Loading...
HomeMy WebLinkAbout20190159 Ver 1_Field Meeting Notes_20190227Meeting Notes Date: February 27, 2019 Type of Site: NCDMS Stream Site & Buffer Prepared By: Mac Haupt Sponsor/Provider: Resource Environmental Solutions Meeting Type: Field Site Review NCDMS ID Number: Project Name: Strawberry Hill County: Johnston USACE Action ID Number: HUC and Basin: Neuse - 03020201 NCDWR Project Number: 20190159 Coordinates: `N W Attendees: RES- Brad, David, Fraser, Matt?, Bert WRC- Travis COE- Todd DMS- Jeff, Lindsay Notes, Sketch, etc.: Started at JH5- proposed as E2 on a ditch with flowing water. Likely did have stream characteristics however, IRT folks did not like just planting for stream credit, that is more of a buffer site, which it could be (there is alot of rip buffer credit proposed for this project). Also, they mentioned the 1,000 foot bank add on, proposing stream restoration. Two issues here, 1) site is too small, 2) whether you do priority 1 or 2 type work. Group definitely preferred P1 work, however, this section is still too small. Also, P1 would cause hydrologic trespass issues RES would have to work out. Bottom line, recommended approach is buffer only. Then went to JH1-A- another proposed E2 reach although drainage is larger. As proposed would recommend the rip buffer approach, however, if they get another landowner, its possible to consider restoration approach. Still have to bring it down to culvert at road. JH1-B- proposed as R. Probably a combo P1/2. I amok with this approarch, Travis expressed some trepidation with amount of functional uplift (some of the stream was not incised and did not show evidence of getting out of bank). I believe moving the stream over and giving it more floodplain access and likely restoring some wetland sin the process is worthwhile. Action Items: Page 1 Notes, Sketch, etc.: Page 2