Loading...
HomeMy WebLinkAboutWQ0040653_Application (FTSE)_20181217State of North Carolisaa . DWR Department of Environmental Qtaality. Division of Water Resources ISA NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: Qlo be completed by DWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: City of Mebane (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation rp El General Partnership El Privately -Owned Public Utility ❑ Federal ❑ State;County ® Municipal ❑ Other 3. Signature authority's name: David Cheek per M NCAC 02T .0106(b) Title: Ci1y Manag ger 4. Applicant's mailing address: 106 E. Washington Street City: Mebane State: North Carolina Zip: 27302-_ 5. Applicant's contact information: Phone number: (2L9) 563-5901 Email Address: dcheek(@,ciiyofmebane.com II. PROJECT INFORMATION: 1. Project name: Townes at Oakwood Square 2. AppiicatioWProject status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Orange 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.083356 Longitude:-79.257438 5. Parcel ID (if applicable): 9824491111 0 (or Parcel ID to closest downstream sewer) �. V 0 I11. CONSULTANT INFORMATION: W rn ev < 1. Professional Engineer: Barret Hagen License Number: 30469 qp• ti o• o Firm: Hagen Engineering. PA Mailing address: 3859 Battleground Ave. Suite 300 Qo City: Greensboro State: NC Zip: 27410- q c� y ra Phone number: (336) 286-3350 Email Address: bhagen@hagen-eng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Mebane WWTF Permit Number: NC 0021474 Owner Name: City of Mebane V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable : WQCS00081 Owner Name(s): City of Mebane FORM: FTA 04-16 Page I of 5 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORNIATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Reciional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 1 INSTRUCTIONS FOR FORNI: FTA 04-16 & SUPPORTING DOCUNIENTATION Pa­C 3 ol-3 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Owncd Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Develoner's Operational Awreement (FORM: DEV) been attached? [:]Yes [:]No ®N/A 3. If the Applicant is a Home/Proverty Owners' Association_ has an Operalinnal A ,regiment FORM: HOA I been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / denial / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ® Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (4ee 15A NCAC- 021.()1 03g2_01) 4 Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 021.01 14 ? ❑ Yes ® No T- If yes, Provide a cony of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01140 Daily Design Flow °'" No. of Units Flow i & 2 bedroom unit 160 gal/day 11 1,760 GPD 3 bedroom unit 240 gal/day 73 17,520 GPD Pool 10 gal/persom 30 300 GPD gall GPD gall GPD gale GPD Total 19,580 GPD a See I5A NCAC 02T .01 14(b),t&.(Of I) and fek2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14141 shall be determined using available flow data, water using fixtures, occupancy or ope Lion patterns, and other measured data. 8. Wastewater generated by project: 19.580 GPD (per 15A NCAC 02T .0114) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VI1. GRAVITY SEINER DESIGN CRITERIA (If Applicable) - f)_' r ,()31)5 & liI)C t(.ra%in ti«<ers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material x 215 DIP x 22101 Pvc L 1 % Section I1 8- 111 of the hIDC for Permitting of Gravity Sewers contains information related to design criteria % Section III rontams information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a Violation of the MDC Fill. PUMP STATION DESIGN CR]TER1:\ (if.%pplicablc) — t)3'1' .()3()5 S MDC ♦ ains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name. _,_ 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -� 3. Design (low of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) ofthe pump(s): gallons per minute at feet total dynamic head ('rDH) 5. Summarize the force main to be permitted (for this Pump Sttttion): Sire (inches) I Length (feet) I Material 6. Power reliability in accordance with IS V' V* 0-IT .tt_05th1r I is ❑ Standby power source or pump wvith automatic activation and telemetry - 15A NCAC 02T .0305(h)(I )(B)_ % Required for all pump stations with an average daily flow treater than or equal to 15.000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day ❑ Portable potter source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T -0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(c). % It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft ak;rcement) and is compatible with the station. % It' the portable power source or pump is dedicated to multiple pump stations, an e%aluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case ofa multiple station power outage. I:OIZM: FTA 04-16 Pale 3 ol'5 IX.: -SETBACKS & SEPARATIONS— (02B .0200 & I5A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305ff3 & t ® Yes ❑ No i 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) I8 inches Reclaimed water lines horizontal - reclaimed over sewer) ,, 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet 10 feet "Any other stream, Iake, impoundment, or ground water lowering and surface drainage ditches Any building foundation 5 feet Any basement 10 feet Top slo a of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools Final earth grade (vertical) 10 feet 36 inches D I5A NCAC 02T.0305(g contains alternatives where separations in n2T.0305(f} cannot be achieved. > **Stream classifications can be identified using the Division's NC SurFace Water Clamit3catictns_webpa e > If noncompliance with 02T.0305(f) or (P-1, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N A )• Seethe Division's draft separation requirements for situations where separation cannot be meet i No variance is required if the alternative design criteria specified is utilized in design and construction Y As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B _0200? ® Yes ❑ No ❑ N A Z This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage.'authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with I5A NCAC 02T.0lW4c1L6) (additional permitsicertifications)? ® Yes ❑ No Per 15A NCAC.02T;0105fc1(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N'A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: City of Mebane Project Name for which flow is being requested: Townes at Oakwood Square More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Mebane b. WWTP Facility Permit #: NCO021474 All flows are in MGD c. WWTP facility's permitted flow 2.5 d. Estimated obligated flow not yet tributary to the WWTP 0.6620 e. WWTP facility's actual avg. flow 1.228 £ Total flow for this specific request 0.020620 g. Total actual and obligated flows to the facility 1.91062 h. Percent of permitted flow used 76.4% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) Design Pump Average Daily Approx. Station Firm Flow** Current Avg. (Name or Capacity, * (Firm / pl), Daily Flow, Number) MGD MGD MGD LJRogers 0.141 0.056 0.002 GE 0.72 0.288 0.12475 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** 0 0.002 0.054 0 _ 0.12475 0.16325 -*-The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): City of Mebane Downstream Permit Number: WQ0019731 Page I of 6 FTSE 04-16 Ill. Certification Statement: I David Cheek certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater (low. Signaf lure 7lz LI/, p Date Page 2 of 6 FTSL 04-I6 MUSGSY.S. OVAortmm CF im WTIRM ••-•.w JK•wTQ[. R"= rrr.+rryr M. Gr°LMCX tYN(Y T *1 US 10� M1ar x r.i081un Won 7 b y k 94, i« • =j3 y S = • i _+ w�~vr � • S * �.l n �• it— . � t f Mlifil m i r L ■ T O CRA77AA) S { '{- tw � I 1 i • • ! Il Sr4r t:lt OOC dsswwum ii........_ r ruurr.NC leRf� m+a H HAGEN ENGINEERING, PA City of Mebane 106 E Washington St Mebane, NC 27302 919-563-3629 3859 Battleground Ave, Suite 300 Phone: (336) 286-3350 Greensboro, NC 27410 nfranz@hagen-eng.com RE: Townes at Oakwood Square City of Mebane Submission Public Sewer Permit Cover Letter December 6, 2018 The purpose of this cover letter is to outline the contents of this Public Sewer Permit application package as well as to provide of a summary of the project to which is pertains. The Townes at Oakwood Square is an 84 unit, townhouse development with an associated pool which will require an estimated peak flow of 19,580 GPD for utility consumption. The project will be entirely comprised of public, gravity sewer. In terms of public sewer, this project will be have 2210 LF of 8" PVC and 215 LF of 8" DIP. Within this submittal package you will find the following items: 1) $480 check for the Public Sewer Permit 2) One completed DWR Fast Track Sewer System Extension application 3) One 8.5" x 11" USGS Topo Map 4) One street level map (aerial) 5) Flow Tracking Form Thank you, Nolan Franz, EIT Hagen Engineering, PA 540-539-0617 N t. Department of Environmental Quality Received HAGEN ENGINEERING, PA DEC 11 2018 Winston-Salem Regional Office TO: Attn: Justin Henderson NCDEQ - Water Quality Section 450 W. Hanes Mill Rd. Suite 300 Winston Salem, NC 27105 336-776-9800 PROJECT: Townes at Oakwood Square PLEASE FIND ATTACHED: ITEM TRANSMITTAL DATE: 12/6/2018 DATED 2 Flow Tracking Form 7/24/2018 2 DWR Fast Track Sewer Extension app 11/1/2018 2 Cover Letter 12/6/2018 2 8.5" x 11" USGS topo map n/a 2 Street level map (aerial map) n/a 1 Application Fee (Chk #15826) 10/26/2018 Nolan Franz E.I.T ci Cl CD . v n ° � o' --j 0 � o O An co Hagen Engineering, PA PO Box 14851 Greensboro, NC P-336-404-9796 bhagen@hagen-eng.com ffV NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 15, 2011 Robert L. Wilson City Manager City of Mebane 106 East Washington Street Mebane, NC 27302 Subject: Mebane WWTP (NC0021474) Flow Reduction Request Alamance County Dear Mr. Wilson: Dee Freeman Secretary On February 14. 2011 , the Pretreatment, Emergency Response and Collection System (PERCS) Unit of the Division of Water Quality received a flow reduction request for connections to the City of Mebane WWTP. The letter requests an allowable flow rate of 80 gallons per day (gpd) per bedroom based on the evaluated data. As daily WWTP data is not representative of the project area. the DN1R data from the City of Mebane WWTP (NC0021474) from January 2009 through December 2009 «as evaluated to determine the peak sewage month. The highest flow month was December 2009. Daily waste«ater flows were recorded downstream of the Holly Ridge Subdivision during December 20M. This data was reviewed by PERCS and Regional Office staff. Based on the data. the Division hereby grants a reduction in floe to 80 gpd±bedroom (minimum of 160 gpd for 1 and 2 bedroom residences) for sewer extension permits issued tributary to the City of Mebane WWTP. Reaardless of the adjusted design daily wastewater flow rate. at no time shall the wastewater flows exceed the effluent limits defined in the NPDES vermit for the treatment facility or exceed the capacity of the sewers downstream of anv new sewer extension or service connection(s). If you have any questions or comments regarding this matter, please contact Sarah Morrison at (919) 807-6310, or email [Sarah.Morrison ct ncdenr.gov] or Deborah Gore, Unit Supervisor at (919) 807-6383, or email [Deborah.Gore@ncdenr.gov]. Sincerer. _�,( Coleen H. Sullins cc: Darrell L. Russell, P.E., Alley, Williams, Carmen K King. Inc. (via email: dtussell �tawck.corn) Steve Mauney, Winston-Salem Regional Office (via email) NPDES Unit, Permit File NCO021474 PERCS Flow Reduction File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 One Location 512 N Salisbury St Raleigh. North Carolina 27604 Phone: 91"07$3001 FAX 919-807.64921 PERCS Unit FAX. 919-3074189 C_stomer Service 1-877-623.6745 Noort- th Carol i n a Internet hn .!l�nal.ncdenr.orQhveb� PERCS Unit htt .ti nal.ncdenr.orctwebtw ,sw s1 ref �/ L ;/ V%t1/rally An Equal Opportunity 1 Affirmative Anion Emt Byer Cashion, Ted From: Franz Molt <fholt@cityofinebane.com> Sent: Friday, February 15, 2019 7:44 AM To: Cashion, Ted Cc: Robinson, Jason Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application �•'-'r External email, Yd not-clicklinks or open attachments unfessyou,verify. Send all suspicious emall!as an attachment -to Ce�orts�iamnc.�av -- Ted, Each townhome is on a single lot with a single %" water service and 4" sewer service. The services connect to proposed public mains in the street that the city will own and maintain when completed and certified. Please let me know if there are additional questions and sorry to be so late getting back with you (i was tied up in a meeting all day). Thanks, Franz From: Cashion, Ted (mailto:ted.cashion@ncdenr.gov] Sent: Thursday, February 14, 2019 8:51 AM To: Franz Molt <fholt@cityofinebane.com> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Thanks Franz. One question, do the townhomes have their own separate utility lines? Or are the utility lines shared, as in an apartment complex? ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Franz Halt <fholt cit ofinebane.com> Sent: Thursday, February 14, 2019 7:35 AM To: Cashion, Ted <ted.cashion@ncdenr.eov> Subject: FW: [External] RE: Townes at Oakwood Square fast track sewer extension application External email. Do not click -links or open attachments unless you verify. send'all susplcious email as a'n'attachment to rcnoal.s arm �n�d v Ted, Please consider the attached flow reduction letter before changes are made to the permit application and FTSE form. The City has been completing FTSE forms and sewer application extensions at 160 gpd for 1 and 2 bedroom residences and 240 gpd for 3 bedroom residences since 2011. Thanks, Franz Holt, PE Mebane City Engineer 336 213-0316 cell From: David Cheek Sent: Wednesday, February 13, 2019 5:32 PM To: Chris Rollins <crollins tit ofinebane.com>; Franz Holt <fhoItL@cityofinebane.com> Subject: Fwd: [External] RE: Townes at Oakwood Square fast track sewer extension application Sent from my iPhone Begin forwarded message: From: "Cashion, Ted" <ted.cashion@ncdenr.eov> Date: February 13, 2019 at 1:43:45 PM EST To: Barret Hagen <BHa en ha en -en .com>, N Franz <NFranz@hagen-eeene.com> Cc: "dcheek cit ofinebane.com" <dcheek@cityofinebane.com>, "Robinson, Jason" <'ason.t.robinson ncdenr. ov>, "Deck, Erin M" <erin.deck@ncdenr.eov> Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Nolan, Just left you a voice mail. We'll need a revised page 2 showing the correct flows according to the 2T rules. 1 & 2 bedroom units will have design flows of 240 gpd. 3 bedroom units will have design flows of 360 gpd. We'll also need a revised USE form showing the correct flow and signed by the Town. You can email these revisions to speed the issuance of the permit. Cashion, Ted From: Cashion, Ted Sent: Thursday, February 14, 2019 8:51 AM To: 'Franz Holt' Cc: Robinson, Jason Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Thanks Franz. One question, do the townhomes have their own separate utility lines? Or are the utility lines shared, as in an apartment complex? ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 —Nothing Compares - Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Franz Holt <fholt@cityofinebane.com> Sent: Thursday, February 14, 2019 7:35 AM To: Cashion, Ted <ted.cashion@ncdenr.gov> Subject: FW: [External] RE: Townes at Oakwood Square fast track sewer extension application External emall. Do not clink links or open attachments unless yoU verify. Send all suspkious ernail as an attachment to e0ort:5om rna.g4u i Ted, Please consider the attached flow reduction letter before changes are made to the permit application and FTSE form. The City has been completing FTSE forms and sewer application extensions at 160 gpd for 1 and 2 bedroom residences and 240 gpd for 3 bedroom residences since 2011. Thanks, Franz Holt, PE Mebane City Engineer 336 213-0316 cell Cashion, Ted From: Cashion, Ted Sent: Wednesday, February 13, 2019 1:44 PM To: 'Barret Hagen'; 'N Franz' Cc: 'dcheek@cityofinebane.com'; Robinson, Jason; Deck, Erin M Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Nolan, Just left you a voice mail. We'll need a revised page 2 showing the correct flows according to the 2T rules. 1 & 2 bedroom units will have design flows of 240 gpd. 3 bedroom units will have design flows of 360 gpd. We'll also need a revised FTSE form showing the correct flow and signed by the Town. You can email these revisions to speed the issuance of the permit. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 'Nothing Compares - Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the !North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Cashion, Ted Sent: Wednesday, February 13, 2019 11:47 AM To:'Barret Hagen' <BHagen@hagen-eng.com>; N Franz <NFranz@hagen-eng.com> Cc: dcheek@cityofinebane.com; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Following up on the email below. Please submit the info so we can issue the permit. Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Barret Hagen <BHagen@ha eg n eng com> Sent: Monday, February 04, 2019 12:20 PM To: Cashion, Ted <ted.cashion(@ncdenr.eov>; N Franz <NFranz@hagen-eng.com> Cc: dcheek@cityofinebane.com; Robinson, Jason <'ason.t.robinson@ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: [External] RE: Townes at Oakwood Square fast track sewer extension application External emall. Do not click .inks o�`op n'-attachments unless you verify. Send all suspicious email.as an attachment tb report sd amR ric.Rov - Nolan, See below. Please get Ted what he needs Barret A. Hagen, P.E. 11)v 1 \(1I\1 I.I:IM P\ 3859 Battleground Ave, Suite 300 Greensboro, NC 27410 (c) 336-404-9796 (o) 336-286-3350 bhagen@hagen-eng.com www.hagen-eng.com Cashion, Ted From: Cashion, Ted Sent: Wednesday, February 13, 2019 11:47 AM To: 'Barret Hagen'; N Franz Cc: dcheek@cityofinebane.com; Robinson, Jason; Deck, Erin M Subject: RE: [External] RE: Townes at Oakwood Square fast track sewer extension application Following up on the email below. Please submit the info so we can issue the permit. Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 -"Nothing Compares 'r Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Barret Hagen <BHagen@hagen-eng.com> Sent: Monday, February 04, 201912:20 PM . To: Cashion, Ted <ted.cashion@ncdenr.gov>; N Franz <NFranz@hagen-eng.com> Cc: dcheek@cityofinebane.com; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: [External] RE: Townes at Oakwood Square fast track sewer extension application + External emajl.:Dy tal# links or open attaakiments unlisss you. verify- Send a :cusp€cious email as an.attachin ent to a Nolan, See below. Please get Ted what he needs Barret A. Hagen, P.E. 3859 Battleground Ave, Suite 300 Greensboro, NC 27410 (c) 336-404-9796 (o) 336-286-3350 bhagen@hagen-eng.com www.hagen-eng.com From: Cashion, Ted [mailto:ted.cashion d-ncdenr. ov] Sent: Monday, February 04, 2019 12:10 PM To: Barret Hagen Cc: dcheek@cityofinebane.com; Robinson, Jason; Deck, Erin M Subject: RE: Townes at Oakwood Square fast track sewer extension application Barret and David, Fallowing up on the info needed in the email below. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Cashion, Ted Sent: Thursday, January 24, 2019 4:09 PM To: 'bhagen@hagen-eng.com'<bha en ha en -en -com> Cc: 'dcheek @cityofrnebane.com' <dcheek@cityoI'm ebane.com>; Robinson, Jason <iason.t.robinson@ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: Townes at Oakwood Square fast track sewer extension application Barret and David, Cashion, Ted From: Cashion, Ted Sent: Monday, February 04, 201912:10 PM To: 'bhagen@hagen-eng.com' Cc: 'dcheek@cityofinebane.com'; Robinson, Jason; Deck, Erin M Subject: RE: Townes at Oakwood Square fast track sewer extension application Barret and David, Following up on the info needed in the email below. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ---'Nothing Compares Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Cashion, Ted Sent: Thursday, January 24, 2019 4:09 PM To:'bhagen@hagen-eng.com' <bhagen@hagen-eng.com> Cc: 'dcheek@cityofinebane.com' <dcheek@cityofinebane.com>; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: Townes at Oakwood Square fast track sewer extension application Barret and David, We are reviewing the subject application and need additional information. Item VI.6 of the application notes a flow reduction has not been approved, however, item V1.7. shows a flow reduction of 80 gpd/bedroom (160 gpd min.) has been incorporated into the calculated proposed flows. No flow reduction approval letter was included with the application as required. Please email us a copy of the flow reduction approval letter. Please review the flow reduction approval letter carefully. If the approval letter is for single family residences, townhomes may only be considered for the approved flow reduction if they each have their own service line for utilities. Please provide us a description of the utilities plan (or send us the plans) for the townhomes and state if each townhome will have their own service lines for utilities. If a flow reduction is approved for this project, we'll mark the 'yes' box under VI.b provided both of you give us permission to do so to expedite the issuance of this permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. Cashion, Ted From: Cashion, Ted Sent: Thursday, January 24, 2019 4:09 PM To: 'bhagen@hagen-eng.com' Cc: 'dcheek@cityofinebane.com'; Robinson, Jason; Deck, Erin M Subject: Townes at Oakwood Square fast track sewer extension application Barret and David, We are reviewing the subject application and need additional information. Item VI.6 of the application notes a flow reduction has not been approved, however, item V1.7. shows a flow reduction of 80 gpd/bedroom (160 gpd min.) has been incorporated into the calculated proposed flows. No flow reduction approval letter was included with the application as required. Please email us a copy of the flow reduction approval letter. Please review the flow reduction approval letter carefully. If the approval letter is for single family residences, townhomes may only be considered for the approved flow reduction if they each have their own service line for utilities. Please provide us a description of the utilities plan (or send us the plans) for the townhomes and state if each townhome will have their own service lines for utilities. If a flow reduction is approved for this project, we'll mark the 'yes' box under VI.S provided both of you give us permission to do so to expedite the issuance of this permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 --'�`l'Nothing Compares . oc� Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Cashion, Ted From: Henderson, Justin L Sent: Monday, February 18, 2019 4:16 PM To: Cashion, Ted Subject: Re: 84 townhomes in Mebane, fast track permit No objections. Thanks. Sent from my iPhone On Feb 18, 2019, at 3:39 PM, Cashion, Ted <ted.cashion@ncdenr.eov> wrote: Hi Justin, We're issuing a fast track sewer permit to City of Mebane for 84 townhomes and 19,580 gpd; any objections? We'll cc you on the permit via email. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 <image0ol.png> Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation.