Loading...
HomeMy WebLinkAbout20050732 Ver 47_Stormwater Site Plans_20190220v�MCIQNI&cREED TO NCDENR — Division of Water Resources 401 & Buffer Permitting Unit 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 ATTENTION: Ms. Karen Higgins '�) cOSG T?,L- V /- {- LETTER OF TRANSMITTAL DATE: February 8, 2019 PROJECT NO: 2735-0214 TASK NO: REIMB RE: Modification to DWQ 05-0732v17 TRANSMITTAL NO: 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg No. Rev. Description Status 1 Cover Letter Requesting Stormwater Management Plan Approval C 2 Stormwater Design Plans G 2 Narrative & Supporting Calculations G 2 Granite Mill Wetland Design Supplements G 2 Granite Mill Wetland O&M Agreements G Issue Status Code: REMARKS: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Ms. Higgins, Please find the enclosed documents for your review and approval. Please let us know if you have any questions or comments. Thank you. 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919/2338091 Fax 919/233-8031 Cc: McKIM &CREED, INC. I� 1 19 + Signed Gareth Avant, PE v. MCKIM&CREED February 8th, 2019 Ms. Karen Higgins 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 RE: DWQ 05-0732v17 Ms. Higgins, E N G I N E E R S S U R V E Y O R S P L A N N E R S R @ uu ray 2 0 2019 Please find enclosed the plans, caclulations, supplement forms and operation and maintenance agreements for the Granite Mill Blvd. Wetland at Briar Chapel. This letter is to formally request approval for modifying the previously approved stormwater management program per Water Quality Certification June 28, 2010 as issued by the Division of Water Resources 05-0732v17 Please let me know if you have any questions on this. Thank you for your assistance. Sincerely, McKIM & CREED, INC. Venture IV Building ✓&46e-4 {.If�l - Suit. 500 Gareth Avant, PE Project Engineer 1730 Varsity Drive Raleigh, NC 27606 919.233.8091 Fax 919.233.8031 www.mckimcreed.com Operation & Maintenance Agreement Project Name: Project Location: Briar Chapel - Granite Mill Wetland East of Andrews Store Rd and Granite Mill Blvd Intersection Cover Page; Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & correspc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: 1 Wet Detention Basin Quantity: Disconnected Impervious Area Present: No User Defined BMP Present: No O&M tables wil Location(s) Location(s) Location(s) Location(s) Location(s) Location(s) Location(s) Location(s). Location(s) Location(s) Location(s) Location(s) Location(s) Location(s): Location(s): iixtllx• I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Lee Bowman Senior Project Manager, NNP -Briar Chapel, LLC 1342 Briar Chapel Parkway Chapel Hill, NC 27516 (919)951-0700 (bowman newlandco.com Signature: ASM, Date: -211F13 J�Zj I, LA,( }(-nnY`CCA a Notary Public for the State of t1)0Y iC-,Lr 11 it/1A. County of y\0-YYs do hearby certify that (� W ,n�,•�T personally appeared before me this day of PbY (ACLX and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Kin 1NIIf CP aotary Pub�xo U ham Co�� �`� a l usWL My commission expires Version 1.4 Ce / Z-3 /a 6 20 2/7/2019 Page 1 of 3 Stormwater Wetland Maintenance Requirements Important maintenance procedures: Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). _ No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. - Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, it shall be inspected monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. Forebay Sediment has accumulated in Search for the source of the sediment and remedy the problem if the forebay to a depth that possible. Remove the sediment and dispose of it in a location where it inhibits the forebay from will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). STORM -EZ 2/7/2019 Version 1.4 O&M Manual Page 2 of 3 Stormwater Wetland Maintenance Requirements (Continued) Deep pool, shallow water Algal growth covers over 50% Consult a professional to remove and control the algal growth. and shallow land areas of the deep pool and shallow water areas. Cattails, phragmites or other Remove invasives by physical removal or by wiping them with invasive plants cover 50% of pesticide (do not spray) — consult a professional. the deep pool and shallow Shallow land remains flooded Unclog the outlet device immediately. more than 5 days after a storm event. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices Prune according to best professional practices. show that pruning is needed to maintain optimal plant Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth of will not cause impacts to streams or the BMP. Embankment A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by Make all needed repairs. appropriate professional shows that the embankment Evidence of muskrat or Consult a professional to remove muskrats or beavers. beaver activity is present. Micropool Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM -EZ 2/7/2019 Version 1.4 O&M Manual Page 3 of 3 Operation & Maintenance Agreement Project Name: Project Location: Briar Chapel - Granite Mill Wetland East of Andrews Store Rd and Granite Mill Blvd Intersection Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & a Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ing O&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): oe aaoeo I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Lee Bowman Senior Project Manager, NNP -Briar Chapel, LLC 1342 Briar Chapel Parkway Chapel Hill, NC 27516 919)951-0700 P40�wman@newlandco.com o Signature: Z-- Date: .2113 1, %Yy1'u I.. �( � 010 Y -Cr a Notary Public for the State of i')Or CCAY711 i0o� County of QQDL&yyxo-yyi do hearby certify that (-�, L G W personally appeared before me this day of )-PbY (ACLJ L�, and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, �altf ``�, K ngCP e e notary Pubs'° U: O $ �..` ,,/ham vac My commission expires Version 1.4 (g / Z3 /a 62.-o 2/7/2019 Page 1 of 3 Stcrrnwater Wettand Milnten ' a Requirements Important maintenance procedures: Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. - Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, it shall be inspected monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. Forebay Sediment has accumulated in Search for the source of the sediment and remedy the problem if the forebay to a depth that possible. Remove the sediment and dispose of it in a location where it inhibits the forebay from will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). STORM -EZ 2/7/2019 Version 1.4 O&M Manual Page 2 of 3 Stormwater Wetland Maintenance Requirements (Continued) Deep pool, shallow water Algal growth covers over 50% Consult a professional to remove and control the algal growth. and shallow land areas of the deep pool and shallow water areas. Cattails, phragmites or other Remove invasives by physical removal or by wiping them with invasive plants cover 50% of pesticide (do not spray) — consult a professional. the deep pool and shallow Shallow land remains flooded Unclog the outlet device immediately. more than 5 days after a storm event. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices Prune according to best professional practices. show that pruning is needed to maintain optimal plant Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth of will not cause impacts to streams or the BMP. Embankment A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by Make all needed repairs. appropriate professional shows that the embankment Evidence of muskrat or Consult a professional to remove muskrats or beavers. beaver activity is present. Micropool Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM -EZ 2/7/2019 Version 1.4 O&M Manual Page 3 of 3 SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System Bioretention Cell Wet Pond Stormwater Wetland 1 East of Andrews Store Road and Granite Mill Blvd Intersection Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: Gareth C. Avant Organization: McKim and Creed, Inc. Street address: 1730 Varsity Drive, Suite 500 City, State, Zip: Raleigh, NC 27606 Phone number(s): (919)233-8091 Email: gavant@mkcimcreed.com Designer �•'P�\A CARCi,, �CC ES 3lp�V�'L9 2 Q 9� Gr_AL = 036348 = C99FH� I NES yP�� lot Signature of Designer _1cllzoly Date Applicant: Project Name: Briar Chapel - Granite Mill Wetland Address N/A City / Town Pittsboro, NC Company: NNP -Briar Chapel, LLC Contact: Lee Bowman, Senior Project Manager Mailing Address: 1342 Briar Chapel Parkway City, State, Zip: Chapel Hill, NC 27516 Phone number(s): (919) 951-0700 Email libowman@newfandco.com Certification Statement: I certify, under penalty of law: that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 2:17 PM 2/7/2019 STORMWATER WETLAND Briar Chanel - Granite Mill Wetland THE DRAINAGE AREA I Drainage area number NIA Break down of BUA in the drainage area both new and existing): Total coastal wetlands area (sq R) sf - Parking I driveway (sq R) sf Total surface water area (sq R) of - Sidewalk (sq ft) sf Total drainage area (sq R) 303(101 sf - Roof (sq ft) 49899 sf BUA associated with existing development (sq R) sf - Roadway (sq R) 87399 sf Proposed new BUA (sq R) 151028 sf - Other. please specify in the comment box below (sq R) 13730 id Percent BUA of drainage area 50% Total BUA (sq R) 151028 sf COMPLIANCE WITH THE APPUCAINA STOR19WATM PROGRAM Stormwater program(s) that a easespecify). Desgn rainfall depth (in) 1.0 in Minimum volume required (cu R) Design volume of SCM (cu ft) 12592 cf 17422 cf 91 Is the SCM sized to treat the SW from all surfaces at build o ? Yes #7 If a -ble, wM the SCM be cleaned out after construction? Yes #2 Is the SCM located on or mar contaminated soils? No #8 Does the maintenance access comply with General MDC 8)? Yes #3 What are the side slopes of to SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have missing walls. gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with Genral MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yee 911 Is there an O&M Agreement that complies with General MDC 11)? Yes #5 Is Imre a a bypass for flows in excess of the design Row? No #12 Is there an O&M Plan that complies with General MDC 12)? Yes #6 What is the method for devartering the SCM for maintennce7 I Pump (Preferred) 1#13 Was Bre SCM designed by an NC licensedprofessional? Yes #1 Permanent pool elevation ((mil) 439 R #8 Total surface area of the shallow water zone at temporary pool (square feet) 7912 sf #1 Temporary pool elevation (fmsi) 44D R #8 SW wetland surface area comprised of shallow water zone at temporary % 57.6% #1 Ponding depth (inches) 12 in #8 Depth of the shallow water zone below permanent pool Inches 12 in #2 Is the SW warlord designed for peak attenuation? yes #8 Elevation of bottom of the shatlow water zone (fms4 439 It #2 If so, peak attenuation depth inches 16.2 in #9 Total surface area of the temporary inundation zone at temporary 1 square feet) 2110.3 sf #3 Surface area of SW wetland at temporary (square feel 13740 sf #9 SW wetland sudace area Comprised of temp inundation zone at temp pool %) 34.9% #4 Depth of soil amendment inches 6 in #9 Height of the temporary inundation zone above permanent pool (inches) 12n #4 Describe how the soil is being amended to promote plantgrowth: #9 Elevation of bottom of the temporary inundation zone fmsl 439 ft Topsoil all be added so anstae edeNale militants while plants are being established. #10 Drawdown time for the temporary pool (hours) #10 Does the orifice drawdown from below the top surface off�rmanent pool? _ #11 Does the pond minimize impacts In the receiving channelfrom the 1 -yr. 24 -hr storm? 84.5 hos Yes Yes #6 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #12 Has a landscaping plan that meets SW Wetland MDC (12) been provided? _ Yin 06 Describe any measures, such as berms or bafRes, that will be taken to improve the flow path: #13 of plants per 200 square feel (#) In Bre shallow water zone: —---- ._.._..-- 50 _Number The wetland was in a ('rear manner to increase th distance from doe inlet to the outlet The inbt and outlet are d � #13 Describe the planting plan for the shallow water zone: located on opposite sides of the basin and as far as possible from each other in the space 50 plants per 200 all. plants chosen as outlined in C-4 of NCDEQ Stortmwater Design Manual — -------------- _—_ #6 Surface area of the forebay at temporary pool (square feet) 2840 sf #6 #6 Overall SW wetland surface area comprised of forebay at temporary pool (%) 20.6% #6 Depth of forebay below pertnannt pool (inches) 42 in #14 Does planting for the temporary inundation zone comply with SW Welland MDC_ (14)? Yes 06 Elevation of bottom of forebay (fmsl) 435.5 R #14 Describe the planting plan for the temporary inundation zone: #6 Will the foretbay be cleaned out when depth Is reduced to 15 inches or less? #7 Total surface area of the non-forebay deep pools at temporary pool (square feet) Yes 2989 sf _ 50 plants per 200 at, plards chosen as outlined in C4 of NCDEQ Stamwater Design Manual #7 SW wetland surface area comprised of nn-forebay deep pools at temporary pool (% 21.8% Are the dam structure and temporary fill slopes planted in nom -clumping lurfgmss? #15 n Yes #7 Depth of non-forebay deep pools below permanent pool (inches) 42 in #16 Will cattails be planted in the wetland? No #70—hon of bottom of non-forebay deep Pods (fmsl) 435.5 R #t 7 Is a trash rack or other device provided to protect the outlet system? Yes ADDITIONAL INFORMATION Please use this s ace to provide an mformation about this slormwaler wetland that you think is relevant to the review: Other BUA impervious is a 10% contingency Included In our design Wetland 2 1:33 PM 2/13/2019 SUPPLEMENT -EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity. Location(s) Infiltration Svstem Bioretention Cell Wet Pond Stormwater Wetland 1 East of Andrews Store Road and Granite Mill Blvd Intersection Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: Gareth C. Avant Organization: McKim and Creed, Inc. Street address. 1730 Varsity Drive, Suite 500 City, State, Zip: Raleigh, NC 27606 Phone number(s): (919)233-8091 Email: gavantQmkcimcreed.com Designer '00%H CAR�Z'�.,�, �CPC� E�31prv.!29 .Q Sr.AL 066.8 = C'yRFq'GINEtiP�� �FTH P,`'`��; i 44"4 " /� Signature of Designer Date Applicant: Project Name: Briar Chapel - Granite Mill Wetland Address N/A City / Town Pittsboro, NC Company: NNP -Briar Chapel, LLC Contact: Lee Bowman, Senior Project Manager Mailing Address: 1342 Briar Chapel Parkway City, State, Zip: Chapel Hill, NC 27516 Phone number(s): (919) 951-0700 Email: Ibowman n&Mandco.com Certification Statement: I certify, under penalty of law: that this Supplement -EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 2:17 PM 2/7/2019 STORMWATER WETLAND Briar Chanel - Granite Mill Wetland E DRAINAGE AREA Drainage area rwmber _ _ _ _ _ _ WA Break down of BUA in the drainage area (both new and existing):__ Total coastal wetlands area (sq fl) d- Parlong / Ur vi sway (sq 0) d Total surface water area (sq fl) d - Sidewalk (sq ft) d Total drainage area (sq ft) BUA associated win existing development (sq ft) ' Proposed new BUA (sq h) 303601 d sf 151028 sf Root (sq ft) - -� - Roadway (sq 111 - Other. please specify in the comment box below (sq ftl 49899 at 87399 d 13730 d Percent BUA of drainage area 50% Total BUA (sq ft) 151028 d COMPLIANCE WITH THE APPLICABLE STORINWATER PROGRAM Sbrmw-sten ams Oat a ase s if ).Design rainfall depth (in) 1.0 n Minimum volume required (cu ft) Design volume of SCM (cu ft) 12592 cf 17422 d #1 Is the SCM sized to treat the SW from all surfaces at build -outs Yes #7 O applicable. with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetanance access ce wtlh Gerorel MDC B ? Yes 93 What are the side slopes of the SCM (H: V )? 3:1 #9 Does the drains easement cont with General MDC 9 ? Yea #3 Does Ute SCM have retaini walls, bion walls or Omer a peered side slopes? No #10 O the SCM is on a Singlefamilylel, does Ore at cam with General MDC 10 ? #4 Are the inlets. outlets, and receiving sVeam protected from erosion (10 -year storm)? Yet 11 Is there an 08th Agreement that complies with General MDC 11)? Yes #5 Is there a a bypass for flows in excess of the design 11-1 No #12 Is mere an O8M Plan that m ies went General MDC 12 ? Yes #6 W hat is the meOtod for dewaten the SCM for maintenance? Pump (prafened) 13 Was IM SCM desi reed an NC licensed /essional? Yes #1 Permanent pool elevation (hmsp 439 It #8 Total surface area of the shallow water zone at ttmieorruy pool (,I, -e leer 7912 9f #1 Temporary pool elevation (fmsl) 440 ft #8 SW wetland surface area composed of shallow water zone, at temporary % 57.6% #1 Ponding depth (inches) 12 In De of me shallow water zone below rmanent riches 12. 2 Is the S W wetland designed for ale attenuation? Yea Elevation of bottom of me shallow water zone fmsl 439 ft #2O so, ak attenuation depth inches 16.2 n #9 Total surface area of me tem re inundation zone at tem I (square feet 21103 sf #3 Surface area of SW wetland at temporary (square feel) 13740 of= and surface area -sed of tem inundation zone at tem % 34.9% #4 Depth of soil amendment inches 8 in He of the temporary inundation zone above permument inches 121n #4 Descnbe how the soil is being amended W promote plantgrowth: #9 Elevation of bottom of the tem rot inundation zone imsl 439 ft opeol will be added b ensurer adequate nutrients while planar are bekg established. #10 Drawdown time for the temporary pool (hours) 10 Does Use onfice drawdown from below the top surface of this permanent 11 Does the pond minimize impacts In the receiving channel from his 1 -yr, 244r storm? 84.5 his Yes Yes #6 Are the inlet(s) and oullel located In a manner that avoids shod-rircuifirg? Yes 12 Has a landscape plan that meets SW Welland MDC (12) been provided? Yes . _ #6 Describe any measures, such as benne a bathes, mat will be taken to memve the flow path: 13 Number of plants per 200 square feel (#) in the shallow water mne: 50 The wretleM well designed In e user cheerer to increase the distance from the ktlM to ms outlet, The ft," and ou"are13 krcaled on opposis sides of ms bean and r for as possiN from each other n the space. 06 Surface area of the forebay M temporary pool (square feet) 2840 of 06 Overall SW wetland surface area comprised of forebay, at temporary pod (%) 20.6% Descnbe the plantingplan for the shallow water zone: —_ plans per 200 d, parMs (mtlsan as owned in C4 of NCDEO Sbmwaler Design Manfred #6 Depth of lorebay, below permanent pool (inches) _ 42 n #1d Does planting far the temporary enundatlon zone ce mply with SW Wetiared MDC (14)? Yea #6 Elevation of bottom of forebay (fmsl) 435.5 R _ #14 Describe the planting plan for the temporaryinundation zone: #6 Will the /orebay be cleaned ora when depth is reduced to 15 inches or less? 7 To1a1 surface area of the non-forebaytl pools M tempora pool (square feet) Yes 2989 d Diems Der 200 d, plates Imoewl ea outlksdn Gil ot NCDEO Saamtwaarr Design Mahal #7 SW wetland surface area comprised of non-forebay deep Is at tempora 11% 21.8% #15 Are the dam structure and temporary fill slopes planted in non -dumping turfgmss? Yee 07 Depth d non-foreba deep pools below permanent pool (inches) 42 n 16 Will cattails be planted in the wetland? No #7 Elevation of bosom of non tomboy deep pools (frost) 435.511 17 Is a trash rack or other device provided to protect me outlet system? Yes ADDITIONAL BIFORMATIDM Plea s, this s ce to provide an information about this slow le, wetland that u think is relevant to the review. Omer BUA impetvkxls b a 10%contingency In�Aded in our design Wetland 2 1.33 PM 2/13/2019 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Granite Mill Blvd. Wetland Chatham County, North Carolina February 8, 2019 Prepared for: BRIAR.S CHAPEL'S Newland COMMUMMS NNP Briar Chapel, LLC 1342 Briar Chapel Parkway Chapel Hill, North Carolina 27516 Prepared By: v MCIUM&CREED v 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 `\\aul+Illi+r�ai,,, Fax: (919) 233.8031 �.0``�Z ..••••..... ,. + M&C Project No. 02735-0214 148 �9'•Z ?~ fMQ11E�. H• � : //1111111111111\\ PROJECT DESCRIPITON The purpose of the project is to convert the existing Granite Mill bioretention cell into a stormwater wetland to improve its ability to sustainably function as a BMP. Based on monitoring the basin over time, and multiple attempts at corrective action, it appears that, at this time, it will be more effective to convert the previously installed bioretention to a stormwater wetland. Based on other developments in the relative vicinity, and changes over time to the proposed area layouts, stormwater that was originally intended to drain to the BMP are draining to alternative measures. Therefore, the originally approved drainage and impervious areas are somewhat reduced. Refer to drainage area map included with this package for clarification on those drainage areas. However, the proposed BMP is designed to treat runoff from the current drainage area. Based on the conditions of the approved 401 Water Quality Certification, NCDENR-DWR will require runoff from the roads to be captured and treated for 85% TSS removal before being discharged into existing stream buffers. To meet this requirement, the runoff from Granite Mill Blvd. and connected lots currently treated by the bioretention cell will be treated by a stormwater wetland designed per the latest version of NC DEQ's Minimum Design Criteria. Calculations for this new facility is included in this package. SITE DESCRIPTION The project area is east of the intersection of Andrews Store Rd. and Granite Mill Blvd. The existing bioretention cell serves as a stormwater BMP for approximately 6.97 acres of developed land. SOILS The following soil description is a copy from the original narrative for the construction of Granite Mill Boulevard, dated February 16, 2010: According to the Chatham County Generalized Soil Survey, the majority of uplands within the site are classified as Wedowee sandy loam, 2% to 6% slopes (WeB). Along the banks of the stream, soils are classified as Wedowee sandy loam, 6% to 10% slopes (WeC). On the far eastern portion of the site, the development encroaches into an area of Helena sandy loam, 2% to 6% slopes (HeB). The following soil descriptions are associated with the soils found on the site: We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink/swell potential. The seasonal high water is generally more than 6.0 feet below the surface. He(B) - Helena sandy loam soils are often found in piedmont uplands, along ridges, through drainageways and at the heads of drainageways. Permeability is slow and the soils are moderately well drained. Soils have a high shrink/swell potential. The seasonal high water is perched and generally 1.5 to 2.5 feet below the surface from January through April. WETLAND DESIGN The wetland for this project has been designed to remove 85% of the total suspended solids entering from the surrounding drainage areas before discharging into the adjacent stream buffers. The calculations provided with this package includes the area that is currently being treated by the bioretention area. Treated runoff will be dissipated by a riprap outlet protection device before entering any stream buffers. Design parameters were taken from the BMP manual, DEQ's design supplement forms, and the latest version of NC DEQ's Minimum Design Criteria for stormwater Control Measures. BMP SUMMARY OF RESULTS In order to meet the requirements of the development, the wetland has been designed based on the existing conditions plus a 10% contingency to account for any increase in impervious area in the drainage area. MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements included with this submittal. Any measure that fails to function as intended shall be repaired immediately. Granite Mill Wetland 1 -yr 10 -yr 100 -yr Pre -Development 5.51 19.22 37.42 Discharge cfs Post-Development Controlled 0.79 18.12 36.36 Discharge cfs Peak Water Surface 440.35' 441.06' 441.61 ' Elevation tt MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements included with this submittal. Any measure that fails to function as intended shall be repaired immediately. Maps u 6 t -'s 6—, " 00 SITE ZA jol- ' S 4 �� �' �C1� .,r �`Y'`_--r•--_� i.,�i, -.'4. ,,.� � ,` j �. `tip ,� �\ _�i�•-''f y� !f�(""" �....F r 1 '--� i � ! _ _� _ � � �� `"'`„ � I �,,lr ' t rte'•,.., - r 1✓ �I , , a r— �v S ..t Copyright (C) 1998, Maptech. Inc. '♦ - \ APPROVED GRANITE MILL SIORETENTION AREA (NCO WQ PROJECT Y05 -771v17) - ) i POP 835- 8o ® APPROVED BIDREFENPON DRAINAW AREA 5-j � eeAcox RwceeLw 4V► '♦ b / l - PROPOSED SrORMIrATER W nAND `f \ \ DRAINACE AREA s / I \- \ ' APPROVED PHASE 11 WET FOND DR—AGE \ s w Y� Y� im m m m ` Y� m � �� m m m�:iiii1im \ _ �, " AREA —V v ✓IV / /' �\ l CARDINAL RIDGE ROAD op _ -- r--- , - _ J _ ♦ I I 1—J I-- t _ —� WAIL—CE TRAR- --� )`--/,��, ♦ �,—' — — 40 4W f we anB `JII .►� �,� DRAINAGE AREA , 1 I 33.10 ACRES �b (NCDWQ PROJECT $05-732,19) / '•'� ,, i 5-'I ( » \ � J ) I , BMPY17 � 1 GRANITE MILL STORMWATER WETLAND , 1, 1 \ V \ NEW DRAINAGE AREA I V 1 6.97 ACRES `� 'A , , i \ , — 1 GRANITE MILL STORMWATER WETLAND _ - to� ---- - - - aN� -------- NORTH ��_�_ - _______ ______ - I \1 i A& BRIAR CHAPEL DATE: FEBRUARY 8, 2019 SCALE �`v>> 'IVl`�C7CIWL,D GRANITE MILL BLVD. STORMWATER WETLAND p� NO)., D2735 -Dass 4 HOM CHATHAM COUNTY, NORTH CAROLINA DESIGNED 855 AS NOTED 1730 Varsity Drive, Suite 500 � cMECKFD GU VERTICAL: ( Raleigh, North Carolina 27606 BRIAR C H A P E L PRO). MGR. CH, N/A Phone: 919)233-8091, Fax: (919)233-8031 STORMWATER WETLAND F-1222 by DRAINAGE AREA S,NrOSi PRELIMINARY DRAWING .mcximcreed.com NMand COro MUNInFs NOT FOR CONSTRUCTION a �� Granite Mill Stormwater Wetland Design STORMWATER WETLAND SIZING CALCULATIONS Project Name Briar Chapel - Granite Mill Wetland Project Number 02735-0214 Date February 6, 2019 3rd revision 2nd revision 1st revision Stormwater Wetland Drainage Area Data Project Briar Chapel - Granite Mill Wetland Project No. 02735-0214 Date February 6, 2019 Total site area 303,601 square feet = 6.97 acres Impervious areas Drainage area to Existing Proposed s s and Change s Other Drainage Existing s Area Proposed s On-site buildings 0 49,899 49,899 0 0 On-site streets/parking 0 87,399 87,399 0 0 On-site Sidewalk 0 0 0 0 0 On-site Equipment 0 0 0 0 0 Contingency 0 13,730 13,730 0 0 Total Impervious 0 151,028 151,028 0 0 Non -impervious areas Drainage area to and Other Drainage Area Existing s Proposed s Change Existing s s Proposed s On-site grass/landscape 0 152,573 152,573 0 0 On-site woods 303,601 0 -303,601 1 0 0 Total non -impervious 303,601 152,573 1 -151,028 1 0 10 Total Drainage Area 303,601 303,601 0 Percent Impervious 1 0.0 49.7 49.7 Notes: 2019.02.08.GMB Wetland Conversion.xls BMP Drainage Area Data Page 2 of 5 Printed 2/7/2019 2:39 PM Stormwater Wetland Runoff Volume Calculations Project Project No Date Drainage area Impervious area Rainfall depth Percent Impervious Briar Chapel - Granite Mill Wetland 02735-0214 February 6, 2019 303,601 square feet 151,028 square feet 1.00 inches 49.7 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.50 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 12.592.1 cubic feet Notes: 2019.02.08.GMB Wetland Conversion.xls Runoff Volume Calcs Page 3 of 5 Printed 2/7/2019 2:39 PM Project Project No. Date Stormwater Wetland Volume Calculations Stage -Storage Data for Wetland - Temporary Pool Briar Chapel - Granite Mill Wetland 02735-0214 February 6, 2019 Contour ID Stage Area s . ft. Area acres Incremental Area [sq. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre-ft 439 0 13,740.0 0.315 13,740.0 0.3 0.0 0.0 0.0 0.0 440 1 21,103.0 0.484 21,103.0 0.2 17,421.5 0.4 17,421.5 0.4 440.62 1.62 22 310.0 0.512 22,310.0 0.0 13,458.0 0.3 30,879.5 0.7 441 2 23,098.0 0.530 23,098.0 0.0 8,627.5 0.2 39,507.1 0.5 442 3 25 127.0 0.577 25,127.0 0.0 24,112.5 0.6 63,619.6 0.8 443 4 27,191.0 0.624 27191.0 0.0 26159.0 0.6 89,778.6 1.2 2019.02.08.GMB Wetland Conversion.xls Stage Storage (Temp Pool) Page 4 of 5 Printed 2/7/2019 2:39 PM Stormwater Wetland Dewatering Time Calculations Project Briar Chapel - Granite Mill Wetland Project No. 02735-0214 Date February 6, 2019 Water quality treatment volume Total treatment volume Maximum head of water above dewatering hole Driving head Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 12,592 cubic feet 17,421 cubic feet 1.00 feet 0.33 feet 0.60 2.25 inches 1 0.028 square feet 4.0 square inches 0.021 square feet 3.0 square inches 2.5 days 61.1 hours 3.5 days 84.5 hours Notes: Dewatering time formula: t (days) = V / (Cd*A*Sgrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) Granite Mill Stormwater Wetland Design 1S Pre -Development OSubcat Reach on Link1 J 2S Post- Devk lopment New Wetland Design 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD@ 10.00-15 s/n 03870 @2015 HydroCAD Software Solutions LLC Page 6 Summary for Pond 3P: New Wetland Design Inflow Area = 6.970 ac, 49.75% Impervious, Inflow Depth= 0.20" for 1 -Inch event Inflow = 1.82 cfs @ 12.04 hrs, Volume= 0.115 of Outflow = 0.05 cfs @ 19.91 hrs, Volume= 0.098 af, Atten= 97%, Lag= 472.2 min Primary = 0.05 cfs @ 19.91 hrs, Volume= 0.098 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 439.22'@ 19.91 hrs Surf.Area= 15,370 sf Storage= 3,223 cf Plug -Flow detention time= 878.2 min calculated for 0.097 of (85% of inflow) Center -of -Mass det. time= 808.4 min ( 1,701.7 - 893.3 ) Volume Invert Avail.Storage Storage Description #1 439.00' 89,794 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 439.00 13,740 0 0 440.00 21,103 17,422 17,422 441.00 23,098 22,101 39,522 442.00 25,127 24,113 63,635 443.00 27,191 26,159 89,794 Device Routing Invert Outlet Devices #1 Primary 434.83' 24.0" Round Culvert L= 60.6' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 434.83'/434.00' S=0.0137'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 439.00' 2.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 440.00' 12.0" W x 7.4" H Vert. Orifice/Grate C= 0.600 #4 Device 1 440.62' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.05 cfs @ 19.91 hrs HW=439.22' (Free Discharge) L =Culvert (Passes 0.05 cfs of 27.86 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 1.73 fps) 3--Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 0 2015 HydroCAD Software Solutions LLC Page 7 2 0 Pond 3P: New Wetland Design Hydrograph 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Inflow ■ Primary 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD® 10.00-15 s/n 03870 @2015 HydroCAD Software Solutions LLC Paae 8 Time span=5.00-60.00 hrs, dt=0.05 hrs, 1101 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Development Runoff Area=303,601 sf 0.00% Impervious Runoff Depth=0.69" Tc=15.0 min CN=70 Runoff=5.51 cfs 0.402 of Subcatchment 2S: Post -Development Runoff Area=303,601 sf 49.75% Impervious Runoff Depth=1.63" Tc=10.0 min CN=86 Runoff=17.15 cfs 0.946 of Pond 313: New Wetland Design Peak Elev=440.35' Storage=24,831 cf Inflow=17.15 cfs 0.946 of Outflow=0.79 cfs 0.802 of Total Runoff Area =13.939 ac Runoff Volume =1.348 of Average Runoff Depth =1.16" 75.13% Pervious =10.472 ac 24.87°/6 Impervious = 3.467 ac 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD@ 10.00-15 s/n 03870 @2015 HydroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 1S: Pre -Development Runoff = 5.51 cfs @ 12.09 hrs, Volume= 0.402 af, Depth= 0.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (sf) CN Description 303,601 70 Woods, Good, HSG C 303,601 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment IIS: Pre -Development Hydrograph 61 I I ■Runoff Type II 24 -hr 5 1 -Yr Rainfall -2.96" Runoff Area=303,601 sf 4 Runoff Volume=0.402 of Runoff Depth=0.69" LL 3 Tc=15.0 min CN=70 2 6 8 10 12 14 16 18 20 22 '214'"'216'"'218'"'310'"'312'"'314'"'316 318'"4'10 42 44-'4'16-'4''8-'5'10'''5-2 54 56 58 60 Time (hours) 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 2S: Post -Development Runoff = 17.15 cfs @ 12.02 hrs, Volume= 0.946 af, Depth= 1.63" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (sf) CN Description 152,573 74 >75% Grass cover, Good, HSG C 151,028 98 Paved parking, HSG C 303,601 86 Weighted Average 152,573 50.25% Pervious Area 151,028 49.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 19 18 17 16 15 14 13 12 � 11 10 3 9 0 LL 7 5- Subcatchment 2S: Post -Development Hydrograph Type II 24 -hr 1 -Yr Rainfall=2.96" Runoff Area=303,601 sf Runoff Volume=0.946 of Runoff Depth=1.63" Tc=10.0 min CN=86 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 2019.02.08.GMB Wetland Routing Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD®10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 11 Summary for Pond 3P: New Wetland Design Inflow Area = 6.970 ac, 49.75% Impervious, Inflow Depth= 1.63" for 1 -Yr event Inflow = 17.15 cfs @ 12.02 hrs, Volume= 0.946 of Outflow = 0.79 cfs @ 13.64 hrs, Volume= 0.802 af, Atten= 95%, Lag= 97.5 min Primary = 0.79 cfs @ 13.64 hrs, Volume= 0.802 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 440.35'@ 13.64 hrs Surf.Area= 21,792 sf Storage= 24,831 cf Plug -Flow detention time= 789.9 min calculated for 0.801 of (85% of inflow) Center -of -Mass det. time= 721.8 min ( 1,548.4 - 826.6) Volume Invert Avail.Storage Storage Description #1 439.00' 89,794 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 439.00 13,740 0 0 440.00 21,103 17,422 17,422 441.00 23,098 22,101 39,522 442.00 25,127 24,113 63,635 443.00 27,191 26,159 89,794 Device Routing Invert Outlet Devices #1 Primary 434.83' 24.0" Round Culvert L= 60.6' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 434.83'/ 434.00' S=0.0137'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 439.00' 2.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 440.00' 12.0" W x 7.4" H Vert. Orifice/Grate C= 0.600 #4 Device 1 440.62' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.79 cfs @ 13.64 hrs HW=440.35' (Free Discharge) L=Culvert (Passes 0.79 cfs of 32.14 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 5.39 fps) 3=Orifice/Grate (Orifice Controls 0.65 cfs @ 1.89 fps) =Orifice/Grate ( Controls 0.00 cfs) 2019.02.08.GMB Wetland Routing Type 1124 -hr 1-YrRainfall=2.96" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 12 1 1 1 1 1 1 1 1 H 1 1 3 O LL Pond 3P: New Wetland Design Hydrograph 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Inflow ■ Primary 2019.02.08.GMB Wetland Routing Type Il 24 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD® 10.00-15 s/n 03870 02015 HydroCAD Software Solutions LLC Page 13 Time span=5.00-60.00 hrs, dt=0.05 hrs, 1101 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Development Runoff Area=303,601 sf 0.00% Impervious Runoff Depth=2.17" Tc=15.0 min CN=70 Runoff=19.22 cfs 1.261 of Subcatchment 2S: Post -Development Runoff Area=303,601 sf 49.75% Impervious Runoff Depth=3.64" Tc=10.0 min CN=86 Runoff=37.30 cfs 2.111 of Pond 3P: New Wetland Design Peak Elev=441.06' Storage=40,957 cf Inflow=37.30 cfs 2.111 of Outflow=18.12 cfs 1.957 of Total Runoff Area = 13.939 ac Runoff Volume = 3.372 of Average Runoff Depth = 2.90" 75.13% Pervious =10.472 ac 24.87% Impervious = 3.467 ac 2019.02.08.GMB Wetland Routing Type Il 24 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 1S: Pre -Development Runoff = 19.22 cfs @ 12.08 hrs, Volume= 1.261 af, Depth= 2.17" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.18" Area (sf) CN Description 303,601 70 Woods, Good, HSG C 303,601 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre -Development Hydrograph 21- 20- 19 zz crs 19 Type II 24 -hr 18 17- 10 -Yr Rainfall=5.18" 15 Runoff Area=303,601 sf 13 Runoff Volume=1.261 of Runoff Depth=2.17" ° '° LL y. Tc=15.0 min CN=70 1 0 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 2019.02.08.GMB Wetland Routing Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 2S: Post -Development Runoff = 37.30 cfs @ 12.01 hrs, Volume= 2.111 af, Depth= 3.64" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.18" Area (sf) CN Descriotion 152,573 74 >75% Grass cover, Good, HSG C 151,028 98 Paved parking, HSG C 303,601 86 Weighted Average 152,573 50.25% Pervious Area 151,028 49.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post -Development Hydrograph 40 38 37.30 cts 36- Type II 24 -hr 32 10 -Yr Rainfall=5.18" 30Runoff Area=303,601 sf 28- 26- Runoff Volume=2.111 of 24 22 --Runoff Depth=3.64" 20 U. 18 Tc=10.0 min IL 16 CN=86 14 12 10 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 2019.02.08.GMB Wetiand Routing Type Il 24 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD® 10.00-15 s/n 03870 @2015 HydroCAD Software Solutions LLC Page 16 Summary for Pond 3P: New Wetland Design Inflow Area = 6.970 ac, 49.75% Impervious, Inflow Depth= 3.64" for 10 -Yr event Inflow = 37.30 cfs @ 12.01 hrs, Volume= 2.111 of Outflow = 18.12 cfs @ 12.15 hrs, Volume= 1.957 af, Atten= 51 %, Lag= 8.2 min Primary = 18.12 cfs @ 12.15 hrs, Volume= 1.957 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 441.06'@ 12.15 hrs Surf.Area= 23,224 sf Storage= 40,957 cf Plug -Flow detention time= 384.9 min calculated for 1.956 of (93% of inflow) Center -of -Mass det. time= 347.0 min ( 1,150.7 - 803.7) Volume Invert Avail.Storage Storage Description #1 439.00' 89,794 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 439.00 13,740 0 0 440.00 21,103 17,422 17,422 441.00 23,098 22,101 39,522 442.00 25,127 24,113 63,635 443.00 27,191 26,159 89,794 Device Routing Invert Outlet Devices #1 Primary 434.83' 24.0" Round Culvert L= 60.6' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 434.83'/ 434.00' S=0.0137'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 439.00' 2.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 440.00' 12.0" W x 7.4" H Vert. Orifice/Grate C= 0.600 #4 Device 1 440.62' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=18.02 cfs @ 12.15 hrs HW=441.06' (Free Discharge) t- =Culvert (Passes 18.02 cfs of 34.59 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.18 cfs @ 6.76 fps) 3=Orifice/Grate (Orifice Controls 2.56 cfs @ 4.15 fps) =Orifice/Grate (Weir Controls 15.29 cfs @ 2.17 fps) 2019.02.08.GMB Wetland Routing Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 17 Pond 3P: New Wetland Design Hydrograph 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) FE -1 n —fI o -w ■ Primary 2O19.O2.08.GMB Wetland Routing Type Il 24 -hr 100 -Yr Rainfall=7.67" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD® 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 18 Time span=5.00-60.00 hrs, dt=0.05 hrs, 1101 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Development Runoff Area=303,601 sf 0.00% Impervious Runoff Depth=4.18" Tc=15.0 min CN=70 Runoff=37.42 cfs 2.429 of Subcatchment 2S: Post -Development Runoff Area=303,601 sf 49.75% Impervious Runoff Depth>6.00" Tc=10.0 min CN=86 Runoff=60.04 cfs 3.486 of Pond 3P: New Wetland Design Peak Elev=441.61' Storage=53,905 cf Inflow=60.04 cfs 3.486 of Oufflow=36.36 cfs 3.326 of Total Runoff Area =13.939 ac Runoff Volume = 5.915 of Average Runoff Depth = 5.09" 75.13% Pervious =10.472 ac 24.870/6 Impervious = 3.467 ac 2019.02.08.GMB Wetland Routing Type Il 24 -hr 100 -Yr Rainfall=7.67" Prepared by McKim & Creed Printed 2/7/2019 HydroCAD®10.00-15 s/n 03870 @2015 HydroCAD Software Solutions LLC Page 21 Summary for Pond 3P: New Wetland Design [82] Warning: Early inflow requires earlier time span Inflow Area = 6.970 ac, 49.75% Impervious, Inflow Depth > 6.00" for 100 -Yr event Inflow = 60.04 cfs @ 12.01 hrs, Volume= 3.486 of Outflow = 36.36 cfs @ 12.11 hrs, Volume= 3.326 af, Atten= 39%, Lag= 6.2 min Primary = 36.36 cfs @ 12.11 hrs, Volume= 3.326 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 441.61'@ 12.11 hrs Surf.Area= 24,329 sf Storage= 53,905 cf Plug -Flow detention time= 254.9 min calculated for 3.326 of (95% of inflow) Center -of -Mass det. time= 227.8 min ( 1,018.3 - 790.5 ) Volume Invert Avail.Storage Storage Description #1 439.00' 89,794 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 439.00 13,740 0 0 440.00 21,103 17,422 17,422 441.00 23,098 22,101 39,522 442.00 25,127 24,113 63,635 443.00 27,191 26,159 89,794 Device Routing Invert Outlet Devices #1 Primary 434.83' 24.0" Round Culvert L= 60.6' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 434.83'/434.00' S=0.0137'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 439.00' 2.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 440.00' 12.0" W x 7.4" H Vert. Orifice/Grate C= 0.600 #4 Device 1 440.62' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=36.32 cfs @ 12.11 hrs HW=441.60' (Free Discharge) -=Culvert (Inlet Controls 36.32 cfs @ 11.56 fps) 2=Orifice/Grate (Passes < 0.20 cfs potential flow) 3=Orifice/Grate (Passes < 3.36 cfs potential flow) =Orifice/Grate (Passes < 50.43 cfs potential flow) 2019.02.08.GMB Wetland Routing Type Il 24 -hr 100 -Yr Rainfall=7.67' Prepared by McKim & Creed Printed 2/7/2019 HydroCADO 10.00-15 s/n 03870 © 2015 HydroCAD Software Solutions LLC Page 22 q v 3 0 LL Pond 3P: New Wetland Design Hydrograph 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Inflow ■ Primary • ' " • • DATE: 2/06/2019 DESIGNED BY: ENS PROJECT NAME: Briar Chapel - Granite Mill Wetland PROJECT NO: CHECKED BY PROJECT LOCATION: Chatham County, NC 12735-0214 GCA Storm Outlet Structure Structure= GMB Wet Out Quo/Qfull = 0.69 Size= 24 in V/Vfull = 1.07 Qio = 18.12 cfs V = 9.0 fps Qfull = 26.43 cfs Vfull = 8.41 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 6.0 ft Storm Outlet Structure Structure= GMB Wet In Q10/Qfull = 0.83 Size= 36 in V/Vfull = 1.12 Q 1 o = 37.30 cfs V = 7.1 fps Qfull = 45.16 cfs Vfull = 6.39 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B _ Apron Thickness = 22 in J Apron Length = 18.0 ft Length Apron Width = 3 x Dia = 9.0 ft