Loading...
HomeMy WebLinkAbout20190157 Ver 1_Meeting Notes_20190226Date * 2/26/2019 Site Type Stream and buffer Prepared By* Mac Sponsor/Provider WEI Project Name * Perry Hill NCDMS ID # USACE ID # DWR 20190157 Version* 1 ID#* HUC 01 Basin Neuse County* Orange Coordinates Degrees North Degrees West Attendees WEI-Hutton, Daniel COE- Todd, Kim WRC- Olivia, Travis DWR- Katie Notes and Sketch, etc Nutrient bank outside of proposed (shown) easement Perry br reach 3 proposed as E2 - should be restoration Move crossing to bottom? UT1- top had head cut, would be doing combo p1/2, bottom half had good groundwater discharge BMP at top of UT1 Middle Perry branch- not as incised UT2- proposed E1- looks like more E2 UT3-E2- has bed and bank -forested- cattle access Upper Perry- proposed R- ok - not incised Small pond at top was drained, will take out berm BMP below existing pond or will do as nutrient bank A lot of wetlands at top below drained pond. Action Items