Loading...
HomeMy WebLinkAbout20190234 Ver 1_PCN Form Submission_20190220DWR MOM— of Water Resources Site Coordinates Latitude: 35.971 FA. Processing Information County (or Counties) where the project is located: Durham Is this project a public transportation project?* r Yes r No Longitude: -78.873 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) F- Regional General Permit (RGP) F Standard (IP) Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 tial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Qiange only if needed. BIMS # Assigned * Version#* 20190234 1 Is a payment required for this project?* * No payment required What amout is owed?* * Fee received r $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Stephanie Goss:eads\szgoss Information for Initial Review 1a. Name of project: RCC Development 1a. Who is the Primary Contact?* Mr. Michael Kane P.E. 1b. Primary Contact Email:* 1c. Primary Contact Phone:* mkane@capitalcivil.com (919)249-8587 Date Submitted 2/20/2019 Nearest Body of Water Third Fork Creek Basin Cape Fear Water Classification WS -V; NSW Site Coordinates Latitude: 35.971 FA. Processing Information County (or Counties) where the project is located: Durham Is this project a public transportation project?* r Yes r No Longitude: -78.873 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) F- Regional General Permit (RGP) F Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 14 - Linear transportation r 401 Water Quality Certification - Express W Riparian Buffer Authorization 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? 0 Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Scannell Properties 2b. Deed book and page no.: 2c. Responsible party: Joel Scannell 2d. Address Street Address 500 Nbntgomery Street Address Line 2 Suite 400 ab Alexandria Fbstal / Zip Cxie 22314 2e. Telephone Number: (571)527-1659 2g. Email Address:* joels@scannellproperties.com C. Project Information and Prior Project History 1. Project Information State / Rwince / ftim VA Country USA 2f. Fax Number: r Yes r No r Yes r No 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Durham 2. Project Identification 2a. Property Identification Number: 083111761927,083008787317, 083011761927 2c. Project Address Street Address 708 Ellis Road Address Line 2 City Durham Postal / Zip Cade 27703 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Third Fork Creek 3b. Water Resources Classification of nearest receiving water:* WS -V; NSW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12 -digit HUC in which the project is located. 030300020602 4. Project Description and History 2b. Property size: 65 State / Rwince / Fbgion NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is currently developed and contains numerous warehouse and storage buildings and associated infrastructure. The project applicant is proposing to redevelop the site into a mixed-use development with modern facilities and improvements to the infrastructure, including adding another point of ingress and egress. land use in the vicinity is primarily commercial and industrial. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) topo_soils.pdf 374.63KB 4e. Attach an 8 1/2X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) topo_soils.pdf 374.63KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 200 4h. Explain the purpose of the proposed project:* The existing warehouse development has had only one access point across railroad tracks at the northeast corner of the property to Ellis Road. We are redeveloping the site with new buildings and have purchased the narrow property where a new and safer entry drive will be constructed in order to provide better access in and out of the development. The site plan has approved by City of Durham. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* A new access road is being proposed for the redeveloped warehouse site to provide a safer point of ingress and egress. The current access crosses railroad tracks adjacent to Ellis Road. A perennial stream will be crossed with the new access road. Typical construction equipment will be utilized including graders, excavators, back hoes, dump trucks, etc. 4j. Please upload project drawings for the proposed project. combined permit drawings.pdf 809.25KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No C Unknown Comments: S&EC conducted a stream determination with Durham County in 2017 (uploaded) 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Steven Ball Agency/Consultant Company: S&EC Other: 5d1. Jurisdictional determination upload Final Stream Determination Letter (Ellis Rd) -From Durham.pdf 6. Future Project Plans 2.06MB 6a. Is this a phased project?* r Yes d No 7b. If yes, explain. The project is phased in the way that the future buildings Will be constructed, but not in the activities that will result in impacts to wetlands and/or waters. The future buildings Will replace emsting buildings on the site and no wetland or waters impacts willresult from that future work. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Not applicable D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands W Streams -tributaries W Buffers F Open Waters r Pond Construction 3. Stream Impacts ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* Road Crossing 1 Permanent Culvert Ui to Third Fork Creek Perennial Both 8 70 S1 9 Average (feet) (linear feet) S2 Road Crossing 1 g Permanent Rip Ra Fill p p Ui to Third Fork Creek ��� Both 8 Ave age (feet) 67 (linear fee ) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 137 0 31. Total stream and ditch impacts: 137 3j. Comments: Culvert Will be buried a minimum of 12 inches belowthe stream bed to allowcontinued movement of aquatic life 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r Neuse r Tar -Pamlico F Catawba r Randleman F Goose Creek V Jordan Lake F Other 6b. Impact Type 11 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Road Crossing 1 P UT to Third Fork Creek No 3,732 3,447 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 3,732.00 3,447.00 Zone 1 Zone 2 Total combined buffer impacts: 3,732.00 3,447.00 61. Comments: An ebsting drainage easement occurs runs parallel With the buffered stream proposed for impact. The small amount of buffer that is already affected by this dedicated drainage easement has been subtracted from the Zone 1 impact amount resulting from this road crossing. Supporting Documentation combined permit drawings.pdf E. Impact Justification and Mitigation 1. Avoidance and Minimization 809.25KB 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The stream crossing cannot be completely avoided and still provide a necessary ingress and egress point for the project. The road crossing has been designed to minimize the amount of impact as much as practicable while still meeting NCDOT and local engineering standards for road crossings. No other jurisdictional impacts occur as a result of this project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The road crossing is utiliang tail walls and wing walls to minimize stream impacts. The culvert will be buries a minimum of 12 inches below the stream bed to promote movement of aquatic life. Rip -rap is being placed upstream and downstream of the culvert to prevent scour and erosion at the crossing location. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The stream impact is less than 150 feet and does not require compensatory mitigation per the current MNP 14 regulations. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? F- Level Spreader F_ Vegetated Conveyance (lower SHWf) F- Wetland Swale (higher SHWT) F Other SCM that removes minimum 30% nitrogen R Proposed project wall not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No 2d. Which of the following stormwater management program(s) apply: R Local Government r State Local Government Stormwater Programs R Phase II r NSW r USMP r Water Supply Please identify which local government stormwater program you are using. City of Durham Comments: Even though we are redeveloping at less than the eAsting impervious area we are providing new storm water ponds to control TSS, 1 -yr water quality and pre -post quantity for all storms including the 100 -yr. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* f Yes r No 3b. If you answered "no," provide a short narrative description. This project only involves the construction of a single, two-lane access road that will provide a safe and efficient ingress and egress point for the proposed development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? ESI obtained a report on February 19, 2019 from the NC Natural Heritage Program indicating that there are no known occurrences of federal threatened or endangered species in the study area. There is a Historic occurrence of smooth coneflower (Echinacea laevigata) within one mile of the study area but this was last observed in 1954. The existing infrastructure on the site and the disturbed surrounding landscape make the site's habitat unsuitable for other federal protected species. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NDAA-EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpov,eb. Additionally, the site is currently developed and contains warehouses that will be replaced 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes c No 8c. What source(s) did you use to make the floodplain determination?* https:Hmsc.fema.gov/portal/search Miscellaneous Comments Miscellaneous attachments not previously requested. Durham approved site plan.pdf 105.62KB Signature W By checking the box and signing below, I certify that: . I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jeffery W. harbour Signature ��PJ ��itt�au2 Date 2/20/2019 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. NA PLAN NO. NA PARCEL NO. :119.11 ;1a9.1010024111 1211 Person Street Please print: Property Owner: Scannell Propertiesr 4320, LLC c/o Scannell Properties, LLC Property Owner: -_- The undersigned, registered property owners of the above noted property, do hereby authorize Jeff Harbour . of _Environmental Services, Inc (Contractor I Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): 8801 River Crossing Blvd, Ste 300 Indianapolis, IN 48240 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. are b� Authorized Signature Authorized Signature Date: 2118/2019 Date: RCC Development, Durham County, NC Owner/Applicant: Scannell Properties Source: Soil & Environmental Consultants, PA (USGS SW/SE Durham Quadrangle) RCC Development, Durham County, NC Owner/Applicant: Scannell Properties Source: Soil & Environmental Consultants, PA (Soil Survey of Durham County, NC) �nfqte S y and � "all A Dae 4• Rd n 0 m i a d Hop u Ellis Rd ' EMGs Rd � gra 9 r d m uA n _ WAW -400 ac � S, 9R/SGS A►� V� JTTMTTT� i v m PERSON ST. C -0 ^u rig a �D-4 ZC7 a ��� v v J �zmrn 70 � z f 0� rn —�� --I cn --_ ter i m z > > cl) V / z RAILROAD R/W z / � Ews R p Z—► D D 0 0 0 0 0 0 0 0 N��Vm(I�A4N-• N m m m ca (D Z mm m m mm m m m cc L Zz mF FFA Doti -IDLE to m m m cc-�zZ-xoo o n bb o 0 c Sn n b$ 0 0 0 n s ' A>� $s> m om>- N z m n `n DD D 6 n� ss F 6 gg FF� s49 Zr2,, �r5�g mon m z oo zN o5 m 0� m $ 0 �LZ7>1 "UDO m ss v v Z ss y v Z mm n LLO OCL > xm L1 mr m m M. L�ZO 2 �� mn >> mOL L'f vy'0 s mm >> m0� 0 n Yp nm •��AL FZ m> n i o z A m rarm rt as m TN nm xln s> z 1nT nm xmm xln > za xmm SSL < nLo= iN o N z a m�1NZD'O Z mm x L.L N T x N mm x Lm N T 'S g m s z g �g�a Qiic m� ti� iriv !^ n To 0 rr Zr o Inm z mm z I "" z mm Z I f� " z m Tm y- T>T c>i 'i L o 00 D m o0 L m KI n O 00 L m !;1 n i^ 5 mol0 F y D c m p0 Z L.L 5 z LD 5 m m 3:C i "L>g so > A.. m .. n M� O am pl Og nm OI Og me m m n U^ av z O� 5 n,a Og m s S:nO o H� g si��z c�i" x� n > I. rr N 5- m m m P -4u O op O a v O Qiv m �v� �z •m In I^m i �.�. ~ ZZ mrn IT o o �I11 U$1 p mm 1 m$ a v OC "> V O m MA mCi 00> J m O <RnI -Z1 T K m m A Mm t my O p m Int �m mint mm i LLL UI xq mm4 rc s g51E SpZF Nm(gJ�(m�CO� �VOn Qm f"9 _m g g <m D D m A A m A N^�2oV m2 p� uJ=m2 A29 �O mJ £` .0 pm g N g g Q g "C1 g �N g �� g � Ez mn£b TOS m w „ Nm� „ o: $ W;� "nTii�I p pp yy r LTO, 0mU OoVL {PJp$ (It NN rmr VIN m 'M1 �V ; C C+A 6F y m- w 4mN`Imp JNgz s" A v 'A m N .. S n f>9 'L m (o/11 mA mm m 0J`UI OU1y �Z ZZ m +" p�D AIM �c n p " y A .N. ; 1 I Sg p= mm �4 OOIZ m<A< no ro R s> '00 $ m m A 4 u pyI ! g 2 I T m J � O T N J o -"fl"40N5: C�C�. US/.- PER DURHAM COMAMTS 7/21/21718 - PER WIN" COMMENTS RCC DEVELOPMENT S t/i 708 EWS ROAD. DURHAM, NC `�^ •iv r ��� m t s � zzm 1/15/2019 - PER DURHAM CUMOTS 4::�� ZONING: IL Ews R p Z—► D D 0 0 0 0 0 0 0 0 N��Vm(I�A4N-• N m m m ca (D Z mm m m mm m m m cc L Zz mF FFA Doti -IDLE to m m m cc-�zZ-xoo o n bb o 0 c Sn n b$ 0 0 0 n s ' A>� $s> m om>- N z m n `n DD D 6 n� ss F 6 gg FF� s49 Zr2,, �r5�g mon m z oo zN o5 m 0� m $ 0 �LZ7>1 "UDO m ss v v Z ss y v Z mm n LLO OCL > xm L1 mr m m M. L�ZO 2 �� mn >> mOL L'f vy'0 s mm >> m0� 0 n Yp nm •��AL FZ m> n i o z A m rarm rt as m TN nm xln s> z 1nT nm xmm xln > za xmm SSL < nLo= iN o N z a m�1NZD'O Z mm x L.L N T x N mm x Lm N T 'S g m s z g �g�a Qiic m� ti� iriv !^ n To 0 rr Zr o Inm z mm z I "" z mm Z I f� " z m Tm y- T>T c>i 'i L o 00 D m o0 L m KI n O 00 L m !;1 n i^ 5 mol0 F y D c m p0 Z L.L 5 z LD 5 m m 3:C i "L>g so > A.. m .. n M� O am pl Og nm OI Og me m m n U^ av z O� 5 n,a Og m s S:nO o H� g si��z c�i" x� n > I. rr N 5- m m m P -4u O op O a v O Qiv m �v� �z •m In I^m i �.�. ~ ZZ mrn IT o o �I11 U$1 p mm 1 m$ a v OC "> V O m MA mCi 00> J m O <RnI -Z1 T K m m A Mm t my O p m Int �m mint mm i LLL UI xq mm4 rc s g51E SpZF Nm(gJ�(m�CO� �VOn Qm f"9 _m g g <m D D m A A m A N^�2oV m2 p� uJ=m2 A29 �O mJ £` .0 pm g N g g Q g "C1 g �N g �� g � Ez mn£b TOS m w „ Nm� „ o: $ W;� "nTii�I p pp yy r LTO, 0mU OoVL {PJp$ (It NN rmr VIN m 'M1 �V ; C C+A 6F y m- w 4mN`Imp JNgz s" A v 'A m N .. S n f>9 'L m (o/11 mA mm m 0J`UI OU1y �Z ZZ m +" p�D AIM �c n p " y A .N. ; 1 I Sg p= mm �4 OOIZ m<A< no ro R s> '00 $ m m A 4 u pyI ! g 2 I T m J � O T N J -"fl"40N5: C�C�. US/.- PER DURHAM COMAMTS 7/21/21718 - PER WIN" COMMENTS RCC DEVELOPMENT 708 EWS ROAD. DURHAM, NC `�^ •iv r ��� 7 1/2013 - PER MM" COMMENTS 11/20/2010 - SITE PIAN AMIDOMEHT 1/15/2019 - PER DURHAM CUMOTS ZONING: IL N\�^o` - CAPITAL CIVIL ENGINEERING 2/11/2019- PER DURHAM COMMENTS S C A N N E L L zG' •d Wit P H 919 w HRL R0, RTE 205, 590 27502PROPERTIES Mc 5o2 PH 9w 2"o Muer rx 919 soo-l9eT eem Mt CR0SSNC eLw SM3m DOA APOus, IN 40240 COVER SHEET m T1111I1111 COMIXIT mte CAPITAL aw. EROINEER9 c. PLLc P-01109 PH 317 114.7-5959 .. dWap.11...mm DURHAM 1869 CITY OF MEDICINE CITY OF DURHAM Department of Public Works Stormwater Services 101 City Hall Plaza I Durham, NC 27701 919.560.4326 1 F 919.560.4316 www.durhamnc.gov November 30, 2017 Via E-mail Steven Ball Soil & Environmental Consultants, PA 8412 Falls of Neuse Road Suite 104 Raleigh, NC 27615 919-846-5900 sball@sandec.com SUBJECT: 708 Ellis Road/RCC Project Site REFERNCE: COD Jordan # 2017-024 Project Name 708 Ellis Road/RCC Project Site PIN 0830-12-76-6982, 0830-11-76-1927 Parcel ID 156730, 156739 Location/Directions 708 Ellis Road Sub Stream Third Fork Creek Date of Determination November 17, 2017 Table 1. Stream Feature Determination 708 Ellis Road/RCC Project Site N/A: Not Applicable Explanation: The feature(s) listed on the attached Table 1 have been located on the Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale, or was determined to be subject per section 8.5(B)(4) of the Durham Unified Development Ordinance. Each feature that is checked "Not Subject" has been determined not to Not Stream Soil USGS Feature Subject Subject Start @ Stop @ Type Survey Topo A X End of Concrete Flume N/A Perennial X X 51 X Consultant's Flag S01 Confluence withFeature Intermittent A B X N/A N/A Ephemeral X C X Culvert near Western Culvert just East of Perennial X Project Area Boundary Anson Street Cul De Sac S2 X Consultant's Flag SF5 Confluence with Ephemeral Feature D D X Consultant's Flag SF4 Confluence with Perennial X Person Street E X Consultant's Flag SF6 N/A Ephemeral X FX Consultant's Flag SF7 Continues off Project Perennial X Area Site N/A: Not Applicable Explanation: The feature(s) listed on the attached Table 1 have been located on the Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale, or was determined to be subject per section 8.5(B)(4) of the Durham Unified Development Ordinance. Each feature that is checked "Not Subject" has been determined not to Stream Determination — 708 Ellis Road/RCC Project Site Page 2 of 3 be a stream. Features that are checked "Subject" possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced but, still may be considered jurisdictional according to the US Army Corps of Engineers (USACE) and the Division of Water Resources (DWR), or both. Wetlands are evaluated by the City of Durham Planning Department. If a wetland is suspected to exist within or in close proximity to the project area, contact Dennis Doty (Dennis.Doty@durhamnc.gov or 919-560-4137 ext. 28252) to determine wetland setbacks. This on-site determination shall expire five (5) years from the date of determination in this letter. Landowners or affected parties that dispute a determination made by the City of Durham may request a determination by DWR. An appeal request must be made within sixty (60) calendar days of the date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by DWR shall be referred to them in writing c/o Karen Higgins, 401 and Buffer Permitting Section, 1617 Mail Service Center, Raleigh, NC 27699-1617. DWR's determination can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Durham — Where Great Things Happen Stream Determination — 708 Ellis Road/RCC Project Site Page 3 of 3 Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) calendar days. The owner/future owners should notify the City (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity or other City of Durham permit(s). Any inquiries regarding section 404/401 permits should be directed to DWR (Central Office) at (919) 807-6300, and the USACE (Raleigh Regulatory Field Office) at (919) 554-4884. If you have any questions about the City's determination or need clarification please contact me. Sincerely, Travis Marion, Senior Engineering Technician Travis.Marion@durhamnc.gov (919) 560-4326, x 30238 Attachments: Table 1. Stream Feature Determination 708 Ellis Road/RCC Project Site Consultant's USGS Map - Figure 1 Consultant's Soils Survey Map - Figure 2 Consultant's Site Map - Figure 3 Durham — Where Great Things Happen - ut IR , v L i Pl. n, W c E 0) w CU zn cu ca a) 12 .0 a) cu E E 25 - =.i �+` ,bel � - �• -v7 - ut IR , v L i Pl. n, W c E 0) w CU zn cu ca a) 12 .0 a) cu E E 25 SOURCE: GOOGLE MAPS VICINITY MAP SCALE N T S SHEETINDEX East End Ave P,� ,rIV, yl 4 �� gent ` 0 J c Clover Rd S � � MN 50{W��WGL YAPS b C1 N C2 NOTES C3 EXISTING CONDITIONS C4 SITE PLAN C5 LANDSCAPE PLAN N GRADING PLAN i' qL co SITE DETAILS P CENTER SCM PLAN CIO SOUTH SCM PLAN QeI SCM DETAILS C12 u'+ C13 SOUTH SCM PLAN PLANTINGS PLAN >7 STORMWATER PROFILES C15 � a STORMWATER PROFILES C17 STORMWATER PROFILES C18 STORMWATER PROFILES C19 STORMWATER PROFILES C20 STORMWATER PROFILES C21 STORMWATER PROFILES SOURCE: GOOGLE MAPS VICINITY MAP SCALE N T S SHEETINDEX East End Ave P,� ,rIV, yl 4 �� gent ` 0 J c Clover Rd S � � MN 50{W��WGL YAPS b C1 COVER SHEET C2 NOTES C3 EXISTING CONDITIONS C4 SITE PLAN C5 LANDSCAPE PLAN C6 GRADING PLAN C7 UTILITY PLAN co SITE DETAILS C9 CENTER SCM PLAN CIO SOUTH SCM PLAN C11 SCM DETAILS C12 CENTER SCM PLANTINGS PLAN C13 SOUTH SCM PLAN PLANTINGS PLAN C14 STORMWATER PROFILES C15 STORMWATER PROFILES C16 STORMWATER PROFILES C17 STORMWATER PROFILES C18 STORMWATER PROFILES C19 STORMWATER PROFILES C20 STORMWATER PROFILES C21 STORMWATER PROFILES C22 SANITARY SEWER PROFILES C23 SANITARY SEWER PROFILES C24 SANITARY SEWER PROFILES C25 UTILITY DETAILS C26 UTILITY DETAILS C27 STORM DETAILS C28 STORM DETAILS C29 STORM DETAILS ECO EROSION CONTROL — NOTES EC1 EROSION CONTROL — PHASE 1 EC2 EROSION CONTROL — PHASE 2 EC3 EROSION CONTROL — PHASE 3 EC4 EROSION CONTROL — PHASE 4 EC5 EROSION CONTROL DETAILS EC6 EROSION CONTROL DETAILS EC7 EROSION CONTROL DETAILS RCC DEVELOPMENT CONSTRUCTION DRAWINGS 708 ELLIS ROAD DURHAM, NORTH CAROLINA DURHAM COUNTY FUTURE SCM i /FUTURE zT BUILDING 5 i I � I FUTURE BUILDING 4 C." C! j. RFUTURE BUILDING 3 BUILDING 2 F- rn _1 � SCM 1 N� r9 �h DEVELOPER: SCANNELL PROPERTIES 8801 RIVER CROSSING DRIVE, /300 DEVELOPER ADDRESS: INDIANAPOLIS. INDIANA 46240 ENGINEER /APPLICANT: CAPITAL CIVIL ENGINEERING 1011 PEMBERTON HILL ROAD, SUITE 203 APEX NC 27502 919-249-8587 SITE DATA: OWNER: SCANNELL PROPERTIES /320 LLC SITE ADDRESS: 708 EWS RD; 863 S BRIGGS AVE; 1211 PERSON ST DURHAM, NC 27703 PIN: 0830-11-76-1927; 0830-08-78-7317, 0830-11-76-1927 PARCEL ID: 156739; 156728; 156739 DEED BOOK, PAGE OB. 8378, PG. 739; DB. 8364, PG 116 TOTAL GROSS ACERAGE: 65.6 ACRES ZONING: IL OVERLAY DISTRICT:NONE DEVELOPMENT TER: URBAN RIVER BASIN: CAPE FEAR RIVER BASIN - JORDAN LAKE WATERSHED WATERSHED: THIRD FORK CREEK WATERSHED WATER SUPPLY WATERSHED: NONE OPEN SPACE: NO REQUIREMENT BUILDING USE SUMMARY THE PRIMARY USE FOR BOTH BUILDINGS SHALL BE A COMBINATION OF WAREHQUSE AND OFFICE. REFER TO THE BUILDING FLGORPLAN SHEETS FOR BREAKDOWN OF EACH USE. IMPERVIOUS SUMMARY EXISTING IMPERVIOUS AREA: 1,886,148 SF - 43.3 ACRES NEW IMPERVIOUS AREA •: 1,BB6.140 SF - 43.3 ACRES NEW IMPERVIOUS PERCENTAGE: 66% • INCLUDES ULTIMATE BUILD -OUT PARKING CALd1LATIONS: PARKING REQUIREMENTS PER CITY OF DURHAM UDO• OFFICE: (1) SPACE PER 250 SF WAREHOUSE: (1) SPACE PER 5000 SF URBAN TIER MINIMUM IS 90% OF REQUIRED URBAN 71ER MAXIMUM IS 175% OF REQUIRED BICYCLE SPACES REQUIREMENTS PER CITY OF DURHAM UDO:: OFFICE: (1) SPACE PER 500D SF WAREHOUSE: 2% OF MV PARKING (MINIMUM OF 2) BUILDING 1 - 410,000 SF VEH•CLE PARKING OFFICE: 62,000 SF REQUIRES 248 SPACES WAREHOUSE 348,000 SF REQUIRES 70 SPACES TOTAL SPACES REQUIRED: 318 SPACES TOTAL SPACES PROVIDED: 316 SPACES (99X OF REQUIRED) ADA SPACES RED.- 7 SPACES ADA SPACES PROVIDED - 8 (8 VAN ACCESSIBLE) BICYCLE PARKING BICYCLE SPACES REQUIRED: 15 SPACES (13 OFFICE k 2 WAREHOUSE) BICYCLE SPACES PROVIDED: 16 SPACES (8 RACKS) BUILDING 2 - 144,000 SF VEHICLE PARKING OFFICE: 24,000 SF REQUIRES 96 SPACES WAREHOUSE 120,000 SF REQUIRES 24 SPACES TOTAL SPACES REQUIRED: 120 SPACES TOTAL SPACES PROVIDED: 117 SPACES (98X OF REQUIRED) ADA SPACES REO. v 5 SPACES ADA SPACES PROVIDED e 5 (4 VAN ACCESSIBLE) BICYCLE PARKING BICYCLE SPACES REQUIRED: 7 SPACES (5 OFFICE & 2 WAREHOUSE) BICYCLE SPACES PROVIDED: 8 SPACES (4 RACKS) CONSTRUCTION ORAWING9 CRY OF DURRAM PURE t58M FORT WORKS DEPARTMENT APPROVED ■ PRELIMINNP' O DO DO 600 ■ MUNICIPAL RENEW ENGINEERING DATE ❑BIO SET STORMNATER DATE ALE: -INCH - t0P•FEET ❑ CONSTRUCTION DOCUMENTS TRANSPORTATION DATE U Z Z Lu c H IL o J W 0 W< z FA 5. O Z I xW 0 N ON / V to V W 1 O r 1 U D Z 11 w =s� wb�s e tu) Z r j O 1 d U =slg Q s U y� SEAL ..71,111111,,.. 6 �ilPll N7-�``d1 12/20/2018 DATE DECEMBER 20, 2018 ISSUED FOR CD REVIEW SHEET NO. - Jl;tj 20- 10i PRIVATE LEGEND SEWER EASEMENT SANITARY PROPERTY UK ADJORIND PROPERTY UK MOPOSED 1. r.' lllllllllrfl�� --------=-U°'1 '/ � pr-- I WA- WA- WA PROPOSED Wr LINE SA- SA SA- SA PROPOSED 4TARY SCM EASEMENT -• . PIN: .11-77 1352 SANITARY SEVIEROR 6U9 PM 75 DEVELOPED PARCEL PIN 083G-11-76-1927 EKISTNO 25' WIDE A AN AR L SANITARY SEWER EA �lrliu►►►� �� f.SLIFIVEYED TOP OF BAW 1 I.• J'� �, FAV'�' �1►ill� 1 111 ' Ili � �_�.!�����.�. - f � , �►� - Nilm3a SCM WET POND BW. 37Y r"TY LINE IF, f f, RETAINING WALL 4 611. JI fla ., ��rre�. �►r.�llr►�1�L. �J W ILL. U O Z a J (n V s 0 2 v J �r r v 1 _1 o � V s 0 2 v J Culvert Design Inlet Inlet Type: Square Edge, 30 to 75 Degree Wingwall Flares Thu Dec 20 2018 400 Ke: 0.40 ----------T---------- Design Parameters I I Inverts Inlet Invert Elevation: 349.000 ft (ABOVE 12" BURY) Section Outlet Invert Elevation: 348.000 ft (ABOVE 12" BURY) Shape: Box Length: 66.000 ft Material: Concrete Slope: 1.52 ---------- Rise: (ABOVE 12" BURY) 60.00 in Culvert Calculation +–––– – – – – – – -----I----380 Width: 78.00 in Discharge: 201.26 cfs (100–year storm) Manning's n: 0.0130 Headwater Elevation: 354.27 ft Number of Barrels: 1 Tailwater Elevation: 349.91 ft 370 ------------1-- Downstream Velocity: 16.001 ft/s --L-----�---- 370 Downstream Flow Depth: 1.93 ft Flow Control Type: Outlet Control, Gradually Varied Flow 400 400 ----------- I I ----------T---------- I I -----I---- I I 390 I I I I I I I I I 390 380 ---------- -- --–– +–––– – – – – – – -----I----380 I PROPOSED I I GRADE 370 ------------1-- —-------------- --L-----�---- 370 CONCRETE END,WALL PER NCDOT STD DWG 838.27 BOTH ENDS 360 I i i 360 ---------- 100' YR I —_ ----------------- I — T ---- I 1 00'YR HEADWATER WATER TAIL_ 354.27' 49.91' I '5' 350350 '_____ 10YR I — — +--------- i — — HEADWATER/I 350.85' INN=348 66'(INCL NDWALLS) _ x 6'x6.5' RCP I§OX CULVERT x INV=347 m ® 1.152% m I 340U-) I EXISTING i I 340 w x GROUND z x I M co I BURY 12" I w (D I I I I I I + I + I 0 0 1+ PERSON ST ACCESS ROAD CULVERT PROFILE SCALE: 1"=20' H, 1"=10' V