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Red-cockaded v�,nodpecker is listed as Historic for Wilson Co. Also, foraging or nesting habitat is not found adjacent to project area. NHP database records no element occurrence within a mile of project area. (No Affect) / Michaux's sumac is listed as Historic for Wilson Co. NHP database records no element occurrence within a mile of the project. area. (No Affect) // Programmatic BO of MALTAA for NLEB Consultation Documentation Upload FWS IPaC TE list.pdf NCNHP element occurance letter.pdf Wilson Co. TE Llstpdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * GIS / NOAA Atlantic Sturgeon proposed rule dated 06/03/2016 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 206.94K6 634.67KB 183.59KB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?" � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU Clearance 7c. Historic or Prehistoric Information Upload 17-08-0023 No Archaeological Survey Required Form Br No 113 on SR 1514 Holdens Cross Rd over Whiteoak 489.64KB Swamp Wilson.pdf 17-08-0023NoSurvey.pdf 1.74MB 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* f Yes r No Sc. What source(s) did you use to make the floodplain determination?* FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * rJ By checking the box and signing below, I certify that: ,. � • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature C�RCt L.. O�/�c%fc/- Date 2/27/2019