Loading...
HomeMy WebLinkAbout20190250 Ver 1_401 Application_20190208Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW- Begin Date (Date Received): Prepare file folder ❑ Assign Action ID Number in ORM ❑ 1. Project Name [PCN Form A2a]: Line 363 M&R Station 2. Work Type: ❑Private ❑ Institutional ❑ Government ❑✓ Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: Piedmont Natural Gas proposes to install a new 16" steel natural gas distribution line inside of a 30' wide private easement located north and west of the intersection of Rushmore Dr. and Ballantyne Commons Pkwy in Charlotte, NC. This line will be fed from an existing regulator station and will tie into an existing 12" distribution system located along Ballantyne Commons Pkwy. The purpose of the project will be to provide additional and more reliable service to existing and future customers in the greater Charlotte Area and is located at Lat Long (35.057186, -80.862044), requiring approx. 4.943 ac. of earth disturbance, including approx. 1.313 ac. of wetlands. 4. Property Owner / Applicant [PCN Form A3 or A4]: Applicant: Megan Plassman, Piedmont Natural Gas 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Jacqueline M. McCort, Maser Consulting P.A. 6. Related Action ID Number(s) [PCN Form B5b]: N/A 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: Latitude: 35.057186, Longitude: -80.862044; Rushmore Drive 8. Project Location— Tax Parcel ID [PCN Form Bla]: 22364369, 22315101, 22315102, 22315111 9. Project Location — County [PCN Form A2b]: Mecklenburg 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Charlotte 11. Project Information — Nearest Waterbody [PCN Form 132a]: McAlpine Creek 12. Watershed / 8 -Digit Hydrologic Unit Code [PCN Form 132c]: Catawba Authorization: Section 10 ❑ Section 404 ❑✓ Regulatory Action Type: ❑ Standard Permit ✓ Nationwide Permit # Regional General Permit # Jurisdictional Determination Request Section 10 and 404 ❑ ❑ Pre -Application Request ❑ Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 r MASER C 8Y 11 LtiAC F. A. Engineers Planners Surveyors Landscape Architects Environmental Scientists February 8, 2019 VIA EMAIL David Shaeffer U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Re: Pre -Construction Notification — NWP No. 12 Rushmore Drive Proposed 16" Steel Distribution Rushmore Drive City of Charlotte, Mecklenburg County, North Carolina MC Project No. 17004827A Dear Mr. Shaeffer: 5275 Parkway Plaza Boulevard, Suite 100 Charlotte, NC 28217 T: 980.245.3161 F: 704.973.7962 www.maserconsulting.com Piedmont Natural Gas (PNG) is installing approximately 2,700 linear feet of a new 16 -inch steel distribution gas line feeding from an existing 12" distribution regulator. The purpose of the project will be to provide additional and more reliable service to meet the demand of its existing customers in the greater Charlotte area. The Project is located at Lat Long (35.057186, -80.862044) and will require approximately 4.943 acres of earth disturbance, including 1.313 acres of wetlands. Based upon regulations set forth in Section 404/401 of the Clean Waters Act, the proposed project will result in temporary and permanent impacts to waters of the U.S.; therefore, PNG is submitting the following information to satisfy the requirements of a Pre -Construction Notification (PCN) in accordance with Nationwide Permit (NWP) No. 12 and the corresponding North Carolina Water Quality Certification (WQC) No. 3884. Based on project design and impacts, written approval from the North Carolina Department of Environmental Quality (NCDEQ) is NOT required and the 401 Certification is automatically approved in conjunction with the approved 404 Permit. Enclosed by copy of this correspondence and completed PCN, we are requesting your written concurrence with this NWP 12 and WQC 1884 Permit Application. PNG is seeking to start construction promptly. Customer Loyalty through Client Satisfaction ■ MASER s I r: I l t I N i R L David Shaeffer MC Project No. 17004827A February 8, 2019 Page 2 of 2 Should you have any questions in regard to the enclosed, or require additional information, please contact me by telephone at (980) 245-3161 or via email at jmccort&maserconsulting com. Very truly yours, MASER CONSULTING P.A. (Ja ueli M. McCort ssociate, Ecological Services JMM/TD Enclosures - USACE/NCDWQ Application w/Appendices R:\A11Offices\Charlotte\Projects\2017\17004827A\Reports\Ecological\PCN\190208_Submission Materials\001_190208_jmm_USACE cover letter.docx a pp W R rE�< o Niii� -r Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑X Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Rushmore Drive Proposed 16" Steel Distribution 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Multiple owners of record- See attached sheets 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Sponsor 4b. Name: Megan Plassman 4c. Business name (if applicable): Piedmont Natural Gas 4d. Street address: 4301 Yancey Road 4e. City, state, zip: Charlotte, NC 28217 4f. Telephone no.: 704-587-3455 4g. Fax no.: 704-587-3189 4h. Email address: megan.plassman@duke-energy.com 5. Agent/Consultant Information (if applicable) 5a. Name: Jacqueline M. McCort 5b. Business name (if applicable): Maser Consulting P.A. 5c. Street address: 5275 Parkway Plaza Boulevard, Suite 100 5d. City, state, zip: Charlotte, NC 28217 5e. Telephone no.: 980-245-3161 5f. Fax no.: 704-973-7962 5g. Email address: jmccort@maserconsulting.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): see attached list of owners of record 1 b. Site coordinates (in decimal degrees): Latitude: 35.057186 Longitude: 80.862044 1 c. Property size: 4.943 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: McAlpine Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site currently consists of bottom hardwood palustrine forested wetland (PFO) and palustrine emergent wetland (PEM). The site is located within a heavily developed commercial and residential area with steep slopes leading from the wetland to the development. Also located within the site is a sanitary sewer easement. Please see the attached document for additional supporting information. 3b. List the total estimated acreage of all existing wetlands on the property: 1.663 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: To provide additional, safe, reliable, and efficient energy to Piedmont's existing and future natural gas customers throughout the greater Charlotte Area 3e. Describe the overall project in detail, including the type of equipment to be used: Please see the attached document for additional supporting information. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑ Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Land Clearing Bottomland Hardwood Forest Yes Corps 0.395 W2 T Land Clearing Bottomland Hardwood Forest Yes Corps 0.918 W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 1.313 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one S2 - Choose one S3 - Choose one - S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 3i. Comments: A stream flows through the wetland, but is located outside of the project limits. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Please see the attached document for additional supporting information. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Please see the attached document for additional supporting information. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑X Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 0.395 acres 4f. Non -riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The total area of earth disturbance is 4.943 acres. There is no proposed increase in impervious surface. In consultation with the City of Charlotte, a Stormwater Management Plan is only required when the net increase from pervious to impervious is greater than 1 acre. However, a site-specific Erosion and Sediment Control Plan has been developed and submitted to NCDEQ-DMLR for approval of General Permit No. NCG010000. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? N/A ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes X❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑X Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS iPac was reviewed. See agency consultation responses. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The project site is not located near the Atlantic Ocean, and therefore, does not contain Essential Fish Habitat as identified by the National Marine Fisheries Service. This was verified through the NOAA EFH Mapper (www.habitat.noaa.gov/protection/efh/efhmapper.index.html) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NCHPO was contacted; See agency consultation response. A Phase I Archaeological Identification Survey was prepared by Commonwealth Heritage /Group, Inc. and submitted to NCHPO on 11/27/18, which documented that no archaeological sites were present. NCHPO response pending. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The project involves the placement of an underground natural gas distribution pipeline. No above -ground structures or buildings are proposed. The pre-existing ground elevations will be maintained post -construction. 8c. What source(s) did you use to make the floodplain determination? North Carolina Flood Risk Information System (FRIS), http://fris.nc.gov/fris/Home.aspx?ST=NC and Charlotte -Mecklenburg Stormwater Services 3d Floodzone Mapping - http://meckmap.mecklenburgcountync.gov/3dfz/ Megan Plassman ?� 12/31/2018 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 10 of 10 A. Applicant Information Following is a list of owners of record within the limits of disturbance for the Rushmore Drive Proposed 16" Steel Distribution project. For construction within Parcels #002, #003, #004, and #006, the respective owners have authorized USACE access to the property while the final recorded permanent and temporary construction easements are pending. In addition, construction is proposed within Tax Parcels 22315105 and 22311113 (Deed Book 4369, Page 740), owned by Mecklenburg County, at the northern end of the project. Within these tax parcels, Piedmont Natural Gas has an existing easement, located in Deed Book 9007, Page 296. Since all activities will be limited to an existing easement through these two tax parcels, additional authorization by Mecklenburg County is not required. 3. Owner Information: Tract No. Name on Recorded Deed Deed Book and Page No. Responsible Party (if app Street Address City, State, Zip Telephone No. Fax No. Email Address Tract No. Name on Recorded Deed Deed Book and Page No. Responsible Party (if app Street Address City, State, Zip Telephone No. Fax No. Email Address Tract No. Name on Recorded Deed Deed Book and Page No. Responsible Party (if app.) Street Address City, State, Zip Telephone No. Fax No. Email Address Parcel #002 22364349 Ballantyne Meadows Homeowner Association, Inc. Deed Book 13666, Page 831 Heather Skinner c/o Hawthorne Management Company, P.O. Box 11906 Charlotte, NC 28220 Parcel #003 22315101 NW Rushmore Two, LP Deed Book 31605, Page 979 Michael Beste 11605 N. Community House Road Charlotte, NC 28277 Parcel #004 22315102 Ballantyne Corporate Park Owners Association, Inc. Deed Book 30338, Page 485 Julie R. Hobbs 11510 N. Community House Road, Suite 150 Charlotte, NC 28277 Tract No. Name on Recorded Deed Deed Book and Page No. Responsible Party (if app Street Address City, State, Zip Telephone No. Fax No. Email Address Parcel #006 22315111 NW Rushmore One, LP Deed Book 31605, Page 971 Elizabeth Grove 11605 N. Community House Road Charlotte, NC 28277 AUTHORIZATION TO ACCESS PROPERTY Parcel # D02 PROPERTY LEGAL DESCRIPTION, 6,254 acres of vacant land off of Ballantyne Commons Parkway V16 PARCEL ID: 223-384-49 STREET ADDRESS: Vacant land PROPERTY OWNER, Beflantyne Meadows Homeowners Association, Inc. c/o. Hawtharne Management Company P. 0. Box 11906 Charlotte, NC 28220 S , the owner or legal representative of the registered property owner(s) of the above noted property, do hereby authorize representatives of Piedmont Natural Gas, the U.S. Army Corps of Engineers and the N.C, Division of Water Resources to access the property for the purposes of reviewing the area within the proposed gasline easement for the presence of jurisdictional waters of the U.S. It is understood that if necessary, Piedmont will work to acquire necessary permits from the U,S. Army Corps of Engineers and N.C. Division of Water Resources that may be necessary to construct and maintain the pipeline on the property referenced above. SIGNED DATE AUTHORIZATION TO ACCESS PROPERTY Parcel # 003 PROPERTY LEGAL DESCRIPTION: Map Book 58, Page 339 PARCEL ID: 223-151-01 STREET ADDRES& 1101 Rushmore Drive, Charlotte, NC 28277 PROPERTY OWNER: NW Rushmore Two, LP M iG 68 f DB5 +e „ _ , the owner or legal representative of the registered property owner(s) of the above noted property, do hereby authorize representatives of Piedmont Natural Gas, the U.S. Army Corps of Engineers and the N.G. Division of Water Resources to access the property for the purposes of reviewing the area within the proposed gasline easement for the presence of jurisdictional waters of the U.S. It is understood that if necessary, Piedmont will work to acquire necessary permits from the U.S. Army Corps of Engineers and N.C. Division of Water Resources that may be necessary to construct and maintain the pipeline on the property referenced above. / I iol � y !9 r8 SIGNED DATE AUTHORIZATION TO ACCESS PROPERTY Parcel # 004 PROPERTY LEGAL DESCRIPTION: Map Book 58, Page 156 PARCEL ID: 223-151-02 STREET ADDRESS: 5.41 acres of vacant land PROPERTY OWNER: Ballantyne Corporate Park Owners Association, Inc. 17.51.0 N. Community House Road, Suite 150 Charlotte, NC 28277 I J 14 b5 the owner or iegal_ representative of the registered property owner(s) of the above noted property, do hereby authorize represen atives of Piedmont Natural Gas, the U.S. Army Corps of Engineers and the N.C. Division of Water Resources to access the property for the purposes of reviewing the area within the proposed gasline easement for the presence of jurisdictional waters of the U.S. It is understood that if necessary, Piedmont will work to acquire necessary permits from the U.S. Army Corps of Engineers and N.C. Division of Water Resources that may be necessary to construct and maintain the pipeline on the property referenced above. SIGNED DATE AUTHORIZATION TO ACCESS PROPERTY Parcel # 006 PROPERTY LEGAL DESCRIPTION: 13.773 -acre parcel PARCEL ID: 223-151-11 STREET ADDRESS: 10840 Ballantyne Commons Parkway, Charlotte, NC 28277 PROPERTY OWNER: NW Rushmore One, LP 11605 Community House Road Charlotte, NC 28277 �lita►�hC�r��e , the owner or legal representative of the registered property owner(s) of the above noted property, do hereby authorize representatives of Piedmont Natural Gas, the U.S. Army Corps of Engineers and the N.C. Division of Water Resources to access the property for the purposes of reviewing the area within the proposed gasline easement for the presence of jurisdictional waters of the U.S. It is understood that if necessary, Piedmont will work to acquire necessary permits from the U.S. Army Corps of Engineers and N.C. Division of Water Resources that may be necessary to construct and maintain the pipeline on the property referenced above. -7119 1 IX SIGNED DATE The following Sections correspond to the Sections outlined on the USACE/DWQ PCN Application Form. A. Applicant Information This PCN is being provided to the US Army Corps of Engineers (USACE) for approval and compliance with applicable conditions of a NWP No. 12 as they pertain to §404/10 and §401 of the Clean Waters Act. Written concurrence from the North Carolina Division of Water Quality (NCDWQ), is not required since no perennial or intermittent streams have been identified within the project boundary. The Project Sponsor (Applicant) Piedmont Natural Gas Megan Plassman 4301 Yancey Road Charlotte, NC 28217 Agent/Consultant for Applicant Maser Consulting P.A. Jacqueline M. McCort 5275 Parkway Plaza Blvd Suite 100 Charlotte, NC 28217 B. Project Information and Prior Project History 3. Proiect Description 3e - Piedmont Natural Gas is installing approximately 2,700 linear feet of a new 16 -inch steel distribution gas line feeding from an existing 12" distribution regulator. The purpose of the project will be to provide additional and more reliable service to meet the demand of its existing customers in the greater Charlotte area. The Project is located at Lat Long (35.057186, -80.862044) and the project will require approximately 4.943 acres of earth disturbance, including 1.313 acres of wetlands. The Project will meet the requirements for approval under a Nationwide Permit No. 12. The current design includes mechanized clearing in a forested wetland and wetland impacts greater than 0.1 acres; therefore, a Pre -Construction Notification (PCN) is required. A Project Location Map and other site drawings are included in Appendix A. Construction of a gas pipeline consists of distinct phases: clearing, grading, lowering in, backfilling, and restoration. A figure depicting typical pipeline construction is shown below. Typical Pipeline Construction Sequence I� Surveying and Staking Many months ahead of cunsrruction, field Surveys are conducted along rhe propoud pipeline rouse, or right-of-way, to better undersrand environmental, development and Focal issues.A final route is then salecled. The specific location of the selecled rouse is Then marked with stakes. 7a) Trenching These pipes are already coated to prevent corrosion -The integrity of the weld is inspected, and the weld joint i5 coared Note: These iii ar a6am are cvrxewual and general fn natum: specific constructron and restoration fechrnrques cnufdvasy denendrng a cirnrr-sw-ces. 2) front -End Clearing pare YOWher [oWiliom permit, crews begin W prepare for tonslitdon by grading the right-of-way and temporary work space to remove trees and prepare the working space. 3] Right -of -Way Grading In cultivated areas, the topseR aropg the right•ol•way is stripped by bulldozer and stared in piles for careful replacement later. 8) Final Coating and Inspection In agricullur- af areas, carelul alten- lion is paid to properly sepaiat ng and storing the topsoil and subsoil so they do not mhc The pipe coating is inWted one more time 4) Sidriging Pipe Crews then ie -stake the center of the trench, lay out or "siring' sections of Che pipe along the right -of -way - 9) Lowering Pipe Into Trench The pipe is lowered into the trench where it is surveyed and Laid within prepared trench bottom. Sj Bending Plpe Crews bend and weld the pipe into one long piece. 10) Pad, 6adrffll, Rough Grade The french is then backfilled wah subsoil land Sepa- rated topsoil Set aside in many areas) - fi} Lineup, Initial Weld the pipeline will follow the contours of the land. 11 j Testing Final Tie- n Wore operation, soarer is used to test the pressure 121 Final Clean -UR Full of the line and enure the Re5tOratiOn Final grading structural integri,of the is performed and topsoil pipe and welds. spread over work area using a bulldozer. In general, approximately 60 -foot lengths of 16 -inch pipe will be trucked to the site, strung along the easement, and placed on skids (wooden pedestals). Specialized machines will be used to bend individual segments of the pipe to fit the contours of the trench where necessary. The pipe segments will be welded together, x-rayed, inspected for structural integrity, and then lowered into the trench. Permanent trench breaks will be installed where necessary and then backfilled with excavated subsoil and topsoil. In certain areas, such as residential areas and wetlands, efforts will be made to segregate topsoil from the subsoil and backfilled as such. Following final backfill, affected areas will then be cleaned up by rough grading and temporary seeding (if necessary), followed by final grading, permanent seeding and mulching to restore the easement as close as possible to pre -disturbance contours and conditions. Prior to construction activities, all easement boundaries (e.g., workspace limits) will be clearly delineated and flagged so that no clearing/grubbing occurs beyond these boundaries. Wetland and stream boundaries will be clearly marked prior to any clearing activities. Vegetation within wetlands require mechanized clearing, and generally no grubbing or below ground vegetation removal will occur, with the exception of the area directly over the trench line. Pipeline construction activities, such as welding, x-raying, and coating will take place in the upland area. Vegetation within the working side of the ROW will require grinding of stumps to ground surface, leaving the existing root system in place. At times, a tree stump or two directly under a temporary bridge/matting may be removed to facilitate safe passage of equipment and stability of mats. Appropriate erosion and sediment control devices will be installed immediately after clearing and prior to initial soil disturbance. The temporary mats and bridges shall remain in place until final grading and permanent seeding is completed. 4. Jurisdictional Areas Investigations were conducted within and adjacent to the project site to identify land use, plant community types, and presence of regulated wetland and water resources. Locations of wetland features were captured utilizing a hand-held Trimble GPS unit with sub -meter accuracy. Jurisdictional features are depicted on the Jurisdictional Waters of the U.S. Impact Plan drawings available in Appendix A. Plant community types were investigated for wetlands and waterbodies. Wetlands and waters were identified as emergent, scrub/shrub, or forested wetlands, perennial streams, intermittent streams, or ephemeral channels (stormwater ditches, seeps). Perennial streams and intermittent streams are typically considered waters of the U.S. Streams are considered perennial if they contain base flow throughout the year which is supported with groundwater. Intermittent streams are those which contain base flow at least a portion of the year which is supported with groundwater. Ephemeral channels, stormwater ditches and seeps are sometimes considered waters of the U.S. In ephemeral channels and stormwater channels, the primary sources of hydrology are snow and rain precipitation. Stormwater channels are manmade features specifically constructed for the conveyance of surface water from upslope areas. Seeps may discharge groundwater or surface water. These channels can be considered waters of the U.S. if they exhibit an Ordinary High Water Mark (OHWM), are tributary to jurisdictional waters, or if they are built in waters of the U.S. or wetlands. The OHWM is that line on the shore established by the fluctuations of water and typically characterized by a clear, natural line impressed on the bank, shelving, changes in the character of soil, destruction of terrestrial vegetation, or the presence of litter and debris (USC Title 33). Stormwater channels are also considered waters of the U.S. in the absence of an OHWM, if the channel connects two wetlands or waters of the U.S. or are tributary to jurisdictional waters. Waters of the U.S. are ultimately determined based on the outcome of a USACE jurisdictional determination. Maser Consulting conducted wetland and waterbody field delineations in February 2018. Investigations were conducted to identify and delineate the extent and location of jurisdictional waters and wetlands within the Project study area. The field investigation identified two regulated waters of the U.S., a palustrine forested wetland and a predominantly emergent wetland. A stream was observed in the vicinity, but outside of the project limits. A complete wetland delineation report is included as Appendix B. C. Proposed Impacts Inventory The Project involves permanent impacts that will occur as a result of trench excavation, temporary side casting of materials, placement of timber mats for equipment crossings, and fill for safe operation and maintenance at the M&R Station. Every effort during the planning stage of the Project was made to minimize the impacts to forested wetlands by installing the proposed pipeline as far out of the wetland as possible. However, due to construction constraints and an existing sanitary sewer easement and infrastructure, the removal of trees and stumps within the trench line and a portion of the station location in forested wetlands (PFO) will be required, thus resulting in permanent impacts. Typically, such disturbed areas associated with the pipeline installation return as emergent wetlands (PEM) following construction. Although the project will result in the conversion of these forested wetlands to herbaceous wetlands, it will not result in a loss to waters of the U.S. As previously stated, temporarily impacted wetlands, along the temporary work space used during construction, will be allowed to re -vegetate naturally to their pre -disturbance condition. In all aspects, the disturbed areas will be restored to their original grade and contour following construction. Geographical location of each wetland and stream crossing along the proposed route and proposed erosion sediment control Best Management Practices (BMP) at each crossing are included on the Erosion and Sediment Control (ES&C) Plans as Appendix C. Wetland Impacts Project -wide total wetland impacts will be 1.313 acres and will encompass 0.918 acres of temporary impacts and 0.395 acres of permanent impacts. Permanent impacts will be due to conversion. Impacts associated with the 30 -ft wide private easement will result in the conversion of PFO to PEM of 0.395 acres. Within the temporary easements and additional temporary workspace (ATWS) areas, existing trees will be cut flush to the ground and grubbing will not be required, leaving the root mass intact. Following construction, the temporary work easements and areas will be restored, seeded, and allowed to return to pre - disturbance vegetative condition and will not result in a conversion, as future mowing or maintenance will not occur following construction. A Jurisdictional Waters of the U.S. Impact Plan is provided in Appendix A. D. Impact Justification and Mitigation Avoidance and Minimization To avoid and minimize impacts to the waters of the U.S. within the project area, Piedmont looked at various alternate project location and pipeline routes. Other alternatives either impacted more wetlands, were not constructible due to topographic features, or impacted additional private land. The chosen location was located as far out of the wetland area as possible; however, due to an existing sanitary sewer easement, existing business park and residential development, and steep slopes to the east, the wetland could not be avoided all together. Impacts to wetlands are minimized, as one long wetland crossing at the northerly limits of the project area will be constructed using HDD. Thus, the wetland will not be disturbed at this location. Wetland impacts will be minimized during construction through the use of equipment mats at each crossing, and the use of trench plugs to prevent alterations to wetland hydrology. Additionally, construction equipment operating within the wetland will be limited to that necessary to complete the installation and restoration activities. Wetland vegetation will be cut by hand or grinded to ground level, leaving the existing root mass in place to promote re -growth. To the extent practical, wetland topsoil will be separated from the underlying subsoil in areas disturbed by trenching. Where, based on field observations, wetland soils are not "stackable" due to saturation, additional ECDs will be installed along the construction corridor to prevent off -ROW impacts. Within wetlands, yearly vegetation maintenance activities will only be conducted in within the proposed permanent easement areas. All other TWS and ATWS areas will be seeded with a native wetland seed mix and allowed to re -vegetate naturally. Mitigation Construction of the project will result in the permanent conversion of forested wetland (PFO) to emergent (PEM). Although conversion is considered a temporary impact, it typically requires some level of compensatory mitigation. The mechanized clearing of the forested wetland will result in a conversion of 0.395 acres of forested wetlands. The NCDWQ and USACE have accepted a 1:1 ratio for previous projects similar in nature. The project will impact a wetland where the conversion will be greater than 0.10 of an acre and may require mitigation for those impacts greater than 0.1 acre. Based on these calculations, the project will require the mitigation of riparian wetlands. Since there are not enough credits available in the Catawba 03050103 bank, Piedmont Natural Gas plans to provide payment in -lieu for the appropriate amount of loss and conversion of wetlands of 0.395 acres. A Payment In -lieu request letter was submitted to the North Carolina Ecosystem Enhancement Program (NCEEP) and accepted on January 29, 2019. A copy of the correspondence is included in Appendix D. E. Stormwater Management The National Pollutant Discharge Elimination System (NPDES) stormwater program regulates construction activities that disturb more than one acre. The proposed Project falls under the general requirements to be covered under the new Construction NPDES Stormwater General Permit NCGO100000 providing that the required ground stabilization and basin design are included in the Erosion and Sediment Control (E&SC) Plan (Appendix Q. F. Supplementary Information Endangered Species and Desimnated Critical Habitat To comply with applicable section of the Endangered Species Act (ESA) 1973, Maser Consulting conducted a desktop analysis followed by field review for Threatened and Endangered (T&E) Species within the Project site and initiated consultation with the US Fish and Wildlife Service (USFWS) and the North Carolina Natural Heritage Program (NCNHP). Consultation letters were sent to the USFWS and NCNHP for their review of the Project and the potential impact on T&E Species. Final responses from USFWS and NCNHP are included in Appendix D. During the pre -survey desktop analysis, the following five (5) listed T&E species had the potential of being present within the Project footprint: Northern Long-eared Bat (Myotis septentrionalis) - During summer, northern long-eared bats roost singly or in colonies underneath bark, in cavities, or in crevices of both live and dead trees. Males and non -reproductive females may also roost in cooler places, like caves and mines. This bat seems opportunistic in selecting roosts, using tree species based on suitability to retain bark or provide cavities or crevices. It has also been found, rarely, roosting in structures like barns and sheds. Northern long-eared bats spend winter hibernating in caves and mines. During the initial site review, Northern Long Eared Bat habitat including caves, roost trees, or other potential habitat (i.e. dead trees, crevices, etc.) were not observed. Piedmont Natural Gas will conduct tree clearing during winter months (between September 1 and March 31) to the best of its ability when practical to minimize the potential impact. Carolina Heelsplitter (Lasmigona decorate) - The Carolina heelsplitter requires cool, clean, well -oxygenated water. Stable, silt -free stream bottoms appear to be critical to the species. Typically, stable areas occur where the stream banks are well -vegetated with trees and shrubs. Although the project is in the vicinity of McAlpine Creek, the project does not require crossing or impacting the stream or stream bank. The wetlands to be disturbed do not contain the required habitat to support the Carolina Heelsplitter. Michaux's Sumac (Rhus michauxii) — Habitat characteristics includes sandy, loamy swales and depressions, acidic and circumneutral uplands, and rocky open woods. This sumac grows best where disturbance has maintained an open area. The project location is a predominately forested wetland that has not been disturbed. Soils in the area are classified as Monacan Loam (MO) and are typical of floodplain areas. Schweinitz's Sunflower (Helianthus schweinitzii) — This species occurs in full to partial sun and is found in areas with poor soils, such as thin clays that vary from wet to dry. It is believed that this species once occurred in natural forest openings or grasslands. Many of the remaining populations occur along roadsides. Based upon observations during the field reconnaissance, the existing site conditions do not support this habitat. Smooth Coneflower (Echinacea laevigate) — This plant occurs in open sunny areas in which it receives little competition from other plants. It requires neutral to alkaline soils rich in calcium and magnesium with good drainage. The existing site conditions includes forested wetland with very little understory and open sunny areas and therefore does not support the habitat. Upon completion of environmental surveys, Maser Consulting did not observe the potential habitat or any individuals of the above-mentioned species. The USFWS and NCNHP correspondence letters in Appendix D concur with Maser Consulting's conclusion that the project will have no potential impacts on endangered species. Historical or Prehistoric Cultural Resources On July 12, 2018, Maser Consulting submitted a letter to the North Carolina State Historic Preservation Office (NCSHPO) requesting a review of their files and a determination of "No Affect". A review of the SHPO GIS mapping indicated there are no historic properties within, or adjacent to the Area of Potential Effect (APE). The NCSHPO response, dated August 10, 2018, required a comprehensive archaeological survey. The results of the archaeological survey were forwarded to NC SHPO on November 27, 2018. The final response from NC SHPO, dated December 20, 2018 concurred with the findings that no sites were reported and no additional work is necessary (Appendix D). i LIST OF APPENDICES A. Figures B. Wetland Delineation Report C. Erosion and Sediment Control Plan D. Agency Correspondence i APPENDIX A FIGURES w Y VA f • ` N f .$vyn KY;: 2,640 1,320 0 2,640Feet ■ 7 w e 1 inch = 2,640 feet s GA SCAa ;r= 'J �'v\ '- .. i y OLaxm h•' �~V t. :`• f� •,"•.•- : �r ..'.•• •. .,• - _. `_-'+� r.. h. >� r,' lob r.' ' �. rte■, '� 4 ♦�cJ f`. `_ - 4 - Project Location: `. ' ���i"■ - ��` £ ,� '"'. _ '!' ��.5 - � - . - �- stiff ��"����r�; �1 � �"� • ;:_.. -�} �� :•�, Y"7" - �• ire\?- 1..t �L. S •'1..r�l. .• 4— - .� _ ftz -S1 _ _ r _ y / 17 ow CO IJI Vis_ - �y■ —� r A 1 Copyright:© 2013 National Geographic Society, i -cubed �• �.� Prepared For: MPiedmont Project Location Map Figure Y Natural Gas Rushmore Drive Distribution Project Prepared By: CharlottOMecklenburg County, North Carolina e ffic 5275 Parkway Plaza Z711 Charlotte, NC 2821007 y Date: MC Project #: Drawn By: Project Location T: 704,973 - 7962 MAS E R www.moserc onsulting.com June 18, 2018 17004827A AAP 1V N W E SITE \ o. \ \�1 A Os Oq ?(j� SIG C� C S PKW \ �0 \� VICINITY MAP I" = 1000' 15savirnrrr SEIMR Enuavr \ \ \ \ l QWUD Jag Na 100 -94 -ran G` \ VkQODED NFL \ \ / G, RIGHT OF WAY CONFIGURATION \Jr\ W W W err/gj\ PROPOSED EASEMENT G �� G PROPOSED GAS LINE WETLAND W 102 (OPEN CUT): PROPOSED EASEMENT - \ v, .� w 10' PERMANENT CONVERSION AREA b W W W W W 7,523 SQ.FT. 0.17 ACRES W W W W W W 6�� — — PROPOSED TWS TEMPORARY IMPACT AREA 9,664 SQ.FT. \ 0.22 ACRES N, + \ — k_ W NOTES: �,b WFZ LEGEND I. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND W W W W W W w DISTANCES IN FEET UNLESS OTHERWISE NOTED. AREA �\ BY COORDINATE COMPUTATION. W W w 0 TEMPORARY IMPACT AREA W 2. THIS MAP IS NOT INTENDED FOR RECORDATION. 3. WETLAND AND STREAM DATA WERE PROVIDED TO w W W W WFL W\ ✓ ✓ W W / PERMANENT CONVERSION AREA MASER CONSULTING P.A. IN SHAPEFILE FORMAT BY MASER CONSULTING P.A. ON FEBRUARY 13, 2018. 4. THE PURPOSE OF THIS PLAN IS TO SHOW THE �, �\ W WETLAND AREA JURISDICTIONAL BOUNDARIES AND DELINEATED BY / MASER CONSULTING. 5. BASIS OF BEARING IS NORTH CAROLINA STATE PLANE e / 515 / — — — — PROPOSED EASEMENT COORDINATES (NAD 83/NSRS 2011). PROPOSED TWS 100 0 100 \ / G PROPOSED GAS LINE / —G EXISTING GAS LINE SCALE: 1" l��f = ����'� REV DATE D B WN DESCRIPTION JURISDICTIONAL WATERS OF THE U.S. IMPACT PLAN OF RUSHMORE PIPELINE � PROTECT YOURSELF ALL STATES REQUIRE NOTIFICATION OF EXCAVATORS, DESIGNERS, OR $CALE: DATE: DMWN BY: CHECKED BY: F R FOR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE .iV i \ C 8 N S U L T I N 6 P. A PIEDMONT NATURAL GAS ANYWHERE IN ANY STATE Kno iee below. Call cef—p. di& SHHOW 01/30/19 CJK/TAH NMG ' - NAME PRO17O 4827A Office Locations: FOR STATE SPECIFIC DIRECT PHONE NUMBERS VISIT: W W W.CALL81 ICOM C-SESCG 17004827A C-SESC-EXBT Customer Loyalty through Client Satisfaction ■ Red Bank, NJ ■ Lehigh Valley, PA www.maserconsu l ting.com ■ Clinton, NJ ■ EMon, PA HEET TITLE: Engineers • Planners •Surveyors ■ Hamilcon, NJ ■ Philadelphia, PA ■ Harbor, NJ ■ Pittsbur PA Lands Architects • E,,ironmental Saiendsts �Pe ■ o wale, NJ ■ Tampa, L NJrlando, FLSore of N C Firm No. C-4042 ■ Mt Laurel, NJ ■ Miami, FL RUSHMORE PROPOSED 12" STEEL DISTRIBUTION IMPACT PLAN I OF 2 CHARLOTTE OFFICE 75 Prkway Plao Boulevard■Mt.Aringt Suite 100 ■ Albany, NY ■ t1sonvllle, FL •New Windsor, NY ■ SSterling, VAWestchester, CITY OF CHARLOTTE Charlotte, NC 28217 49"" I I OL 2 V NY Norfolk, A Charlotte NC ■ Alb uquerq Raleigh, Nuec ■ Colambia MoNM MECHI.ENBLJRG COUNTY NORTH CAROLINA Phone: 980.245.3161 Fax: 704.973.7952 N CROSSING METHOD: HDD EX/ST//yG C) SITE SEX/STj - GAS z/NE. ANG E=EMENT are W E 5p.� EX/STjNGIE Wµ}LW %%X_.%%% M_ EN . \ SPKWY WWWW .G WO©DED _ G G . . . rrnAll�P VICINITY MAP y .3. -o W I"= 1000' `O RIGHT OF WAY CONFIGURATION OPEN CUT CROSSING . ' PROPOSED EASEMENT ' �I . , . ` . ` W ` 0 T G G PROPOSED GAS LINE W I N PROPOSED EASEMENT ♦ ♦ ♦ u- ♦ W o WETLAND-W101: WW .W ., `W.W`WWW`W .rtwlW 30' PERMANENT CONVERSION AREA —PROPOSED TWS 9,745 SQ.FT. W W , 0.22 ACRES I HDD CROSSING VARIABLE TEMPORARY IMPACT AREA LL II 30,224 SQ.FT. 0.70 ACRES CROSSING METHOD: OPEN CUT EXISTING EASEMENT T NOTES: I. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND "' DISTANCES IN FEET UNLESS OTHERWISE NOTED. AREA '" W W W W W 4,\ G G �- PROPOSED GAS LINE 1 °0 p IM �G � EXISTING GAS LINE - BY COORDINATE COMPUTATION. 2. THIS MAP IS NOT INTENDED FOR RECORDATION. N EXISTING EASEMENT 3. WETLAND AND STREAM DATA WERE PROVIDED TOLEGEND MASER CONSULTING P.A. IN SHAPEFILE FORMAT BY . ' ' ' " ' ' " " " MASER CONSULTING P.A. ON FEBRUARY 13, 2018. . � 4. THE PURPOSE OF THIS PLAN IS TO SHOW THE ' . . W W WOODED � TEMPORARY IMPACT AREA JURISDICTIONAL BOUNDARIES AND DELINEATED BY MASER CONSULTING. y y PERMANENT CONVERSION AREA 5. BASIS OF BEARING IS NORTH CAROLINA STATE PLANE \ COORDINATES (NAD 83/NSRS 2011). HDD - IMPACT AVOIDANCE AREA / / \ � W � � WETLAND AREA 00 0 100 . .�4 �, — — — — PROPOSED EASEMENT PROPOSED TWS SCALE: I" = 100' \ G PROPOSED GAS LINE G EXISTING GAS LINE REV DATE ID—NI DESCRIPTION JURISDICTIONAL WATERS OF THE U.S. //••��y— PROTECT YOURSELF IMPACT PLAN OF RUSHMORE PIPELINE ALL STATES REQUIRE NOTIFICATION OF _ATORS. DFSIGNERS, OR SCALE: DATE: DMWN BY: CHKKED BY: F R FOR ANY PERSON PREPARING TO DISTUR6 THE EARTH'S SURFACE .iV i \ C 0 N SULTING P.A. PIEDMONT NATURAL GAS ANYWHERE IN ANY STATE Knmrn below. Call bdmyoa di& s1HOW 01/30/19 CJK/TAH NMG ' - PROTECT NUMBER: DRAWING NAME Office Locations: FOR STATE SPECIFIC DIRECT PHONE NUMBERS VISIT: W .CALL81 ICOM W W COM 17OD4827A C-SESC-EXBT Customer Loyalty through Client Satisfaction ■ Red Bank, NJ ■ Lehigh Valley, PA erco nsu lting.com ■ Clinton, Nl ■ Enh' PA HEET Trt�E: Engineers • Planners • Surveyors ■ Hamilton, NJ ■ Philadelphia, PA ■ Harbor, NJ ■ PitObur PA Lands Architecas • E-1—mental Sd-ti is �Pe ■ o wale. NJ ■ Tampa, L ■ Mt. Arlingt NJ ■ Orlando, FL RUSHMORE PROPOSED I2" STEEL DISTRIBUTION IMPACT PLAN 2 OF 2 CHARLOTTE OFFICE 5275 Parkway Plao Boulevard Sore of N C Firm No. C-4042 ■ Mt Laurel, IN ■ Miami, FL ■ Albany, ■ la<rling, CITY OF CHARLOTTE Suite 100 Chadoae, INC 16117 SHEET NUMBER: AFL nd c�M.p,. Is. n:,., ce�.�M1are rw wal,�e. ml. n.�l • New Windsor, NY ■ SSterling, VA ■ Wewhester, NY ■ Norfolk, A my d, a,r pvq V MECKLENBURG COUNTY . Phone: Charlotte NC ■ Albuquerque NM Raleigh, NC ■ Colurnbla, Mo NORTH CAROLINA 4.973.5962 Fax: 704.973.7952 ^ OL L I L i APPENDIX B WETLAND DELINEATION REPORT V) Ln U V L am W CL M U U1 J s!7 0 Ln L, 'i7 a LU IVLVL%A a 0 N S U l T I N 8 P. A. MOM www.maserconsulting.com Wetland Delineation Report Piedmont Natural Gas Rushmore Drive 16" Steel Distribution Rushmore Drive & Ballantyne Commons Parkway Charlotte, Mecklenburg County, North Carolina November 1, 2018 Prepared For Piedmont Natural Gas 4301 Yancey Road Charlotte, NC 28217 Prepared By Maser Consulting P.A. 5275 Parkway Plaza Blvd, Suite 100 Charlotte, North Carolina 28217 MC Project No. 17004827A i!q TABLE OF CONTENTS 1.0 PROJECT INFORMATION................................................................................................ 1 2.0 INTRODUCTION............................................................................................................... 2 3.0 PROPERTY DESCRIPTION.............................................................................................. 2 4.0 BACKGROUND INFORMATION.................................................................................... 2 4.1 U.S. Geological Survey Map............................................................................................ 3 4.2 Soil Survey........................................................................................................................ 3 4.3 Federal and State Wetland Maps..................................................................................... 3 5.0 WETLAND DELINEATION METHODOLOGY.............................................................. 4 6.0 WETLAND DELINEATION PARAMETERS.................................................................. 4 6.1 Vegetation.........................................................................................................................4 6.1.1 Freshwater Wetland Plant Communities...................................................................... 5 6.1.2 Upland Plant Communities.......................................................................................... 6 6.2 Soils.................................................................................................................................. 6 6.3 Hydrology.........................................................................................................................7 7.0 NAVIGABLE WATER NEXUS......................................................................................... 7 8.0 WETLAND DELINEATION RESULTS............................................................................ 7 9.0 CONCLUSIONS..................................................................................................................8 10.0 REFERENCES.................................................................................................................... 9 APPENDICES APPENDIX A — SITE FIGURES APPENDIX B — PHOTOGRAPHS APPENDIX C — WETLAND DETERMINATION DATA FORMS LIST OF FIGURES FIGURE 1. Project Location Map (U.S.G.S. Map) FIGURE 2. Soil Series Map FIGURE 3. National Wetlands Inventory Map FIGURE 4. Project Site Map WETLAND DELINEATION REPORT PAGE i RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC ri 1.0 PROJECT INFORMATION Site Location Rushmore Drive Municipality Charlotte County Mecklenburg State North Carolina Latitude/Longitude 35.057186 N / -80.862044 W (Subject Property) U.S.G.S. Quadrangle Charlotte, NC Wetland Area W 101 Wetland Delineation Areas Wetland Area W 102 Nearest Stream McAlpine Creek tributary (off-site) (on-site/off-site) Navigable Water Nexus Wetland Areas W 101 & W 102 — Wetland abuts McAlpine Creek tributary which drains to McAlpine Creek, which drains to Sugar Creek and ultimately drains to the Catawba River (TNW). *RPW = relatively permanent waters, TNW = traditionally navigable waters Isolated Wetlands/Waters No Present (Yes/No) WETLAND DELINEATION REPORT PAGE 1 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC 2.0 INTRODUCTION The site, located along Rushmore Drive northwest of the intersection of Rushmore Drive and Ballantyne Common Parkway (herein referred to as "Subject Property" or "Property") in Charlotte, Mecklenburg County, North Carolina, was investigated to determine the location and extent of wetlands or waters subject to Federal or State regulatory jurisdiction. According to the U.S. Army Corps of Engineers (USACE) and U.S. Environmental Protection Agency (USEPA) regulations described in Section 404 of the Clean Water Act (33 CFR Section 328.3 and 40 CFR Section 230.3) respectively, wetlands are "...areas that are inundated or saturated with surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions." Currently within the State of North Carolina, the USACE is typically the lead agency responsible for verifying the accuracy of freshwater wetland delineations and authorizing encroachments into freshwater wetlands. The USACE regulates all jurisdictional wetlands within the State. This report was prepared for the submission of a Pre -Construction Notification to the USACE. 3.0 PROPERTY DESCRIPTION The project site appears on the Charlotte, NC Quadrangle of the U.S. Geological Survey Map (Figure 1). The project site consists of forested land, maintained utility right-of-way, existing roads, and landscaping associated with the corporate office park. The site is located northwest of the intersection of Rushmore Drive and Ballantyne Commons Parkway. A tributary of McAlpine Creek runs from south to north immediately west of the project's limit of disturbance. Photographs of the project site and representative wetland and upland areas are included in Appendix B. 4.0 BACKGROUND INFORMATION Several sources of information were reviewed to determine the likelihood of freshwater wetlands/waters occurring on the subject property. WETLAND DELINEATION REPORT PAGE 2 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC 4.1 U.S. GEOLOGICAL SURVEY MAP The subject property appears on the Charlotte, NC Quadrangle of the U.S. Geological Survey (USGS) Map (Figure 1) and is depicted as undeveloped land forested land. The USGS Map depicts a blue -line stream identified as McAlpine Creek to the north of the site. 4.2 SOIL SURVEY The Web Soil Survey (Soil Survey) (Figure 2) depicts the following four (4) map units on the property and provides the corresponding drainage descriptions: • Mecklenburg fine sandy loam, 2 to 8 percent slopes (MeB) — Well Drained with a depth to water table at over 80 inches. • Mecklenburg fine sandy loam, 8 to 15 percent slopes (MeD) — Well Drained with a depth to water table at over 80 inches. • Monacan loam, 0 to 2 percent slopes, frequently flooded (MO) Somewhat poorly drained with a depth to water table at about 6 to 24 inches. • Wilkes loam, 15 to 25 percent slopes (WkE) — Well Drained with a depth to water table at over 80 inches. Based on the soil map units documented for the property and the corresponding descriptions, areas of the subject property that contain Monacan loam soils are most likely to contain freshwater wetlands, primarily due to the shallow seasonal high-water table. 4.3 FEDERAL AND STATE WETLAND MAPS The National Wetlands Inventory (NWI) (Figure 3) identifies the following freshwater wetlands on the subject property: Riverine — Running through the property. Palustrine Forested Wetland — Located adjacent to the riverine wetland. Palustrine Emergent Wetland — Located on the northern portion of the property within the utility right-of-way. WETLAND DELINEATION REPORT PAGE 3 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC 5.0 WETLAND DELINEATION METHODOLOGY The wetland delineation methodologies developed by the USACE and the USEPA, as described in the 1987 Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1 and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic & Gudf Coast, were utilized during our investigation. These methodologies generally involve the review of three parameters (vegetation, soils, hydrology) when making a wetland or non -wetland determination. The property was walked, community types were characterized, and preliminary wetlands/waters boundaries were established on the property. Sample stations were then established along the preliminary wetlands/waters boundaries to examine vegetation, soils, and hydrology. Using this data, final wetlands/waters boundaries were established at the sample stations, from which obvious changes in vegetation, soils, and hydrology was used to extend the wetlands/waters boundaries to the next sample station and/or the property boundary. Four (4) representative sample stations were established along the wetland boundary within the project site. At each sample station, a detailed description of vegetation, soils, and hydrology was performed according to the above -referenced methodologies. 6.0 WETLAND DELINEATION PARAMETERS 6.1 VEGETATION The USACE defines hydrophytic vegetation as the sum total of macrophytic plant life that occurs in areas where the frequency and duration of inundation or soil saturation produce permanently or periodically saturated soils of sufficient duration to exert a controlling influence on the plant species present (Environmental Laboratory 1987). WETLAND DELINEATION REPORT PAGE 4 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC Table 1. Plant Indicator Status CateLories* Indicator Category Indicator Symbol Definition Obligate Wetland OBL Plants that occur almost always (estimated probability >99%) in Plants wetlands under natural conditions, but which may also occur rarely (estimated probability <1 %) in nonwetlands. Facultative Wetland FACW Plants that occur usually (estimated probability >67% to 99%) in Plants wetlands, but also occur (estimated probability 1 % to 33% in nonwetlands). Facultative Plants FAC Plants with a similar likelihood (estimated probability 33% to 67%) of occurring in both wetlands and nonwetlands. Facultative Wetland FACU Plants that occur almost always (estimated probability 1% to Plants <33%) in wetlands, but occur more often (estimated probability >67% to 991/6) in nonwetlands. Obligate Upland UPL Plants that occur rarely (estimated probability <1%) in Plants wetlands under, but occur almost always (estimated probability >99%) in nonwetlands under natural conditions. * Categories were originally developed and defined by the USFWS National Wetlands Inventory and subsequently modified by the National Plant List Panel. The three facultative categories have been subdivided by (+) and (-) modifiers. FAC+ species are considered to be wetter (i.e. have a greater estimated probability of occurring in wetlands) than FAC species, while FAC- species are considered to be drier (i.e. have a lesser estimated probability of occurring in wetlands) than FAC species. Generally speaking, the hydrophytic vegetation parameter is satisfied when more than 50 percent of the dominant species are OBL, FACW or FAC (Table 1) on the list of plant species that occur in wetlands, which was prepared by the U.S. Fish and Wildlife Service. The following is a list of species typically observed within each plant community on the subject property; however, some plants normally present on the site may not have been apparent or were difficult to identify to species level during the time of year the delineation was performed: 6.1.1 Freshwater Wetland Plant Communities a. Wetland Area W101: This is a palustrine emergent wetland delineated by flag numbers W101-1 through W101-5 and palustrine forested wetland delineated by flag numbers W 101-201 through W101-218. Representative plant species within the emergent wetland include the following: broadleaf cattail (Typha latifolia), arrow arum (Peltandra virginica), pickerel weed (Pontederia cordata), and rice cutgrass (Leersia oryzoides). Representative plant species within the forested wetland include the following: American sycamore (Platanus occcidentalis), black willow (Salix nigra), green ash (Fraxinus pennsylvanica), and river birch WETLAND DELINEATION REPORT PAGE 5 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC (Betula nigra), Japanese stiltgrass (Microstegium vimineum), and Japanese honeysuckle (Lonicera japonica). b. Wetland Area W102: This is a palustrine forested wetland delineated by flag numbers W102-101 through W102-106. Representative plant species within include the following: sweetgum (Liquidambar styraciflua), American sycamore, green ash, box elder (Acer negundo), Japanese honeysuckle, Japanese stiltgrass, sedges (Carex sp.) and a rush (Juncus sp.). 6.1.2 Upland Plant Communities a. Upland forest located adjacent to the forested wetland was identified by the following species: white oak (Quercus alba), flowering dogwood (Cornus florida), American beech (Fagus grandifolia), loblolly pine (Pinus taeda), and tulip poplar (Liriodendron tuilipifera), among others. b. Upland maintained utility right-of-way found at the northern project limits, near the end of Dovehunt Place, was identified by the following species: blackberry (Rubus sp.), bush clover (Lespedeza sp.), goldenrod (Solidago sp.), Japanese honeysuckle (Lonicera japonica), deer tongue (Dichanthelium clandestinum) and American wisteria (Wisteria frutescens), among others. The National Wetland Indicator Status for typical species observed within plant communities along representative portions of the delineated wetland boundary are included on the Wetland Determination Data Forms (Appendix Q. 6.2 SOILS Hydric soils are defined as soils that formed under conditions of saturation, flooding, or ponding long enough during the growing season to develop anaerobic conditions in the upper part of the soil (USDA 2003). The soils observed in upland areas on the property generally consisted of clayey loams with a matrix chroma that was equal to or greater than 4. The soils in the wetland areas were variable, but for the most part, exhibited low chroma matrices with redoximorphic features. WETLAND DELINEATION REPORT PAGE 6 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC 6.3 HYDROLOGY The delineated wetlands exhibited primary and secondary indicators of wetland hydrology. Positive indicators of wetland hydrology on the property included the following: Wetland Area W101: This wetland area exhibited inundation, water -stained leaves and drift deposits, indicative of the presence of surface water. In addition, vegetation species in the area consisted of wetland species that passed the FAC -neutral test and hydric soils were identified. Wetland Area W102: This wetland area exhibited water -stained leaves and drift deposits, indicate of the presence of water moving on the surface. In addition, vegetation species in the area consisted of wetland species that passed the FAC -neutral test and hydric soils were identified. 7.0 NAVIGABLE WATER NEXUS The subject property drains to McAlpine Creek which is tributary to Sugar Creek and ultimately to the Catawba River. The Catawba River is a traditionally navigable water. Based on the described drainage sequence, wetlands on the subject property which drain to the McAlpine Creek tributary appear to have a nexus to a navigable water. The navigable water nexus is subject to USACE verification. 8.0 WETLAND DELINEATION RESULTS Two (2) areas of freshwater wetlands/waters were delineated on the subject property. These areas are identified as W 101 and W 102 which correspond to the numeric prefixes of the wetland delineation flag numbers. A summary of the delineated wetland and water areas is provided in Table 2. The surveyed limits of the freshwater wetlands/waters are shown the Project Site Map (Appendix A). WETLAND DELINEATION REPORT PAGE 7 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC Table 2. Summary of Delineated Freshwater Wetlands/Waters Wetland Area Flag Points Wetland Type Area Wetland Area W 10 1 W101-1 to W101-5; PEM/PFO 1.269 acres W101-201 to W101- 218 Wetland Area W 102 W102-101 to W102- PFO 0.394 acre 106 PFO = Palustrine forested; PSS = Palustrine scrub -shrub; PEM = Palustrine emergent; OW = Open Water 9.0 CONCLUSIONS Freshwater wetlands/waters were delineated on the subject property by Maser Consulting in February 2018. The delineated wetland areas are identified as W101 and W102. The location and jurisdictional status of the delineated wetlands are subject to USACE verification. Freshwater wetlands/waters were delineated on the subject property using the methodologies outlined in the 1987 Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1 and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic & Gulf Coast. WETLAND DELINEATION REPORT PAGE 8 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC 10.0 REFERENCES Environmental Laboratory. 1987. "Corps of Engineers Wetlands Delineation Manual" Technical Report Y-87-1. US Army Engineer Waterways Experiment Station, Vicksburg, Miss. Environmental Laboratory. 2012. "Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coast". Technical Report ERDC/EL TR -09-19. US Army Engineer Research and Development Center, Vicksburg, Miss. Federal Interagency Committee for Wetland Delineation. 1989. Federal Manual for Identifying and Delineation Jurisdictional Wetlands. U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, and U.S.D.A. Soil Conservation Service, Washington D.C. Cooperative technical publication. 76 pp. plus appendices. Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nres.usda.gov/. Accessed February 2018. USDA, NRCS. 2003. Field Indicators of Hydric Soils in the United States, Version 5.01, G.W. Hurt, P.M. Whited, and R.F. Pringle (eds.). USDA, NRCS in cooperation with the National technical Committee for Hydric Soils, Fort Worth, TX. R:\AllOffices\Charlotte\Projects\2017\17004827A\Reports\Ecological\PCN\wetland delineation\181101_jmm WetDe1Rptdocx WETLAND DELINEATION REPORT PAGE 9 RUSHMORE DRIVE DISTRIBUTION PROJECT NOVEMBER 2018 CHARLOTTE, MECKLENBURG COUNTY, NC i APPENDIX A SITE FIGURES Ma 7 W r•Y VA TN 2,640 1,320 0 2,640 -- Feet ■ W+ E 1 inch = 2,640 feet s GA Sc JO-"** K F1 10100— J�~ Project Location i ivy, 4Z\ � i�ai_ y . iat� 401 N. Copyright:© 2013 National Geographic Society, -cubed Prepared For., 01Piedmont Project Location Map Figure 11 Natural Gas Rushmore Drive Distribution Project Prepared By: CharlottOMecklenburg County, North Carolina e ffic 5275 Parkway Plaza Z711 suite Charlotte, NC 2821007 '. Date: MC Project #: Drawn By: Project Location T:704,97,1.7911 MASE T7 www.maserconsulting.com i June 18, 2018 17004827A AAP BJP14 0 r4t- 4p# •. ti: •_ d• 1 r . , r u• r � LL f r AN V *� ,."" + r NO i� - ; m Sqj Its! Ike +�i►,, - 10 .00 1 i AIM WoeOoh` \ 1 ,. es- 11101101 ox /d�� • 01111 CIO of r _ •• � Tara Glenn Ct o ,r e o o o0 Earhhstar Geographies, CNES/Airbus ©S, USDA, USES, AeroGf�ID, IGN, and the GIS User C'ornmunity r + r '� •� wL�l'J , + � r i r + r. 0. NO bo W 0,V r o Tgqww 1 w 10, JOP .a � 1110hgrIla Dr 2j d� O i g IL VITA 11 �,0,o x Tara Glenn Ct 1 i APPENDIX B PHOTOGRAPHS Piedmont Natural Gas Rushmore Drive Proposed 16" Steel Distribution Charlotte, North Carolina 2017-2018 MC Protect No. 17004827A Photograph B: Culvert at intersection of Rushmore Drive and Ballantyne Commons Parkway, discharging into stream adjacent to project area. � l' a� :r i� y i •� a� t i f �jr ''�'--. �- 'f'' ��• -itch'! +''� Jam' '''' ���,.. � ` � • �`- r ' "%.� � e i r � ��rr � - `� o'-'.�:: - . -� . �-..•- r�.F�-. '' . mac. j 'titin.' :� ;a•1. •' - is �• •�' .•r` - •-� . Imo,{' w " .�c.j.. "' _ �'-.`. •..-t- '.,- . �. �- ~ : ..fir 'ir ��' r �.' r•!g � �•{.:, [� :,yam.. is 'n a.i°� .r*:._ e+.[ _ :. op �- `Ail w- �- r►ik ^�� i I + yr y ,W 7 iap- --'�,,,,,,pp��,, ��o'Y•`-� ••h 'rte b�. y y y,�• � � .�; '] iF'p f..-�.� tom. yriti' ���-1b ��'��. . i1•, • % Yr '.'�.�i��'I �a 1 � # � � f. .� .:' + "•;• yy � .•.' ... 'f- it -T i. .-...�.: '--m�•':d-' •xPlie :111 _-�±n :'9'F• �'ra -�'• '' 4�' r �'�',�• ��.•;iS .. . � . � � . � -•fi-' .�' Sys....-. • .+ice - -: - �, ! '` - � -�i �.�iC�._•C- -� .rr. ; 4W Piedmont Natural Gas Rushmore Drive Proposed 16" Steel Distribution Charlotte, North Carolina 2017-2018 MC Protect No. 17004827A Photograph G: View into interior forested wetland, typical of southern project area. ; 4V Piedmont Natural Gas Rushmore Drive Proposed 16" Steel Distribution Charlotte, North Carolina 2017-2018 MC Protect No. 17004827A Photograph H: Creek flowing through emergent wetland in utility right-of-way at northern project limits. i APPENDIX C WETLAND DETERMINATION DATA FORMS U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: W101-103 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): floodplain Local relief (concave, convex, none): concave Slope (%): 2 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0592686 Long: -80.8635787 Datum: WGS-84 Soil Map Unit Name: Monacan loam, 0 to 2% slopes, frequently flooded NWI classification: PSS1Ch Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) X Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (135) _ Geomorphic Position (D2) X Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) X FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes X No Depth (inches): 2 Water Table Present? Yes No Depth (inches): Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: appears as pond on aerial photos Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W101-103 Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited area of the wetland that was accessible on foot due to inundation and to the limits of the easement, sample plots were limited to a 15 -foot radius in which all strata were sampled. There was no tree, sapling, shrub, or woody vine present in this portion of the wetland. ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 HDsoiuie uominam inaicaior Tree Stratum (Plot size: 15 foot radius) % Cover Species? Status Dominance Test worksheet: 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC: 3 (A) 3. Total Number of Dominant 4. Species Across All Strata: 3 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 100.0% (A/B) 7. Prevalence Index worksheet: =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20% of total cover: OBL species 30 x 1 = 30 Sapling/Shrub Stratum (Plot size: 15 foot radius) FACW species 60 x 2 = 120 1. FAC species 0 x 3 = 0 2. FACU species 0 x 4 = 0 3. UPL species 0 x 5 = 0 4. Column Totals: 90 (A) 150 (B) 5. Prevalence Index = B/A = 1.67 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. X 2 - Dominance Test is >50% 9. X 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Typha latifolia 20 Yes OBL 'Indicators of hydric soil and wetland hydrology must be 2. Peltandra virginica 10 No OBL present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Scirpus cyperinus 30 Yes FACW 4. Polygonum pensylvanicum 30 Yes FACW Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 90 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 45 20% of total cover: 18 height. Woody Vine Stratum (Plot size: 15 foot radius ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes X No Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited area of the wetland that was accessible on foot due to inundation and to the limits of the easement, sample plots were limited to a 15 -foot radius in which all strata were sampled. There was no tree, sapling, shrub, or woody vine present in this portion of the wetland. ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: W101-103 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-3 10YR 5/3 90 Loamy/Clayey 3-5 10YR 4/2 90 10YR 5/4 3 C M Loamy/Clayey Distinct redox concentrations 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) X Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) `Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes X No ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: U101-103 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): hillside Local relief (concave, convex, none): concave Slope (%): 10 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0593190 Long: -80.8640255 Datum: WGS-84 Soil Map Unit Name: Mecklenburg fine sandy loan, 2 to 8 percent slopes NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: U101-103 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 1 (A) Total Number of Dominant Species Across All Strata: 3 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 33.3% (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species 0 x 1 = 0 FACW species 0 x 2 = 0 FAC species 30 x 3 = 90 FACU species 35 x 4 = 140 UPL species 0 x 5 = 0 Column Totals: 65 (A) 230 (B) Prevalence Index = B/A = 3.54 Hydrophytic Vegetation Indicators: _ 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is 553.0' 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Four Vegetation Strata: Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Herb - All herbaceous (non -woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Woody Vine - All woody vines greater than 3.28 ft in height. Hydrophytic 15 =Total Cover Vegetation 50% of total cover: 8 20% of total cover: 3 1 Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) Due to the project limits in the vicinity of the wetland boundary, sampling areas were limited to a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 Absolute Dominant Indicatc Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status 1. 2. 3. 4. 5. 6. 7. =Total Cover 50% of total cover: 20% of total cover: Sapling/Shrub Stratum (Plot size: 15 -foot radius ) 1. 2. 3. 4. 5. 6. 7. 8. 9. =Total Cover 50% of total cover: 20% of total cover: Herb Stratum (Plot size: 15 -foot radius ) 1. Solidago sp. 30 Yes 2. Phytolacca americana 10 No FACU 3. Dichanthelium clandestinum 20 Yes FAC 4. Eupatorium serotinum 10 No FAC 5. Lonicera japonica 10 No FACU 6. 7. 8. 9. 10. 11. 80 =Total Cover 50% of total cover: 40 20% of total cover: 16 Woody Vine Stratum (Plot size: 15 -foot radius ) 1. Rubus allegheniensis 15 Yes FACU 2. 3. 4. 5. Sampling Point: U101-103 Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 1 (A) Total Number of Dominant Species Across All Strata: 3 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 33.3% (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species 0 x 1 = 0 FACW species 0 x 2 = 0 FAC species 30 x 3 = 90 FACU species 35 x 4 = 140 UPL species 0 x 5 = 0 Column Totals: 65 (A) 230 (B) Prevalence Index = B/A = 3.54 Hydrophytic Vegetation Indicators: _ 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is 553.0' 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Four Vegetation Strata: Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Herb - All herbaceous (non -woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Woody Vine - All woody vines greater than 3.28 ft in height. Hydrophytic 15 =Total Cover Vegetation 50% of total cover: 8 20% of total cover: 3 1 Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) Due to the project limits in the vicinity of the wetland boundary, sampling areas were limited to a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: U101-103 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-8 5YR 4/4 90 Sandy 8-12 7.5YR 4/6 80 Sandy 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) Sandy Redox (S5) ? Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: W101-204 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): floodplain Local relief (concave, convex, none): concave Slope (%): 2 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0588092 Long: -80.8629276 Datum: WGS-84 Soil Map Unit Name: Monacan loam, 0 to 2% slopes, frequently flooded NWI classification: PF01A Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) X Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) X Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) X FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes x No Depth (inches): 2 Water Table Present? Yes No Depth (inches): Saturation Present? Yes X No Depth (inches): Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W101-204 Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status Dominance Test worksheet: 1. Platanus occidentalis 10 Yes FACW Number of Dominant Species 2. Fraxinus pennsylvanica 20 Yes FACW That Are OBL, FACW, or FAC: 4 (A) 3. Salix nigra 10 Yes OBL Total Number of Dominant 4. Species Across All Strata: 6 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 66.7% (A/B) 7. Prevalence Index worksheet: 40 =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20 20% of total cover: 8 OBL species 10 x 1 = 10 Sapling/Shrub Stratum (Plot size: 15 -foot radius) FACW species 30 x 2 = 60 1. FAC species 25 x 3 = 75 2. FACU species 10 x 4 = 40 3. UPL species 0 x 5 = 0 4. Column Totals: 75 (A) 185 (B) 5. Prevalence Index = B/A = 2.47 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. X 2 - Dominance Test is >50% 9. X 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 -foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Microstegium vimineum 25 Yes FAC 'Indicators of hydric soil and wetland hydrology must be 2. Lonicera japonica 10 Yes FACU present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 35 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 18 20% of total cover: 7 height. Woody Vine Stratum (Plot size: 15 -foot radius ) 1. Vitis sp. 10 Yes 2. 3. 4. 5. Hydrophytic 10 =Total Cover Vegetation 50% of total cover: 5 20% of total cover: 2 Present? Yes X No Remarks: (Include photo numbers here or on a separate sheet.) Due to the project area limits in the vicinity of the wetland boundary, sample plots were limited to a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: W101-204 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-4 10YR 5/2 90 Mucky Loam/Clay saturated at surface 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) X Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes X No ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: U101-204 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): hillside Local relief (concave, convex, none): concave Slope (%): 10 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0590546 Long: -80.8626060 Datum: WGS-84 Soil Map Unit Name: Mecklenburg fine sandy loam, 8 to 15% slopes NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: No wetland indicators observed. ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Tree Stratum (Plot size: 15 -foot radius ) 1. Platanus occidentalis 2. Liriodendron tulipifera 3. 4. 5. 6. 7. 50% of total cover: 15 Sapling/Shrub Stratum (Plot size: 15 -foot radius ) 1. Rhus copallinum 2. 3. 4. 5. 6. 7. 8. 9. Absolute Uominant % Cover Species? 20 Yes 10 Yes Sampling Point: U101-204 idicator Status Dominance Test worksheet: FACW Number of Dominant Species FACU That Are OBL, FACW, or FAC: 3 (A) Total Number of Dominant Species Across All Strata: 6 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 50.0% (A/B) 30 =Total Cover 20% of total cover: 6 15 Yes FACU 15 =Total Cover 50% of total cover: 8 20% of total cover: Herb Stratum (Plot size: 15 -foot radius ) 1. Dichanthelium clandestinum 10 2. Microstegium vimineum 10 3. Lonicera japonica 10 4. 5. 6. 7. 8. 9. 10. 11. I Yes FAC Yes FAC Yes FACU 30 =Total Cover 50% of total cover: 15 20% of total cover: Woody Vine Stratum (Plot size: 15 -foot radius ) 1. 2. 3. 4. 5. 6 Total % Cover of: Multiply by: OBL species 0 x 1 = 0 FACW species 20 x 2 = 40 FAC species 20 x 3 = 60 FACU species 35 x 4 = 140 UPL species 0 x 5 = 0 Column Totals: 75 (A) 240 (B) Prevalence Index = B/A = 3.20 Hydrophytic Vegetation Indicators: _ 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% 3 - Prevalence Index is 553.0' 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Four Vegetation Strata: Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Herb - All herbaceous (non -woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Woody Vine - All woody vines greater than 3.28 ft in height. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: I Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) Due to the project area limitations in the vicinity of the wetland boundary, the sampling plots were limited to a 15 -foot radius in which all strata were sampled. ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: U101-204 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-8 5YR 5/4 90 Loamy/Clayey 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: W101-215 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): floodplain Local relief (concave, convex, none): concave Slope (%): 0 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0570405 Long: -80.8621562 Datum: WGS-84 Soil Map Unit Name: Wilkes loam, 15 to 25% slopes NWI classification: PF01A Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) X Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) X Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) X FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes X No Depth (inches): 1 Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W101-215 Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status Dominance Test worksheet: 1. Salix nigra 20 Yes OBL Number of Dominant Species 2. Acer negundo 10 Yes FAC That Are OBL, FACW, or FAC: 5 (A) 3. Liquidambar styraciflua 10 Yes FAC Total Number of Dominant 4. Species Across All Strata: 6 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 83.3% (A/B) 7. Prevalence Index worksheet: 40 =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20 20% of total cover: 8 OBL species 30 x 1 = 30 Sapling/Shrub Stratum (Plot size: 15 -foot radius) FACW species 0 x 2 = 0 1. FAC species 40 x 3 = 120 2. FACU species 0 x 4 = 0 3. UPL species 0 x 5 = 0 4. Column Totals: 70 (A) 150 (B) 5. Prevalence Index = B/A = 2.14 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. X 2 - Dominance Test is >50% 9. X 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 -foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Microstegium vimineum 20 Yes FAC 'Indicators of hydric soil and wetland hydrology must be 2. Typha latifolia 10 Yes OBL present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Carex sp. 10 Yes 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 40 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 20 20% of total cover: 8 height. Woody Vine Stratum (Plot size: 15 -foot radius ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes X No Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited project area, the sampling plot was measured with a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: W101-215 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-4 10YR 5/2 95 Mucky Loam/Clay saturated at 1" below surface 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) X Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes X No ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: U101-215 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): hillside Local relief (concave, convex, none): concave Slope (%): 15 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0572230 Long: -80.8618261 Datum: WGS-84 Soil Map Unit Name: Wilkes loam, 15 to 25% slopes NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: U101-215 Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status Dominance Test worksheet: 1. Number of Dominant Species 2. That Are OBL, FACW, or FAC: (A) 3. Total Number of Dominant 4. Species Across All Strata: (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: (A/B) 7. Prevalence Index worksheet: =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20% of total cover: OBL species x 1 = Sapling/Shrub Stratum (Plot size: 15 -foot radius) FACW species x 2 = 1. FAC species x 3 = 2. FACU species x 4 = 3. UPL species x 5 = 4. Column Totals: (A) (B) 5. Prevalence Index = B/A = 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. 2 - Dominance Test is >50% 9. 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 -foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Maintained lawn ' Indicators of hydric soil and wetland hydrology must be 2. present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 20% of total cover: height. Woody Vine Stratum (Plot size: 15 -foot radius ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited project area in the vicinity of the wetland boundary, sampling plots were limited to a 15 -foot radius in which all strata were sampled This area consisted of a sloping maintained lawn. ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: U101-215 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-10 2.5YR 4/4 95 Loamy/Clayey 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distribution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: W102-103 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): floodplain Local relief (concave, convex, none): concave Slope (%): 0 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0558339 Long: -80.8605759 Datum: WGS-84 Soil Map Unit Name: Mecklenburg fine sandy loam, 8 to 15% slopes NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) X Saturation (A3) —Oxidized Rhizospheres on Living Roots (C3) _ Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) X Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) X FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes X No Depth (inches): 1 Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W102-103 Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status Dominance Test worksheet: 1. Platanus occidentalis 10 Yes FACW Number of Dominant Species 2. Liquidambar styraciflua 15 Yes FAC That Are OBL, FACW, or FAC: 6 (A) 3. Acer negundo 15 Yes FAC Total Number of Dominant 4. Salix nigra 10 Yes OBL Species Across All Strata: 8 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 75.0% (A/B) 7. Prevalence Index worksheet: 50 =Total Cover Total % Cover of: Multiply by: 50% of total cover: 25 20% of total cover: 10 OBL species 10 x 1 = 10 Sapling/Shrub Stratum (Plot size: 15 -foot radius) FACW species 10 x 2 = 20 1. FAC species 55 x 3 = 165 2. FACU species 5 x 4 = 20 3. UPL species 0 x 5 = 0 4. Column Totals: 80 (A) 215 (B) 5. Prevalence Index = B/A = 2.69 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. X 2 - Dominance Test is >50% 9. X 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 -foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Microstegium vimineum 20 Yes FAC 'Indicators of hydric soil and wetland hydrology must be 2. Juncus sp. 5 Yes present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 25 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 13 20% of total cover: 5 height. Woody Vine Stratum (Plot size: 15 -foot radius ) 1. Toxicodendron radicans 5 Yes FAC 2. Rubus allegheniensis 5 Yes FACU 3. 4. 5. Hydrophytic 10 =Total Cover Vegetation 50% of total cover: 5 20% of total cover: 2 Present? Yes X No Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited project area in the vicinity of the wetland boundary, sample plots were limited to a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: W102-103 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-5 10YR 5/2 90 Mucky Loam/Clay saturated at 1" below surface 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) X Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes X No ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 U.S. Army Corps of Engineers Requirement Control Symbol WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region EXEMPT (Authority. AR 335-15, See ERDC/EL TR -07-24; the proponent agency is CECW-CO-R paragraph 5-2a) Project/Site: Rushmore Drive Proposed 16" Steel Distirbution City/County: Charlotte/Mecklenburg Sampling Date: 02/27/18 Applicant/Owner: Piedmont Natural Gas State: NC Sampling Point: U102-103 Investigator(s): S. Ryan/J. McCort Section, Township, Range: Landform (hillside, terrace, etc.): hillside Local relief (concave, convex, none): concave Slope (%): 20 Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.0561492 Long: -80.8605483 Datum: WGS-84 Soil Map Unit Name: Mecklenburg fine sandy loam, 8 to 15% slopes NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS —Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) —Surface Soil Cracks (66) _Surface Water (Al) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (138) —High Water Table (A2) —Hydrogen Sulfide Odor (C1) —Drainage Patterns (B10) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (B16) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _ Iron Deposits (65) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) —Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: U102-103 Tree Stratum (Plot size: 15 -foot radius) % Cover Species? Status Dominance Test worksheet: 1. Pinus taeda 10 Yes FAC Number of Dominant Species 2. Liriodendron tulipifera 20 Yes FACU That Are OBL, FACW, or FAC: 3 (A) 3. Ailanthus altissima 10 Yes FACU Total Number of Dominant 4. Liquidambar styraciflua 10 Yes FAC Species Across All Strata: 7 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 42.9% (A/B) 7. Prevalence Index worksheet: 50 =Total Cover Total % Cover of: Multiply by: 50% of total cover: 25 20% of total cover: 10 OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: 15 -foot radius) FACW species 0 x 2 = 0 1. FAC species 30 x 3 = 90 2. FACU species 40 x 4 = 160 3. UPL species 0 x 5 = 0 4. Column Totals: 70 (A) 250 (B) 5. Prevalence Index = B/A = 3.57 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. 2 - Dominance Test is >50% 9. 3 - Prevalence Index is 553.0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 20% of total cover: data in Remarks or on a separate sheet) Herb Stratum (Plot size: 15 -foot radius) -Problematic Hydrophytic Vegetation' (Explain) 1. Solidago sp. 15 Yes ' Indicators of hydric soil and wetland hydrology must be 2. Microstegium vimineum 10 Yes FAC present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9 (1 m) tall. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 25 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 13 20% of total cover: 5 height. Woody Vine Stratum (Plot size: 15 -foot radius ) 1. Rubus allegheniensis 10 Yes FACU 2. 3. 4. 5. Hydrophytic 10 =Total Cover Vegetation 50% of total cover: 5 20% of total cover: 2 Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) Due to the limited project area in the vicinity of the wetland boundary, sample plots were limited to a 15 -foot radius in which all strata were sampled ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: U102-103 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-12 2.5YR 4/4 95 Loamy/Clayey 'Type: C=Concentration, D=Depletion, Hydric Soil Indicators: _ Histosol (Al) _ Histic Epipedon (A2) —Black Histic (A3) —Hydrogen Sulfide (A4) —Stratified Layers (A5) _ 2 cm Muck (A10) (LRR N) —Depleted Below Dark Surface (A11) _Thick Dark Surface (Al2) _Sandy Mucky Mineral (S1) —Sandy Gleyed Matrix (S4) —Sandy Redox (S5) —Stripped Matrix (S6) Dark Surface (S7) Restrictive Layer (if observed): Type: Depth (inches): Remarks: RM=Reduced Matrix, MS=Masked Sand Grains. _ Polyvalue Below Surface (S8) (MLRA 147, 148) _Thin Dark Surface (S9) (MLRA 147, 148) —Loamy Mucky Mineral (F1) (MLRA 136) _ Loamy Gleyed Matrix (F2) _ Depleted Matrix (F3) _ Redox Dark Surface (F6) —Depleted Dark Surface (F7) _ Redox Depressions (F8) _ Iron -Manganese Masses (F12) (LRR N, MLRA 136) _ Umbric Surface (F13) (MLRA 122, 136) —Piedmont Floodplain Soils (F19) (MLRA 148) Red Parent Material (F21) (MLRA 127, 147, 148) 2Location: PL=Pore Lining, M=Matrix Indicators for Problematic Hydric Soils3: _ 2 cm Muck (A10) (MLRA 147) —Coast Prairie Redox (A16) (MLRA 147, 148) —Piedmont Floodplain Soils (F19) (MLRA 136, 147) —Red Parent Material (F21) (outside MLRA 127, 147, 148) —Very Shallow Dark Surface (F22) Other (Explain in Remarks) 3Indicators of hydrophytic vegetation and wetland hydrology must be present, unless disturbed or problematic. Hydric Soil Present? Yes No X ENG FORM 6116 -4 -SG, JUL 2018 Eastern Mountains and Piedmont – Version 2.0 i APPENDIX C EROSION AND SEDIMENT CONTROL PLAN INDEX OF SHEETS SHT. No. DESCRIPTION I COVER SHEET 2 EROSION CONTROL NOTES 3 EROSION CONTROL NOTES 4 GENERAL NOTES 5 SHEET INDEX 6 SOIL EROSION & SEDIMENT CONTROL PLAN 7 SOIL EROSION & SEDIMENT CONTROL PLAN 8 SOIL EROSION & SEDIMENT CONTROL PLAN 9 SOIL EROSION & SEDIMENT CONTROL PLAN 10 SOIL EROSION & SEDIMENT CONTROL DETAILS SOIL EROSION & SEDIMENT CONTROL DETAILS 12 SOIL EROSION & SEDIMENT CONTROL DETAILS . LATEST EROSION CONTROL PLANS REVISION FOR PIEDMONT NATURAL GAS r6111 Piedmont Natural Gas RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA PROPOSED 16" STEEL NATURAL GAS L1N\E n G� G_ 100 -YEAR FLOODPLAIN WETLAND BOUNDARY 1 200 a 200 O°ASO �F IL 0P I SCALE: V - 200' SER C O N S U L T I N G P. A. Costumer Loyalty through Client Sndaf don sulxing.com Engineers • PI""' • Seneyorsa•efLand—pe Architects • Environmental Sciendsrs DRCe Lo • Red Bank Nf • Mc Laurel, NJ •tI LE Valley, PA • Orlando, FL • Climm�, NI • Albanl, NY • Eawn, PA • Miami, FL • HamHlmb f • LWndsor,� • Riladel" PA • 1re- yVA •n ar or, NJ gm firer Rxmburtl�, PA olk, NJ • Columbia, MD pa, • Albuquerque NM • Mc Niingon, NJ 5sare of N.C. Firm No. AM2 • CM1arloaa NC au ada ae....a. maane °Foaaa LOCATION MAP SCALE: I " = 200' NCDOT COMMENTS DIR9l20I9. DESCRIPTION EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA 49v AS SHOWN "ABWIBllB -CJRIIN y CMENMGY NUMBER. 17W9827A ID NI -NAME C-SESC-OVER --- COVER SHEET -PRq[I7 CHARLO EOFFICE Twelve Parkway Place T se loo 5275 Parkway Rau 13-1 erd C-SE01 Charlotte, NC 28217 Phone: 704.516.8295 FFT `meek. Fax: 732.383.1984 01 Of 12 ECT DESCRIPTION PIEDMONT NATURAL GAS IS UPGRADING ITS NATURAL GAS DISTRIBUTION IN AND AROUND CHARLOTTE, NORTH CAROLINA. THIS UPGRADE INCLUDES THE INSTALLATION OF APPROXIMATELY 2,787 LINEAR FEET (LF) OF NEW 16 -INCH DIAMETER STEEL PIPE. THE PROJECT WILL BE WITHIN EXISTING 30' AND 50' WIDE PERMANENT PNG UTILITY EASEMENTS; HOWEVER, ADDITIONAL WORKSPACE AT CERTAIN PROPOSED HORIZONTAL DIRECTIONAL DRILL (HDD) DRILL LOCATIONS WILL REQUIRE ADDITIONAL TEMPORARY EASEMENTS FROM PRIVATE LANDOWNERS. THE NORMAL CONSTRUCTION EASEMENT WILL BE I S -FEET WIDE (10 -FT PERMANENT AND 5 -FT TEMPORARY) ALONG THE PROPOSED ROUTE. THE TOTAL ACREAGE OF DISTURBANCE IS 4.92 ACRES. EXISTING SITE CONDITIONS THE PROJECT IS LOCATED WITHIN THE UTILITY EASEMENT AND CONSISTS OF GRASSY ROAD SIDE, RESIDENTIAL LAWNS, AND RESIDENTIAL AND ROADWAYS. WETLANDS, 100 YEAR FLOODPLAINS AND SANITARY SEWER CONVEYANCE SYSTEMS ARE LOCATED ALONG THE ROUTE. SCHEDULE CONSTRUCTION OF THE PIPELINE IS ANTICIPATED TO BEGIN ON JULY 30, 2018 AND BE COMPLETED BY NOVEMBER 31, 2018. ONCE CONSTRUCTION BEGINS IT IS ANTICIPATED TO LAST FOUR MONTHS. EROSION AND SEDIMENT CONTROL NARRATIVE ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION INCLUDING REVISIONS. THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • ROCK CONSTRUCTION ENTRANCES • INLET PROTECTION • EROSION CONTROL BLANKETS • MOVABLE/TEMPORARY DIVERSION BERMS AND/OR FILTER SOCK WATTLES MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. CONSTRUCTION SEQUENCE NOTES I. PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBANCE ONSITE AND DURING THE CONSTRUCTION ACTIVITIES, AN APPROVED COPY OF THE E&SC PLAN WITH PLACARD, APPROVAL LETTER, AND A COPY OF THE NPDES PERMIT WITH A MINIMUM OF 30 DAYS OF SELF -INSPECTION REPORTS ARE TO BE KEPT ON SITE UNTIL PROJECT CLOSURE BY NC DEQ OFFICE. THESE DOCUMENTS MUST BE KEPT CURRENT AND UP TO DATE. 2. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 3. ALL WORK IS TO OCCUR WITHIN THE LIMIT OF DISTURBANCE BOUNDARY AS INDICATED ON THE PLANS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. 4. LIMIT TREE REMOVAL TO ONLY WHAT IS REQUIRED FOR CONSTRUCTION. S. IF ANY EROSION CONTROL DEVICE FAILS TO FUNCTION AS INTENDED, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY. 6. SILT FENCE SHALL BE INSTALLED DOWN GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 7. CONSTRUCTION ENTRANCE LOCATIONS ARE SHOWN AT APPROXIMATE LOCATIONS. FINAL LOCATIONS WILL BE DETERMINED AT THE PRE -CONSTRUCTION MEETING. 8. WATER, WHICH ACCUMULATES IN THE OPEN TRENCH, SHALL BE COMPLETELY REMOVED BY SILT BAG PUMPING, BEFORE PIPE PLACEMENT AND/OR BACKFILLING BEGINS. 9. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. r6111 Piedmont Natural Gas CONSTRUCTION SEQUENCE I. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE -CONSTRUCTION MEETING. CALL NC DEQ LQS AT THE MOORESVILLE REGIONAL OFFICE AT 704-663-1699 TO SCHEDULE PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS PRIOR TO PROJECT ACTIVATION. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES WITH MINIMAL LAND DISTURBING ACTIVITIES. 5. BEGIN CLEARING. INSTALUREPLACE ANY DAMAGED EROSION CONTROL MEASURES IMMEDIATELY, AS REQUIRED. 6. BEGIN PIPE INSTALLATION. 7. IN WETLAND AREAS: 7.1. KEEP CLEARING AND EXCAVATION TO A MINIMUM. 7.2. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE WETLANDS. 7.3. REMOVE WETLAND MATTING IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. 7.4. SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. SEED IN ACCORDANCE WITH SEEDING SPECIFICATIONS. 7.5. PROVIDE PERMANENT STABILIZATION OF ALL DISTURBED WETLANDS. 8. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: • ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3:1 SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. • ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 9. ALL DISTURBED AREAS SHALL BE STABILIZED WITH SEED AND STRAW OR VIA HYDROSEEDING. PLACE EROSION CONTROL BLANKETS ALONG STEEP SLOPES AS REQUIRED AND SPECIFIED ON THE PLANS. 10. AFTER SITE IS STABILIZED AND FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE HAS BEEN OBTAINED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND INSTALL PERMANENT VEGETATION OF THE DISTURBED AREAS. EROSION CONTROL DEVICE NOTES I. CONSTRUCTION ENTRANCES SHALL BE UTILIZED AT ALL INGRESS/EGRESS LOCATIONS FROM PUBLIC ROADS. CONTRACTOR SHALL TAKE NECESSARY ACTION TO MINIMIZE THE TRANSPORT OF MATERIAL FROM THE CONSTRUCTION SITE ONTO R.O.W. PERIODIC TOP DRESSING WITH FRESH STONE MAY BE REQUIRED. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM SITE TRAFFIC ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 50 FEET OUTSIDE STREAMS AND/OR WETLANDS. 3. DEWATERING STRUCTURE, USED DURING HYDROSTATIC DISCHARGE TESTING, LOCATION TO BE DETERMINED AND FIELD VERIFIED WITH STORMWATER INSPECTORS FROM MECKLENBURG COUNTY. 4. GROUND STABILIZATION, SUCH AS WHEAT STRAW APPLICATION, MUST BE APPLIED WITHIN 14 DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. FOR STEEP SLOPES, THAT AREA MUST BE STABILIZED WITHIN 7 DAYS. 5. ALL GROUND COVER TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR IN CRITICAL AREAS, AT END OF DAY. 6. SILT FENCE SHALL BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND/OR WETLANDS, IF PRESENT. 7. ALL TIMBER BRIDGES/MATS CROSSING STREAM, WETLANDS, OR CONVEYANCES MUST BE CLEANED AT THE END OF THE DAY OR IMMEDIATELY AFTER CROSSING IF SEDIMENT IS DEPOSITED BEFORE OR DURING A RAIN EVENT. SEDIMENT REMOVED FROM BRIDGES MUST BE PLACED IN A CONTAINED AREA AWAY FROM JURISDICTIONAL WATER OR DRAINAGE STRUCTURES. 8. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION, TEMPORARY BRIDGES SHALL BE USED TO CROSS STREAMS. MAINTFNAN['F I. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED EVERY 7 DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT FENCE BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. #V4 SER C 0 N 5 U L T I N G P. A. Cesromer Loyalty through Clwu Sndaf doe g.c Engineers • Plannen • Surveyors"•eflanduape Architects • Environmental Sciendsrs J • New Windsor, NY N NJJ • Columbia, M6"T -NJ S..&MC. FirmI GRASSED AREAS WILL BE MOWED AT LEAST ONCE PER YEAR. EQUIPMENT AND OPERATION MAINTENANCE - EQUIPMENT UTILIZED DURING THE CONSTRUCTION ACTIVITY ON A SITE MUST BE OPERATED AND MAINTAINED IN SUCH A MANNER AS TO PREVENT THE POTENTIAL OR ACTUAL POLLUTION OF THE SURFACE OR GROUND WATERS OF THE STATE. FUELS, LUBRICANTS, COOLANTS, AND HYDRAULIC FLUIDS, OR ANY OTHER PETROLEUM PRODUCTS, SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO SURFACE WATERS. SPENT FLUIDS SHALL BE CLEANED UP AND DISPOSED OF IN A MANNER SO AS NOT TO ENTER THE WATERS, SURFACE OR GROUND, OF THE STATE AND IN ACCORDANCE WITH STATE AND FEDERAL REGULATIONS. GENERAL NOTES I. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 2. FILL, COVER, AND CLEAN TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IN RESIDENTIAL AREAS OR WITHIN ANY ACTIVE ROADWAYS, ADEQUATE OPEN TRENCH PROTECTION MUST BE PROVIDED AT THE END OF EACH WORKDAY. 3. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 4. THE EXISTING CONTOUR LINEWORK IN THIS DRAWING IS GIS DATA FROM MECKLENBURG COUNTY GIS. S. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUNRICANT/MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 6. CONTRACTOR SHALL MAINTAIN A MINIMUM CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. CONSTRUCTION SITE POLLUTANTS EQUIPMENT AND OPERATION MAINTENANCE - EQUIPMENT UTILIZED DURING THE CONSTRUCTION ACTIVITY ON A SITE MUST BE OPERATED AND MAINTAINED IN SUCH A MANNER AS TO PREVENT THE POTENTIAL OR ACTUAL POLLUTION OF THE SURFACE OR GROUND WATERS OF THE STATE. FUELS, LUBRICANTS, COOLANTS, AND HYDRAULIC FLUIDS, OR ANY OTHER PETROLEUM PRODUCTS, SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO SURFACE WATERS. SPENT FLUIDS SHALL BE CLEANED UP AND DISPOSED OF IN A MANNER SO AS NOT TO ENTER THE WATERS, SURFACE OR GROUND, OF THE STATE AND IN ACCORDANCE WITH STATE AND FEDERAL REGULATIONS. MATERIAL HANDLING - HERBICIDE, PESTICIDE, AND FERTILIZER USAGE DURING THE CONSTRUCTION ACTIVITY SHALL BE CONSISTENT WITH THE FEDERAL INSECTICIDE, FUNGICIDE, AND RODENTICIDE ACT AND SHALL BE IN ACCORDANCE WITH LABEL RESTRICTIONS. SELF INSPECTION AND REPORTING REQUIREMENTS MINIMUM SELF INSPECTION AND REPORTING REQUIREMENTS ARE AS FOLLOWS UNLESS OTHERWISE APPROVED IN WRITING BY THE DIVISION OF WATER QUALITY: A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN -MONITORING DEVICE HAS BEEN APPROVED. A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO DIVISION OF WATER QUALITY OR AUTHORIZED AGENT UPON REQUEST. IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE DURING WEEKEND OR HOLIDAY PERIODS, AND NO INDIVIDUAL -DAY RAINFALL INFORMATION IS AVAILABLE, THE CUMULATIVE RAIN MEASUREMENT FOR THOSE UN -ATTENDED DAYS WILL DETERMINE IF A SITE INSPECTION IS NEEDED. (NOTE: IF NO RAINFALL OCCURRED, THE PERMITTEE MUST RECORD "ZERO".) EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. INSPECTION RECORDS MUST BE MAINTAINED FOR EACH INSPECTION EVENT AND FOR EACH MEASURE. AT A MINIMUM, INSPECTION OF MEASURES MUST OCCUR AT THE FREQUENCY INDICATED BELOW: 3.1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS, AND 3.2. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. ONCE LAND DISTURBANCE HAS BEGUN ON THE SITE, STORMWATER RUNOFF DISCHARGE OUTFALLS SHALL BE INSPECTED BY OBSERVATION FOR EROSION, SEDIMENTATION AND OTHER STORMWATER DISCHARGE CHARACTERISTICS SUCH AS CLARITY, FLOATING SOLIDS, AND OIL SHEENS. INSPECTIONS OF THE OUTFALLS SHALL BE MADE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. INSPECTIONS ARE ONLY REQUIRED TO BE MADE DURING NORMAL BUSINESS HOURS. WHEN ADVERSE WEATHER CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY, THE INSPECTION CAN BE DELAYED UNTIL IT IS DEEMED SAFE TO PERFORM THESE DUTIES. (TIMES WHEN INSPECTIONS WERE DELAYED BECAUSE OF SAFETY ISSUES SHOULD BE NOTED IN THE INSPECTION RECORD.) IF THE INSPECTION CANNOT BE DONE ON THAT DAY. IT MUST BE COMPLETED ON THE FOLLOWING BUSINESS DAY. NC- COMMENTS UIR9l2019. DESCRIPTION 6. TWENTY-FOUR HOUR REPORTING FOR VISIBLE SEDIMENT DEPOSITION 6.1. THE PERMITTEE SHALL REPORT TO THE DIVISION OF WATER QUALITY CENTRAL OFFICE OR THE APPROPRIATE REGIONAL OFFICE ANY VISIBLE SEDIMENT BEING DEPOSITED IN ANY STREAM OR WETLAND OR ANY NONCOMPLIANCE WHICH MAY ENDANGER HEALTH OR THE ENVIRONMENT. ANY INFORMATION SHALL BE PROVIDED ORALLY OR ELECTRONICALLY WITHIN 24 HOURS FROM THE TIME THE PERMITTEE BECAME AWARE OF THE CIRCUMSTANCES. 6.2. A WRITTEN SUBMISSION SHALL BE PROVIDED TO THE APPROPRIATE REGIONAL OFFICE OF THE DIVISION OF WATER QUALITY WITHIN 5 DAYS OF THE TIME THE PERMITTEE BECOMES AWARE OF THE CIRCUMSTANCES. THE WRITTEN SUBMISSION SHALL CONTAIN A DESCRIPTION OF THE SEDIMENT DEPOSITION AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. THE DIVISION OF WATER QUALITY STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE-BY-CASE BASIS. 7. RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS 30 DAYS SHALL REMAIN ON THE SITE AND AVAILABLE FOR AGENCY INSPECTORS AT ALL TIMES DURING NORMAL WORKING HOURS, UNLESS THE DIVISION OF WATER QUALITY PROVIDES A SITE-SPECIFIC EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL. OLDER RECORDS MUST BE MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE AVAILABLE UPON REQUEST. THE RECORDS MUST PROVIDE THE DETAILS OF EACH INSPECTION INCLUDING OBSERVATIONS, AND ACTIONS TAKEN IN ACCORDANCE WITH THIS PERMIT. THE PERMITTEE SHALL RECORD THE REQUIRED RAINFALL AND MONITORING OBSERVATIONS OF THE INSPECTION RECORD FORM PROVIDED BY THE DIVISION OR A SIMILAR INSPECTION FORM THAT IS INCLUSIVE OF ALL THE ELEMENTS CONTAINED IN THE DIVISION'S FORM. USE OF ELECTRONICALLY -AVAILABLE RECORDS, IN LIEU OF THE REQUIRED PAPER COPIES FOR INSPECTION WILL BE ALLOWED IF SHOWN TO PROVIDE EQUAL ACCESS AND UTILITY AS THE HARD -COPY RECORDS. 8. INSPECTION RECORDS MUST INCLUDE, ATA MINIMUM, THE FOLLOWING: 8.1. CONTROL MEASURE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: 1) IDENTIFICATION OF THE MEASURES INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 4) INDICATION OF WHETHER THE MEASURES WERE OPERATING PROPERLY, 5) DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, 6) CORRECTIVE ACTIONS TAKEN, 7) DATE OF ACTIONS TAKEN, AS WELL AS THE DATE AND AMOUNTS OF RAINFALL RECEIVED. 8.2. STORMWATER DISCHARGE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: 1) IDENTIFICATION OF THE DISCHARGE OUTFALL INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 4) EVIDENCE OF INDICATORS OF STORMWATER POLLUTION SUCH AS OIL SHEEN, FLOATING OR SUSPENDED SOLIDS OR DISCOLORATION, 5) INDICATION OF VISIBLE SEDIMENT LEAVING THE SITE, 6) ACTIONS TAKEN TO CORRECT/PREVENT SEDIMENTATION, AND 7) DATE OF ACTIONS TAKEN. 8.3. VISIBLE SEDIMENTATION FOUND OUTSIDE THE SITE LIMITS: INSPECTION RECORDS MUST INCLUDE: 1) AN EXPLANATION AS TO THE ACTIONS TAKEN TO CONTROL FUTURE RELEASES, 2) ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE SEDIMENT THAT HAS LEFT THE SITE LIMITS AND 3) THE DATE OF ACTIONS TAKEN. 8.4. VISIBLE SEDIMENTATION FOUND IN STREAMS OR WETLANDS: ALL INSPECTIONS SHOULD INCLUDE EVALUATION OF STREAMS OR WETLANDS ONSITE OR OFFSITE (WHERE ACCESSIBLE) TO DETERMINE IF VISIBLE SEDIMENTATION HAS OCCURRED. 9. VISIBLE STREAM TURBIDITY - IF THE DISCHARGE FROM A SITE RESULTS IN AN INCREASE IN VISIBLE STREAM TURBIDITY, INSPECTION RECORDS MUST RECORD THAT EVIDENCE AND ACTIONS TAKEN TO REDUCE SEDIMENT CONTRIBUTIONS. SITES DISCHARGING TO STREAMS NAMED ON THE STATE'S 303(d) LIST AS IMPAIRED FOR SEDIMENT -RELATED CAUSES MAY BE REQUIRED TO PERFORM ADDITIONAL MONITORING, INSPECTIONS, OR APPLICATION OF MORE -STRINGENT MANAGEMENT PRACTICES IF IT IS DETERMINED THAT THE ADDITIONAL REQUIREMENTS ARE NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE IMAIRED-WATERS CONDITIONS. IF A DISCHARGE COVERED BY THIS PERMIT ENTERS A STREAM SEGMENT THAT IS LISTED ON THE IMPAIRED STREAM LIST FOR SEDIMENT -RELATED CAUSES, A TOTAL MAXIMUM DAILY LOAD (TMDL) HAS BEEN PREPARED FOR THOSE POLLUTANTS, THE PERMITTEE MUST IMPLEMENT MEASURES TO ENSURE THAT THE DISCHARGE OF POLLUTANTS FROM THE SITE IS CONSISTENT WITH THE ASSUMPTIONS AND MEETS THE REQUIREMENTS OF THE APPROVED TMDL. EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS CHARLOTTE OFFICE RUSHMORE PROPOSED Twelve Parkway Place Suim loo 16" STEEL DISTRIBUTION 5275 Parkway Rau Boulevard CITY OF CHARLOTTE Charlotte, NC 28217 MECKLENBURG COUNTY, NORTH CAROLINA 4.516 8295 Phoee:70.383.1984 Fax: 732.383.1984 AS SHOWN "AUWIBIIB aA C"K CM[NMGY M07 McEB: oaA N�N�ME I1W9827A C-SESC-OVER ME�T1 EROSION CONTROL NOTES C-SE02 02 of 12 SEEDING SPECIFICATIONS THE FOLLOWING SPECIFICATIONS ARE IN ACCORDANCE WITH NC DEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.10 AND 6.11. TEMPORARY SEEDING SEEDBED PREPARATION: • LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF I TO I Y2 TONS TONS/ACRE ON COARSE-TEXTURED SOILS AND A MINIMUM OF 2 TONS PER WITH 3 TONS PER ACRE IN CLAY SOILS OR PER SOILS TEST. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. • FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. • SURFACE ROUGHENING - IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAIC UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). PLANT SELECTION: SEE SEEDING SPECIFICATIONS TABLE. SEEDING: EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER. OR HYDROSEEDER. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN I INCH DEEP, AND GRASSES AND LEGUME= NO MORE THANY2 INCH BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPAKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. MULCHING: THE USE OF AN APPROPRIATE MULCH IS REQUIRED UNDER THE FOLLOWING HARSH SITE CONDITIONS: • SEED IN IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE), • SLOPES STEEPER THAN 3:1, • EXCESSIVELY HOT OR DRY WEATHER, • ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND), AND • AREAS RECEIVING CONCENTRATED FLOW. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATERFLOW, AS IN CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). PERMANENT SEEDING SOIL PREPARATION OF AREAS TO BE SEEDED: PREPARATION FOR PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA HAS BEEN COMPLETED. TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR (4) 4NCHES. REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD PH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE DRAINAGE, SEEDING OF GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETED. SEEDBED PREPARATION: • LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOWN, APPLY GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 75 LBS/1,000 SQ. FT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. • FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. MULCHES AND TACKING AGENTS: THE MULCH MUST COVER A MINIMUM OF EIGHTY (80) PERCENT OF THE SOIL SURFACE AND MUST BE SECURED BY A TACKING AGENT, CRIMPING, OR PROTECTIVE BIODEGRADABLE NETTING. NETTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHOULD NOT BE USED IN WETLANDS, RIPARIAN BUFFERS OR FLOODPLAINS DUE TO THE POTENTIAL OF SMALL ANIMAL MORTALITY. SEE SECTION 6.14 FOR DETAILED SPECIFICATIONS AND PRODUCT APPLICATIONS. r6111 Piedmont Natural Gas STABILIZATION IN WETLANDS, RIPARIAN BUFFERS, AND FLOODPLAINS: • OBTAIN SOIL TESTS TO DETERMINE SOIL TYPE, PH, TEXTURE, AND AVAILABLE NUTRIENTS. • BASED ON THE SOIL TESTS PROVIDE A SCHEDULE OF NUTRIENTS AND OTHER SOIL AMENDMENTS THAT WILL BE REQUIRED. • SELECT A SEEDING MIX OF NON-INVASIVE SPECIES THAT WILL PROVIDE IMMEDIATE STABILIZATION (A SHORT-TERM ENVIRONMENT THAT WILL SUPPORT AND COMPLIMENT PERMANENT VEGETATIVE STABILIZATION) AND INCLUDE A SELECTIVE NATIVE SPECIES MIX THAT WILL EVENTUALLY PROVIDE A PERMANENT COVER (A LONG-TERM ENVIRONMENT THAT, WITH MINIMAL MAINTENANCE, WILL PROVIDE ADEQUATE ROOT AND LEAF COVER). • INVASIVE SPECIES ARE TO BE AVOIDED. IF NATIVE SPECIES AND INTRODUCED NON-INVASIVE SEED SOURCES ARE NOT AVAILABLE, PROTECTIVE MATTING THAT WILL HOLD AND FOSTER THE DEVELOPMENT OF NATIVE COVER FROM ADJACENT SEED SOURCES SHOULD BE USED. CONTINUOUS MAINTENANCE MUST BE EMPLOYED UNTIL THE SELECTED SPECIES HAVE MATURED AND ARE NO LONGER SUSCEPTIBLE TO COMPETITION FROM INVASIVE PLANTS. IF NO ALTERNATIVE TO THE USE OF INVASIVE SEEDS AND PLANTS IS AVAILABLE. INVASIVE APPROVED ON THE PLANS MAY BE UTILIZED ONLY WITH STRICT CONTAINMENT MEASURES OUTLINED IN DETAIL ON THE PLANS, IN THE CONSTRUCTION DOCUMENTS a Taae[+ar 0,plawa Muk - Coe. arae Wlal.m x•Ie .. Bee! wren Bab Sac.. 141 Pry,u tw md, 6kWd•wne Fan klwel or Wlttl.b3 wM.A . IwPw nmrJ umvrlhwW: ewd r dby hwd.—ch-:r,w¢ EnE Emory rery ra My Imm, .ned. bo .ckwo iM14ue on.ps E4 I— Ak Pt T—rMll, 121. ttleOwftn. Aayy maws gI.-mrsd 7 G wM nn.deiksd a .8 eIo kks (CAN BE USED IN Md' _11M a...•,. axra s�rdl•r nr 50 Lloyd omvdpv Wow, Ox L hth.w Nal4na¢�n M• 10.. W_ Aber G.Gt lulu Ma••n Af.g 4wt d,e w s.wd s>dWtr. Not"."I mere 01"s.V1. A.rraarray .n.pnar.r. Mp b. hWa. 0—A uw In lyrepau AJS .,.ofiodk.rw ANCHOR STRAW BY TACKING hm, dry W_thQ Berk 35.W1cyero. AB Wf, alkeda•Ra +111Wy MOM" 9M h!4.w..—p FOLLOW RECOMMENDATIONS WITH ASPHALT, NETTING, OR ren.rar-nsl.u, ori.. nwldl¢, ww hrld oa I�I� TO EXTEND BEYOND JUNE Gar . l.b OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND RAL LIMESTONE AND 750 LB/ACC RE 750 LBI eEp1mN1•C,'. Gwn •Iws 4!!k- Wv�nrddnd (nW Apply •dTh,.," W.•r w CYC (CAN BE USED IN ALMO) In 4eg►u Nd iW uue n I- ke Beim 1 -gym GG". naryd ld RYE (GRAIN) boo.d.s ..pypWirq REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS ban r,m,n+Ned. klwrn WN ."d M kl DEERTONGUE ANCHORING TOOL. WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO Jule nm iwf a aee F,aeyy , ft-, 9wlver WIIM— waleH.ssr. Buis x4. EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 dI N. �*.rn U.ed wlh es8•n.e, FlGarpaas lwt Coe. arae Wlal.m x•Ie .. Bee! wren Bab PERIMETER DIKES, SWALES, Ured Mn ]k_tn, 6cera t:par a•• Wlttl.b3 wM.A . IwPw nmrJ SPECIES RATE (LB/ACRE) EnE Emory rery ra My Imm, 15 to 25 +_w nslfml. ca.b—Ah .l AXly9Msa[diasm 4atr eJxio, 120 G©1d+[an Yr [henna Slit Iaam, maws gI.-mrsd 7 G wM nn.deiksd a .8 eIo kks (CAN BE USED IN fmgdnar h o nnnamlo d 25 35 gd! I." a P. 50 Lloyd omvdpv Wow, Ox L cN.m.w ■reilmr•� WETLANDS) 0to4 Ma••n Isera. Not"."I mere 01"s.V1. A.rraarray .n.pnar.r. OMIT ANNUAL LESPEDEZA WHEN lyrepau AJS .,.ofiodk.rw ANCHOR STRAW BY TACKING P"mrr" SR FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY APPLY GROUND AGRICULTURAL DURATION OF TEMPORARY COVER IS NOT T_ race FOLLOW RECOMMENDATIONS WITH ASPHALT, NETTING, OR Qn W) NOT kJ WETLANDS) TO EXTEND BEYOND JUNE Gar . l.b OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND RAL LIMESTONE AND 750 LB/ACC RE 750 LBI A MULCH ANCHORING TOOL. A DISK WITH BLADES SET M-..} MAY I -AUG. 15 GERMAN MILLET Na 6ll[I, Cama• Lmed Ty-_ ess "m urwly endorsemet a armarz kLi= 44,MASER C 0 N 5 U L T I N G P. A. C_._ L.y I:ry through Clwu Sndfa don g.c Engineers • Planners • Su,veyorse ee flanduape Architects • Environmental Sciendsrs j J Alban!, ­ "1 NJ • New Windsor, NY N NJJ • Columbia, M�"T n" NJ S.. d N.C. Firm I NCDOT COMMENTS DIR9y2019. DESCRIPTION TEMPORARY SEEDING SPECIFICATIONS - PIEDMONT REGION 5011 pe SEEDING MIXTURE Bab PERIMETER DIKES, SWALES, 2 to S DATES SOILAMENDMENTS MULCH MAINTENANCE SPECIES RATE (LB/ACRE) EnE Emory rery ra My Imm, 15 to 25 Gm[ JAN. I - MAY I RYE (GRAIN) 120 G©1d+[an Yr [henna Slit Iaam, 4 to 15 kks (CAN BE USED IN ANNUAL LESPEDEZA (KOBE IN PIEDMONT) 50 Lloyd omvdpv Wow, 2 to 8 MhH WETLANDS) 0to4 OgA oakbara cdt loam. APPLY 4,000 LB/ACRE STRAW. Pk SEPT. I - IMAY I OMIT ANNUAL LESPEDEZA WHEN I S INOT IN WETLANDS) ANCHOR STRAW BY TACKING REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY APPLY GROUND AGRICULTURAL DURATION OF TEMPORARY COVER IS NOT VI FOLLOW RECOMMENDATIONS WITH ASPHALT, NETTING, OR AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. NOT kJ WETLANDS) TO EXTEND BEYOND JUNE OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND RAL LIMESTONE AND 750 LB/ACC RE 750 LBI A MULCH ANCHORING TOOL. A DISK WITH BLADES SET REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. MAY I -AUG. 15 GERMAN MILLET 40 (CAN BE USED IN ALMO) 10-10-10 FERTILIZER NEARLY STRAIGHT CAN BE USED AS A MULCH AUG. IS -DEC. 30 RYE (GRAIN) 120 REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS ANCHORING TOOL MAY i - APRIL I DEERTONGUE ANCHORING TOOL. WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE IESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. * SEEDING SPECIFIED MAY BE SUBSTITUTED WITH AN APPROVED EQUAL. PERMANENT SEEDING SPECIFICATIONS - PIEDMONT REGION 5011 pe SEEDING MIXTURE Bab PERIMETER DIKES, SWALES, 2 to S DATES SOILAMENDMENTS MULCH MAINTENANCE SPECIES RATE (LB/ACRE) EnE Emory rery ra My Imm, 15 to 25 Gm[ MAY 15 - AUGUST IS GERMAN MILLET 10 G©1d+[an Yr [henna Slit Iaam, 4 to 15 kks (CAN BE USED IN 0 to 6 8 Lloyd omvdpv Wow, 2 to 8 MhH WETLANDS) 0to4 OgA oakbara cdt loam. APPLY 4,000 LB/ACRE STRAW. Pk SEPT. I - IMAY I SERICEA LESPEDEZA (LESPEDEZA CUNEATA I S INOT IN WETLANDS) DUMONT') Tb0 FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY APPLY GROUND AGRICULTURAL ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR VI APRIL IS -JUNE 30 BERMUDA GRASS 25 NOT kJ WETLANDS) LIMESTONE AT THE RATE OF 7S LBS/1,000 SQ. FT. APPLY A 10- GRADE FERTILIZER AT A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. DEC. I -MAY I SWITCHGRASS (PANICUM VIRGATUM / IS (CAN BE USED IN ALMO) USED AS A MULCH WETLANDS) 700-1,000 LB/ACRE. ANCHORING TOOL MAY i - APRIL I DEERTONGUE 21 iCAN BE USED IN WETLANDS) * SEEDING SPECIFIED MAY BE SUBSTITUTED WITH AN APPROVED EQUAL. $011 Legend sym6ol 5011 pe e Bab PERIMETER DIKES, SWALES, 2 to S Sao IMF Badln rLeflflCly Llt loam. Badln &amln 511 IOam, St. Is 15 to 45 Enc Enna very cohmy loam, 4 to 15 EnE Emory rery ra My Imm, 15 to 25 Gm[ Gnrgeolllp mit loam, 4 to 15 Ga[ G©1d+[an Yr [henna Slit Iaam, 4 to 15 kks vaisev sdt loam, 0 to 6 8 Lloyd omvdpv Wow, 2 to 8 MhH ML•enkeirrer cdann silt loam, 0to4 OgA oakbara cdt loam. 0 to 2 Pk Ru.i.a w TbB Tam% tNF$Mery dItIo . 2 to a Tb0 Terra: rharmery sUHOam, s to is VI Water TABLE 5: STREAM AND WETLAND IMPACT SUMMARY TYPE OF IMPACT AMOUNT APPROVED [NON -REPORT 404!401 WETLAND 0.92 ACRES tNPORARY IMPACT 404/401 WETLAND 0.39 ACRES PERMANENT IMPACT 404/401 STREAM 0.00 LF TEMPORARY IMPACT 404/401 STREAM 0.00 LF PERMANENT IMPACT SEEDING STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, ­7NUMBER. 17W9827A oaAwwc C-SESC-OVERVER DITCHES, AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES err Numaea Fax: 732.383.1984 SLOPES STEEPER THAN 3:1 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN SLOPES 3:1 OR FLATTER 14 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1.14 DAYS ARE ALLOWED ALL OTHER AREAS WITH IF SLOPES ARE 10' OR LESS IN SLOPES FLATTER THAN 4:1 14 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1.14 DAYS ARE ALLOWED EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA 49v ASL' aAUW I8ll8 -7 CMENMG Y ­7NUMBER. 17W9827A oaAwwc C-SESC-OVERVER ­­­ ­1EROSION CONTROL EROSION CHARLOTTE OFFICE Twelve Parkway Place Sale loo NOTES 5275 Parkway Rau Boulererd Charlotte, NC 28217 C-SE03 Phone: 704.516.8295 err Numaea Fax: 732.383.1984 03 of 12 PIPELINE REPLACEMENT GENERAL NOTES GRADING NOTES VARIATIONS IN PLAN OR PROFILE BORE PRE -REAMING REQUIREMENTS I. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE MOST UP TO DATE SPECIFICATIONS AND STANDARDS OF PIEDMONT NATURAL GAS. 2. WORK SHALL BE IN COMPLIANCE WITH OSHA TITLE 29 SECTION OF THE CODE OF FEDERAL REGULATIONS AND ALL OTHER FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. 3. ALL LOCATIONS AND/OR ELEVATIONS OF THE EXISTING UTILITIES SHOWN ON ALL PLANS ARE BASED ON UTILITY COMPANY RECORDS, AND WHERE POSSIBLE, FIELD MEASUREMENTS. CONTRACTOR SHALL NOT RELY ON THIS INFORMATION AS BEING EXACT OR COMPLETE. A DETAILED VERIFICATION OF THE SIZE, LOCATION AND DEPTH SHALL BE MADE BY THE CONTRACTOR PRIOR TO ANY EXCAVATION AND DIAL 811 FOR ONE CALL TO VERIFY. 4. PRIOR TO ANY CONSTRUCTION THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY OF LOCATING ALL UNDERGROUND UTILITY'S (PUBLIC AND PRIVATE) THAT MAY EXIST IN THE AREA OF CONSTRUCTION. ALL UTILITY OWNERS SHALL BE NOTIFIED IN ACCORDANCE WITH ONE CALL TIME REQUIREMENTS IN ADVANCE OF ANY EXCAVATION WHERE UTILITIES MAY BE PRESENT AT THE CONTRACTORS EXPENSE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIRS OF EXISTING UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION. 5. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITY SERVICE CONNECTIONS AND AVOID DAMAGING THEM DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES. 6. CONTRACTOR SHALL RESTORE ALL PAVEMENT DURING CONSTRUCTION TO PRE -CONSTRUCTION CONDITIONS TO THE DESIGN REQUIREMENTS OF THE REGIONAL OFFICE OF THE DOT HAVING JURISDICTION. 7. THE GAS MAIN SHALL BE INSTALLED AT A MINIMUM OF 24 -INCHES IN CLEARANCE TO ALL OTHER UNDERGROUND UTILITIES AND STRUCTURES. IF NOT POSSIBLE, PROTECTION SHALL BE PROVIDED BY CONTRACTOR. 8. DRAINAGE PIPES AND STRUCTURES SHALL BE CLEANED OF DEBRIS AND OTHER MATERIALS RESULTING FROM CONSTRUCTION. ALL PIPES AND STRUCTURES SHALL BE MAINTAINED AND CLEANED DURING CONSTRUCTION. 9. ALL SLOPES THAT ARE DISTURBED SHALL BE RESTORED TO THEIR ORIGINAL GRADES AND STABILIZED SEED/STRAW AND TACK AS NEEDED. 10. CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL MEASURES AS PER THE PROJECT PLANS AND SPECIFICATIONS DURING CONSTRUCTION. CONTRACTOR SHALL INSTALL AND MAINTAIN ALL CONTROLS AS PER THE REGIONAL OFFICE OF WATER QUALITY HAVING SAID JURISDICTION. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY AND CONVENIENCE OF THE GENERAL PUBLIC AND THE RESIDENTS WITHIN THE PROPOSED CONSTRUCTION AREA. 12. CONTRACTOR SHALL CHECK ALL EXISTING CONDITIONS, (INVERTS, UTILITY ROUTES, CROSSING AND DIMENSIONS) IN THE FIELD PRIOR TO THE START OF ALL UTILITY WORK. CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE OWNER'S REPRESENTATIVE. 13. THE CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING UTILITIES AND TAKE CARE TO PROTECT UTILITIES THAT REMAIN. CONTRACTOR SHALL REPAIR ANY EXISTING UTILITY TO THE LOCAL STANDARDS AT THE CONTRACTOR'S EXPENSE AND COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY. 14. CONTRACTOR SHALL CONFORM WITH ALL APPLICABLE CODES AND LAWS AND OBTAIN APPROVAL AS NECESSARY PRIOR TO START OF CONSTRUCTION. 15. CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT AND ADJUST GRADES AS NECESSARY. 16. CONTRACTOR SHALL DISPOSE OF ALL CHIPPING DEBRIS DURING AN CLEARING OPERATION AT THE PROJECT SITE. 17. ALL UTILITIES AFFECTED BY CONSTRUCTION ACTIVITIES SHALL BE LOCATED HORIZONTALLY AND VERTICALLY BY THE CONTRACTOR PRIOR TO CONSTRUCTION ACTIVITIES COMMENCING AND ANY POTENTIAL CONFLICTS WITH THE CONSTRUCTION OF THE PROPOSED GAS LINE, BORES, OR OTHER CONSTRUCTION SHALL BE REPORTED TO THE ENGINEER FOR ANY REDESIGN REQUIRED. 18. LAND FARMING OF DRILLING MUD ON THE PIPELINE EASEMENTS WILL BE THE CONTRACTORS RESPONSIBILITY TO NEGOTIATE WITH THE PROPERTY OWNER IN ADVANCE OF SUCH ACTIVITY. I. CONTRACTOR TO REPAIR ALL DAMAGE TO EXISTING FEATURES (PAVEMENT, CURBS, WALKS, DRIVEWAYS, YARDS, LANDSCAPING, ETC.) TO NEW CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 2. TRENCHES CUT INTO EXISTING ROADWAYS OR DRIVEWAYS SHALL BE SAW -CUT AND SHALL BE BACKFILLED AT 100% TO FINAL SUBGRADE ACCORDING TO THE REGIONAL OFFICE OF THE DOT. 3. ALL CONCRETE FOR CURBS AND SIDEWALKS SHALL BE 3500 PSI CONCRETE. 4. ANY WORK THAT IS UNACCEPTABLE TO THE OWNERS REPRESENTATIVE, LOCAL REPRESENTATIVE, OR UTILITY REPRESENTATIVE SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE. 5. ALL PAVEMENT MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE REGIONAL OFFICE OF THE DOT STANDARDS AND SPECIFICATIONS. 6. ALL PAVEMENT STRIPPING SHALL BE THERMOPLASTIC OR APPROVED ALTERNATIVE. 7. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT SAFETY, INCLUDING PROVISION OF ALL APPROPRIATE SAFETY DEVICES, TRAFFIC CONTROL AND TRAINING REQUIREMENTS. I. ALL APPROVED EROSION CONTROL AND POLLUTION DEVICES SHALL BE CONSTRUCTED, INSTALLED, MAINTAINED, AND REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, ORDINANCES AND POLICIES. 2. CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS AFTER FINAL GRADING IS COMPLETED, UNLESS OTHERWISE INDICATED. CONTRACTOR SHALL ESTABLISH PERMANENT SOIL STABILIZATION. 3. CONTRACTOR TO PROVIDE TEMPORARY CONSTRUCTION ACCESS AT THE POINT WHERE CONSTRUCTION VEHICLES EXIT THE CONSTRUCTION AREA AND MAINTAIN PUBLIC ROADWAYS FREE OF TRACKED MUD AND DEBRIS. 4. CONTRACTOR SHALL CHECK ALL GRADES AND DIMENSIONS IN THE FIELD PRIOR TO STARTING WORK AND REPORT ANY DISCREPANCIES TO THE ENGINEER. S. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE MANUAL OF ACCIDENT PREVENTION AND CONSTRUCTION ISSUED BY AGC OF AMERICA, INC. AND THE SAFETY AND HEALTH REGULATIONS OF CONSTRUCTION ISSUED BY THE U.S. DEPT. OF LABOR. 6. VEGETATION OR TREES INSIDE THE PERMANENT EASEMENT AND TEMPORARY WORK AREAS SHALL BE REMOVED, OR PER PNG REPRESENTATIVE'S INSTRUCTIONS. 7. TOPSOIL STRIPPED FROM CUT AND FILL AREAS SHALL BE STOCKPILED FOR USE ON DISTURBED AREAS. CONTRACTOR SHALL PLACE AT A MIN. OF 6" AND SHALL SUPPLY ADDITIONAL TOP SOIL IF INSUFFICIENT QUANTITIES EXIST ON SITE. 8. POSITIVE DRAINAGE SHALL BE ESTABLISHED AS THE FIRST ORDER OF WORK AND SHALL BE MAINTAINED AT ALL TIMES DURING AND AFTER CONSTRUCTION. SOIL SOFTENED BY PERCHED WATER TABLE IN FOUNDATION AND PAVEMENT AREAS MUST BE UNDERCUT AND REPLACED WITH SUITABLE FILL MATERIALS THAT ARE APPROVED BY A GEOTECHNICAL ENGINEER. ALL GROUNDWATER INFILTRATION INTO EXCAVATIONS SHOULD BE EXPECTED, AND WATER SHALL BE REMOVED USING GRAVITY DRAINAGE OR PUMPING METHODS. 9. THE LOCATION OF ALL DIVERSION SWALES AND DITCHES SHALL BE FIELD ADJUSTED TO AVOID TREES AS MUCH AS POSSIBLE. THE CONTRACTOR SHALL WALK THE ALIGNMENT OF THESE AREAS AND VERIFY. 10. ALL STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE CONTAINED SO SEDIMENT RUN-OFF IS CONTROLLED AND WILL NOT CONTAMINATE AREA STREAMS. 11. ALL SITES USED FOR DISPOSAL AND/OR STOCKPILES SHALL BE PERMITTED FOR SUCH ACTIVITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL PERMITS. COPY OF PERMITS MUST BE APPROVED AND PROVIDED TO THE INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON ANY PROPERTY. FAILURE TO DO SO WILL RESULT IN THE CONTRACTOR REMOVING ALL ILLEGALLY PLACED MATERIAL AT THEIR EXPENSE. 12. ONCE ALL TOPSOIL HAS BEEN STRIPPED AT THE STATION AREAS, PROOF ROLLING SHALL BE PERFORMED ON THE EXPOSED SUBGRADE WITH A LOADED TRUCK TO VERIFY UNSTABLE SOILS. CONTRACTOR SHALL STABILIZE THESE AREAS BY UNDERCUTTING AND REPLACING UNSTABLE AREAS WITH COMPACTED SELECT MATERIAL. 13. ALL FILL MATERIAL SHALL BE FREE OF ORGANIC MATTER, TRASH AND OTHER DELETERIOUS MATERIALS CONTAINING NO ROCK FRAGMENTS LARGER THAN 6" IN ANY DIRECTION. 14. ALL STRUCTURAL FILLS SHALL HAVE A STANDARD PROCTOR MAX. DRY DENSITY OF 90 POUNDS PER CUBIC FOOT (PCF) OR GREATER AND A PLASTICITY INDEX (PI) OF 30 PERCENT OR LESS. ALL MATERIAL USED AS A SOIL FILL SHALL BE TESTED AND APPROVED BY THE GEOTECHNICAL ENGINEER BEFORE PLACED. I5. ALL FILL SHALL BE COMPACTED AS PER THE SPECIFICATIONS. 16. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISH GRADE. PROPER ADJUSTMENT SHOULD BE MADE BY THE CONTRACTOR FOR THE SUBGRADE. 17. ALL EXISTING ELEVATIONS, CONTOURS, AND BENCHMARKS SHOWN ON PLANS ARE BASED ON NAD88. 18. CONTRACTOR TO SHAPE ALL DITCHES ACCORDING TO TYPICAL SECTIONS OR SPECIAL DETAILS. 19. ONLY MATERIAL MEETING THE CONTRACTOR'S GEOTECHNICAL ENGINEER'S REQUIRMENTS FOR EMBANKMENT SHALL BE USED. 20. ALL EXCAVATIONS ARE UNCLASSIFIED WITHOUT REGARD TO THE MATERIALS ENCOUNTERED. CONTRACTOR SHALL VISIT SITE AND DRAW HIS OWN CONCLUSIONS TO THE CONDITIONS ENCOUNTERED. LINE AND GRADES SHOWN SHALL BE ACHIEVED WITHOUT ADDITIONAL COMPENSATION. 21. ALL ASPHALT PAVEMENT, AGGREGATE BASE AND CONCRETE MATERIALS AND CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE REGIONAL OFFICE OF THE DOT STANDARD SPECIFICATIONS. 22. ALL PROPOSED CONTOURS ARE SHOWN AT 2 FOOT INTERVALS. 23. ALL AREAS DISTURBED OUTSIDE THE LIMITS OF CONSTRUCTION DURING THE LIFE OF THE PROJECT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 24. CONTRACTOR SHALL NOT DISPOSE OF ANY MATERIAL ON OR OFF THE PROJECT SITE IN A REGULATORY FLOOD ZONE AS DEFINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY WITHOUT APPROVAL BY SAME. ALL MATERIAL SHALL BE DISPOSED OF IN AN UPLAND (NON -WETLAND) AREA AND ABOVE THE ORDINARY HIGH WATER MARK. THIS DOES NOT ELIMINATE THE NEED TO OBTAIN ANY OTHER LICENSES OR PERMITS THAT MAY BE REQUIRED BY ANY OTHER FEDERAL, STATE, OR LOCAL AGENCY FOR THE CONSTRUCTION OF THE PROJECT. 25. USE SPOIL FROM TRENCH EXCAVATIONS TO DIVERT FLOW FROM UPSLOPE AREAS. USE CARE IN SPOIL PLACEMENT TO AVOID BLOCKING NATURAL SURFACE OUTLETS. I. CONTRACTOR SHALL MAINTAIN THE HORIZONTAL ALIGNMENT AS INDICATED ON THE PROJECT PLANS WITH A 12 FOOT VARIANCE. 2. ALL CONTROL POINT ELEVATIONS SHOWN INDICATE MINIMUM COVER AND SHALL NOT BE REDUCED. CONTRACTOR CAN ONLY DRILL DEEPER WITH ENGINEER APPROVAL. 3. CONTRACTOR MAY REQUEST CHANGES TO THE PROPOSED VERTICAL AND HORIZONTAL ALIGNMENT OF THE INSTALLATION AND THE LOCATION OF THE ENTRY AND EXIT POINTS FOR HDD BORES. ALL PROPOSED CHANGES SHALL BE SUBMITTED TO THE OWNER AND RECEIVE APPROVAL OF THE OWNER PRIOR TO STARTING WORK. COMPANY HAS NOT PHYSICALLY LOCATED ALL THE UNDERGROUND UTILITIES. ABOVE GRADE AND UNDERGROUND UTILITIES SHOWN WERE TAKEN FROM VISIBLE APPURTENANCES AT THE SITE, PUBLIC RECORD, MAPS PREPARED BY OTHERS AND LIMITED QUALITY LEVEL B DESIGNATION, IF ANY. MASER CONSULTING, P.A. MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. MASER CONSULTING, P.A. FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES ARE IN THE EXACT LOCATION INDICATED. THEREFORE, RELIANCE UPON THE TYPE, SIZE, AND LOCATION OF UTILITIES SHOWN SHOULD BE DONE SO WITH THIS CIRCUMSTANCE CONSIDERED. DETAILED VERIFICATION OF EXISTENCE, LOCATION AND DEPTH SHOULD ALSO BE MADE BY THE CONTRACTOR PRIOR TO ANY DECISION RELATIVE THERETO IS MADE. LOCATIONS OF UTILITIES SHOULD BE CONFIRMED WITH THE APPROPRIATE UTILITY COMPANY. A VALID 811 CALL TICKET SHALL BE IN HARD BEFORE ANY EXCAVATION TAKES PLACE. AN UNDERGROUND UTILITY LINE IS DAMAGED ONCE EVERY SIX MINUTES NATIONWIDE BECAUSE SOMEONE DECIDED TO DIG WITHOUT FIRST CALLING 81 I. CALL BEFORE YOU DIG. WWW.CALL81 ICOM BORE PILOT HOLE REQUIREMENTS I. CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN INSTRUMENTATION WHICH WILL ACCURATELY LOCATE THE PILOT HOLE, MEASURE DRILL STRING AXIAL AND TORSION LOADS, AND MEASURE DRILLING FLUID DISCHARGE RATE AND PRESSURE. 2. OWNER SHALL HAVE ACCESS TO THESE INSTRUMENTS AT ALL TIMES AND THEIR READINGS. 3. THE CONTRACTOR WHEN REQUESTED BY THE OWNER, WILL PROVIDE INSPECTION HOLES AT NO ADDITIONAL COST TO VISUALLY VERIFY THE LOCATION AND CONDITION OF THE DRILLED PIPELINE. 4. CONTRACTOR SHALL PLOT THE ACTUAL HORIZONTAL AND VERTICAL ALIGNMENT OF THE PILOT HOLES AT INTERVALS NOT EXCEEDING 20 FEET, AND CORRESPONDING WITH THE PROJECT STATIONING AND DATUM. 5. CONTRACTOR SHALL MAINTAIN AND UPDATE AN "AS BUILT" PLAN AND PROFILE AS THE PILOT BORE IS ADVANCED. 6. CONTRACTOR SHALL GRANT THE OWNER ACCESS TO ALL DATA READOUTS PERTAINING TO THE POSITION AND INCLINATION OF THE BORE HEAD WHEN REQUESTED, CONTRACTOR SHALL PROVIDE EXPLANATIONS OF HIS POSITION MONITORING AND STEERING EQUIPMENT. 7. THE ACTUAL PILOT HOLE EXIT POINT SHALL BE LOCATED WITHIN TWO (2)FEET LATERALLY OF THE EXIT POINT SHOWN ON THE DRAWINGS. LONGITUDINALLY, THE ACTUAL EXIT SHALL BE NO MORE THAN FIVE (5)FEET SHORT OR FIVE (5) FEET PAST THE EXIT POINT SHOWN ON THE DRAWINGS. 8. ALL PILOT HOLES SHALL BE DRILLED ALONG THE PATH SHOWN ON THE PLAN AND PROFILE DRAWING MAINTAINING THE SPECIFIED TOLERANCES. 9. THE OWNER SHALL APPROVE THE ALIGNMENT OF THE PILOT BORE BEFORE THE REAMING PHASE OR PIPE PULLING MAY COMMENCE. 10. IF THE PILOT BORE FAILS TO CONFORM TO THE ABOVE TOLERANCES, OWNER MAY, AT HIS OPTION, REQUIRE A NEW PILOT BORE TO BE MADE. 11. IN ALL CASES, RIGHT-OF-WAY RESTRICTIONS SHALL TAKE PRECEDENCE OVER THE LISTED TOLERANCES. 12. NO PILOT HOLE WILL BE ACCEPTED IF IT WILL RESULT IN ANY OF THE PIPELINE BEING INSTALLED IN VIOLATION OF THE RIGHT-OF-WAY RESTRICTIONS. 13. CONCERN FOR ADJACENT UTILITIES AND/OR STRUCTURES SHALL TAKE PRECEDENCE OVER THE LISTED TOLERANCES. LISTING OF TOLERANCES DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR SAFE OPERATION OR DAMAGE TO ADJACENT UTILITIES AND STRUCTURES. 14. ALL BEND RADII SHALL BE EQUAL TO OR GREATER THAN THOSE LISTED IN THE PROJECT PLANS. BORE INSTALLATION I. ALL HDD DRILLS TO BE INSTALLED BY WIRE LINE PROCESS. 2. CONTRACTOR IS SUBJECT TO THE REQUIREMENTS OF THESE PLANS AND WILL DETERMINE THE EXACT METHOD AND TECHNIQUES FOR COMPLETING THE HDD CROSSINGS. EXCAVATED MUD PITS CONSTRUCTED IN THE ENTRY AND EXIT LOCATIONS WILL BE LIMITED TO THE PIPE BORE HOLE AREA ONLY. 3. AFTER COMPLETING THE DRILLING DIRECTIONAL WORK, THE ENTRY AND EXIT PIT LOCATIONS SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS. 4. THE GEOTECHNICAL REPORT IS AVAILABLE FOR THE CONTRACTOR TO THE BORING LOGS SHOWN ON THE PLANS ARE FOR THE CONTRACTOR'S CONVENIENCE AND ARE A REPRODUCTION FROM THE GEOTECHNICAL REPORT. THIS SUBSURFACE INFORMATION IS PRESENTED IN GOOD FAITH AND IS NOT INTENDED AS A SUBSTITUTE FOR PERSONAL INVESTIGATION, INDEPENDENT INTERPRETATIONS OR JUDGEMENT OF THE CONTRACTOR. I. AFTER THE PILOT HOLE IS ACCEPTED, THE CONTRACTOR SHALL PERFORM A REAMING AND PRODUCT PIPE PULL. 2. THE MAXIMUM PRE -REAMING SHALL BE DETERMINED BY THE COMPANY SPECIFICATIONS AND CONSTRUCTION SUPERVISOR'S APPROVAL UNLESS APPROVED BY THE ENGINEER. 3. BUOYANCY MODIFICATIONS SHALL BE USED AT THE DISCRETION OF THE CONTRACTOR. ANY BUOYANCY MODIFICATION PROCEDURE PROPOSED FOR USE SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE PULL SECTION RESULTING FROM BUOYANCY MODIFICATIONS. BORE PULLBACK REQUIREMENTS I. CONTRACTOR SHALL PULL EXTRA LENGTH OF PIPE SO ONE JOINT CAN BE INSPECTED. 2. CONTRACTOR SHALL SUPPORT THE PIPE PULL SECTION AS IT PROCEEDS DURING THE PULLBACK SO THAT IT MOVES FREELY AND IS NOT OVER STRESSED. BORE DRILLING FLUIDS I. CONTRACTOR SHALL SUBMIT THE COMPOSITION OF ALL DRILLING FLUIDS TO THE ENGINEER FOR APPROVAL. 2. CONTRACTOR SHALL NOT USE ANY DRILLING FLUID THAT DOES NOT COMPLY WITH THE PERMIT REQUIREMENTS AND ENVIRONMENTAL REGULATIONS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, TRANSPORTING, AND STORING ANY WATER REQUIRED FOR DRILLING FLUIDS. 4. CONTRACTOR SHALL MAXIMIZE RECIRCULATION OF DRILLING FLUID SURFACE RETURNS. 5. CONTRACTOR SHALL PROVIDE SOLIDS CONTROL AND FLUID CLEANING EQUIPMENT OF A CONFIGURATION AND CAPACITY THAT CAN PROCESS RETURNS AND PRODUCE DRILLING FLUID SUITABLE FOR REUSE. 6. DISPOSAL OF EXCESS DRILLING FLUID IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE CONDUCTED IN COMPLIANCE WITH ALL ENVIRONMENTAL REGULATIONS, RIGHT-OF-WAY AND WORKSPACE AGREEMENTS, AND PERMIT REQUIREMENTS. 7. CONTRACTOR SHALL SUBMIT DRILLING FLUID DISPOSAL PROCEDURES TO OWNER FOR APPROVAL. 8. CONTRACTOR SHALL EMPLOY BEST EFFORTS TO MAINTAIN FULL ANNULAR CIRCULATION OF DRILLING FLUID. 9. DRILLING FLUID RETURNS AT LOCATIONS OTHER THAN THE ENTRY AND EXIT PITS SHALL BE MINIMIZED. 10. IN THE EVENT THAT ANNULAR CIRCULATION IS LOST, CONTRACTOR SHALL TAKE ACTION TO RESTORE CIRCULATION. 11. IF INADVERTENT SURFACE RETURNS OF DRILLING FLUIDS OCCUR, CONTRACTOR SHALL IMMEDIATELY CLEAN AND COLLECT. ENVIRONMENTAL NOTE: THIS SET OF PLANS IS NOT DEPICTING ENVIRONMENTAL CONDITIONS OR A CERTIFICATION/WARRANTY REGARDING THE PRESENCE OR ABSENCE OF ENVIRONMENTALLY IMPACTED SITE CONDITIONS. MASER CONSULTING HAS PERFORMED NO EXPLORATORY OR TESTING SERVICES, INTERPRETATIONS, CONCLUSIONS, OR OTHER SITE ENVIRONMENTAL SERVICES RELATED TO THE DETERMINATION OF THE POTENTIAL FOR TOXIC, RADIOACTIVE, OR OTHER TYPE OF CONTAMINANTS AFFECTING THE PROPERTY AND THE UNDERSIGNED PROFESSIONAL IS NOT QUALIFIED TO DETERMINE THE EXISTENCE OF THE SAME. SHOULD ENVIRONMENTAL CONTAMINATION OR WASTE BE DISCOVERED, THE OWNER AND CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE LAWS AND REGULATIONS. 1�Y lI W ER EROSION CONTROL PLANS AS SHOWN DAOWI -WN 11: C"[NMGev. FOR � PRD, R HDMaER. Piedmont ­ 82 A C -SERC -OVER - aaaomea Loyalq rnmG9n aieRa sadara�doR PIEDMONT NATURAL GAS " x ° g. r. ° m CHARLOTTE OFFICE Natural Gas EROReere .ala""ere . sreroaa.a vn apeaAreniettt . ErvinRmeRtt1S a"watt Twelve Park wayPlae GENERAL NOTES RUSHMORE PROPOSED orr««aaon s"ite loo C-SE04 . Rad -1, INJ • Mc lalIu��rel, Nf • LeM1i�VaIIq, PA . orla°a°, rL 16" STEEL DISTRIBUTION 1111 Parkway Rau 13 -1 -rd • Hlamilmn, NJ • Wew"Wi°r, NY • RiladelpM1ia, PA �ce�mn FVA _ Charlotte, NC 2821] "o1I A CITY OF CHARLOTTE NNJ • Rxmbu ,PA 1 02106119 TAH NC- COMMENTS DIR912oI9. TAH r�°"aSe°NJ . cowmnQ nb"' . Pa,'i . Nbuqueryue NM MECKLENBURG COUNTY, NORTH CAROLINA Phone: 704.516.8295 a�"""�R • MC Arlington, Nf Stare of N.C. Firm No�C4042 • CM1arl°tta NC DRAWN CHECKED Fax: 732.383.1984 2 mar drcmmia,u...�,,.xTew. nuwmae....a, maanw.e�a vi.n.mb..7 ra.Nh�-�,yn..n.....m.a..,. mM.� REV DATE ,,.. DESCRIPTION e. O4 Of I2 ■ • • I SHEET 06 . G_G mac_ lk r6111 Piedmont Natural Gas ►, SHEET 07 If G G 04 • is • •Ap • if SER C O N S U L T I N G P. A. C.-- Loyalty through Client Sndaf don sulxing.com Engineers • Planners • Suneyorsa;e L duape Architects • Environmental Sciendsrs OB « Lo • Red Bank NJ • Mc Laurel, NJ .O Lehl� Valla, PA • Orlando, FL • Ch..' NI • AlbanlI, NY • Eawn, PA • Miami, FL • HamHlmb f • Wew Windsor, • RiladelpM1ia PA • 1- yVA a ar or, NJ esm firer Rxmburtl�, PA olk, NJ • Columbia, MD pa, • Albuque_._NM • N, Niingon, NJ smre of N.C. Firm No. U042 • CM1arl.:. NC au ada a.....a.maane°Foca-Nhwn..nomm. �,. NCDOT COMMENTS DIR9l20I9. DESCRIPTION EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA 44V AS SHOWN DABWIBllB �CJRT CXeNMGY PaDJ[NUMBER. I7W9827A DBAwlrvc NAME C-SESC-OVER FFr•lnF. SHEET INDEX CHARLO EOFFICE Twelve Parkway Place suhl loo 5275 Parkway Rau 13-1 erd C-SE05 Charlotte, NC 28217 Phone: 704.516.8295 FFr NumaFa Fax: 732.383.1984 05 of 12 25' SANITARY SEWER EARNT CMIO DRAWING JOB N0. 254-95 SILT FENCE [TYP.)1 LI Mif50F DI STORRANCE PROPOSED I6- STEEL GAS LINE ' GgDE 2D36 PG. ; DUKE ppWER CdMPANY EASEVENT V MB9PG61DS 1995 PG_ 70,• OB 1991 PG. 551, —moi:--ts ds -4'c --ds x—asis— r/ r ti y •.I �} `� � "! Y 1, �' wan LEnavEAeLE � f I' { '•�, DIVERS'014 SARS{TYP.) PFEOMONT NA TUR L I ' ISI GAS IkEGULA TOR E EMENT } ` D 9007 PG296 FLOODPLAIN �' , 41 • I �Y ' �xrsrlNG _ � _— '• • I -t CONSTFULTION OPEN Cur _--f lei jMjjjjIjjjjjjdjjjjjjjjjj rj..i" METHOD STA d-70 TO 1 *00 SF c HOED SrA I -w TO 8.50 T ol LEGEND WETLAND MATTING CROSSING Vow CE CONSTRUCTION ENTRANCE + WATTLEIMOVABIE DNERSION RARS iR IP INLET PROTECTION = _ _ CONTOURS PROPERTY LINE STREAM CENTERLINE (GIS) TF— WETLAND BOUNDARY IDD -YEAR FLOOOPWIN LIMITS OF DISNRBANCE FASF2+FllT LIMITS —9i— ACT FENCE G— PROPOSED GAS LINE LG CONSMUC TION METHOD 30 0 30 60 SCALE: P' = 30' _ SER EROSION CONTROL PLANS AS SHOWN : ...... NG NAMCEK r. CReNMGev. FOR PRD,EGT:8Z7A. Piedmont4 ITIiW 82 A C-SESC-P AN C O N G U L i I MASER P. A. - a:comer L.r I:ry th..gh aie Sndef den PIEDMONT NATURAL GAS aulxi"q.c"m CHARLOTTE OFFICE sH RSOIL EROSION & Natural Gas ERgReers . P1aRRen . suneyonOft,LdaaapeA hies . EmiroRmeRa1S eRda Twelve PakwayPlae SEDIMENT CONTROL PLAN RUSHMORE PROPOSED once L«adon seize loo . R8aeaeklNI) • Mc laIu�rel,Nf • LeM1i�PaIl ,PA . Oda -,FL 16" STEEL DISTRIBUTION 5275 Parkway Rau Boulevard C-SE06 • Hlamilmn,Nf • A"w Zror, • Riladelphf,PA : S.rfim FLA Charlotte, NC 28217 :Hare "r, N) gpgrer :RmButl,PA oIA CITY OF CHARLOTTE ITN"�R empa,FL • Albugeeryue NM 02IObll9 TAH NCDOTCOMMENTSDIR9l20I9. TAH Phone: 704.5 1291 . COIu.."I. MECKLENBURG COUNTY, NORTH CAROLINA • MC Arlington, M Stare of N.C. Firm No.Ci042 • CM1arlotta NC DRAWN CHECKED Fax: 732.383.1984 r� �amw moria w...�,rFxTew. nu ad�a••...a.maane-°Foaa �yeN h,�.n..nomm.-m.a..,. m,,,..� REV DATE BY DESCRIPTION DY O6 (!f L . � . ,' LIM1T5 OF DISTi1R8ANCf --�- --moo - ! i I .. OF - F r - - RAAPPiAIN i I- WATTLeMOVEABLf DIVERSION BARS ITYP.) l � 1 [[ PRO P05E1) 1675TUL GAS LINE -.00 . - ` �_i•r' r 5 1�=Sam � .I' Y� �" � �,� �_ _ � � � WETLAND BOUNVARY II. .� . _. _� r-----• -- � ir. YYom�.. _ -iSF � rau �laa�clr.�l SILT PENCE ".I-. -a. L J. ..--- CONSMUL— [ONHDD METHOD SFA 1+00 TO 6+50 r611 Piedmont Natural Gas fAMASER co Ks uis I Ms F.l [.>m„�:r ar.in mmivn ni.,.l smna<ve., gc E*rcers • {gM.rs • S�rv.prs [ rL.� �P�W�ryRKy [ �.e�l5cienta[s ol4e ��1' . Pee Bvi ry a nc lawx. M S� µ+•n. Yn . [Puma. IL [ 5tlgrmyn�rvyl mm� � � L . M YCYry/i v-.. M , w ��F r. ifY • Mae�tiyM i ry��vl. µ^L^� P9 Stile oFNG ihm No. Com! oW " -, rvrmic— RE DAZE b0.RWN DESCRIP m APEN CUT STA 8+SOTO 25+30 EROSION CONTROL PIANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16n STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY. NORTH CAROLINA L�ENG !P_YV A•'CIM' � � 9011. EFIeMIG ,I.9 rrl�nt�lo► C-SED7 {°n Baa LmQll VF' NI IYIL CC 6RLsC3'LVN W'110i) 9011. EFIeMIG ,I.9 f�.IMFW-CONTROL PLAN C-SED7 07 Z4 12 7, N, x�Ypr. q�%� tt1�1mJ � zl* snc +e+ � 3wr1 aair ]ak-nrr eocn rce� .-K- S 3ms� � - - fo e� E _ — s _ . • - - - _t ti� ti»--^ �} �� �° �c cmc n `������� � �.- a -. ���- ~-{+-`rn 1d� 54ry.11j Vit. /I �• -LIM11.51J"P L]]5rUR13ANCE _ 013 --f __ - __ - - •_ - PROPOSED I er?UL GAS UNE _ _ 'RAL 1 y1 SSO IA nA���riy� NSr a485 Wil p --N - aou DN WATTLE"OVEASLE _ - ---��—�__g3yER5fON BARS IrYP.j WETLAND MATTING CROSSING 8181.1 £•r -' � -� — Ty} � � � %� 4 ,i � CE CONSTRUCFIONEMRANCE NY� CId,.C] — �'�� _ -- _ - �� _ .�, - � % _ .� I ��"� '• S WATTLEIMOVABLE DIVERSION BARS � — F— — � � �` J �' � � I IP INLET PROTECTION 4 •7 — } CONTOURS PROPERTY LINE STREAM CENTERLINE (GIS) O__ 0•Plr �'��� E.2$F,>,�iYi � �: 100-YEAR FL1-OODPLAIND—N -A{)f )PAPwrLIMITS OF DISTURRANCE - — JCA@ NO. 2�J-45 — EASEMENT LIMITS SF SILT FENCE 1 • - —G PROPOSED GAS LINE 30 D 30 60 VONSTRUCTION OPEN CUT C•CINS TR L' C] ]ON M1=']'I]OL7 STA 8K0 TO 25.30 MET] 10D SCALE : V= 30 AMER �SS DATE oRA�N�� ji, NMG EROSION CONTRA. PLAINS AS SHOWN OW IBllB CfK CR NMG r FORPRo,­ H McER. Piedmont U P S l 1 1 L 8 P �IiW 82 A C-SESC-PLAN CuaatgmeP Loyalty:nro„gn aleRc sad:racdeR PIEDMONT NATURAL GAS aulxi�g.com CHARLOTTE OFFICE sH RSOIL EROSION & Natural Gas Engneers. Plannen.5uneyo Oft.LduapeArchiec . EmironmenalSiens Twelve Park wayPlae SEDIMENT CONTROL PLAN RUSHMORE PROPOSED Oft. L«scion seize loo . RaaBanklNI, • MCLaIIu��rel,N, • LeM1i�Valley,PA . Oda�ao,FL Ib° STEEL DISTRIBUTION 5275 Parkway Rau Boulevard C-SE08 • R8id mn, Nf • WewaW —', • RiladelpM1ia, PA : �'rea�i FLA Charlotte, NC 28217 :Hareo.,N) g�Rnbutl,PA oII A CITY OF CHARLOTTE �NM�R empa,FL • Albuquerque NM 02IObll9 TAH NCOOT COMMENTS OIRBl2019. TAH Phone: 704.516.8295 . Colu_I bi M� MECKLENBURG COUNTY, NORTH CAROLINA • MC Arlington, N, Stare of N.C. Firm No.Ci042 • CM1arloaI NC DRAWN CHECKED Fax: 732.383.1984 r� �amw moria w...�,rFxTew. au ad_ae....a.maana-"Foss ..any ge.n..nomm._m._..,. mM.� REV DATE BV DESCRIPTION BY OH Of 12 PPOPOSEO/3.66 ACRE , r.sel+mo,¢D'"cP 11 MM OF Uh–L JK6ANCE .r.. n: fcWi�: s7aBq'P:Tr A SILT FENCE MR) L,: I 11� ; 3N r WETLANO P ' BOUNDARY r611Piedatumont Naas SER C O N S U L T I N G P. A. C.-- Loyalty through Client Sadafacdon g.c Engineers • Planners • Surveyors O11 ft, L duape Architects • Environmental Sciendsrs ORice Loc • Red Bank NJ • Mc Laurel, NJ .O LeM1i� Valley, PA • Orlando, FL • Clinm�y NI • AlbanlI, NY • Eawn, PA • Miami, FL • HamHlmb f • Newzr-r,,N • RiladelpM1iA PA • Sre"nyy VA • n ar or, NJ • -h--, Rxmburtl�, PA • olk, NJ • Columbie,M� pa, • Albu.:.: ue. NM • Mc N1ingon, NJ S.. of N.C. Firm No. AM2 • CM1arloaa NC uiwa ae.-..a. maane°Foa'a .. aNhe.n..nom m.-,. 1� EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION NCDOTCOMMENTSBI S-19. TAH CITY OF CHARLOTTE DESCRIPTION CHECKED MECKLENBURG COUNTY, NORTH CAROLINA BY 30 0 30 60 SCALE: 1" = 30' 49v AS SHOWN LEGEND RACJRY I GMFNMGY WETLAND MATTING CROSSING DBAw1Nc NAME C-SESC-PLAN --- SOIL EROSION & ®Q CONSTRUCTION ENTRANCE N SEDIMENT CONTROL PLAN — WATTLEIMOVABLE DIVERSION BARS C-SE09 Charlotte, NC 28217 �P INLET PROTECTION Phone: 704.516.8295 eEr NumaFR CONTOURS PROPERTY LINE OC� C7f IZ STREAM CENTERLINE (GIS) T7— —ND BOUNDARY _ IBB -YEAR FLOODPLAIN LIMITS OF DISTURBANCE EASEMENT LIMITS . SF SILT —G— PROPOSEDFENCE GPS LINE 1� EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION NCDOTCOMMENTSBI S-19. TAH CITY OF CHARLOTTE DESCRIPTION CHECKED MECKLENBURG COUNTY, NORTH CAROLINA BY 30 0 30 60 SCALE: 1" = 30' 49v AS SHOWN I DAB1Itll18 RACJRY I GMFNMGY F`07NUMBER. I709827A DBAw1Nc NAME C-SESC-PLAN --- SOIL EROSION & CHARLOTTE OFFICE Twelve Park way Place seiloo re SEDIMENT CONTROL PLAN 5275 Parkway Rau Boulevard C-SE09 Charlotte, NC 28217 Phone: 704.516.8295 eEr NumaFR Fax: 732.383.1984 OC� C7f IZ INSPECTION: COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT (I INCH OR GREATER). MAINTENANCE: ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVE GROUND HEIGHT OF THE SOCK AND DISPOSED OF IN A MANNER DESCRIBED ELSEWHERE IN THE PLAN. REPAIR: DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS OR REPLACED IMMEDIATELY. 1.5X 17 PLIED G ALTERNATVESTAKINGOPTION COMPOST TOCK IS'.,12' TYPICAL) . WORKMEA EAT BEPROTECTED 2" MIN SECTION n.s IS X1.5' WOODEN STAKES PLACED ID O.C. ■ ® AREATOBE eM ALTERNATNESTAKING OPTION _ PROTECTED lol N.1OTSM OMEET SPECIFICATIONS 2. FILTER MEDIA'FILL TO MEET APPLICATION . REQUIREMENTS 3. CO POST MATERIAL TO BE DISPERSED ON SITE, AS PLAN- DETERMINED BY ENGINEER. COMPOST SOCK FOR SEDIMENT CONTROL NTS INSPECTION: WATTLES SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT 6IINCH OR GREATER). MAINTENANCE: ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVE GROUND HEIGHT OF THE WATTLE AND DISPOSED OF IN A MANNER DESCRIBED ELSEWHERE IN THE PLAN. REPAIR: DAMAGED WATTLES SHALL BE REPAIRED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS OR REPLACED IMMEDIATELY. FILTER SOCK DIVERSION (TYP) 24" MAN TER SEE NOTE 7 6" MIN. FREEBOARD INSTALL BEGINNING OFROLL IN 6'X6' ANCHOR TRENCH, STAPLE, BACKFILL AND COMPACT SOIL. EROSION CONTROL MATTING. INSTALL TO HEIGHT AT FREE BOARD DEPTH. SEE NOTE 5 INFILL MATERIAL (FILIRIXX CRONNCMEDIA-) SEE NOTE 6 2'12'x36° WOODEN STAKES PLACED 10' O.C. SINGLE INSTALLATION SECTION VIEW N.T.S. NOTES: 1. REMOVE SEDIMENT MGM NE UPSLOPE SID E OF THE FILTER SOCK DIVERSION WHEN ACCUMULATION TH HAS REACHED 1/2 OF E EFFECTIVE HEIGHT OF NE FILTER SOCK DIVERSION. SEDIMENT SHALL ALSO BE REMOVED DURING INSTALLATION OF FINAL STABILIZATION MEASURES (E.G. EROSION CONTROL MATTING, SEEDING, MULCHING, ETC.) TO UNIT POTENTIAL DISTURBANCE FROM CONSTRUCTION EQUIPMENT WHILE VEGETATION IS ESTABLISHING, 2. SLOPES GREATER THAN 5% MAY REQUIRE ADDITIONAL STABIUZATON PRACTICES AS DETERMINED BY NE ENVIRONMENTAL INSPECTOR. 3. TUE M R SOCK DIVERSION SHALL BE FILLED 'MTI( FlLTREX% KROWINGYAEDIA"' OR APPROVED EQUAL AND BE DO AT THE TIME OF INSTALLATION.TH SOIL OR AND MAY BE ADDED TO E GROWINGMEDIA'" TO ADD MIGHT AND BALLAST TO THE RUNOFF DIVERSION. 4. IF UNDERMINING IS OBSERVED CONTRACTOR SHALL PROVIDE AND MAINTAIN GROWING MEDIA PACKING TO AT E OF FILTER SOCK DIVERSION. 5. EROSION CONTROL MATTING INSTALLED UNDER AND ADJACENT TO NE FILTER SOCK DIVERSION FOR ACCESS ROADS SHALL BE NORTH AMERICAN GREEN C-125^' OR APPROVED EQUIVALENT AND SEEDED AT THE TIME OF INSTALLATON. REFER TO TABLE 2: TEMPORARY CLEAN WATER DIVERSION OF THIS PLAN SET FOR NE REWIRED NORTH AMERICAN GREEN (OR APPROVED EQUIVALENT) UNING ASSOCIATED WITH THE PIPELINE FILTER SOCK DIVERSIONS. REFER TO NE EROSION CONTROL BLANKET DETAIL (ECB) ON PAGE 3 FOR PROPER INSTALLATION OF EROSION CONTROL MATTING. 6. INFILL MATERIAL (M_TREXX GROMINKAIEDIATM OR APPROVED EQUAL) SHALL BE MODIFIED TO REDUCE PERMEABILITY AND PROMOTE VEGETATIVE CROWN IN ACCORDANCE WN BMP REQUIREMENTS. NE KROWTH NGMEDIATM SHALL BE DISPERSED ON SITE OR E FILTER BOOK DIVERSION SHALL BE REMOVED ONCE THE DISTURBED AREA HAS BEEN FERMI STABILIZED OR AS DETERMINED BY NE ENVIRONMENTAL INSPECTOR. 7. MAXIMUM EFFECTIVE HEIGHT OF A 24" FILTER SOCK IS 19', THEREFORE TOTAL DEPTH IS ALSO 19'. EFFECTIVE HEIGHT MINUS FREEBOARD (6') SHOULD NOT EXCEED 13`. B. EROSION CONTROL MATTING SHOULD NOT EXTEND UPHILL PAST NE LIMIT OF DISTURBANCE r6111Piedmont Natural Gas FILTER SOCK DIVERSION / WATTLE 701L S1DE N WORK SIDE 3o TOPSOILNDSTRIPPING W r TOPSOIL TRENCH I SPOIL []H I I UNDISTURBED SOIL (UNDISTURBED SOIL DITCH LINE TOPSOIL STRIPPING ALSO USED IN NON -SATURATED WETLANDS 'MOTH OF TOPSOIL STRIPPING SPOIL SDE WORK SIDE TOPSOIL TRENCH SPOIL j TRENCH N UNDISTURBED SOIL UNDISTURBED SOIL DITCH PLUS SPOIL SIDE SEGREGATION NOTES: 1. ALLOW FOR A 3' SEPARATION BETWEEN THE TOPSOIL PILE AND THE TRENCH SPOIL. 2. RETURN TRENCH SPOIL TO TRENCH AND COMPACT. FEATHER OUT EXCESS SPOIL OVER STRIPPED AREA LEAVING A LOW CROWN CENTERED OVER THE TRENCH. ALLEVIATE COMPACTION OF SUBSOILS OVER THE STRIPPED AREA. 3. RETURN TOPSOIL EVENLY OVER THE STRIPPED AREA AFTER TRENCH HAS SUFFICIENTLY SETTLED OR HAS BEEN COMPACTED. 4. ALLEVIATE COMPACTION OF TOPSOIL OVER ENTIRE RIGHT-OF-WAY. 5. SEGREGATED TOPSOIL MAY NOT BE USED FOR PADDING THE PIPE. 6. INSTALL SEDIMENT BARRIER AS SHOWN ON PLAN. TOPSOIL SEGREGATION TRENCH SLOPE (%) 4ASER ,M C D N G U L i I N G P. A. Cusromer Loyalty through Client Sadsfacdon ulx ng.c ineers III SPACING L (m DARD <5 1,000 AD ED 5 - 15 500 FILL 15 - 25 300 •GUY, BEMONIIE, OR CONCRETE RULED SACKS 25 - 35 200 •GUY, BENIONIIE, OR CONCRETE AMD SACKS 35 - 100 100 GUY, BENTONITE, OR CONCRETE FlUED SACKS >100 50 1 -FILLED BAGS (WET1E0) OR MORTARED STONE t0l FULL DEPTHTABLE 13.1 FOR MATERIAL SECTION VIEW NOT TO SCALE CE I� TRENCH PLUG SPACING f� (L) �T TRENCH PLUG SLOPE PIPELINE PIPE PIPE INVERT TRENCH BOTTOM BEDDING PROFILE VIEW TABLE 13.1 NOT TO SCALE MAXIMUM SPACING AND MATERIALS I'M TRENCH PLUGS •TOPSOIL ANY NOT BE USED TO FILL SACKS. IMPEFV0JS TRENCH PLUGS ARE REDUIRED FOR ALL STREAM, RIVER, WEIIAND, OR OTHER WATER BODY CROSSINGS. RAN TRENCH PRIGS ME NOT TO BE USED IN WETLANDS. ADAPTED FROM MARYLAND DOE -77777 TRENCH PLUG INSTALLATION TRENCH SLOPE (%) 4ASER ,M C D N G U L i I N G P. A. Cusromer Loyalty through Client Sadsfacdon ulx ng.c ineers III SPACING L (m TRENCH PWC MATERIAL FOR FlLIED SACI(S <5 1,000 WY, BENTONITE, OR CONCRETE FlUEO SACKS 5 - 15 500 •GUY, BENTONITE, OR CONCRETE FlUEO SACKS 15 - 25 300 •GUY, BEMONIIE, OR CONCRETE RULED SACKS 25 - 35 200 •GUY, BENIONIIE, OR CONCRETE AMD SACKS 35 - 100 100 GUY, BENTONITE, OR CONCRETE FlUED SACKS >100 50 1 -FILLED BAGS (WET1E0) OR MORTARED STONE EngPlanners • Suneyorsa Wa rlanduape Architects • Emironmenml ScienOsrs j 1 � Albanl, SNI NJ • New Windsor, NY NJ NJ • Columbia, FID � na• N1 Stare of N.C. Firm I NCOOT COMMENTS DIR6Y2019. DESCRIPTION INSPECTION: FILTER/SILT BAGS _ SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT d INCH OR GREATER). �^ MAINTENANCE FILTERISILT BAGS SHALL BE REPLACED I 5 WHEN THEY BECOME HALF - FULLOFSEDIMENT. �FaBAG .v_ REPAIR: IF ANY PROBLEM IS DETECTED, PUMPING SHALL (� CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED. .� r�.A'dusTA{Tx'AsEe`Avio pT.AN`klk`yFl e - U m--csaWr: E �[EVAiIONNE'N_f LOW VOLUME FILTER BAGS SNAIL BE IMDE FROM NEON-.TSWOYIId. GEOIEXIIIE MATERIAL SEWN W11H HIGH STRENGTH, DOUBLE SIRCHED 'J' TYPE. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS fBGH VOLUME FILTER BAGS MAY BE WE FROM WOVEN GEOTE%TILES THAT MEET THE FOLLOWING STANDARDS: PROPERTY IEBf METHOD MIN TV STM0.NtO AVC. WIDE WIDTH 5TRENGN MIN D -48B4 60 IB/IN CRAB TENSILE ASTM D-4632 205 W PUNCTURE ASTM 0-4833 1100 MULIFN BURST ASRA D-3766 350 PSI W RESISTANCE ASTM 0-4355 70% A05 % RETAINED MIN D-4751 80 SIEVE A SJRMIE MFM6 OF ACCESSING THE 84G WIN MACHINERY REQUIRED FOR DISPOSAL PURPOSES NUSF BE MNVIDED. FILTER &iG5 SMALL BE REPLACED WHEN THEY BECOME K FULL 6 SEDIMENT. SPARE 81KS SMALL BE KEPI AVNIABIE FOR FEPV.CENFM 6 MDSE THAT HAVE FAILED OR ARE FILLED. BMS TO BE PLACE) ON STRAPS TO FACILITATE FEMOIPL UNLESS BAGS CONE WIN LIFTING STRAPS AIRDWY ATTACHED. BAGS SMALL BE LOCATED IN WELL-VEGDATED (GRASSY) OTrtA AND DISCHARGE ONTO STABLE, EROSgN RESISTANT Ofd"M. WHERE NIS IS NOT FOSSIRE, A GEOIEI(IILE UNCERUYMENF AND FLOW PATH SMALL BE PROVIDED. 8105 MY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPMRY. BAGS SMALL NOT BE PLACED ON SLOPE GREATER IIWN A. MR SLOPE EXCEEDING 5& CLFM ROOK OR OSIER NON-DIDDIBIE AND NON-POLLUTING N41B§OL MAY BE PLACED UNDER THE 81G TO REDUCE SLOPE STEEPNESS. NO DOWNSLOPE SEDINEM BMMER B REWIRED FOR MOST INSTALLATIONS. COMPOST BERN OR COMPOST FILTER SOCK SMALL BE INSTALLED BELOW BAf3 LOCKED IN FDI OR EV WATERSHEDS, N11HIN 50 FED OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY MFA B NOT AVAILABLE. THE PUMP DISCHARGE HOSE SMALL BE INSERTED INFO THE BMS IN THE MANNER SPECIFIED ED THE MANUFACTURER AND SECURELY DAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE. THE PUMMNG ME SHALL BE NO GREATER 1WW 750 GPM OR '� THE 14XIMUN SPECIFIED BY THE NMUFACIURED, WHICHEVER IS (ESS. PUMP MAKES SH011 BE FLOATING AND SCREENED. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM! IS OETECIED, PUMPING SHALL COIF IMMEDIATELY AND NOT RESUME UNTIL TMA MA HE PROBUAI IS CORRECTED. ADAPTED FROM PAGER REMOVED WHEN IT REACHES HALF THE ABOVE GROUND HEIGHT OF THE FENCE AND DISPOSED OF IN A MANNER DESCRIBED ELSEWHERE IN THE PLAN. REPAIR: DAMAGED SILT FENCE SHALL BE REPAIRED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS OR REPLACED IMMEDIATELY. Pe@a[aM.S3aI.* ATaeAaYmtMrppA _. SILT FENCE 1 of 2 THE TREALH. I TRENCH DEWATERING P'cA1(R-T1FE�iiFf�!fKOSo5NP 3G£7FlCAT(ONS-SEffIfN. E'F7T££RfiE '3`B°ffAA¢.3}'AfP,.3f7# 01NST9UU`TJN19+Gi1cAtlOxs: K3AVaf L RLQ ydthEefikerkfi o£sV Yea DS%lNlrwerghfdFpolyakRrs PeNye G;.wf@TSUs hfiMbyN. m�eooh wppee F gtoifirregmTeareak %•Az K646L,vd3dii tumnsa padfn4;£rRxNNSTB, !u'�APi7aeNPTlfermbriCAhPMfl3 tpaLaxf ultraoiVl$�aAM Ammo ars fo preW midTrtam PffimAbt efM°TA" MKP#.tad MsaMe,coasCrIIciRfi (� #aY4mLlePoWret2�Nas}2PF K tSWVreTTIAtpestsYor v.EFETSY§Peslces6td p:R3Y6�a@#murksfeelMrth 4'arffehRth ER5iE2C.:MA(le_'� titsesf�vrersnaue'amf �w.iiaNaza4artLmxgfe 8. RNr."rkn�rf4me'nCbT3[arrW�(51�3gEHi8�c'i56D�;lko WWt'TcrlfSadiia`klinrt3ftli159,g"aTd "d h"aaWi€A1' 5�'F�o1L'vrAec SCS 4. (C'aottMeseblmestt:tnaiernfsiaedards eedth.ore.rcaatreggRgynihe7cPdlteariatifrcs. W, IP,Rynr�yhar@�,�glK pj,`AHe'Te{Mpentm.Peedaes na enceM7$'Tn�'ai2bPYR MRYP.Ope¢,APNp5c lBlgher(.eRb:...sPPY bpppy�(yglyrp[S'pJ'WaSp}'yglFcrent so taus urenffjf }traRw.F� atNL{r§{gsflYNq,Acont mous. cuttadtW(epR[Nh oldrgbam`e(EO W�$aq@wW_N(ltnJgnefp® 1rt81i�, �gY45fil t nW uPP�a�tWt�4k [siiRMb@T�'ar1aP �4tBfi4sd�N � SWTPunxaxv�mrMNpA#g1'fLri 5 'K nta r€AutAhi wfkW. NP�}41sa 51S 'VfsSlWf4uRti1.M�§U)AaM t neem sa:tee¢�xwYx+e' N�emVa�ip�N Ls't.'mifk�amR�'tldkM gg{pMppM. `Aysr+�'>aa'*� :snoalc na mmmom.6yrnoand sae:erex¢th, Mal(tH h'WekTlse§Tt MiWNx sea :spa ma.JmU.m, yfVet apart $ypEgrtyess55ngyN liexh3 seosmlyUitYdlNe gwued a mNhOYm�f 22nches +� u.eb���r Nryy�r tP ,Pa gJ PTM n aPcoart= eMrzY ,rN�%adM-eEtWwY Pgre e� P n n .e oar,a; n g_ "� 'AMHSB _B€b:;�; �i�§g{a=iQe M eeP & P Rosea P nal±PsbyN,1P$fY 'INN�M'NUsuW:�al): s&'. t LtNhdsesdl�rR�la$PTARm m#s aeef'Ahgtesa a', ISN1kFtlIMiMtt6aMAwt4 NkA .}peTiktylalaT,c�TsgSp UppYr, Thorougntompamon olFhe backtiBrb �NKa'1 !38<:�hEeQei/omkR[ti. WR �IWCUIYasTfil[erlFatu¢Ya#B[N�tirWY. INS3sA14At7D[$.KgE➢11:1iATW{k} z 'f�2aae�tmene�a:Pas..dnwiaEreaarea:Y�aawdar�k�a�me mmmle or.fnerervte. aneeA.,amn.�fe. ru 'NayeYAasy. F.. I$4)ail PRs W'{c6{WB:M;iN ar'Nt-d #eas anabiAeA?PaA�E!aailpNkaPlMwlmns_, IYLi#)aYI p9 2T a1 ep;m'tl, tl : fan akj. _.. _�M'a @%.Llosea A '�fi,tP�S{a�c, seg,R{Af�Alis'(-. DP 44P. f b c'fra_ Ps( tecp 4 MTMpIIPost m npyk fac g rem am c. AAY� A S F btL A earn I1_oSkWlth n = � II edvf MrAi th ap acn VmLti2M1'bY;ry35 AttYeA Shue K)p'�e2aiQ§Stlq�'GeWHMd1�1kYn rbc, wit cM1 pPrnw.Ks;Wtl IN.aFNIt-Also ndiefhplAd pN IpoaNeWc�B:mlanpsa Ml wneo-sisnrepea maBMV,�rnaesiae: 5. B}eP:aPPurm9rouafxdA,efw i iy .nuadihe :3ities. a INP!^@.Ntilf2rv2¢+^[MtitdA NG •��, _.. '_.. ___.' ��. IL.`4mPaoTmauwSYjimR2s}�t�c,�'AAWci tl�a•�f+aimmeeatew rP]dra [TWLIt{epc�Ja¢iKs'l!Ui. ',tR@TrogCrrpeN AWiN411agp3M'3k1$Meer.&Std(1;.-._. hu�0}G°naSP9T'3�2i4 "etch. lfomPaakAnAs.1W. LSNk'ths:aaa giber+each fsylkre:�Sn d Merl sT+4 Mfi SILT FENCE 2of2 i0 FlL1ER BAG (PWB). SPOIL PILE PUMP SUCTION LINE FILTER FABRIC PIPELINE TRENCH FLOATING IIRME PIPELINE ELEVATION N.T.S. 1. 'NATER PUVBPEO OJC OF TRENCH MALL NOi BE LYSCHARGFD INTO W:s.TFYWAYS. WATER ' SHAsl BE OTSCHA'tfr11 INTO A PTL� BAG OR CEWATERING STRUCTURE I 2. FWP SY.ALL 9E LLiV"ROLLm SG TI{AF CP9GaARGE BOB NOT C's£4=CCM' OENATRING STRUCTURE. J. WMP SIYCTCN NOSE VUST NOT BE ALLOWED Tv COME YN CONTACT YNTH TRENCH BOTTOM. ' PRCb1510NS VVST SE MADE TO ELEVATE THE SUCTION HOSE i0 .4T LEAST ONE =00T I ABOVE THE BOTTOM C THE PYr'E TREAC1f UNT'd 80TTtllt DEWATERiYG :5 NiOESSARY. I 4. DEWATERING SHALL NO' CCfAR OUTING TIMES 0- HEA'iY RAINFALL EXCEPT AS REQUIRED TO PREVENT F-OCOING Of CCNSTRUC'ICN EWfFMENT LCGAIEO IH BLTRE (cf15 AND [BENCHES 5. FL'VP WATER FILAR BAG (PAS) SHALL. BE FLVCEO ON A NIIL VEs£TAIEO PfYcA AWAY FRED CCNSTRJCTCN 50 MA` FiIERED WATERMA 15 #OT FETtIRNEO TO I PUMPED WATER FILTER SAG EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA AS SHOWN DAOWIBllB -CJKT GMENMGY TmolEcr NUMBER. DRAWING NAME I]ON62]A C-SESC-DTLS CHARLOTTE OFFICE 16IL EROSION &SEDIMENT Twelve Parkway Place sUire loo CONTROL DETAILS 5275 Parkway Mau Boulevard C -SEI O Charlotte, NC 28217 INSPECTION: SILT FENCE SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT (#INCH OR GREATER). MAINTENANCE: ACCUMULATED SEDIMENT SHALL BE Phone: 704.516.8295 eEr NUNaER Fax: 732.383.1984 1 IO Of I2 IEP O Aoe NIS W1011, A RTn1 BIL Kr olrNAIA1IG DAS� JlRPlLE (SEF DUAL q] OERI1 to DIEU Own L-ROR OF 11010: 9�ESr 9'KdBf'N rS w iYEIHI Y TIS a w SAB ,01TmR to Rav SlTSSOGE AE3E Mows 6 Y mm' A EI'm r 4lIw "M 1 R10 MO, R SP01_ RM Wyl OE Omuta. Dar nfX sialldr WM30 � TIE aesi oBRAflm 4w ARE Im IEOd Om 1 �R 11R4ER3 8RDWI " v P n Ialn IFipwFN IFsfCc* G ES➢'8.9FI! A Il11EA E1QtW not 0DI E PIT MIO IFrlr1YIF RI �11[L K nowTIyfA1[X A : wELLPNr. SndCRF1E n4 m-1EN Wu a IMI nAf•11F 5 e S F Parr m EN]MYAU soli PIR, WRw014L S IT IMIT /IR �'NrfF FInVtr UPRAL !G'L . Pr�F 16 L♦1MBLtYJIr rf ! 03MTR1CICN w> E T ul b TEPP M Dk^al! VFUI 6 tHEIS of yy ilES 1, eor MOEI k Di -T-'0 IlRy1 Sq Plsfi N (a'EER 10 SBIPIIF BWAY 1118. 6 R EOLOR Itl W T i f M NN SreR roh RO+IN, 4M1EM Sa11Sk WAY OE w 4EaDFm AI]Er8 nr CMRE ClpS1eRTD4 RI]P CF k rt n[ C1Q Q Im1P. N wuilrl In nb rc.,k rErtn m IR LAwloneEllrk kunslr aMwc '� RKOiIr D 3nsEFr aILAEAS APweva menwvs c a•.4- BORED ROADI RAAFDAII CROSSING ar.rt J' 3116' pal •rased a f r9w s+e.r e,lnl. ��Inn LIRI .rutY Of MnlfrES01,1 F9 07009 A geolextlfe on derlayrnenf shall be used isnder the wood mAt. M TLH9P&1dATiTN[:IN N'EILANDSGx AT WW PDXII., P Piedmont Natural Gas,11 - HLIRI2ONPAL DDLEC110NAL DRILL 4 lip MASER � C O Y Y II l F l E E Y.. L C——r Loyal ry through Cr— Sndacden u lxing.com Engineers • Planners • Surveyors • rL duape Architects • Environmental Scientlsrs C: d. L« • Red Bank NJ • Mc Laurel, NJ atI L:h Valley, PA • Orlando, FL • Clinm�y NI • AlbanlI, NY • Eawn, PA • Miami, FL • HamHlmb f • Wew Windsor, • RiladelpM1ia PA • 11 nyy VA a ar or, NJ esm firer R mburtl�, PA ol1 —.1—aNJ • Columbia, MD pa, • _d'deryae. NM ilagmn,Nla.,...a..n, anWnSsare of N.C. Firm No. U042 �n..re.• CJM1arloaav �4I ..ALR IMPECTION: EROSION CONTROL BLANKETS SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT 4INCH OR GREATER) UNTIL GROUND COVER IS ESTABLISHED. MAWTENANCE: MONITOR AND REPAIR THE BLANKETS AS NECESSARY. REPAIR: ANY AREAS OF THE BLANKETS THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHOULD BE REPAIRED AND STAPLED. ROLLED EROSION CONTROL PRODUCTS TABLE SLOPE (H:V) LENGTH (FT) EROSION CONTROL MATTING 2:1 0-40 S75 3:1 0-55 S75 ® 1 m a nplrax. ley Elea `-- rasasa 'rwyrC4sr9Rr• Rb'T 1�V1. Pr+m�r 7' NCDOT COMMENTS DIR9l2DI9. DESCRIPTION o f— A. b ro-� E w ar rrr xea HORtZOwrM- F1fOF.CTIOHAL DRI 1. M1'+Ih 'reAfhl MQrrMlxdaGu irAllE eFrxrMEilkIO h P400�4'ON I AMI RiAAeiD� CL1@ACifO! J �, t tt 5�1 liAnrwa,TTvpDTYOF, � � A / RpL nDM [ah - or 9N y • Dlrn . a IeAtuT.ulw --------------- �TWIeTTA 3' eRFRAeF ■FEn AES 'i nrn.'wr,c FA'Pux*nr � j liF�,cent ai¢sc as[pB eRF�X 1� ksefk:AI NE01 ' II 1 I AelEi1105NrA.�AETs/gPq __ - RrGDINrr;feEp utAPLIrF i•RTTE� UR r1ElRHEtilAril LF rl01n Cw w.PY � r1 �� eEllecp-wrTw (0.9m) IHFB�FJkT SeIDG[P MDT >* pnl Ap9 FT rWi><e• IWN t'arFa tl yA%U" SfRETrJI�RMUS'rMWRAN pLAns2r-0vE0...raG nif P]IWE:.fir 1LANIiET roman w'Em+racT n,+T+r+r s*rr�I rrAne+lweF•r 1101 lw CLP lyra I. MAY JL AIERDIRAI.S eyu Et wR 1p mlme m m€. MID N W FtiN D IrE RoclL 0 161N14b x �NIQ. i �1AQ( +E41�IE i3M']I yl m N SW,A f,41nON AS [t 1fY a< SiLrE aL %3o, ANG ok44 l SO EF FR3 BP NJ4'16, AfLG, .PI] A- ME NB {. 'a , = mm IXNfi PR $ O t rb Mol II B -Mr C 40E WAl3Allr EllllC'lNy'iM. &4. Ar �Mlm Ig4sBT NR} •JME ta 5T,v1t ro trgrbr oMl>=€ cvrttKr wn ml. cD Mut SYET'SI a TE 1E CrsS M N,VJeOMIG[ s1Be W/AN'4"111uel- �S. 1-9D'F1A14 Dr TE 41/1gT N As E aNie'TEO in9h 91'12 5F M9 J.iFP aEc Er;Rt AFTEF EA(M WIfD EHIR n1RL EgE2ENaL KAiFT¢a i4 f5TN1LLiD TO A IOMIIM UIFIIRI SFRICE'llFdl]BiRIR 6/NhlEa NSA ID R FI NDNbR LF oP'W.91 a1/arEi' `SSW R 11r"fpnp BR 11ER+'E[0 r1Tab1 F gLFl01E arsY ]. w��ru+r ST1A13 9VL.L 9E BHO 519PIFF]F1RL Aril: rdElR1[r0R 3Wi ICE a w o WT 51l1R FD11 5r BE AFTFA Tuw 11 w 2. rRTfdyli 1PPIR➢ TAOAM D:lOR2 SIIYIEIS AW � LiV M IifU A V6 "otto rlml Nmp EB0510N CONTROL SLANUT MA54R HLIRI2ONPAL DDLEC110NAL DRILL 4 lip MASER � C O Y Y II l F l E E Y.. L C——r Loyal ry through Cr— Sndacden u lxing.com Engineers • Planners • Surveyors • rL duape Architects • Environmental Scientlsrs C: d. L« • Red Bank NJ • Mc Laurel, NJ atI L:h Valley, PA • Orlando, FL • Clinm�y NI • AlbanlI, NY • Eawn, PA • Miami, FL • HamHlmb f • Wew Windsor, • RiladelpM1ia PA • 11 nyy VA a ar or, NJ esm firer R mburtl�, PA ol1 —.1—aNJ • Columbia, MD pa, • _d'deryae. NM ilagmn,Nla.,...a..n, anWnSsare of N.C. Firm No. U042 �n..re.• CJM1arloaav �4I ..ALR IMPECTION: EROSION CONTROL BLANKETS SHALL BE INSPECTED WEEKLY AND AFTER EACH SIGNIFICANT RUNOFF EVENT 4INCH OR GREATER) UNTIL GROUND COVER IS ESTABLISHED. MAWTENANCE: MONITOR AND REPAIR THE BLANKETS AS NECESSARY. REPAIR: ANY AREAS OF THE BLANKETS THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHOULD BE REPAIRED AND STAPLED. ROLLED EROSION CONTROL PRODUCTS TABLE SLOPE (H:V) LENGTH (FT) EROSION CONTROL MATTING 2:1 0-40 S75 3:1 0-55 S75 ® 1 m a nplrax. ley Elea `-- rasasa 'rwyrC4sr9Rr• Rb'T 1�V1. Pr+m�r 7' NCDOT COMMENTS DIR9l2DI9. DESCRIPTION o f— A. b ro-� E w ar rrr xea HORtZOwrM- F1fOF.CTIOHAL DRI 1. M1'+Ih NS}ECTIOM SILT FENCE MTLFTS SHALL BE INSPECTED WEFML f ANSI AFTEF EACH sIGNIHCANT BUNCO EVENT r INCA OR znyAM) uNTt GROUND COVER 6 ESTASUSHFb MWN�T-NW�CL NOHTTDM AND OvAik OUTLETS AS NECESUkI FEMIR A,Ny ARERSOT T]-EaL !-ET THAT ARE DAMACFb OR NOT IN CLO`,ie Co AET w,TH THE QKJ IW Q5s4� BE REPAIRED AND STAPLED FLOW DIRECTION FILTER OF 57. it 11 4 11 WASHED STONE . SILT FENCE FABRIC ��" ._ T •ti^ ,'�' . _1'r e OVERLAP HARDWARE T -t •{: i•s CLOT14 BY 12 INCHES STEEL FENCE _ WIRE FENCE PLAN VIEW''5T EEL FENCE POST FNLTER OF k Wf4OTE WASHED STpNE .Z r• APPLICABLE FOR DRAINAGE AREAS NO MORE THAN if4 ACRE. 2 USE ASA REPAIR OF SILT FENCE FAILURES. P LAW DIAECT€ON _ +:,� s -=r! 1 3. BURY WIRE FENCE, HAROWAFiE CLOTH, AND SILT FENCE FABRIC 6INCHES . SIDI TOWN OF APE) STANI)ARDS EROSION CONTROL. PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA urc As 9Rome Pur a.re FRI :iy�aW" MIID �TWIeTTA 3' SOIL- EROSION & SEDIMENT rt CHARLOTTE OFFICE Twelve Parkway Place Swire loo CONTROL DETAILS 5275 Parkway Rau Boulererd (0.9m) Charlotte, NC 28217 Phone: 704.516.8295 FFT wuneFx Fax: 732.383.1 984 6' .Sm) 3.3' Q 3:1 Slopes (B) 33' (lm) O 2:1 Slopes (C) O O Q 1:1 & Steeper Slopes (D) 1.15 Staples per SQ.YD. O Medium/High Flow Channel (D) Q High Flow Channel And © � Shoreline (E) 2,._5„ 2"-5"� 2a1_5„ 2„3n (5-12.5cm) (5-12.5cm) (5-12.Scm) (5-12.Scm) 2' 2' 2' 10" 4, (0.6m) 4, (0.6m) 4, (0.6m) (25cm) (1.2m) (1.2m) O O (1.2m) b O 1.6' 20"(O.Sm) 20"(0.5m) (O.Sm) 00 O 3.3' 10"(25cm) O (V) O O (0) O O 3.3' O 0 0 0 0 0 O(lm)O 17 .9wples per SQ.YD 3.4 Staples per SQ.YD. 3.75 Staples per SQ.YD. NOTES: Use ECMDS® for more accurate staple pattern selection. - FORTH Disclaimer: elasa a• AMER)CM The information presented herein is general design information only. For specific applications, GREEN' consult an independent professional for further design guidance. MOI Sr. Wou&L-C'yntiir1e11 Ad. PIF: M0 -722-2040 OrawilTO Not To Scale PmnvOiu, IN J7633 .m>:rBeamm CIaw1T on: 3-7677 NS}ECTIOM SILT FENCE MTLFTS SHALL BE INSPECTED WEFML f ANSI AFTEF EACH sIGNIHCANT BUNCO EVENT r INCA OR znyAM) uNTt GROUND COVER 6 ESTASUSHFb MWN�T-NW�CL NOHTTDM AND OvAik OUTLETS AS NECESUkI FEMIR A,Ny ARERSOT T]-EaL !-ET THAT ARE DAMACFb OR NOT IN CLO`,ie Co AET w,TH THE QKJ IW Q5s4� BE REPAIRED AND STAPLED FLOW DIRECTION FILTER OF 57. it 11 4 11 WASHED STONE . SILT FENCE FABRIC ��" ._ T •ti^ ,'�' . _1'r e OVERLAP HARDWARE T -t •{: i•s CLOT14 BY 12 INCHES STEEL FENCE _ WIRE FENCE PLAN VIEW''5T EEL FENCE POST FNLTER OF k Wf4OTE WASHED STpNE .Z r• APPLICABLE FOR DRAINAGE AREAS NO MORE THAN if4 ACRE. 2 USE ASA REPAIR OF SILT FENCE FAILURES. P LAW DIAECT€ON _ +:,� s -=r! 1 3. BURY WIRE FENCE, HAROWAFiE CLOTH, AND SILT FENCE FABRIC 6INCHES . SIDI TOWN OF APE) STANI)ARDS EROSION CONTROL. PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA urc As 9Rome Pur a.re aas9.m Ly :iy�aW" MIID �TWIeTTA CSESi. nTL3 SOIL- EROSION & SEDIMENT rt CHARLOTTE OFFICE Twelve Parkway Place Swire loo CONTROL DETAILS 5275 Parkway Rau Boulererd C -SE Charlotte, NC 28217 Phone: 704.516.8295 FFT wuneFx Fax: 732.383.1 984 1 11 of 12 0jww FXTEq L1GI RDa. K MONENY VIM mrL i R'R84'4 �+mIBiT 9PDL �f w.� PPB,E ` �� ➢EMmR 11{F Nor TO CRS RCMt x11rt me RNPI I + a!i Art IAR w8A91FA d1 w3l 14BW17P+ RR WE 5) AUWiP WATlR r1I1P NF•OAweamb ",Y WtEArt W WAt[RINc �w[nuE RIL4i,11VIAW WANNNVV& .THE PDX--EQ MFl NOT M 5511E Duk lam iTEAR RETl.Y4 NQ ADVIES M DBTNL FDuom' VE PPOM MLUIEi I AE .4NM sAE1Nc W NQ kog RFI *U VW -01 6 ALLM Wr Im REE 4 AE"K. RAK! 1u EV UN1 SPI hb S 1m FE3 8 EPW Illi BDIIOrrf wlF 'BRWV Y -4E mWf16 01918 IIF 'AE•INN R 16%.x• AS rHfiM ON OANINS AND SINMU N6 + PRFFIEGOEB 11AiEl1R YWL AFS tJINE NE111aD /�1 DI M aveE4 >rf ff Rm �1alA.eI41 mpJmeR. M 1Qs r 1 a Alar M Om rt BSE 4 MDI AL TESTI" 0 b4 i" I. W Bwx M Y+NEC i1E Ir M 911 a 11E OEiAE.0 SuIrEE111A IIFSXION MN rNam AW IYL•mC Am gr W. m¢ T' i' Q1lMC f EIS W. YAC eZSE RTS Rimle 6 TYE yq1 NAE, Nd SERi1r 6YNB'6 mRE Ap Tawam La TK III)MLIAG aF M iK GTJ9� uuu m,aAnrt T1REBvlc TFKIAiI Tz XET.Ym rwT�s sal re smEnEr Ee oar TE DngauLToll wwa1� l J r PM%➢i tr TIN 511WP:' ND R�IIS PLIh116 W Drtd,TLT PER iFE 11E11O1 IDIE W Iu 4PINI Nv RF1h4 130" CA Ac9r LAaY1TS FRpI TK N'GT i 118 IAIMt -+n w EA:RAApE srIIY� nE tlEF rdPEcwt AFD EIW MIEAWP W SEE BETBIYIE INR SA7EFt 16 ATf➢ ASRLREIKTIRI EDI{SiREIe' i1ED1�1 NNRWII p 1TWIT 41y95 1A1f1Y INBBE RE RPPeII 98C W DO NO fl y L EOIntY TaTRI UE LF'a 511w.r ttv TY50/ a rot snJur.Oi SSLwy xP� m .: nw ffrm w . wTErtul owM Lf- 1E NOES. AS DEI��r1Ym R+ TE e4ffl _ ROM iEdA3Atm W971L PRf IMV BF � m UI SVA BAOC C [ "rIAg1 MIs e• lE fJC ?' KILYTA :AMID E P I1a0A RO TREACNfi A iWIU •I�.w! R[M1,IAn .i frD*b wER BE PIPE CMD D I FEUkC 61 M 1 KP TO AAI. IOMI 1 ,6IEYSY3 WIE- 5. 1 nlrp.pl /I.a IIE1I,'it F PI HbgED �mAsdrAt uIR 1ME o>�yp 1S ppgE)[q gspl PLI A1B Al=lllty i4 [TI: ID 4Meti I•LL vo E TEE 1FE ITOIW d IE DI °ff SITE{ YAi g F.6Gl1FR 1RRNr Eln RAItNO AnAVE1N 10 A'A'E eRE11tll 011 ,0 5A10[A1 NEm 1V19{E M I(TJffl WIND WAm➢ Y NE fYll'LE i]]rTYe CTAAPr IIIc 1m fY-T R in1lE1 iCiw Yr INIffi APPwYG Er DRrdI[vrr_ 6w, la LLNFA•M PPC PAFfR 10. 9R�1 RUC 11EXDE YRSFALL IIOOI r W5 L NlTEXptl1L RAT At g NR AP Kk-t)ry I}. AWK WYE 10 IEA! PfE'A �Yv1 TEA°rl�mAlT, IapIACi NFSOR nF r5TN1 H1RWllrrllr DFADrI mn91. I?_ SM) PAEF�IG Td 11us c�I rEaMDE VPQI DIfIMFFN u rkfD D$R1FiL NTjmF6 AFNya VNSATURATRU WCI-LAND L\57ALLAT70N PRQCFD11RF- j �hlASER MK47AONI NL rs7'AWTECr*G rSHALL rE IN5PECTED WEENY AND AFTER EA<H RUNO" FPWT MAINTENANCE: SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE HEIGHT OF THE STONE. REPAIR: DAMAGED OR CLOGGED INSTALLATIONS SHALL BE REPAIRED OR REPLACED IMMEDIATELY. DOT NO. 57 CLEAN STONE CONCRETE BLOCK GRATE PLAN VIEW WIRE MESH GALVANIZED, 11 GA. OR PLASTIC MESH, 0R� CONCRETE 1/2 IN. OPENING FLATTER \ � INLET NOTES: MAXIMUM DRAINAGE AREA = 1 ACRE. KEEP THE HEIGHT OF THE BARRIER AT LEAST 12 INCHES AND NO GREATER THAN 24 INCHES. DO NOT USE MORTER. TOP OF BLOCK SHALL BE ADJUSTED IF PONDED WATER WOULD POSE A SAFETY HAZARD TO TRAFFIC. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH BLOCK OPENINGS. SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE HEIGHT OF THE STONE DAMAGED OR CLOGGED INSTALLATIONS SHALL BE REPAIRED OR REPLACED IMMEDIATELY. BLOCK AND GRAVEL INLET PROTECTION 1p NOT TO SCALE r6111 Piedmont Natural Gas ((N4'QE ifOIRRAR4R18 IfW � trLuel %EKT Kw - , II ! I Isiv PR I ° I �p � I t%� r1E8 FN1DF eaa °JGL DQWYm� Td� �� EmF 4 TLTN4 FpRdLDR atRRErR1IA ®IEXiE �IEaNE I I PF mcrWx I I � nE A.�FTW. v nc =K=0cpN Ln1rE61 �FRTFR 970f N71 TO 1 i 1 ala IN25 ' RAN I- EDA: 1llI,Y4 RLUd'� A14 ASrFL1 XE11114 `.,LJG R9CR RI IxEYdtl4 Id! ID WALE IA UNB RCE 10 CR R711F11M1C Q W1W 6AaRHM 5 kll LAW tm f91 ff ■"IAAF RACE � NYs1C Sa P036 1m FFQ EICI fRU1 E[PJt9 d%MdTY. mIU4K TEW'ORYQE ' � 111F1+0-rc sl w' K DF 11GlAID BNr4YEE5 9 91AaN BM DTNWO 4W 9qrs ym I Wm AmyPan -MAWr, NSTA L 5WAm RINNEr1 AT MFA tw# 5 IT FE'hAN Al) AIM WN, IETL W Miss to P1NUr6 w TFEE YvAM 00 OWN A71AM TO ,MEMT DEE TI100 13i- fA WE WGBE OF ALINWE 6TErs W RDor EGIDR Fri W IRST WTK FA;4 O -W N'AEiLOW I11{%9g THE r V FRECO 124 EMYEfSaVIAL N9 WRIN KW WE 1nb '�4h w y m A WNMA 01I6'TRitR REDff RLWISL m T MT TE U[EF1 M a01EEAL MX 0 No. wlAroyPFt. A W= 6RRVRR SWL IV BE AEWM W MIYFATED SIN 00MNS. !. tam mvi° EA`A'AIIDC {PWRILW Enl!® )w iRADr9 bLM2a Slrsvlm PA PBQAeIam D>19TIEMt YA75 Ale R➢95. T9 EMPI0M FimIER E FN3:AlwOI m EtllA1ETIF M6 NS ISP EPI RAi+rF A Rrt EAOPAY 9w1 LR II 11inE IIyDLr M AEJIAI4 9r am TME wM F miuma, Bow m vIium ELr N � w AE 31Dr4.S INTAL i FNiAwTL MYNA 9MRG NE. •},, ' M ITPE • NERIl4 lal CxF]Er CUIOC AE•1M•' MIHW 1m iFu w lERW4 ®IYIQRI, LKM Apwnam er Ohm-+•1Ern rrvF%�.oE ua[ RUTc HlAS M 1I E9i U 1MfLWm AETu2u IWt4 WISS FIRM TV PYF N/LDENF. Id Fu]II PNS w PIAS LLRTfE-A N74L ffl A FDG AND m M I RA.1E rs " ft --N TfSLTRN TUW4*- AND N51ML PNFAE1aN1 EII EwN LCIRR0. I- 4111E W NINA UTL?a 4 SEE I y�- BA1rIEIM ARRA YEMANA WN EtlI 1A ADIAK[ r3nw 1191E M NW eA IEIMO TDP 1D d TOD !1 PWr EPAFI]BE 9DLbIL Idl[[i1 r 11F LR. is ER' DOfll MD E uEELTEO W TME raEcmx. NS 9M DIUNDATED WETLAND QKSTALLATWN PRUCFUURS INBFECFIOPL ROCK CONSTNlX71ON Fr1TRANCE SHALL N Ip9PpCTEO WEEKLY AND AFTER EACH 5WNIEI :MIT RUNOFF EVENT K NCH OR GAFATER) MAOMNANCE ADO STONE TO Fwmm qu FTOP DREsnNG wK 7, sTONET A5 NEEDED TO PREVENT MLtD OR SWIMENT FROM LEAVING RHE SITE REPAIR. DAMAGED ROCK CONETRUCTIgN ENTKAWNS $HALL BE REPpREEMRTPLACED IHMEDIATRT 1 WuNIABIE n' l03�1 Ia IN 111114). NIN FLY3lAW7 RM➢M,>' sS rEA1Rc '-��iN FILL '&'M' F WIN B' AA TD n PPF R9 FIE'ScAA�s E. PROflLE PLAN VIEW '= s R MMAIFAa; BEWt USED TV OWM PRUPM OYER FM PIPE HQI!E5_ I RCMONF TFpyp1 FPoUr TO rYSTALLA hOH 11F ROd O]N51RLR'TQA ENIFWACF E[IETIP 40DK 084E il[.% RIDN a LNTRANICE x RUNOET 9RALL K UI TED FROM RDADMAV N A E 17y 9EQMEyT RE WAL 9IP PANN TO ENTTM,AC 400 r NV6 C" EATUNKI F U%NTA&E BERI% 9 U- BF IMRTAOED YHEEEKR tF1104AL MWR1 > PE 15 uSED ARG wprflr W`�A F.ffTW Sti• u#tuFAMIT, E G RAD' cT1ET=WSC f•CpTTceD. LIhLL 6E SIEo APrptAxAA FELT F0. 5iE ITE NK1i BEIM0. �Qswv- F YANIENAI{y I+oom •�NSmIxi10H Dry raANKE Twarl S$ A W BE [ucS1AI. 1, YARITANEy TO TME 5PEWE9 DIIWENNQA B'/ ABBINL Rt A ROOEAttE 5n MANTAON 5TE FOR TRS PLM CM All ArWWr IT XnN IM I N FAVED HDAPKn'r RIAU a NEMDMEB Alp REnRIEO To 'm COOM1OWN SEE RWmF rc.R EAD4511YI' kyM4ni EY SEBIYErT AM 9DNL DEPG = ON RVADWWT, EATEHO LENGN pF .1[10E Li' vNIADTIEAY MrNMM BY 0 9r f PASwEE.FS ON111. TlXAB 1" IS ALI ENArED OR -4gr&6 XNs NACA YA9 NRW RWWRAr BR Sr1E(Py0 NE DEPM6 , INTO NUADNAV IWOS5. St*t w DUL-VOIS. W 01AER WN1414R. QUIW;S IT NOT ACCEPTABLE A.S r cER.o-EsuLrlc s F.A. C.,=.r Loyal ry through Client SadOxt- u lxing.c"m e Engineers a Planners N Surveyors a rL duape Architects • Environmental Sciendsrs j J � Albanl, �"1 NJ • New Windsor, NY NJ NJ • Columbia, MD"T na• NJ 5sare of N.C. Firm I ROCXICZ FRUCT10N ENTRANUL rn� CFYRI5T RiEll 9ltl FANOWIAD _EDNF.YTr S '�aRe sl� 9YNEY I 61wIEx , I AJMeI[ NAM 1L'�JJ IS?-i4YYm SFE3x,�e wt I_ cyaT%.ErrTA116-0e�r _I my TO %kLf ' 9lP PR Q AAn RADA RNNIEa wAmRLrsA w o. 0" EDN wrtm FIXA'.-O[WhTfW.:s•LCAI.14 ''Nn 2UYA1[m oEwATT3Erc STW [-nnE FNin[f�THE AA}ROy4817ay Th.PBI r+<aFn Irn NOT TO SC4E •. Fuc �Tuw s71nBYu A14 AISTlIi 9ElA4Fle 3Eals FAA•]! m WAYFIIG x0 lFIW1AQR aAeolrc rp iF1Ela1A Ar +sallE m11RE11F � ALFAm IlREI 1m FEES of YETIR4. AAJJ[E T4 RVL114' m Perls Im rLv a¢11 FmI AI[nJI4 9EaDYN 3 WALL TEYPCINRr 9U4 rEAKIM sP y F w IEIF.VA NUUMAWS A( 900 uX NFRWSS Am wav alm 1. NRTALI RICiY3OlTF9 fAPKSIr NATE 1104=1 ERRE ERlA6 AREA M TIE 100M SEE S 1W C1IDRLCI91 mNILTi t A'® Mslml rETA.Im A611a1 �.Pc]FFIIeos c mf/ ®1ow[s ur AE1r+EF /10 �m tmis Rls.m mFis e. LNR F1XLL1c DF vt;= xP�s ll4 llxrLRIC icTrnai m TI°mu 0141 T1[ 1 LIE m Y�R ORbC RI �EEIMR�Wf]TIR l�lP1iW x-IEAI�MF IMN1d�SWeTpEI ��IG1 FI �XS AdLHKFN S IMV `TOIPS � � •TT IIIaINDAE vnE DF RIE NWf-R- i. IpIEOI SPAhID UL11 NOT TE � N SRLAIJER'YIL DtFIQr[IAE !. A6nE wo MIAS AT RE ZQ3 Er TERWNP L111L Jl FAER N Trd1PJ 11. 2AE1AUR/a AWWX 11 XEF1A1Dg WY R On 11E PFS 7v^•1ll 6 F,BtifAi M RDIM TO Uy- DWE RE7 M LPYEDaai mf61KOW IFROM FIF W%W 15 TO PRO= c'Wflh J.%1 INIL W09%" 5 LM� R Ri[D AN I� N DIM 1B W11,1ZE THE JIMMI w RYE R[ TIEMWI IS OPLr. 10. PMS 3ELjW YM rE 1A O= 0 NRTIN 11E TETLIAR AnKEM TO F K TMACR OR F SAbN4 ANG t ISM THE IULW ARD R ' k W 03KREN ,'IKW AM vfnA11 Ipl FRT � KWO Ixmm T, I➢YS5 ANRIID @/ DedBLhYDfAk. 119frICR 1I-EP,wo RS PREF M warku Way"TK" Rugg. 12. E9AL6C SIEVE M IE]R P.PE-cCAra1MN." IEr MPDGR"R M 45ML rMANDR W" =191 13. iE1gE PREFUNIU m 1fWlE Eini fEl11MD8 r e LYYPIEAY. I4, WP MMM N IDM MFA FAe SATLTRATLD W RT LANID IN5TALdTIE1N PRO(M7URP NC -COMMENTS DIR9lLOI9. DESCRIPTION CONSTRUCTION FENCING EROSION CONTROL PLANS FOR PIEDMONT NATURAL GAS RUSHMORE PROPOSED 16" STEEL DISTRIBUTION CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA AS SHOWN DAOWIBllB -CJKt CRENMGY "07NUMBER. 1709827A DRnwING NAME C-SESC-DTLS SOIL EROSION & SEDIMENT CHARLOTTE OFFICE T -1 -Parkway Place SU IBD CONTROL DETAILS 5275 Parkway Mau Boulevard C -SE 12 Charlotte, NC 28217 Phone: 704.516.8295 err NunaER Fax: 732.383.1984 12 of 12 i APPENDIX D AGENCY CORRESPONDENCE QPP�MENT OF FISH &ILDLIFE SERVICE 2A United States Department of the Interior o FISH AND WILDLIFE SERVICEp�r gRCH 3 1a Asheville Field Office 160 Zillicoa Street Suite #B Asheville, North Carolina 28801 November 19, 2018 Matthew McCort Maser Consulting Charlotte Regional Office 5275 Parkway Plaza Boulevard, Suite 100 Charlotte, North Carolina 28217 Dear Mr. McCort: Subject: Listed Species Assessment for Proposed Rushmore Drive Natural Gas Line Project, Mecklenburg County, North Carolina (MC Project No. 17004827A) On October 16, 2018, we received a letter from you that included the federally listed species survey results for the subject project. Your letter and surveys were conducted as a result of recommendations included in an August 27, 2018 letter from Mr. Byron Hamstead of this office. We have reviewed the information that you presented and the following comments are provided in accordance with the provisions of the National Environmental Policy Act (42 U.S.C.§ 4321 et seq.); the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-667e); the Migratory Bird Treaty Act, as amended (16 U.S.C. 703); and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Project Description According to the information provided, the proposed project would consist of a 16 -inch diameter steel natural gas line within a 30 -foot wide easement corridor in Charlotte, North Carolina. The project area consists of cleared open space, forest, wetlands, and transitional habitats along maintained roadways and utility rights-of-way. Surrounding land use is dominated by residential and commercial developments. The proposed work would disturb 4.943 acres including 1.313 acres of wetlands. The proposed work would entail horizontal directional drilling (HDD) below wetlands (approximately 500 linear feet) and two roadways along the proposed alignment. Your correspondence indicated that the proposed work would not disturb the unnamed tributary to McAlpine Creek within the project area. Federally Listed Endangered and Threatened Species According to the information you presented, three federally listed species were assessed for potential occurrence within the project site boundaries including: 1) Smooth coneflower (Echinacea laevigata) currently federally listed as endangered; 2) Michaux's sumac (Rhus Mr. Matthew McCort — Maser Consulting 2 michauxii) currently listed as endangered; and 3) Schweinitz's sunflower (Helianthus schweinitzii) currently listed as endangered. Personnel from Maser Consulting conducted surveys for these species within areas of suitable habitat September 21 and 26, 2018, and October 4, 2018. No individuals of either species were found during surveys and you have made a "no effect" determination for smooth coneflower, Michaux's sumac, and Schweinitz's sunflower. We concur with your "no effect" determinations for these three species. Therefore, we believe the requirements under section 7 of the Act have been fulfilled. However, obligations under section 7 of the Act must be reconsidered if. (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered, (2) this action is subsequently modified in a manner that was not considered in this review, or (3) a new species is listed or critical habitat is determined that may be affected by the identified action. We appreciate the opportunity to provide comments on this project. We ask that you refer to our August 27, 2018 letter for additional comments and recommendations for minimizing the potential impacts of this project. Please contact Mr. Bryan Tompkins of our staff at 828/258-3939, Ext. 240, if you have any questions. In any future correspondence concerning this project, please reference our Log Number 4-2-18-400. Sincerely, - - original signed - - Janet Mizzi Field Supervisor North Carolina Department of Natural and Cultural Resources Natural Heritage Program Govemor Ray Cooper SKretaryy Susi H_ Hamilton NCNHDE-6391 July 5, 2018 Seth Ryan Maser Consulting PA 5275 Parkway Plaza Boulevard Charlotte, NC 28217 RE: Ballantyne Infrastructure Proejct; MC_17004827A Dear Seth Ryan: The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. Based on the project area mapped with your request, a query of the NCNHP database, indicates that there are no records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is found within the project area or is indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: https://www.fws.gov/offices/Directory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Clean Water Management Trust Fund easement, or Federally -listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rod ney.butler&Dncdcr.gov or 919-707-8603. Sincerely, NC Natural Heritage Program MAILING ADDRESS: Tele hone: 019', 7D7-8107 LOCA.TICN 16`1 MaiI Ser,rice Center wrr&ncnhv.org 121 VVest hones S-reat Ralaigh, NC 27899-1881 Ralaigh, NC 27603 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Ballantyne Infrastructure Proejct Project No. MC_17004827A July 5, 2018 NCNHDE-6391 Element Occurrences Documented Within a One -mile Radius of the Pro'ect Area Taxonomic EO ID Scientific Name ommon Name Element Accuracy Federal State Global State Group Observation Occurrence Status Status Rank Rank Date Rank Vascular Plant 7775 Acmispon helleri Carolina Birdfoot-trefoil 1994-06-03 X? 3 -Medium --- Special G5T3 S3 Concern Vulnerable Vascular Plant 13743 Delphinium exaltatum Tall Larkspur 1800s Hi? 5 -Very --- Endangered G3 S2 Low No Natural Areas are Documented Within a One -mile Radius of the Project Area Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Name Owner Owner Type Mecklenburg County Open Space Mecklenburg County Local Government Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/content/help. Data query generated on July 5, 2018; source: NCNHP, Q2 April 2018. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 3 NCNHDE-6391: Ballantyne Infrastructure Proejct gIVA 0 -c C j` 640 R cAlpine Creak I T—r,gdon gR' Toringdon `D o Circle N N \°w Ln ��19dn°V co, Fgan\Ma\ �o rn e \ Fo 0 prgton \ c Dr r - p � \ (�� � Ballanry ne '521• o j 5Q Village \ = Gafesmnc' Ln J c \ ; �4 Klkhu»r Dr �' o hic<lalla L. \ VC Metmbna ' Ec holarsl Academy Whiteoak m �F n, Endharen }� EL--, \ ->yl� Da nhY Ro / r m Cy 101 PR colmamonz e �v �ilrj,gYne G,mm°� k �-3C0 \fig `�.. Easl m nn �a cJ 0,o F:99Wswn`' OOromrF V< �(n 2\4 CY ° bt 9A c1 Ball \\ 9�Ie \•c ' E h a�»<,.:rnnl9an O ` 0 ° ev aalbnyna .� \fin 'lub } o aYsid � v T 2 O n ys G Cuy\"� 6mm n O� \ P $aG0 HCl ?F ``,,,d Q 2 \ 1 y v N \ O Pn meC �> �yys R,rJge p Dr Jockey A� SQ' albnt _ Country clue �� L N d R \9.p y Krkhurn c g' nrn:s (:f i f•'.f?It ap: e fire Q7 W ,no, \y 9 � � � a Ballan tyn l� .bun, i.aks Dr July 5, 2018 Project Boundary Buffered Project Boundary Managed Area (MAREA) Page 3 of 3 1:22,146 0 0.175 0.35 0.7 mi 0 0.3 0.6 1.2 km Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong),—astopo, © OpenStreetMap contributors, and the GIS User Community North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Secretary Susi H. Hamilton December 20, 2018 Thomas Bailey Master Consulting P.A. 5275 Parkway Plaza Blvd, Suite 100 Charlotte, NC 28217 tbailey@masterconsulting.com Office of Archives and History Deputy Secretary Kevin Cherry Re: Phase I Archaeological Identification Survey Report, Rushmore Natural Gas Pipeline, Ballantyne Commons Parkway, Charlotte, Mecklenburg County, ER 18-1651 Dear Mr. Bailey: Thank you for letter of November 27, 2018, forwarding copies of the above -referenced report. We have reviewed the information provided and offer the following comments. Commonwealth Heritage Group (CHG) completed a Phase I archaeological survey within the area of ground disturbance consisting of 100% visual reconnaissance and 9 shovel tests on approximately 5 acres. CHG reported heavily disturbed and wet conditions that prevented additional subsurface investigations. No sites were reported. We concur with the findings in CHG's report and agree with their recommendation that no further work is necessary. The above comments are made pursuant to Section 106 and 110 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-814-6579 or environmental.reviewgncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Bartos Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 DIVISION OF MITIGATION SERVICES (DMS) IN -LIEU FEE REQUEST FORM Revised 4/23/2015 Complete requested information, sign and dateemail to kelly.williams@ncdenr.gov . Attachments are acceptable for clarification purposes (location map, address or lat long is required). Information submitted is subject to NC Public Records Law and may be requested by third parties. Review meetings are held on Tuesday afternoons. CONTACT INFORMATION APPLICANT'S AGENT APPLICANT 1. Business/Company Name Maser Consulting Piedmont Natural Gas 2. Contact Person Jacqueline McCort Megan Plassman 3. Street Address or P O Box 5275 Parkway Plaza Blvd, Suite 100 4301 Yancey Road 4. City, State, Zip Charlotte,NC 28217 Charlotte, INC 28217 5. Telephone Number 980-245-3161 Ext. 5633 704-587-63455 6. E -Mail Address jmccort@maserconsulting.com megan.plassman@duke-energy.com PROJECT INFORMATION 7. Project Name Rushmore Drive 16 -inch Steel Distribution Project Charlotte 8. Project Location (nearest town, city) 9. Lat-Long Coordinates or attach a map See Attached Map (35.057186, 80.862044) 10. County Mecklenburg Catawba HUC-8 (03050103) 11. River Basin & Cataloging Unit (8 -digit) (See Note 1) Owner Type: Q Government Private 12. Project Type *indicate owner type and write in project type (e.g. school, church, retail, residential, apartments. road utilities, military, Project Type: Utility (Natural Gas) etc.)** 13. Riparian Wetland Impact (ac.) (e.g., 0.13) 0.395 14. Non -Riparian Wetland Impact (ac.) 0.00 0.00 15. Coastal Marsh Impact (ac.) 16. Stream Impact (ft.) (e.g. 1,234) Warm Cool Cold NIA NIA NIA 17. Riparian Buffer Impact (sq. ft.) Include subwatershed If Jordan or Falls Lake: Zone 1: Zone 2: NIA N/A 18. Regulatory Agency Staff Contacts NCDWR: USACE: David Shaeffer Other: Check (,.) below if this request is for a; By signing below, the applicant is confirming they have revision to a current acceptance read and understand the DMS refund policy posted at nceep.net and attached to this form. renewal of an expired acceptance Signature of Applicant or Authorized Agent: extension of unexpired acceptance - 12/31/2018 Date: a Note 1: For help in determining the Cataloging Unit, visit:w(43k.nce *,gel or contact DMS Direct questions to Kelly Williams at 919-707-8915 or keliy.Willams@ncdenr.gov or to the front desk at 919-707-8976 Refund Policv for Fees Paid to DMS In -Lieu Fee Programs (9121/2009 Purpose: The purpose of this policy is to make clear the circumstances and process under which a permittee can obtain a refund while simultaneously balancing customer service and responsible business practices. This policy applies to all refund requests made on or after the publication date of this policy. Policy Statement: The policy of DMS is to allow for refunds under certain conditions. 1. All refund requests must be made in writing to the DMS In -Lieu Fee Program Coordinator at kelly.williamsencderingov. 2. All refund requests are subject to fund availability. DMS does not guarantee fund availability for any request. 3. The request must either come from the entity that made the payment or from an authorized agent. Third parties requesting refunds must provide written authorization from the entity that made the payment specifying the name and address of the authorized refund recipient. 4. Refund requests related to unintended overpayments, typographical errors or incorrect invoices should be brought the attention of the In -Lieu Fee Program Coordinator as soon as possible. Such requests are typically approved without delay. 5. Payments made under the incremental payment procedure are not eligible for refunds. 6. Refund requests made within nine months of payment to DMS will only be considered for requests associated with projects that have been terminated or modified where the permittee's mitigation requirements have been reduced. Such requests must be accompanied by written verification from the permitting agency that the project has been cancelled, the permits have been rescinded or have been modified, or the mitigation requirements have been reduced. 7. Refund requests made more than nine months from the payment date will only be considered for permits that were terminated or modified to not require any mitigation. Such requests must be accompanied by written verification from the permitting agency that the project has been cancelled, the permits have been rescinded and/or mitigation is no longer required. 8. Refund requests not meeting the criteria specified above are not eligible for a refund. 9. Refund requests that meet the criteria above will be elevated to DMS Senior Management for review. The following considerations apply to all refund requests: a. availability of funds after consideration of all existing project and regulatory obligations b. the date the payment was made c. the likelihood DMS can use the mitigation procured using the payment to meet other mitigation requirements 10. Once a refund has been approved, the refund recipient must provide a completed W-9 form to the DMS In -Lieu fee Program Coordinator within two weeks in order to process the refund though the State Controller's Office. 11. All decisions shall be final. ROY COOPER Governor NORTH CAROLINA Environmental QuWtry MICHAEL S. REGAN Janua 29, 2019 Secretary January TIM BAUMGARTNER Dlrector Megan Plassman Piedmont Natural Gas PO Box 33068 Charlotte, NC 28233 Expiration of Acceptance: 7/29/2019 Project: Rushmore Drive 16 -inch Steel Distribution Project County: Mecklenburg The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location Impact Type 8 -di it HUC I Catawba + 03050103 Riparian Wetland Impact Quantity 0.395 '"DMS proposes to utilize the Catawba 03 Expanded Service Area to meet the mitigation requirement. Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010 and 15A NCAC 02B .0295 as applicable. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly Williams at (919) 707-8915. Sincerely, ames. B Stan r- sse Management Supervisor cc: Jacqueline McCort, agent North Carolina Department of Environmental Quality I Division of Mitigation Services 47 W.Jones Street 11652 Mad Service Center I Raleigh, North Carolina 27699-1652 919,7078976