Loading...
HomeMy WebLinkAbout20190104 Ver 1_More Information Received_20190219Staff Review Does this application have all the attachments needed to accept it into the review process? � Yes � No ID#* Version* � 20190104 Is this project a public transportation project? * r Yes � No Is this a DOT C•' Yes �' No project?* Reviewer List:* Garcy Ward:eads\gpward Select Reviewing Office:* Washington Regional Office -(252) 946-6481 Submittal Type:* Modifications Does this project require a request for payment to be sent? * (' Yes r No Project Submittal Form * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ansv�red. Project Type: � New Project r Pre-Application Submittal r More Information Response � Other Agency Comments � For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre-Application Submittal - Please check the pre-application submittal if you just want feedback on your submittal and do not have the e�ectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an e�asting project. Project Contact Information Name: Gordon Cashin Who is subrritting the inforrration? Email Address: gcashin@ncdot.gov Project Information Existing ID #: Existing Version: 20190104 1 20170001(no dashes) Project Name: B-4916, Bertie County Is this a public transportation project? � Yes � No Is the project located within a NC DCM Area of Environmental Concern (AEC)? � Yes � No � Unknown TIP#: WBS#: B-4916 40089.1.2 (Applies to DOT projects only) County (ies) Bertie Please upload all files that need to be submited. C7ick the upload button or drag and drop files here to attach docurrent B-4916 Revised Impact Summary Sheet.pdf 100.12KB B-4916 Email from Div_onsite detour.pdf 144.2KB Only pdf or Ivre files are accepted. Describe the attachments: Revised Impact Summary Sheet showing temporary excavation now as excavation, therefore increasing permanent impacts. Additional justification (via email from Division 1 staff) for the use of an onsite detour is also included. A DMS acceptance letter has been requested and will be provided once available. fJ By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: l��k e. �r�.6a�¢� 11l Submittal Date: