HomeMy WebLinkAbout20190157 Ver 1_Meeting Notes_20190226Date * 2/26/2019
Site Type Stream and buffer
Prepared By* Mac
Sponsor/Provider WEI
Project Name * Perry Hill
NCDMS
ID #
USACE
ID #
DWR 20190157 Version* 1
ID#*
HUC 01 Basin Neuse
County* Orange
Coordinates
Degrees North Degrees West
Attendees
WEI-Hutton, Daniel
COE- Todd, Kim
WRC- Olivia, Travis
DWR- Katie
Notes and Sketch,
etc
Nutrient bank outside of proposed (shown) easement
Perry br reach 3 proposed as E2 - should be restoration
Move crossing to bottom?
UT1- top had head cut, would be doing combo p1/2, bottom half had good groundwater discharge
BMP at top of UT1
Middle Perry branch- not as incised
UT2- proposed E1- looks like more E2
UT3-E2- has bed and bank -forested- cattle access
Upper Perry- proposed R- ok - not incised
Small pond at top was drained, will take out berm
BMP below existing pond or will do as nutrient bank
A lot of wetlands at top below drained pond.
Action Items