HomeMy WebLinkAboutFull Gospel Tabernacle Church - 190102 - LETTER OF TRANSMITTAL930 Main Campus Drive • Suite 151 • Raleigh, NC • 27606 • 919.827.0864 • www.daa.com
Blacksburg • Charlottesville • Manassas • Newport News • Richmond • Virginia Beach
Fayetteville
P:\2018\1808\0100\18080144\18080144-010302\WORK\Applications\190102 - LETTER OF TRANSMITTAL.docx
Letter of Transmittal
To: Mike Lawyer Date: 01/02/2019
Environmental Program Consultant Project Number: 18080144-01
NCDEQ Energy and Land Resources Project Name: Full Gospel Tabernacle
Church 225 Green Street, Suite 714
Fayetteville, NC 28301-5095 Phone No. 919.827.0864
cc:
Attached Under separate cover
Shop Drawings Prints Plans Specifications Samples
Copy of letter Plats Proposal Change Order Report
Other:
Copies Date No. Description
2 01/02/19 Stormwater Drawings for Review
2 01/02/19 Stormwater Control Plan & Calculations
2 01/02/19 O&M Form
2 01/02/19 Supplemental EZ Form
1 01/02/19 Check for $505 (stormwater review fee) check #113
These are transmitted as checked below:
For approval Returned for corrections Resubmit copies for review
For your use Submit copies for distribution
As requested Return corrected prints
For review and comment Prints returned after loan to us
FOR BIDS DUE: Other:
REMARKS:
Please give me a call should you have any questions or concerns. Thank you,
Printed Name: Austin Jackson, EI Signature:
Title: Project Designer
We are sending you via: UPS USPS Hand Delivered _______________
LOT - <recipient>
Page 2 of 2
January 2, 2019